【多选题】
Which two SMTP Notification Event Details are specific to alarms triggered by events? (Choose two.)___
A. User Name
B. Summary
C. Old Status
D. Target
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【多选题】
Which two High Availability ___ Cluster admission control policies can help avoid resource fragmentation? (Choose two.)(AC)
A. Define failover capacity by static number of hosts
B. Define failover capacity by reserving a percentage of the cluster resources
C. Use dedicated failover hosts
D. Use Virtual Machine Monitoring
【多选题】
An attempt to enable vSphere Fault Tolerance for a powered-on virtual machine fails. Which two scenarios would result in this failure? (Choose two.)___
A. The virtual machine has three vCPUs configured.
B. The host on which the virtual machine is running has insufficient memory resources.
C. The virtual machine has insufficient resources to accommodate full reservation plus the overhead memory.
D. VMware High Availability is enabled on the cluster of which this host is a member.
【多选题】
A vApp template recently added to a Content Library is not displayed. Which two actions could correct this problem? (Choose two.)___
A. Manually synchronize the library
B. Select the Download all library content immediately option
C. Select the Sync subscribed library option
D. Manually download the vApp template
【多选题】
What are three valid disk configurations for the vSphere Data Protection 6.x Appliance? (Choose three.)___
A. 500GB
B. 1TB
C. 1.5TB
D. 2TB
E. 4TB
【多选题】
Which three connection types are available when configuring a vSwitch in the vSphere Web Client? (Choose three.)___
A. VMkernel Network Adapter
B. Physical Network Adapter
C. Virtual Machine Port Group for a Standard Switch
D. vMotion Network Adapter
E. vSAN Network Adapter
【多选题】
Which three features can be enabled for a new host cluster? (Choose three.)___
A. Storage Distributed Resource Scheduling
B. High Availability
C. Fault Tolerance
D. Distributed Resource Scheduling
E. Virtual SAN
【多选题】
An administrator receives a report that no real time statistics are available for a virtual machine in the vCenter Server inventory. Which two statements indicate likely causes of the problem? (Choose two.)___
A. The virtual machine is powered off.
B. The host containing the virtual machine is disconnected from vCenter Server.
C. There is insufficient real time data to display the information.
D. The vCenter Server service is not running.
【多选题】
Your manager has given you a bash script that retrieves data for ESXi 6.x host configurations. This data needs to be collected right after the installation of a host and must be run directly on the host. Which two actions can be used to run this script on an ESXi host? (Choose two.)___
A. Connect to the host with Ruby vSphere Console and run the script from there.
B. Enable SSH access from the Direct Console User Interface.
C. Enable the ESXi Shell from the
D. irect Console User Interface.
【多选题】
Which two are true about the Risk badge in vRealize Operations? (Choose two.)___
A. The Risk badge indicates potential future problems that may degrade the performance of the system.
B. Risks may require attention in the near future.
C. The Risk badge indicates problems that are degrading performance of the system.
D. Risks require attention now to correct system performance problems.
【多选题】
vSphere Update Manager allows which two virtual machine attributes to be upgraded? (Choose two.)___
A. Virtual machine firewall policies for NSX.
B. Software Packages in the virtual machine.
C. Virtual machine Hardware Version.
D. VMware Tools Upgrade.
【多选题】
What are two benefits of using NFS 4.1 with vSphere 6.x as compared to NFS 3? (Choose two.)___
A. NFS 4.1 supports Kerberos Authentication
B. NFS 4.1 supports multipathing
C. NFS 4.1 supports IPv6
D. NFS 4.1 supports hardware acceleration
【多选题】
Which three statements are true regarding Fault Tolerance? (Choose three.)___
A. Applications need to be continuously available to users.
B. Applications without native clustering capabilities can be protected.
C. Custom clustering solutions are complicated to configure and maintain.
D. Applications that have 16 vCPUs are supported.
E. Prevents application crashes by analyzing the workload and correcting problems.
【多选题】
Which two statements are true regarding VMware vSphere Flash Read Cache (vFRC)? (Choose two.)___
A. Cache fills and cache evictions happen in the granularity of a cache block size.
B. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying storage.
C. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying cache data.
D. Cache fills and cache evictions happen in the granularity of the disk block size.
【多选题】
What are two possible causes of Storage Distributed Resource Scheduler (SDRS) being disabled on one or more virtual machine disks in a datastore cluster? (Choose two.)___
A. The virtual machine has vSphere Fault Tolerance disabled.
B. The virtual machine is a template.
C. The virtual machine swap file is on a shared datastore.
D. The disk is a CD-ROM/ISO file.
【多选题】
An administrator attempts to install vCenter Single Sign-On Server. The installer returns an error message indicating that the installation failed. Prior to the installation, all setup prerequisites were met. The administrator has generated a vCenter Server Single Sign-On support bundle. Which two files should the administrator analyze to determine the cause of the failure? (Choose two.)___
A. Server\utils\logs\imsTrace.log
B. Server\utils\logs\install.txt
C. %TEMP%\utils\logs\vminst.log
D. %TEMP%\vminst.log
【多选题】
An administrator is unable to remove an ESXi 6.x host from a vSphere Distributed Switch. What are two likely reasons for this issue? (Choose two.)___
A. Vmkernel interfaces on the switch are still in use.
B. VM Network port group adapters are connected to different switch.
C. Physical NICs are migrated to different switch.
D. VM Network adapters are connected to this switch.
【多选题】
Which two Identity Sources are available to add for vCenter Single Sign-On authentication? (Choose two.)___
A. LocalOS
B. OpenLDAP
C. NIS as an LDAP Server
D. VCMSDS
【多选题】
What are three goals of resource management within a cluster? (Choose three.)___
A. To prevent virtual machines from monopolizing resources and to guarantee predictable service rates.
B. To exploit undercommitted resources and overcommit with graceful degradation.
C. To provide solutions to potential problems that you might encounter when using vCenter Server.
D. To control the relative importance of virtual machines and provide flexible dynamic partitioning.
E. To provide additional network administration capabilities.
【多选题】
Which three actions can be taken as a result of executing the vSphere Update Manager 6.x scan and remediation wizards? (Choose three.)___
A. Install and upgrade software in virtual machines.
B. Upgrade the firmware on ESXi host devices.
C. Upgrade and Patch ESXi hosts.
D. Install and update third-party software on hosts.
E. Upgrade virtual machine hardware.
【多选题】
Which two statements are true about deploying and using vSphere Replication? (Choose two.)___
A. ESXi hosts managed by a single vCenter Server instance require a connection between the two vSphere Replication appliances.
B. Sites managed by different vCenter Server instances require a connection between the two vSphere Replication appliances.
C. Sites managed by different vCenter Server instances require the use of Site Recovery Manager and a connection between the two vSphere Replication appliances.
D. ESXi hosts managed by a single vCenter Server instance require a single vSphere Replication appliance.
【多选题】
An administrator is attempting to power on a virtual machine, but the task is hanging at 95%. What three scenarios best explain why this problem is happening? (Choose three.)___
A. A virtual machine question is currently being posed to the administrator.
B. Another task for the virtual machine or other component is already in progress.
C. The VMware High Availability cluster has insufficient resources to guarantee failover.
D. The host has lost access to the storage device containing the virtual machine files.
E. The host is under resource contention and unable to power on the virtual machine.
【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
【多选题】
Which two storage controller configurations can be used with Virtual SAN? (Choose two.)___
A. SAS controllers in Passthrough mode
B. SAS controllers in RAID0 mode
C. SAS controllers in RAID1 mode
D. SAS controllers in RAID10 mode
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
【多选题】
An administrator is deploying multiple Windows 2003 Virtual Machines from the same template. What two steps should be taken to avoid network conflicts? (Choose two.)___
