刷题
导入试题
【多选题】
An organization has an ESXi 6.x host that contains two resource pools. The host is being relocated to a DRS cluster. What two actions can be taken to integrate the host into the cluster, and what would happen to the existing ESXi resource pool hierarchy as a result? (Choose two.)___
A. Place all of the host's virtual machines into the DRS cluster root resource pool. The resource pools present on the host will be deleted.
B. Create a resource pool for the ESXi host's virtual machines and resource pools. The resource pools present on the host will be deleted.
C. Place all of the host's virtual machines into the DRS cluster root resource pool. The resource pools present on the host will be preserved.
D. Create a resource pool for the
E. SXi host's virtual machines and resource pools. The resource pools present on the host will be preserved.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
AD
解析
暂无解析
相关试题
【多选题】
Which two parameters are required when adding an iSCSI target to an iSCSI Software Adapter using Dynamic Discovery? (Choose two.)___
A. The iSCSI device's IP Address or Fully Qualified Domain Name
B. The Port Number
C. The iSCSI device's iSCSI Qualified Name (IQN)
D. The Default Gateway IP Address
【多选题】
Which two SMTP Notification Event Details are specific to alarms triggered by events? (Choose two.)___
A. User Name
B. Summary
C. Old Status
D. Target
【多选题】
Which two High Availability ___ Cluster admission control policies can help avoid resource fragmentation? (Choose two.)(AC)
A. Define failover capacity by static number of hosts
B. Define failover capacity by reserving a percentage of the cluster resources
C. Use dedicated failover hosts
D. Use Virtual Machine Monitoring
【多选题】
An attempt to enable vSphere Fault Tolerance for a powered-on virtual machine fails. Which two scenarios would result in this failure? (Choose two.)___
A. The virtual machine has three vCPUs configured.
B. The host on which the virtual machine is running has insufficient memory resources.
C. The virtual machine has insufficient resources to accommodate full reservation plus the overhead memory.
D. VMware High Availability is enabled on the cluster of which this host is a member.
【多选题】
A vApp template recently added to a Content Library is not displayed. Which two actions could correct this problem? (Choose two.)___
A. Manually synchronize the library
B. Select the Download all library content immediately option
C. Select the Sync subscribed library option
D. Manually download the vApp template
【多选题】
What are three valid disk configurations for the vSphere Data Protection 6.x Appliance? (Choose three.)___
A. 500GB
B. 1TB
C. 1.5TB
D. 2TB
E. 4TB
【多选题】
Which three connection types are available when configuring a vSwitch in the vSphere Web Client? (Choose three.)___
A. VMkernel Network Adapter
B. Physical Network Adapter
C. Virtual Machine Port Group for a Standard Switch
D. vMotion Network Adapter
E. vSAN Network Adapter
【多选题】
Which three features can be enabled for a new host cluster? (Choose three.)___
A. Storage Distributed Resource Scheduling
B. High Availability
C. Fault Tolerance
D. Distributed Resource Scheduling
E. Virtual SAN
【多选题】
An administrator receives a report that no real time statistics are available for a virtual machine in the vCenter Server inventory. Which two statements indicate likely causes of the problem? (Choose two.)___
A. The virtual machine is powered off.
B. The host containing the virtual machine is disconnected from vCenter Server.
C. There is insufficient real time data to display the information.
D. The vCenter Server service is not running.
【多选题】
Your manager has given you a bash script that retrieves data for ESXi 6.x host configurations. This data needs to be collected right after the installation of a host and must be run directly on the host. Which two actions can be used to run this script on an ESXi host? (Choose two.)___
A. Connect to the host with Ruby vSphere Console and run the script from there.
B. Enable SSH access from the Direct Console User Interface.
C. Enable the ESXi Shell from the
D. irect Console User Interface.
【多选题】
Which two are true about the Risk badge in vRealize Operations? (Choose two.)___
A. The Risk badge indicates potential future problems that may degrade the performance of the system.
B. Risks may require attention in the near future.
C. The Risk badge indicates problems that are degrading performance of the system.
D. Risks require attention now to correct system performance problems.
【多选题】
vSphere Update Manager allows which two virtual machine attributes to be upgraded? (Choose two.)___
