刷题
导入试题
【多选题】
Which three connection types are available when configuring a vSwitch in the vSphere Web Client? (Choose three.)___
A. VMkernel Network Adapter
B. Physical Network Adapter
C. Virtual Machine Port Group for a Standard Switch
D. vMotion Network Adapter
E. vSAN Network Adapter
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
ABC
解析
暂无解析
相关试题
【多选题】
Which three features can be enabled for a new host cluster? (Choose three.)___
A. Storage Distributed Resource Scheduling
B. High Availability
C. Fault Tolerance
D. Distributed Resource Scheduling
E. Virtual SAN
【多选题】
An administrator receives a report that no real time statistics are available for a virtual machine in the vCenter Server inventory. Which two statements indicate likely causes of the problem? (Choose two.)___
A. The virtual machine is powered off.
B. The host containing the virtual machine is disconnected from vCenter Server.
C. There is insufficient real time data to display the information.
D. The vCenter Server service is not running.
【多选题】
Your manager has given you a bash script that retrieves data for ESXi 6.x host configurations. This data needs to be collected right after the installation of a host and must be run directly on the host. Which two actions can be used to run this script on an ESXi host? (Choose two.)___
A. Connect to the host with Ruby vSphere Console and run the script from there.
B. Enable SSH access from the Direct Console User Interface.
C. Enable the ESXi Shell from the
D. irect Console User Interface.
【多选题】
Which two are true about the Risk badge in vRealize Operations? (Choose two.)___
A. The Risk badge indicates potential future problems that may degrade the performance of the system.
B. Risks may require attention in the near future.
C. The Risk badge indicates problems that are degrading performance of the system.
D. Risks require attention now to correct system performance problems.
【多选题】
vSphere Update Manager allows which two virtual machine attributes to be upgraded? (Choose two.)___
A. Virtual machine firewall policies for NSX.
B. Software Packages in the virtual machine.
C. Virtual machine Hardware Version.
D. VMware Tools Upgrade.
【多选题】
What are two benefits of using NFS 4.1 with vSphere 6.x as compared to NFS 3? (Choose two.)___
A. NFS 4.1 supports Kerberos Authentication
B. NFS 4.1 supports multipathing
C. NFS 4.1 supports IPv6
D. NFS 4.1 supports hardware acceleration
【多选题】
Which three statements are true regarding Fault Tolerance? (Choose three.)___
A. Applications need to be continuously available to users.
B. Applications without native clustering capabilities can be protected.
C. Custom clustering solutions are complicated to configure and maintain.
D. Applications that have 16 vCPUs are supported.
E. Prevents application crashes by analyzing the workload and correcting problems.
【多选题】
Which two statements are true regarding VMware vSphere Flash Read Cache (vFRC)? (Choose two.)___
A. Cache fills and cache evictions happen in the granularity of a cache block size.
B. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying storage.
C. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying cache data.
D. Cache fills and cache evictions happen in the granularity of the disk block size.
【多选题】
What are two possible causes of Storage Distributed Resource Scheduler (SDRS) being disabled on one or more virtual machine disks in a datastore cluster? (Choose two.)___
A. The virtual machine has vSphere Fault Tolerance disabled.
B. The virtual machine is a template.
C. The virtual machine swap file is on a shared datastore.
D. The disk is a CD-ROM/ISO file.
【多选题】
An administrator attempts to install vCenter Single Sign-On Server. The installer returns an error message indicating that the installation failed. Prior to the installation, all setup prerequisites were met. The administrator has generated a vCenter Server Single Sign-On support bundle. Which two files should the administrator analyze to determine the cause of the failure? (Choose two.)___
A. Server\utils\logs\imsTrace.log
B. Server\utils\logs\install.txt
C. %TEMP%\utils\logs\vminst.log
D. %TEMP%\vminst.log
【多选题】
An administrator is unable to remove an ESXi 6.x host from a vSphere Distributed Switch. What are two likely reasons for this issue? (Choose two.)___
