刷题
导入试题
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
BC
解析
暂无解析
相关试题
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
【多选题】
vMotion can be performed between which three physical boundaries? (Choose three.)___
A. Between two vCenter Server Systems
B. Between two vSphere Distributed Virtual Switches
C. Between two vCenter Server Datacenter objects
D. Between two VMware NSX Layer 4 segments
E. Between two NFS datastores
【多选题】
An administrator configures vSphere Replication for a virtual machine and enables multiple point in time (PIT) instances under the recovery settings in the Configure Replication wizard. Which two statements are correct for vSphere Replication with multiple point in time instances enabled? (Choose two.)___
A. vSphere Replication retains a number of snapshot instances of the virtual machine on the target site based on the retention policy that you specify.
B. vSphere Replication uses the virtual machine's snapshot instances to define the target site Point in Time instance based on the retention policy that you specify.
C. vSphere Replication does not support virtual machines with snapshots.
D. vSphere Replication supports virtual machines with snapshots.
【多选题】
An administrator is virtualizing a physical application server and adding it to an existing multi-tiered vApp. The application license is currently tied to the physical NIC's MAC address, so the administrator needs to ensure the license will function properly in the virtual machine. Which two actions can the administrator take to satisfy this task? (Choose two.)___
A. Set the MAC address for the vNIC in the guest operating system.
B. Install the physical server's NIC into the ESXi host.
C. Configure the MAC address for the vNIC using the vSphere Web Client.
D. Assign the physical server NIC's MAC address in the vSphere Distributed Switch.
【多选题】
Which two Fibre Channel zoning options are supported with vSphere 6.x? (Choose two.)___
A. Single-Initiator
B. Single-Initiator-Single-Target
C. Multiple-Initiators-Single-Target
D. Multiple-Initiators-Multiple-Targets
【多选题】
An administrator is attempting to remove an ESXi 6.x host from a vSphere Distributed Switch (vDS). When the administrator attempts to remove the host, the following error is observed: <The resource '16' is still in use.> What three steps are needed to successfully remove the host from the switch? (Choose three.)___
A. Select Manage Ports on the vDS for the host.
B. Locate all ports currently in use on the vDS for the host.
C. Migrate or delete any vmkernel or virtual machine adapters associated with the switch.
D. Remove all network cards from the switch before trying to remove the host.
E. Create a standard switch for everything to be automatically be migrated to.
【多选题】
Which two Virtual SAN related actions might start resynchronization of virtual machine objects? (Choose two.)___
A. Editing a virtual machine storage policy to increase the number of replicas.
B. Editing a virtual machine storage policy to reduce the number of replicas.
C. Editing a virtual machine storage policy to increase the number of disk stripes.
D. Editing a virtual machine storage policy to reduce the number of disk stripes.
【多选题】
An administrator is troubleshooting basic network connectivity issues. Which two scenarios are potential issues that this administrator might face? (Choose two.)___
A. The vSwitch is not attached to the correct physical network.
B. The portgroup is not configured to use correct VLAN.
C. Traffic shaping is configured incorrectly.
D. Jumbo frames is configured incorrectly.
【多选题】
Which three items should be validated prior to installing ESXi 6.x? (Choose three.)___
A. Remote Storage has been disconnected.
B. Installation media is available.
C. Server hardware clock is set to UTC.
D. Storage has been partitioned with a VMFS volume.
E. Network cards have been setup to use Jumbo
F. rames.
【多选题】
An administrator is performing an interactive installation of ESXi 6.x. Which three options are available for installation? (Choose three.)___
A. DVD
B. USB
C. PXE
D. Scripted
E. Auto Deploy
【多选题】
After installation of a host in your test environment, you need to move it to production. The only major change that needs to be made is that the hostname of the server needs to change. What are two ways that an administrator can change the host name without editing configuration files on the host directly? (Choose two.)___
A. Login to the Direct Console User Interface and change it from here.
B. Edit the Default TCP/IP Configuration from the vSphere Web Client.
C. Use the Ruby vSphere Client to send a script to the ESXi host that updates the hostname.
D. Update the information in DNS and the
E. SXi host will automatically update with these changes.
【多选题】
An administrator has unsuccessfully attempted several times to install an Operating System inside a virtual machine. The administrator finds that the installation fails at random intervals. Which two actions can be taken to resolve this issue? (Choose two.)___
A. Verify the md5sum and if invalid, download the installation files again.
B. Attempt the installation an additional time.
C. Attempt to use a different installation media or installation method.
D. Create a new virtual machine and attempt the installation with the existing media.
【多选题】
VMware tools is failing to install on a Microsoft Windows virtual machine. What are two possible situations that would prevent the installation? (Choose two.)___
