刷题
导入试题
【多选题】
Which two Identity Sources are available to add for vCenter Single Sign-On authentication? (Choose two.)___
A. LocalOS
B. OpenLDAP
C. NIS as an LDAP Server
D. VCMSDS
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
AB
解析
暂无解析
相关试题
【多选题】
What are three goals of resource management within a cluster? (Choose three.)___
A. To prevent virtual machines from monopolizing resources and to guarantee predictable service rates.
B. To exploit undercommitted resources and overcommit with graceful degradation.
C. To provide solutions to potential problems that you might encounter when using vCenter Server.
D. To control the relative importance of virtual machines and provide flexible dynamic partitioning.
E. To provide additional network administration capabilities.
【多选题】
Which three actions can be taken as a result of executing the vSphere Update Manager 6.x scan and remediation wizards? (Choose three.)___
A. Install and upgrade software in virtual machines.
B. Upgrade the firmware on ESXi host devices.
C. Upgrade and Patch ESXi hosts.
D. Install and update third-party software on hosts.
E. Upgrade virtual machine hardware.
【多选题】
Which two statements are true about deploying and using vSphere Replication? (Choose two.)___
A. ESXi hosts managed by a single vCenter Server instance require a connection between the two vSphere Replication appliances.
B. Sites managed by different vCenter Server instances require a connection between the two vSphere Replication appliances.
C. Sites managed by different vCenter Server instances require the use of Site Recovery Manager and a connection between the two vSphere Replication appliances.
D. ESXi hosts managed by a single vCenter Server instance require a single vSphere Replication appliance.
【多选题】
An administrator is attempting to power on a virtual machine, but the task is hanging at 95%. What three scenarios best explain why this problem is happening? (Choose three.)___
A. A virtual machine question is currently being posed to the administrator.
B. Another task for the virtual machine or other component is already in progress.
C. The VMware High Availability cluster has insufficient resources to guarantee failover.
D. The host has lost access to the storage device containing the virtual machine files.
E. The host is under resource contention and unable to power on the virtual machine.
【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
【多选题】
Which two storage controller configurations can be used with Virtual SAN? (Choose two.)___
A. SAS controllers in Passthrough mode
