【多选题】
An attempt to enable vSphere Fault Tolerance for a powered-on virtual machine fails. Which two scenarios would result in this failure? (Choose two.)___
A. The virtual machine has three vCPUs configured.
B. The host on which the virtual machine is running has insufficient memory resources.
C. The virtual machine has insufficient resources to accommodate full reservation plus the overhead memory.
D. VMware High Availability is enabled on the cluster of which this host is a member.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【多选题】
A vApp template recently added to a Content Library is not displayed. Which two actions could correct this problem? (Choose two.)___
A. Manually synchronize the library
B. Select the Download all library content immediately option
C. Select the Sync subscribed library option
D. Manually download the vApp template
【多选题】
What are three valid disk configurations for the vSphere Data Protection 6.x Appliance? (Choose three.)___
A. 500GB
B. 1TB
C. 1.5TB
D. 2TB
E. 4TB
【多选题】
Which three connection types are available when configuring a vSwitch in the vSphere Web Client? (Choose three.)___
A. VMkernel Network Adapter
B. Physical Network Adapter
C. Virtual Machine Port Group for a Standard Switch
D. vMotion Network Adapter
E. vSAN Network Adapter
【多选题】
Which three features can be enabled for a new host cluster? (Choose three.)___
A. Storage Distributed Resource Scheduling
B. High Availability
C. Fault Tolerance
D. Distributed Resource Scheduling
E. Virtual SAN
【多选题】
An administrator receives a report that no real time statistics are available for a virtual machine in the vCenter Server inventory. Which two statements indicate likely causes of the problem? (Choose two.)___
A. The virtual machine is powered off.
B. The host containing the virtual machine is disconnected from vCenter Server.
C. There is insufficient real time data to display the information.
D. The vCenter Server service is not running.
【多选题】
Your manager has given you a bash script that retrieves data for ESXi 6.x host configurations. This data needs to be collected right after the installation of a host and must be run directly on the host. Which two actions can be used to run this script on an ESXi host? (Choose two.)___
A. Connect to the host with Ruby vSphere Console and run the script from there.
B. Enable SSH access from the Direct Console User Interface.
C. Enable the ESXi Shell from the
D. irect Console User Interface.
【多选题】
Which two are true about the Risk badge in vRealize Operations? (Choose two.)___
A. The Risk badge indicates potential future problems that may degrade the performance of the system.
B. Risks may require attention in the near future.
C. The Risk badge indicates problems that are degrading performance of the system.
D. Risks require attention now to correct system performance problems.
【多选题】
vSphere Update Manager allows which two virtual machine attributes to be upgraded? (Choose two.)___
A. Virtual machine firewall policies for NSX.
B. Software Packages in the virtual machine.
C. Virtual machine Hardware Version.
D. VMware Tools Upgrade.
【多选题】
What are two benefits of using NFS 4.1 with vSphere 6.x as compared to NFS 3? (Choose two.)___
A. NFS 4.1 supports Kerberos Authentication
B. NFS 4.1 supports multipathing
C. NFS 4.1 supports IPv6
D. NFS 4.1 supports hardware acceleration
【多选题】
Which three statements are true regarding Fault Tolerance? (Choose three.)___
A. Applications need to be continuously available to users.
B. Applications without native clustering capabilities can be protected.
C. Custom clustering solutions are complicated to configure and maintain.
D. Applications that have 16 vCPUs are supported.
E. Prevents application crashes by analyzing the workload and correcting problems.
【多选题】
Which two statements are true regarding VMware vSphere Flash Read Cache (vFRC)? (Choose two.)___
A. Cache fills and cache evictions happen in the granularity of a cache block size.
B. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying storage.
C. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying cache data.