A. Virtual machine firewall policies for NSX.
B. Software Packages in the virtual machine.
C. Virtual machine Hardware Version.
D. VMware Tools Upgrade.
【多选题】
What are two benefits of using NFS 4.1 with vSphere 6.x as compared to NFS 3? (Choose two.)___
A. NFS 4.1 supports Kerberos Authentication
B. NFS 4.1 supports multipathing
C. NFS 4.1 supports IPv6
D. NFS 4.1 supports hardware acceleration
【多选题】
Which three statements are true regarding Fault Tolerance? (Choose three.)___
A. Applications need to be continuously available to users.
B. Applications without native clustering capabilities can be protected.
C. Custom clustering solutions are complicated to configure and maintain.
D. Applications that have 16 vCPUs are supported.
E. Prevents application crashes by analyzing the workload and correcting problems.
【多选题】
Which two statements are true regarding VMware vSphere Flash Read Cache (vFRC)? (Choose two.)___
A. Cache fills and cache evictions happen in the granularity of a cache block size.
B. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying storage.
C. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying cache data.
D. Cache fills and cache evictions happen in the granularity of the disk block size.
【多选题】
What are two possible causes of Storage Distributed Resource Scheduler (SDRS) being disabled on one or more virtual machine disks in a datastore cluster? (Choose two.)___
A. The virtual machine has vSphere Fault Tolerance disabled.
B. The virtual machine is a template.
C. The virtual machine swap file is on a shared datastore.
D. The disk is a CD-ROM/ISO file.
【多选题】
An administrator attempts to install vCenter Single Sign-On Server. The installer returns an error message indicating that the installation failed. Prior to the installation, all setup prerequisites were met. The administrator has generated a vCenter Server Single Sign-On support bundle. Which two files should the administrator analyze to determine the cause of the failure? (Choose two.)___
A. Server\utils\logs\imsTrace.log
B. Server\utils\logs\install.txt
C. %TEMP%\utils\logs\vminst.log
D. %TEMP%\vminst.log
【多选题】
An administrator is unable to remove an ESXi 6.x host from a vSphere Distributed Switch. What are two likely reasons for this issue? (Choose two.)___
A. Vmkernel interfaces on the switch are still in use.
B. VM Network port group adapters are connected to different switch.
C. Physical NICs are migrated to different switch.
D. VM Network adapters are connected to this switch.
【多选题】
Which two Identity Sources are available to add for vCenter Single Sign-On authentication? (Choose two.)___
A. LocalOS
B. OpenLDAP
C. NIS as an LDAP Server
D. VCMSDS
【多选题】
What are three goals of resource management within a cluster? (Choose three.)___
A. To prevent virtual machines from monopolizing resources and to guarantee predictable service rates.
B. To exploit undercommitted resources and overcommit with graceful degradation.
C. To provide solutions to potential problems that you might encounter when using vCenter Server.
D. To control the relative importance of virtual machines and provide flexible dynamic partitioning.
E. To provide additional network administration capabilities.
【多选题】
Which three actions can be taken as a result of executing the vSphere Update Manager 6.x scan and remediation wizards? (Choose three.)___
A. Install and upgrade software in virtual machines.
B. Upgrade the firmware on ESXi host devices.
C. Upgrade and Patch ESXi hosts.
D. Install and update third-party software on hosts.
E. Upgrade virtual machine hardware.
【多选题】
Which two statements are true about deploying and using vSphere Replication? (Choose two.)___
A. ESXi hosts managed by a single vCenter Server instance require a connection between the two vSphere Replication appliances.
B. Sites managed by different vCenter Server instances require a connection between the two vSphere Replication appliances.
C. Sites managed by different vCenter Server instances require the use of Site Recovery Manager and a connection between the two vSphere Replication appliances.