A. The VMware tools installation media is corrupt.
B. The incorrect Operating System was selected in the virtual machine options.
C. The software prerequisites have not been installed.
D. The prerequisite services have not been started.
【多选题】
As part of a multisite Single Sign-On (SSO) deployment what two steps are required to ensure that a change to one Single Sign-On instance is propagated to the other instances? (Choose two.)___
A. Schedule a Replication Task on the primary instance
B. Select the first instance during the installation of subsequent instances
C. During the installation of each instance choose Linked-Mode
D. Enable Synchronize to Active Directory on each instance
【多选题】
You need to add an object to an existing vApp using the vSphere Web Client. How is this accomplished?___
A. Create an Object Inside the vApp.
B. Add an Object to a vApp.
C. Add an Object to the
D. atastore the vApp is located in.
【多选题】
Which three steps must be taken to use vSphere Update Manager 6.x to upgrade an ESXi 5.5 host to vSphere 6.x? (Choose three.)___
A. Download an ESXi Image.
B. Configure the vSphere Update Manager Download Service.
C. Create a baseline and attach it to the ESXi Host.
D. Scan the vCenter Content Library for the
E. SXi Image.
【多选题】
Which two options would allow a database administrator, with no access to the vSphere infrastructure, to connect to a virtual machine? (Choose two.)___
A. Use the Virtual Machine Remote Console (VMRC).
B. Use Remote Desktop Protocol (RDP) to connect.
C. Ask the vSphere administrator to grant permission to access the console through vCenter Server.
D. Ask the vSphere administrator to grant permission to access with the Horizon View Direct Connect Client.
推荐试题
【单选题】
软件工程管理对软件项目的开发管理,即对整个软件( )的一切活动的管理。
A. 软件项目
B. 生存期
C. 软件开发计划
D. 软件开发
【单选题】
许多产品的质量问题源于新产品的开发设计阶段,因此在产品( )阶段就应采取有力措施来消灭由于设计原因而产生的质量隐患。
A. 软件评审
B. 软件测试
C. 开发设计
D. 软件度量
【单选题】
下列几种类型中,耦合性最弱的是( )。
A. 内容型
B. 控制型
C. 公共型
D. 数据型
【单选题】
系统因错误而发生故障时,仍然能在一定程度上完成预期的功能,则把该软件称为( )。
A. 软件容错
B. 系统软件
C. 测试软件
D. 恢复测试
【单选题】
瀑布模型的关键不足在于
A. 过于简单
B. 不能适应需求的动态变更
C. 过于灵活
D. 各个阶段需要进行评审
【单选题】
在面向对象软件开发方法中,类与类之间主要有以下结构关系
A. 继承和聚集
B. 继承和一般
C. 聚集和消息传递
D. 继承和方法调用
【单选题】
以下哪一项不是软件危机的表现形式
A. 成本高
B. 生产率低
C. 技术发展快
D. 质量得不到保证
【单选题】
以下哪一项不是面向对象的特征
A. 多态性
B. 继承性
C. 封装性
D. 过程调用
【单选题】
软件可行性研究一般不考虑
A. 是否有足够的人员和相关的技术来支持系统开发
B. 是否有足够的工具和相关的技术来支持系统开发
C. 待开发软件是否有市场、经济上是否合算
D. 待开发的软件是否会有质量问题