A. Vmkernel interfaces on the switch are still in use.
B. VM Network port group adapters are connected to different switch.
C. Physical NICs are migrated to different switch.
D. VM Network adapters are connected to this switch.
【多选题】
Which two Identity Sources are available to add for vCenter Single Sign-On authentication? (Choose two.)___
A. LocalOS
B. OpenLDAP
C. NIS as an LDAP Server
D. VCMSDS
【多选题】
What are three goals of resource management within a cluster? (Choose three.)___
A. To prevent virtual machines from monopolizing resources and to guarantee predictable service rates.
B. To exploit undercommitted resources and overcommit with graceful degradation.
C. To provide solutions to potential problems that you might encounter when using vCenter Server.
D. To control the relative importance of virtual machines and provide flexible dynamic partitioning.
E. To provide additional network administration capabilities.
【多选题】
Which three actions can be taken as a result of executing the vSphere Update Manager 6.x scan and remediation wizards? (Choose three.)___
A. Install and upgrade software in virtual machines.
B. Upgrade the firmware on ESXi host devices.
C. Upgrade and Patch ESXi hosts.
D. Install and update third-party software on hosts.
E. Upgrade virtual machine hardware.
【多选题】
Which two statements are true about deploying and using vSphere Replication? (Choose two.)___
A. ESXi hosts managed by a single vCenter Server instance require a connection between the two vSphere Replication appliances.
B. Sites managed by different vCenter Server instances require a connection between the two vSphere Replication appliances.
C. Sites managed by different vCenter Server instances require the use of Site Recovery Manager and a connection between the two vSphere Replication appliances.
D. ESXi hosts managed by a single vCenter Server instance require a single vSphere Replication appliance.
【多选题】
An administrator is attempting to power on a virtual machine, but the task is hanging at 95%. What three scenarios best explain why this problem is happening? (Choose three.)___
A. A virtual machine question is currently being posed to the administrator.
B. Another task for the virtual machine or other component is already in progress.
C. The VMware High Availability cluster has insufficient resources to guarantee failover.
D. The host has lost access to the storage device containing the virtual machine files.
E. The host is under resource contention and unable to power on the virtual machine.
【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
【多选题】
Which two storage controller configurations can be used with Virtual SAN? (Choose two.)___
A. SAS controllers in Passthrough mode
B. SAS controllers in RAID0 mode
C. SAS controllers in RAID1 mode
D. SAS controllers in RAID10 mode
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
【多选题】
An administrator is deploying multiple Windows 2003 Virtual Machines from the same template. What two steps should be taken to avoid network conflicts? (Choose two.)___