D. ESXi hosts managed by a single vCenter Server instance require a single vSphere Replication appliance.
【多选题】
An administrator is attempting to power on a virtual machine, but the task is hanging at 95%. What three scenarios best explain why this problem is happening? (Choose three.)___
A. A virtual machine question is currently being posed to the administrator.
B. Another task for the virtual machine or other component is already in progress.
C. The VMware High Availability cluster has insufficient resources to guarantee failover.
D. The host has lost access to the storage device containing the virtual machine files.
E. The host is under resource contention and unable to power on the virtual machine.
【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
【多选题】
Which two storage controller configurations can be used with Virtual SAN? (Choose two.)___
A. SAS controllers in Passthrough mode
B. SAS controllers in RAID0 mode
C. SAS controllers in RAID1 mode
D. SAS controllers in RAID10 mode
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
【多选题】
An administrator is deploying multiple Windows 2003 Virtual Machines from the same template. What two steps should be taken to avoid network conflicts? (Choose two.)___
A. Customize the guest operating system.
B. Install VMware Tools into the new virtual machines.
C. Copy the Microsoft Sysprep tools onto the vCenter Server system.
D. Ensure the e1000 vmnic is selected for each new virtual machine.
【多选题】
Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
推荐试题
【判断题】
65: 改变钞票观察角度时,2019年版第五套人民币20元纸币光彩光变面额数字的颜色在黄色和绿色之间变化
A. 对
B. 错
【判断题】
66:在个人睡眠户账户治理的过程中,应同步做好客户信息治理
A. 对
B. 错
【判断题】
67:未成年人的法定监护人:首先应当由其父母担任
A. 对
B. 错
【判断题】
68:未成年人所有的监护人均需经未成年人住所地的居民委员会、村民委员会或者民政部门同意
A. 对
B. 错
【判断题】
69:无民事行为能力或者限制民事行为能力的成年人(如精神病人),法定监护人首先是配偶
A. 对
B. 错
【判断题】
70:公证遗嘱指的是公民生前对自己的财产作出安排,并经国家公证机关公证,于死亡时立即发生法律效力的法律行为,公证遗嘱指定继承人、公正遗嘱受益人可单独或共同到营业网点查询已故存款人的存款
A. 对
B. 错
【判断题】
71:非完全民事行为能力人办理业务,应由其法定监护人代为办理,并提供监护关系证明(如户口簿、出生医学证明、法院、民政部门、村委/社区证明等)
A. 对
B. 错
【判断题】
72:已故存款人的配偶、父母、子女可单独或共同到营业网点查询已故存款人的存款
A. 对
B. 错
【判断题】
73:有多个客户号时,确认为同一客户的,应进行客户号合并
A. 对
B. 错
【判断题】
74:有多个客户号时,系统提示疑似一户多号的,不需要是否确认为同一客户,可以直接进行客户号合并
A. 对
B. 错
【判断题】
75:有多个客户号时,系统提示疑似一户多号的,确认为同一客户的,可以进行客户号合并
A. 对
B. 错
【判断题】
76:个人客户信息发生变更的,应将信息错误的账户销户,同时进行客户信息治理