A. Customize the guest operating system.
B. Install VMware Tools into the new virtual machines.
C. Copy the Microsoft Sysprep tools onto the vCenter Server system.
D. Ensure the e1000 vmnic is selected for each new virtual machine.
【多选题】
Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
推荐试题
【单选题】
ZY24、项目团队由来自多个不同国家的供应商和团队组成,在项目经理认识到由于存在文化和语言差异,项目团队缺乏凝聚力。项目经理应该怎么做来尽可能提高绩效?___
A. 使用人际交往工具
B. 应用冲突管理技术
C. 推动团队建设活动
D. 实施项目绩效评估
【单选题】
ZY25、在马斯洛需求层次理论中,最高级的需求是:___
A. 生理需求
B. 生存需求
C. 社交需求
D. 自尊
【单选题】
ZY26、团队士气低落。团队成员之间存在严重冲突,多名团队成员同时发言,造成项目会议没有成效。团队处于下列哪一个发展阶段?___
A. 解散阶段
B. 成熟阶段
C. 震荡阶段
D. 形成阶段
【单选题】
ZY27、项目经理所在的团队里,成员来自于不同文化和语言背景。培训开始,建立信任,然后团队成员一起工作,共同实现项目目标。项目团队处于下列哪个发展阶段?___
A. 形成阶段
B. 震荡阶段
C. 规范阶段
D. 解散阶段
【单选题】
ZY28、一个进度计划具有挑战性的项目中,多名相关方的目标互相冲突。为确保项目顺利推进,项目经理必须协助建立关系,处理冲突以及应用积极倾听技巧。项目处于团队发展的哪一个阶段?___
A. 解散阶段
B. 震荡阶段
C. 规范阶段
D. 成熟阶段
【单选题】
ZY29、成功的项目经理理必须具备良好的谈判技巧,包括:___
A. 积极倾听
B. 问题升级
C. 说服
D. 团队建设
【单选题】
ZY30、在组建一支跨职能项目团队时,项目经理没有获得选择团队成员的直接控制权。项目经理应该怎么做?___
A. 与已获任命的团队成员一起开展团队建设活动.
B. 与职能经理协商,确保项目能获得可胜任工作的员工.
C. 让项目团队集中办公,提高项目绩效
D. 制定基本规则,提出对可接受的团队行为的明确期望.
【单选题】
ZY31、一个矩阵式组织中的项目经理正在为一个新项目配备人员,并在组织的人员库中确定了一关键源。而该资源目前隶属于职能经理,并被分配到另一个项目上工作。项目经理应该使用什么技术?___
A. 招募
B. 事先指派
C. 谈判
D. 虚拟化
【单选题】
ZY32、一个为期五年的项目进行到一半。虽然团队绩效没有问题,项目经理担心团队士气低落,项目经理应该怎么做才能保持团队受到激励?___
A. 在项目问题日志中记录任何问题。
B. 确保项目的RACI图准确。
C. 使用德尔菲技术。
D. 完成团队绩效评估。
【单选题】
ZY33、项目经理为客户管理一个重要项目。项目进度和成本都在控制当中,一名关键团队成员离开,项目经理无法找到具有相当技能和经验的替代人选。项目经理首先应执行下列哪一项?___
A. 继续张贴招聘广告,直到招到合格人员
B. 使用技能较低的资源继续项目执行
C. 获得客户的授权终止该项目
D. 跟职能经理协商强行留下关键团队成员,直到做完为止
【单选题】
ZY34、在一个矩阵型组织中工作的项目经理发现一名成员经常在会议中迟到,并且对同事非常粗暴无理。这种行为对项目团队施加了压力。项目经理下一步该怎么做?___
A. 将该名团队成员从项目中开除