【单选题】
软件维护的副作用主要有以下哪几种
A. 编码副作用、数据副作用、测试副作用
B. 编码副作用、数据副作用、调试副作用
C. 编码副作用、数据副作用、文档副作用
D. 编码副作用、文档副作用、测试副作用
【单选题】
软件项目计划一般不包括以下哪项内容
A. 培训计划
B. 人员安排
C. 进度安排
D. 软件开发标准的选择和制定
【单选题】
以下哪一项不属于面向对象的软件开发方法
A. coad方法
B. booch方法
C. jackson方法
D. omt方法
【单选题】
以下哪种测试方法不属于白盒测试技术
A. 基本路径测试
B. 边界值分析测试
C. 循环覆盖测试
D. 逻辑覆盖测试
【单选题】
“软件危机”是指( )
A. 计算机病毒的出现
B. 利用计算机进行经济犯罪活动
C. 软件开发和维护中出现的一系列问题
D. 人们过分迷恋计算机系统
【单选题】
DFD中的每个加工至少需要( )
A. 一个输入流
B. 一个输出流
C. 一个输入或输出流
D. 一个输入流和一个输出流
【单选题】
为了提高模块的独立性,模块之间最好是( )
A. 控制耦合
B. 公共耦合
C. 内容耦合
D. 数据耦合
【单选题】
下面关于PDL语言不正确的说法是( )
A. PDL是描述处理过程怎么做
B. PDL是只描述加工做什么
C. PDL也称为伪码
D. PDL的外层语法应符合一般程序设计语言常用的语法规则
【单选题】
详细设计与概要设计衔接的图形工具是( )
A. DFD图
B. 程序图
C. PAD图
D. SC图
【单选题】
不适合作为数据处理与数据库应用的语言是( )
A. SQL
B. Cobol
C. 4GL
D. Lisp
【单选题】
下列关于功能性注释不正确的说法是( )
A. 功能性注释嵌在源程序中,用于说明程序段或语句的功能以及数据的状态
B. 注释用来说明程序段,需要在每一行都要加注释
C. 可使用空行或缩进,以便很容易区分注释和程序
D. 修改程序也应修改注释
【单选题】
下列关于效率的说法不正确的是( )
A. 效率是一个性能要求,其目标应该在需求分析时给出
B. 提高程序效率的根本途径在于选择良好的设计方法,数据结构与算法
C. 效率主要指处理机时间和存储器容量两个方面
D. 程序的效率与程序的简单性无关
【单选题】
测试的关键问题是( )
A. 如何组织对软件的评审
B. 如何验证程序的正确性
C. 如何采用综合策略
D. 如何选择测试用例
【单选题】
结构化维护与非结构化维护的主要区别在于( )
A. 软件是否结构化
B. 软件配置是否完整
C. 程序的完整性
D. 文档的完整性
【单选题】
软件维护困难的主要原因是( )
A. 费用低
B. 人员少
C. 开发方法的缺陷
D. 得不到用户支持
【单选题】
可维护性的特性中,相互矛盾的是( )
A. 可理解性与可测试性
B. 效率与可修改性
C. 可修改性和可理解性
D. 可理解性与可读性
【单选题】
快速原型是利用原型辅助软件开发的一种新思想,它是在研究( )的方法和技术中产生的。
A. 需求阶段
B. 设计阶段
C. 测试阶段
D. 软件开发的各个阶段
【单选题】
从目前情况来看,增量模型存在的主要问题是( )
A. 用户很难适应这种系统开发方法
B. 该方法的成功率很低
C. 缺乏丰富而强有力的软件工具和开发环境
D. 缺乏对开发过程中的问题和错误具有应付变化的机制
【单选题】
下列文档与维护人员有关的有( )
A. 软件需求说明书
B. 项目开发计划
C. 概要设计说明书
D. 操作手册
【单选题】
( )是为了确保每个开发过程的质量,防止把软件差错传递到下一个过程而进行的工作。
A. 质量检测
B. 软件容错
C. 软件维护
D. 系统容错
【单选题】
表示对象相互行为的模型是( )模型。
A. 动态模型
B. 功能模型
C. 对象模型
D. 静态模型
【单选题】
CASE工具的表示集成是指CASE工具提供相同的( )
A. 编程环境
B. 用户界面
C. 过程模型
D. 硬件/操作系统
【单选题】
在软件开发中,( )是指对将要开发的系统的开发成本进行估算,然后与可能取得的效益进行比较和权衡。
A. 成本—效益分析
B. 可行性分析
C. 结构化分析
D. 软件需求分析
【单选题】
软件开发过程来自用户方面的主要干扰是( )
A. 功能变化
B. 经费减少
C. 设备损坏
D. 人员变化
【单选题】
软件复杂性度量的参数包括( )
A. 结构
B. 问题背景
C. 可重用性
D. 容错性
【单选题】
在 McCall 软件质量度量模型中,( )属于面向软件产品操作。
A. 可维护性
B. 效率
C. 适应性
D. 可互操作性
【单选题】
为了提高软件的可维护性或可靠性而对软件进行的修改称为( )
A. 纠错性维护
B. 适应性维护
C. 完善性维护
D. 预防性维护
【单选题】
面向维护的技术涉及软件开发的( )阶段。
A. 设计
B. 编码
C. 测试
D. 所有
【单选题】
用白盒技术设计测试用例的方法包括( )
A. 边界值分析
B. 条件组合覆盖
C. 因果图
D. 错误推测
【单选题】
软件测试的目的是( )
A. 为了表明程序没有错误
B. 为了说明程序能正确地执行
C. 为了发现程序中的错误
D. 为了评价程序的质量
【单选题】
针对软件需求分析所进行的软件测试是指( )
A. 集成测试
B. 确认测试
C. 黑盒子测试
D. 白盒子测试
欢迎使用我爱刷题
×
微信搜索我爱刷题小程序
温馨提示
×
请在电脑上登陆“www.woaishuati.com”使用