A. Customize the guest operating system.
B. Install VMware Tools into the new virtual machines.
C. Copy the Microsoft Sysprep tools onto the vCenter Server system.
D. Ensure the e1000 vmnic is selected for each new virtual machine.
【多选题】
Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
推荐试题
【多选题】
账户支付限额管理是指客户可申请对结算账户的单笔或一定时期的累计支付金额进行控制,对超过金额的交易予以限制,分为( )。___
A. 单笔支付限额
B. 日支付限额
C. 年支付限额
D. 累计支付限额
【多选题】
多级账簿是指客户在同一结算账户下开设的分类明细核算登记簿(也称辅助账簿),主要记载一定时期内资金收付的详细信息。客户通过多级账簿,不但能实现同一结算账户分类明细核算,还可实现( )等功能。___
A. 外部监管
B. 额度管理控制
C. 分类查询统计
D. 资金内部计价
【多选题】
结算套餐重点营销目标是中小企业优质客户,中小企业优质客户的标准主要参考其账户的( )。___
A. 对公结算量
B. 中间业务收入
C. 月均存款
D. 授信情况
【多选题】
对公人民币结算套餐收费基数包含( )。___
A. 按笔收费
B. 按金额收费
C. 按月收费
D. 按年收费
【多选题】
单位存款分为( )和人民银行规定的其他存款。___
A. 活期存款
B. 定期存款
C. 通知存款
D. 协定存款
【多选题】
单位定期存款是银行与存款单位双方在存款时事先约定( ),到期后支取本息的存款。___
A. 期限
B. 种类
C. 利息
D. 利率
【多选题】
单位银行结算账户按用途分为( )。___
A. 基本存款账户
B. 一般存款账户
C. 专用存款账户
D. 临时存款账户
【多选题】
下列( )情况的,存款人可以申请开立临时存款账户。___
A. 异地常设机构
B. 异地临时经营活动
C. 设立临时机构
D. 注册验资
【多选题】
在现金管理客户端、企业网银办理的定期存款在柜面可以处理的业务( )___
A. 冻结
B. 解冻
C. 挂失
D. 支取
【多选题】
办理协助扣划业务时,金融机构经办人员应当核实( )。___
A. 有权机关执法人员的工作证件;
B. 有权机关县团级以上机构签发的协助扣划存款通知书。
C. 法律、行政法规规定应当由有权机关主要负责人签字的,应当由主要负责人签字;
D. 有关生效法律文书或行政机关的有关决定书。
【多选题】
金融机构在协助冻结、扣划单位或个人存款时,应当审查以下( )内容。___
A. “协助冻结、扣划存款通知书”填写的需被冻结或扣划存款的单位或个人开户金融机构名称、户名和账号、大小写金额;
B. 协助冻结或扣划存款通知书上的义务人应与所依据的法律文书上的义务人相同;
C. 协助冻结或扣划存款通知书上的冻结或扣划金额应当是确定的。
D. 有权机关对个人存款户不能提供账号的,金融机构应当要求有权机关提供该个人的居民身份证号码或其它足以确定该个人存款账户的情况。
【多选题】
金融机构在协助有权机关办理查询、冻结和扣划手续时,应对下列( )情况进行登记。___
A. 有权机关名称,执法人员姓名和证件号码;
B. 金融机构经办人员姓名;
C. 被查询、冻结、扣划单位或个人的名称或姓名;
D. 协助查询、冻结、扣划的时间和金额;
【多选题】
营业机构协助有权机进行保证金强制扣划,对《协助扣划存款通知书》须进行以下审核( )。___
A. 由有权机关县团级以上机构签发,法律、行政法规规定应当由有权机关主要负责人签字的,应当由主要负责人签字。
B. 所列被扣划单位或个人保证金账户的开户行为农行,存款人账号、户名相符。
C. 通知书上的义务人与所依据的法律文书上的义务人为同一人。
D. 通知书上的扣划金额应当是确定的。
【多选题】
保证金开立的账户类型为( )。___
A. 保证金账户
B. 凭证账户