B. 与该名团队成员的职能经理一起解决这个问题
C. 组织一次与该名团队成员的会议,了解这种行为背后的原因
D. 为项目团队增加合同资源,已完成该名团队成员的工作任务
【单选题】
ZY35、项目绩效考评不同于团队绩效评估,因为项目绩效考评注重:___
A. 每个团队成员如何执行项目
B. 项目团队效率评估
C. 团队建设工作
D. 降低员工周转率
【单选题】
ZY36、在制定项目计划的早期阶段,项目经理的领导方式是:___
【单选题】
ZY37、民主管理方式的缺点是:___
A. 难以快速决策
B. 多数原则不一定产生合适的解决方案
C. 如果在项目团队对有错误的成员进行投票,则产生错误决策
D. 以上都是
【单选题】
ZY38、你负责管理一个项目,项目团队中的成员拥有各种技能和特长。你想要劝说各位成员共享他们关于此项目的相关知识,以便做出更好的决策。最适合该过程的管理风格是:___
A. 自由放任型
B. 民主型
C. 专制独裁型
D. 指导型
【单选题】
ZY39、团队项目经理对项目或组织有关的技术知识知之甚少。项目经理最有可能依赖于哪一类型的权力?___
A. 强制型
B. 奖励型
C. 潜示型
D. 法定型
【单选题】
ZY40、你是一名项目经理,在弱矩阵环境中负责一交叉职能的项目。没有团队成员向你汇报,你也不能奖励他们。项目很难,包括时间很紧,质量标准也很有挑战性。这时,下列哪种项目管理权力可能最为有效?___
A. 潜示权力
B. 专业权力
C. 惩罚权力
D. 正式权力
【单选题】
ZY41、假定你和公司的CEO是邻居,你们的关系比较铁,而公司的同事也都知道你们之间的关系比较好。最近,你的公司任命你为一个新项目的项目经理,而这个项目对实现下一年的财务目标是至关重要的。你会依靠下列哪种权力类型来行使项目经理的权力?___
A. 潜示型
B. 酬劳型
C. 正式型
D. 专家型
【单选题】
ZY42、项目经理受命负责一个处于规划阶段的咨询项目,并应开始制定人力资源计划,但项目经理在阅读项目章程和项目的成本效益分析报告后发现,已任命了三名资深分析师,该例属于下列那一项?___
A. 预分派
B. 项目员工指派
C. 组织分解结构
D. 团队清单
【单选题】
ZY43、在确定项目中所需要开展的所有任务后,项目经理根据每个团队成员的技能分配任务。项目经理参考了下列哪一份文件?___
A. 职责分配矩阵
B. 工作分解结构
C. 资源分解结构
D. 工作包分配矩阵
【单选题】
ZY44、资源直方图可以但是责任分配矩阵不能显示的是:___
A. 时间
B. 活动
C. 相互关系
D. 负责每个活动的人
【单选题】
ZY45、如何表述对于WBS下层的每个要素所需要资源的类型和数量?___
A. 资源需求
B. 成本估算
C. 资源库描述
D. 专家判断
【单选题】
ZY46、在制定全球性的项目资源管理计划之前,应更新哪一项工具来确保计划的准确性?___
A. 组织机构图与职位描述
B. 人际交往与责任分配矩阵
C. 团队建设活动与虚拟团队储备
D. 集中办公与预分派矩阵
【单选题】
ZL1、来自公司质量控制部门的检查报告发现有些可交付成果不满足质量测量指标,项目经理应该怎么做?___——(第六版最新全套机密真题及详细解释,请私加微信yoyosun2019)
A. 分析数据,改善质量保证活动并更新项目管理局计划
B. 与相关方协商质量测量指标标准
C. 提交变更请求纠正交付成果
D. 用新的质量测量指标重复测验
【单选题】
ZL2、一项目面临可交付成果的重大变化。如果项目经理要决定哪些质量标准与该变化有关,那么项目经理必须也要参与:___
A. 质量管理
B. 管理质量
C. 规划质量管理
D. 控制质量
【单选题】
ZL3、在创建过程改进计划时,项目经理需要确定什么?___