A. 对
B. 错
【判断题】
77:个人客户号以“01000”、“0103”开头的是柜面客户号,以“0102”开头的是信贷客户号;.机构客户号以“02000”、“0203”开头的是柜面客户号,以“0202”开头的是信贷客户号
A. 对
B. 错
【判断题】
78:支行向总行提交客户号合并申请时,两个客户号均为柜面的,由主管会计签字确认,有一个及以上客户号为信贷客户号的,由支行行长签字确认
A. 对
B. 错
【判断题】
79:客户号合并中系统中未显示两个账户是疑似一户多号客户号,但经柜面核实,确实这两个客户号为一户多号的,需要向总行提交客户号合并申请表
A. 对
B. 错
【判断题】
80:客户号合并中系统中未显示两个账户是疑似一户多号客户号,但经柜面核实,确实这两个客户号为一户多号的,也不能进行合并
A. 对
B. 错
【判断题】
81:客户号合并中两个客户号的其中一个为信贷客户号的,这个信贷客户号必须保留,此类合并由总行运营管理部合
A. 对
B. 错
【判断题】
82:客户号合并中两个客户号均为信贷客户号的,由总行信贷管理部合并
A. 对
B. 错
【判断题】
83:个人账户被转为睡眠户的,需要本人持身份证到我行任一网点办理
A. 对
B. 错
【判断题】
84:个人账户被转为睡眠户的,需要本人持身份证到我行开户网点办理
A. 对
B. 错
【判断题】
85:个人账户被转为睡眠户的,他人可以代为办理款项支取业务
A. 对
B. 错
【判断题】
86:客户在同一机构有多个账户的,该营业网点应综合多个账户的交易信息评定客户洗钱风险等级
A. 对
B. 错
【判断题】
87:二次交易补录模块主要是补充信息不完整的对私客户和对公客户的身份信息, 有时可能需要补录代办人信息,有时可能补录对手信息
A. 对
B. 错
【判断题】
88:有权机关直接到各支行进行查询、冻结、扣划时,有权机关查询、冻结、扣划完成后,支行于15日内向反洗钱牵头管理部门提交《建议调整申请表》,经反洗钱牵头管理部门负责人批准后,在反洗钱系统内将该客户等级调为高风险
A. 对
B. 错
【判断题】
89:有权机关直接到各支行进行查询、冻结、扣划时,有权机关查询、冻结、扣划完成后,支行于10日内向反洗钱牵头管理部门提交《高风险个人客户认定表》或《高风险单位客户认定表》,经反洗钱牵头管理部门负责人批准后,在反洗钱系统内将该客户等级调为高风险
A. 对
B. 错
【判断题】
90:客户信息补录模块主要是补充信息不完整的对私客户和对公客户身份信息
A. 对
B. 错
【判断题】
91:定期存款的本金或者本金加全部或者部分利息转为在同一机构开立的同一户名下的另一账户内的活期存款时,可以免报大额交易报告
A. 对
B. 错
【判断题】
92:系统未提取到,按照规定应上报而未上报的大额交易,本行各营业机构应在交易发生后的10个工作日内通过手工方式增加大额交易
A. 对
B. 错
【判断题】
93:客户要求变更姓名或者名称、身份证件或者身份证明文件种类、身份证件号码、注册资本、经营范围、法定代表人或者负责人的,本行各营业机构应当重新识别客户
A. 对
B. 错
【判断题】
94:对代理多人开立账户或经常使用他人账户进行交易的,应当进行客户身份尽职调查,并考虑提交大额交易报告
A. 对
B. 错
【判断题】
95:发现已经开立的账户有假名情形的,应终止业务关系,并提交可疑交易报告
A. 对
B. 错
【判断题】
96:本行为外国政要客户提供开立账户服务时,应当报本行行长批准后方可开立
A. 对
B. 错
【判断题】
97:自然人客户的“身份基本信息”中,客户的住所地与经常居住地不一致的,登记客户的住所地
A. 对
B. 错
【判断题】
98:对于成年人代理未成年人或者老年人开户预留本人联系电话等合理情形的,由相关当事人出具说明后,联系电话可以保持不变
A. 对
B. 错
【判断题】
99:当自然人客户由他人代理办理人民币单笔5万元(含)以上或者外币等值1万元美元(含)以上的现金存款业务时,如果存款人因合理理由无法提供被代理人有效身份证件或者身份证明文件,各营业机构可参照有关一次性金融服务时履行客户身份识别的要求,只对代理人开展相关客户身份识别工作
A. 对
B. 错
【判断题】
100:本行各营业机构为自然人客户办理人民币单笔5万元(含)以上或者外币等值1万元美元(含)以上的现金存取及转账业务时,应核对客户的有效身份证件或其他身份证明文件,无需摘录身份证号码(或在综合前端系统内录入身份证号码)
A. 对
B. 错
【判断题】
101:反洗钱系统中,针对客户风险评级模块,如果编辑岗和审核岗对同一个客户的等级意见不统一,审批岗拥有最终决定客户等级的权限
A. 对
B. 错
【判断题】
102:新反洗钱系统中,较高风险客户至少应该半年进行一次持续评级
A. 对
B. 错
【判断题】
103:在可疑案例上报过程中,当反洗钱系统中信息补录不完整时,需要首先补录完整客户信息和交易信息,否则无法排除或上报可疑案例
A. 对
B. 错
【判断题】
1:享档档起存金额1万元,存期1年,存取灵活,支持多次支取,享活期便利定期收益,按实际存期向下靠档计息
A. 对
B. 错
欢迎使用我爱刷题
×
微信搜索我爱刷题小程序
温馨提示
×
请在电脑上登陆“www.woaishuati.com”使用