B. SAS controllers in RAID0 mode
C. SAS controllers in RAID1 mode
D. SAS controllers in RAID10 mode
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
【多选题】
An administrator is deploying multiple Windows 2003 Virtual Machines from the same template. What two steps should be taken to avoid network conflicts? (Choose two.)___
A. Customize the guest operating system.
B. Install VMware Tools into the new virtual machines.
C. Copy the Microsoft Sysprep tools onto the vCenter Server system.
D. Ensure the e1000 vmnic is selected for each new virtual machine.
【多选题】
Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
推荐试题
【多选题】
贷前调查的主要对象是( )。___
A. 借款人
B. 保证人
C. 抵(质)押人
D. 抵(质)押物
E. 贷款安全性
【多选题】
借款需求分析对银行的意义在于( )。___
A. 帮助银行有效地评估风险
B. 帮助银行确定合理的贷款结构与贷款利率
C. 为公司提供融资方面的合理建议
D. 确定贷款总供给量
E. 帮助银行增加盈利
【多选题】
借款人资产运用效率越高,( )。___
A. 盈利能力越强
B. 短期偿债能力越强
C. 借款人获得收入越多
D. 资产周转速度越快
E. 长期偿债能力越强
【多选题】
针对商业银行等金融机构的骆驼评级分析系统包括( )。___
A. 流动性
B. 管理能力
C. 资产质量
D. 资本充足率
E. 盈利性
【多选题】
营运能力分析常用的比率主要有( )。___
A. 总资产周转率
B. 固定资产周转率
C. 应收账款周转率
D. 存货周转率
E. 资产收益率和所有者权益收益率
【多选题】
所有者权益主要由( )组成。___
A. 资本金
B. 公积金
C. 利润
D. 未分配利润
E. 盈余
【多选题】
公司客户品质基础分析的主要内容包括( )。___
A. 客户历史分析
B. 法人治理结构分析
C. 股东背景
D. 高管人员的素质
E. 信誉状况
【多选题】
反映客户短期偿债能力的比率主要有( )。___
A. 流动比率
B. 资产负债率
C. 净利润率
D. 速动比率
E. 现金比率
【多选题】
银行进行项目评估时,通常从( )方面对项目建设的必要性进行评估。___
A. 项目产品市场情况分析
B. 贷款项目是否符合国家整体布局和地区经济结构的需要
C. 贷款项目是否符合国家产业政策
D. 项目产品的竞争力分析
E. 贷款项目是否符合地区经济结构的需要
【多选题】
项目融资需求应关注( )。___
A. 存货周期
B. 长期授信
C. 项目可行性
D. 项目批准
E. 项目完工时限
【多选题】
项目企业分析应包括对企业( )等的分析。___
A. 管理水平
B. 财务状况
C. 经营状况
D. 信用度
E. 投资环境
【多选题】
下列选项中,属于项目宏观背景分析的有( )。___
A. 项目建设是否符合国家的产业政策、技术政策
B. 投资者目前市场占有率
C. 企业财务状况
D. 是否符合国家或行业(地区)的社会经济发展规划
E. 替代品的价格
【多选题】
设备选择评估的主要内容有( )。___
A. 设备的可靠性
B. 设备的配套性
C. 设备的经济性
D. 设备的生产能力和工艺要求
E. 设备的使用寿命和可维护性
【多选题】
抵押担保的范围包括( ),或按抵押合同规定执行。___
A. 主债权
B. 主债权的利息
C. 违约金
D. 损害赔偿金
E. 实现抵押权的费用
【多选题】
在抵押期间,银行若发现抵押人对抵押物使用不当或保管不善,足以使抵押物价值减少,或已使抵押物价值减少时,其拥有的权利包括( )。___
A. 要求抵押人停止其行为
B. 要求抵押人恢复抵押物价值
C. 提供与减少的价值相等的担保
D. 只能在抵押人因损害而得到赔偿范围内要求提供担保
E. 只能要求抵押物未减少的部分作为债权的担保
【多选题】
下列属于财产担保的有( )担保。___
A. 房产
B. 企业保证
C. 股票
D. 债券
E. 保险单
【多选题】
下列关于质物、质押权利合法性的说法,正确的有( )。___
A. 所有权、使用权不明或有争议的动产,法律规定禁止流通的动产不得作为质物
B. 凡出质人以权利凭证出质的,必须对出质人提交的权利凭证的真实性、合法性和有效性进行确认
C. 凡发现质押权利凭证有伪造、变造迹象的,应重新确认
D. 以海关监管期内的动产作质押的,需由负责监管的海关出具同意质押的证明文件
E. 非流通股可设定质押
【多选题】
下列财产中不得抵押的有( )。___
A. 土地所有权
B. 抵押人所有的房屋和其他地上定着物
C. 耕地、宅基地、自留地、自留山
D. 学校、幼儿园、医院的教育设施、医疗卫生设施
E. 抵押人依法承包并经发包方同意抵押的荒山、荒沟、荒滩等荒地
【多选题】
根据我国《担保法》对保证人资格的明确规定,以下说法中,正确的有( )。___
A. 《担保法》规定企业法人的分支机构或职能部门在任何情况下都不能做保证人
B. 《担保法》规定医院、学校等以公共利益为目的的事业单位、社会团体不得作保证人
C. 《担保法》规定企业法人的分支机构或职能部门不能做保证人,企业法人的分支机构有该法人书面授权的,可以在授权范围内提供保证