A. 利益相关者
B. 提升活动价值
C. 主题专家
D. 市场条件
【单选题】
ZL4、下列哪一项属于控制质量的范畴?___
A. 确定项目和产品的质量要求和标准
B. 确定工作是否能持续改进
C. 提出措施建议,清除不合格产品性能的根本原因
D. 确定项目活动是否符合组织和项目政策
【单选题】
ZL5、项目经理目前处于控制质量产品检查过程,发现目前生产的产品存在设计缺陷,可能在公司将来的项目中还会发生。项目经理知道这个问题可以通过细微的标准变更得以解决。项目经理下一步应该怎么做?___
A. 继续按原计划执行该项目,在另一个项目中改变这个缺陷。
B. 建议更新标准。
C. 更新质量管理计划
D. 等到下一次项目经理会议时将这个问题通知其他项目经理。
【单选题】
ZL6、检查工作产品以确定是否符合标准,这属于哪种质量控制技术类型?___
A. 缺陷补救评审
B. 趋势图
C. 检查
D. 质量核对表
【单选题】
ZL7、从装配线出来的一系列产品最近出现误差,项目经理需要知道这些误差是否在可接受的范围内。项目经理需要使用哪些工具?___
A. 直方图
B. 帕累托图
C. 石川图
D. 控制图
【单选题】
ZL8、使用控制图时下列哪一种情况可以看做是对某一个流程失去控制?___
A. 六个连续的点都落在同一个方向
B. 一个数据点位于控制上限
C. 80%的点在平均线的同一侧
D. 七个连续的点落在平均线的下方
【单选题】
ZL9、团队成员记录了某产品的每小时不合格品数量。若要评估质量并确保不合格品范围处于规定限制范围,应使用下列哪一项工具?___
A. 控制图
B. 检查
C. 随机抽样
D. 帕累托图
【单选题】
ZL10、为了限制与变更有关的风险,项目经理执行了一个审计,确保新的最小最大值要求能够被正确执行,测试将会进行10次,测试结果将会用图表表示用于可视化分析。下列哪一项质量工具将帮助项目经理判定测试是否成功?___
A. 控制图
B. 统计抽样
C. 帕累托图
D. 散点图
【单选题】
ZL11、项目经理接到客户对于产品质量属性的负面反馈。为解决这个问题,对制造工艺进行了变更。若要评估工艺变更对解决期望的改进是否有效,下列哪一项质量控制工具对项目经理最有用?___
A. 实验设计
B. 帕累托图
C. 控制图
D. 因果图
【单选题】
ZL12、在监控项目过程时,质量经理注意到四个连续数据点存在平均线的同一侧,没有任何一个超出控制限值,这个过程的状态是什么?___
A. 过程失控
B. 过程需要减轻
C. 过程在控制当中
D. 过程需要调查
【单选题】
ZL13、一控制图显示在均值的一侧有7个数据点在一条直线上。应采取什么措施?___
A. 执行试验设计
B. 调整控制图以反映新的均值
C. 寻找原因
D. 什么都不做,这是7点原则,可以忽略
【单选题】
ZL14、下列哪种情况应采用控制图工具?___
A. 说明过程随时间发展的趋势以及预测未来结果
B. 以非预测方式说明两个变量的关系
C. 根据指定界限监控并改进随时间可重复出现的过程
D. 识别问题的可能原因
【单选题】
ZL15、在一个产品开发项目期间,项目经理必须确定生产流程是否登记,项目经理必须决定生产流程是否稳定,项目经理应该回顾如下哪项?___
A. 控制图
B. 鱼骨图
C. 趋势图
D. 帕累托图
【单选题】
ZL16、一名监控流程的团队成员正在查看产品的控制图,有六个连续的点低于平均值,但是都在控制值范围内。项目经理应采取下列哪种行动?___
A. 调整流程
B. 创建石川图
C. 执行实验设计
D. 不需要采取任何行动
【单选题】
ZL17、项目经理注意到可交付成果存在不一致性。应该使用什么工具来确保任务被继续执行?___
A. 质量核对表
B. 控制图
C. 石川图
D. 蒙特卡洛分析