C. 追加账户
D. 合同账户
【多选题】
保证金计结息按照( )的计结息方法执行。___
A. 单位活期
B. 整存整取
C. 非标准期限
D. 协定存款
【多选题】
保证金账户只能在账户状态( )时才能销户。___
A. 正常
B. 无冻结
C. 无封户
D. 清息
【多选题】
保证金( )账户不能做冲正交易。___
A. 活期类
B. 非标类保证金
C. 定期类
D. 非定期类
【多选题】
开立单位结算账户时,客户经理需提供《对公客户尽职调查表》。如存在以下哪些情况的 ,客户经理还需提供《对公客户加强型尽职调查表》。___
A. 异地客户
B. 外国政要控制的对公客户
C. CCS等级高风险客户
D. 法定代表人对开户目的不明确的客户开户
【多选题】
开立单位结算账户基本存款账户时,需要提供以下哪些资料?___
A. 客户身份证明文件原件及复印件
B. 法定代表人(负责人)身份证件原件及复印件
C. 企业法人客户补充信息采集表
D. 客户经理提供客户是否被列入“严重违法失信企业名单”的查询结果
【多选题】
下列关于单位结算账户大额资金交易电话查证的说法正确的有?___
A. 对公账户单笔金额超过一百万元(含一百万元,当地银监局有明确规定的除外)的转账、汇划,以及现金支付等,原则上应进行电话查证。
B. 电话查证的记录应在交易凭证(有交易凭证,一般记载在交易凭证上)或《柜面重要事项登记簿》上记载。
C. 电话查证无需通过协议等形式明确双方的责任。
D. 对于使用电子支付密码的,以及单位正常的工资发放、缴纳各类税与费、向财政支付、集团客户账户间资金归集等性质支付的,可不进行查证。
【多选题】
"270.以下关于同利丰业务的说法正确的有:( )___
A. 最低留存金额:指我行与客户约定的“同利丰”签约账户在协议期内每日日终留存的最低余额。
B. 最高留存金额:指我行与客户约定的“同利丰”签约账户在协议期内每日日终留存的最高余额。
C. 协议约定利率:协议期内,客户满足每日最低留存金额的情况下,我行与客户协商确定的固定利率,包括不超过最高留存金额部分执行的一般约定利率和超出最高留存金额部分执行的超上限利率。
D. 提前解约利率:协议期内,客户提前解约或签约账户单日日终余额未达到最低留存金额等情形下,执行的计息利率。
【多选题】
同利丰业务的服务对象包括:( )。___
A. 增量同业结算客户
B. 所有的对公客户
C. 综合收益较高的大型客户
D. 所有的个人客户
【多选题】
"272.下列关于同利丰业务的说法正确的有:( )___
A. “同利丰”业务合作对象是指经我国金融监督管理机构批准设立的、已在我行开立人民币活期存款账户的境内金融机构。
B. “同利丰”属于新型智能存款产品,采用独立的计息规则,在BoEing系统中设置单独的可售产品、在IFAR系统中设置相应的财会产品。
C. 业务到期或提前解约时,按照业务存续期内实际情况给客户一次性结清利息。
D. “同利丰”业务须经一级分行审批同意后方可办理。
【多选题】
"273.客户部门负责营销、受理“同利丰”业务,识别并留存客户身份资料,并负责上报业务审批、协议签订、解约、“同利丰”协议等客户资料的保管。其中,客户身份资料包括但不限于:( )___
A. 加载统一社会信用代码的新版营业执照复印件(或营业执照、组织机构代码证、税务登记证复印件);
B. 法定代表人身份证件复印件;
C. 授权文书原件和被授权人身份证件复印件;
D. 客户开户许可证复印件。
【多选题】
下列关于同利丰业务的说法正确的有:( )___
A. 经办人员应遵循行内反洗钱、反恐怖融资与制裁合规管理相关规定与政策,签约同利丰前应进行客户身份识别;
B. 客户经理审核资料无误后,柜面经理应首先查询客户CCS等级;
C. 如CCS等级分类为禁止类,柜面经理应拒绝受理业务;
D. 如CCS等级分类为高风险等级,应由客户经理对客户进行加强型尽职调查。
【多选题】
签约同利丰业务前,需要审核哪些资料?___
A. 审核《中国农业银行“同利丰”业务协议》
B. 审核《中国农业银行“同利丰”业务办理审批表》
C. 审核客户是否在开户行开立有权办理“同利丰”业务的账户
D. 对法定代表人身份证件复印件、被授权人身份证件原件进行联网核查