D. 《担保法》规定政府及其所属部门不得为他人提供担保
E. 金融机构具有较强代为清偿能力的,可以接受为保证人
【多选题】
根据我国《担保法》的规定,保证人( )。___
A. 必须具有民事行为能力
B. 必须具有代为履行主债务的资力
C. 不得为医院、学校等以公共利益为目的的事业单位
D. 不可以为自然人
E. 不得为企业法人的职能部门
【多选题】
对于企业管理水平的分析,主要包括( )。___
A. 管理人员的业务素质
B. 机构的设置及合理性
C. 经营管理方面的主要业绩
D. 企业的劳动力结构和层次
E. 已实施投资项目的管理情况
【多选题】
担保的形式有多种,主要有( )。___
A. 抵押
B. 质押
C. 留置
D. 保证
E. 定金
【多选题】
贷款质押是物的担保的一种重要形式,一般商业银行不可接受的财产质押包括( ).___
A. 依法可以转让的基金份额、股权
B. 汇票、支票、本票、债券
C. 珠宝、首饰
D. 租用的财产
E. 字画、文物
【多选题】
贷款授信额度包括( )。___
A. 信用证开证额度
B. 提款额度
C. 各类保函额度
D. 现金额度
E. 承兑汇票额度
【多选题】
贷款审批要素广义上是指贷款审批方案中应包含的各项内容,具体包括( )。___
A. 贷款品种
B. 贷款利率
C. 授信对象
D. 发放条件与支付方式
E. 担保方式
【多选题】
贷款期限的审定要点有( )。___
A. 贷款期限应与借款人资产转换周期相匹配
B. 贷款期限应符合相应授信品种有关期限的规定
C. 贷款期限一般应控制在借款人相应经营的有效期限内
D. 贷款期限应与借款人的风险状况及风险控制要求相匹配
E. 贷款期限应与其他特定还款来源的到账时间相匹配
【多选题】
在满足借款合同用款前提条件的情况下,无正当理由或借款人没有违约,( )。___
A. 银行必须按借款合同的约定按时发放贷款
B. 银行不按时发放贷款是违约行为
C. 银行不按时发放贷款,自身不会遭受任何损失
D. 银行不按时发放贷款,可能影响借款人的生产经营计划
E. 银行不按时发放贷款,可能影响贷款的正常收回
【多选题】
银行在进行贷款发放的审查时,应审查借款人提交的借款凭证是否完全符合要求,确认( )正确无误。___
A. 贷款用途
B. 提款账号
C. 提款日期
D. 提款金额
E. 预留印鉴
【多选题】
银行可以对借款人采取终止提款措施的情况包括( )。___
A. 挪用贷款
B. 未按合同规定清偿贷款本息
C. 违反国家政策法规,使用贷款进行非法经营
D. 其他影响企业偿债能力的违约情况
E. 用于临时周转的款项
【多选题】
商业银行在坚持“区别对待,择优扶植”的原则时,要做到( )。___
A. 贷款的发放和使用应当符合相关的法律法规
B. 贷款的投向应当突出重点
C. 根据企业的经营管理和经济效益选择贷款对象
D. 严格区分企业的优劣
E. 接程序办理贷款
【多选题】
挪用贷款的情况一般包括( )。___
A. 用贷款进行股本权益性投资
B. 用贷款进行有价证券、期货等投机经营
C. 未依法取得经营房地产资格的借款人使用贷款经营房地产业务
D. 套取贷款,相互借贷以获取非法收人
E. 借款企业挪用流动资金进行基本建设或用于财政性开支或用于弥补企业亏损
【多选题】
加强合同管理的实施要点有( )。___
A. 修订和完善贷款合同等协议文件
B. 建立完善有效的贷款合同管理制度
C. 加强贷款合同规范性审查管理
D. 实施履行监督、归档、检查等管理措施
E. 做好有关配套和支持工作
【多选题】
放款执行部门要审核银行内部授信流程的( )。___
A. 合法性
B. 合规性
C. 完整性
D. 有效性
E. 及时性
【多选题】
贷款人出现任何违约事件,银行有权分别或同时采取下列哪些措施?( )。___
A. 要求借款人限期纠正违约事件
B. 停止借款人提款或取消借款人尚未提用的借款额度
C. 宣布贷款合同项下的借款本息全部立即到期,根据合同约定立即从借款人在银行开立的存款账户中扣款用于偿还被银行宣布提前到期的所欠全部债务
D. 宣布借款人在与银行签订的其他贷款合同项下的借款本息立即到期,要求借款人立即偿还贷款本息及费用
E. 向人民法院提起诉讼
【多选题】
贷款合同纠纷解决的方式有( )。___
A. 调解
B. 协商和解
C. 仲裁
D. 诉讼
E. 处置抵押物
【多选题】
贷款合同分为( )。___
A. 格式合同
B. 非格式合同
C. 口头承诺合同
D. 无限制合同
E. 以上都对
【多选题】
在抵押期间,银行经办人员对抵押物检查时应( )。___
A. 定期检查抵押物的存续状况、占有、使用、转让、出租等处置行为
B. 发现抵押物价值非正常减少,应及时查明原因并采取有效措施
C. 如发现抵押人的行为将造成抵押物价值减少,应要求抵押人停止担保
D. 如抵押人行为已造成抵押物价值减少,应要求抵押人恢复抵押物的价值
E. 如抵押人无法完全恢复抵押物的价值,应要求抵押人停止担保
【多选题】
下列属于财务状况预警信号的有( )。___
A. 存货周转速度放慢
B. 现金状况恶化
C. 应收账款余额或比例激增
D. 流动资产状况恶化
E. 固定资产迅速变化
【多选题】
同一财产向两个以上债权人抵押的,拍卖、变卖抵押财产所得的价款按照规定清偿。下列说法正确的是( )。___
A. 登记顺序不同的,按照债权比例清偿
B. 抵押权已登记的先于未登记的受偿
C. 抵押权已登记的,按照登记的先后顺序清偿
D. 登记顺序相同的,按照债权比例清偿
E. 抵押权未登记的,按照债权比例清偿
【多选题】
根据《商业银行授信工作尽职指引》,影响客户资信的重大事项包括( )。___
A. 外部政策变动
B. 客户组织结构、股权或主要领导人发生变动
C. 客户的担保超过所设定的担保警戒线
D. 客户财务收支能力发生重大变化
E. 客户涉及重大诉讼
欢迎使用我爱刷题
×
微信搜索我爱刷题小程序
温馨提示
×
请在电脑上登陆“www.woaishuati.com”使用