【多选题】
"276.下列关于同利丰业务的说法正确的有:( )___
A. 客户签约“同利丰”必须在其开户网点柜面办理。
B. 签约时,须输入一级分行“同利丰”业务办理审批表中的业务审批编号,编号为10位,分别为2位省市代码+4位年份+4位序号。
C. 签约“同利丰”时,签约账户余额必须大于协议约定的最低留存金额,否则不能签约。
D. 协定存款账户、已签约“三丰”(双利丰、多利丰、假日丰)与活利丰产品的账户均不允许签约“同利丰”。"
【多选题】
下列关于柜面签约同利丰业务时的说法正确的有:( )___
A. 签约“同利丰”前,应在签约当日进行清息,否则不能签约“同利丰”
B. 签约信息中的“业务审批编号”填写《中国农业银行“同利丰”业务办理审批表》中的业务审批编号
C. 可售产品信息和会计产品根据签约类型返显
D. 合约生效日期、终止日期、最低留存金额、最高留存金额、利率信息等要素按照协议内容进行录入
【多选题】
下列关于同利丰解约的说法正确的有:( )___
A. 客户需要填写完整的《中国农业银行“同利丰”提前解约申请书》
B. “同利丰”解约前,必须在解约当日进行清息,否则不能解约“同利丰”
C. 客户解约“同利丰”必须在其开户网点柜面办理
D. 合约到期日当天不可解约。
【多选题】
伪造、变造、盗窃、套取、隐匿或擅自销毁( ),给予撤职至留用察看处分;造成不良后果的,给予开除处分。___
A. 重要空白凭证
B. 有价单证
C. 会计凭证
D. 会计账薄
【多选题】
( ),给予警告至记过处分;造成不良后果的,给予记大过至降级处分;造成严重后果的,给予撤职至开除处分。___
A. 无故压票
B. 退票
C. 拖延支付
D. 无理拒付
【多选题】
未按规定管理、保管、更换库房或ATM(自助柜面经理机,下同)等自助银行( ),给予警告至记过处分;造成不良后果的,给予记大过至降级处分;造成严重后果的,给予撤职至开除处分。___
A. 设备密码
B. 静态密码锁PDA
C. 钥匙
D. 指纹
【多选题】
通过( )等方式隐瞒已经发生的金融市场交易的,未造成严重后果的,给予记过至降级处分;造成严重后果的,给予撤职至开除处分。___
A. 编造虚假交易入账
B. 通过不入账
C. 推迟入账
D. 错误入账
【多选题】
未按规定办理网络金融客户证书( )等的,未造成严重后果的,给予警告至记过处分;造成严重后果的,给予记大过至开除处分。___
A. 制作
B. 保管
C. 传递
D. 发放
【多选题】
未按规定进行网络金融业务( )处理的,未造成严重后果的,给予警告至记过处分;造成严重后果的,给予记大过至开除处分。___
A. 记账
B. 对账
C. 清算
D. 差错
【多选题】
收回的现金未经非上门服务人员( ),给予警告至记过处分;造成不良后果的,给予记大过至开除处分。___
A. 清点
B. 确认
C. 记账
D. 记账不符合规定
【多选题】
未按规定办理变更( )等客户重要信息的,未造成严重后果的,给予警告至记大过处分;造成严重后果的,给予降级至留用察看处分。___
A. 法定代表人
B. 账户名称
C. 对账
D. 动账
【多选题】
未按规定办理存款人死亡后或所有权有争议的存款( )等业务的,给予警告至记过处分;造成不良后果的,给予记大过至降级处分;造成严重后果的,给予撤职至开除处分。___
A. 过户
B. 挂失
C. 补发
D. 支付
【多选题】
有下列行为( )之一的,给予警告至记过处分;造成不良后果的,给予记大过至降级处分;造成严重后果的,给予撤职至开除处分。___
A. 未按规定加配钞、装箱或回钞清点的
B. 未按规定办理现金存取业务的
C. 未按规定办理代理业务的
D. 未按规定盘库或查库的
【多选题】
下列行为( )之一,未造成严重后果的,给予警告至记过处分;造成严重后果的,给予记大过至开除处分。___
A. 未按规定审查客户身份证件或审核客户资料的
B. 擅自修改客户指令信息的
C. 未经客户同意,擅自使用客户证书或移动设备进行操作的
D. 未按规定保管本人网络金融系统用户名或密码的
欢迎使用我爱刷题
×
微信搜索我爱刷题小程序
温馨提示
×
请在电脑上登陆“www.woaishuati.com”使用