D. Cache fills and cache evictions happen in the granularity of the disk block size.
【多选题】
What are two possible causes of Storage Distributed Resource Scheduler (SDRS) being disabled on one or more virtual machine disks in a datastore cluster? (Choose two.)___
A. The virtual machine has vSphere Fault Tolerance disabled.
B. The virtual machine is a template.
C. The virtual machine swap file is on a shared datastore.
D. The disk is a CD-ROM/ISO file.
【多选题】
An administrator attempts to install vCenter Single Sign-On Server. The installer returns an error message indicating that the installation failed. Prior to the installation, all setup prerequisites were met. The administrator has generated a vCenter Server Single Sign-On support bundle. Which two files should the administrator analyze to determine the cause of the failure? (Choose two.)___
A. Server\utils\logs\imsTrace.log
B. Server\utils\logs\install.txt
C. %TEMP%\utils\logs\vminst.log
D. %TEMP%\vminst.log
【多选题】
An administrator is unable to remove an ESXi 6.x host from a vSphere Distributed Switch. What are two likely reasons for this issue? (Choose two.)___
A. Vmkernel interfaces on the switch are still in use.
B. VM Network port group adapters are connected to different switch.
C. Physical NICs are migrated to different switch.
D. VM Network adapters are connected to this switch.
【多选题】
Which two Identity Sources are available to add for vCenter Single Sign-On authentication? (Choose two.)___
A. LocalOS
B. OpenLDAP
C. NIS as an LDAP Server
D. VCMSDS
【多选题】
What are three goals of resource management within a cluster? (Choose three.)___
A. To prevent virtual machines from monopolizing resources and to guarantee predictable service rates.
B. To exploit undercommitted resources and overcommit with graceful degradation.
C. To provide solutions to potential problems that you might encounter when using vCenter Server.
D. To control the relative importance of virtual machines and provide flexible dynamic partitioning.
E. To provide additional network administration capabilities.
【多选题】
Which three actions can be taken as a result of executing the vSphere Update Manager 6.x scan and remediation wizards? (Choose three.)___
A. Install and upgrade software in virtual machines.
B. Upgrade the firmware on ESXi host devices.
C. Upgrade and Patch ESXi hosts.
D. Install and update third-party software on hosts.
E. Upgrade virtual machine hardware.
【多选题】
Which two statements are true about deploying and using vSphere Replication? (Choose two.)___
A. ESXi hosts managed by a single vCenter Server instance require a connection between the two vSphere Replication appliances.
B. Sites managed by different vCenter Server instances require a connection between the two vSphere Replication appliances.
C. Sites managed by different vCenter Server instances require the use of Site Recovery Manager and a connection between the two vSphere Replication appliances.
D. ESXi hosts managed by a single vCenter Server instance require a single vSphere Replication appliance.
【多选题】
An administrator is attempting to power on a virtual machine, but the task is hanging at 95%. What three scenarios best explain why this problem is happening? (Choose three.)___
A. A virtual machine question is currently being posed to the administrator.
B. Another task for the virtual machine or other component is already in progress.
C. The VMware High Availability cluster has insufficient resources to guarantee failover.
D. The host has lost access to the storage device containing the virtual machine files.
E. The host is under resource contention and unable to power on the virtual machine.
【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
【多选题】
Which two storage controller configurations can be used with Virtual SAN? (Choose two.)___
A. SAS controllers in Passthrough mode
B. SAS controllers in RAID0 mode
C. SAS controllers in RAID1 mode
D. SAS controllers in RAID10 mode
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
【多选题】
An administrator is deploying multiple Windows 2003 Virtual Machines from the same template. What two steps should be taken to avoid network conflicts? (Choose two.)___
A. Customize the guest operating system.
B. Install VMware Tools into the new virtual machines.
C. Copy the Microsoft Sysprep tools onto the vCenter Server system.
D. Ensure the e1000 vmnic is selected for each new virtual machine.
【多选题】
Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
推荐试题
【单选题】
在信贷资金总量一定的情况下,信贷资金周转速度、流动性、安全性、效益性的关系是___。
A. 周转速度快,流动性就越强,安全性就越能得保证。但效益性较差
B. 周转速度快,流动性就越强,安全性就差,效益性较差
C. 周转速度慢,流动性就越差,安全性也就越差,效益性较差
D. 周转速度慢,流动性就越差,安全性也就越好,效益性较好
【单选题】
以下措施不能提高商业银行经营流动性和安全性的是___。
A. 存贷款期限结构匹配
B. 提高存货周转速度
C. 提高应收账款的周转速度
D. 提高二级市场股票的换手频率
【单选题】
下列属于直接融资的行为有___。
A. 何某向工商银行借款100000 元专门用于其企业的工程结算
B. A 公司向B 公司投入资金8000000 元,并占有B 公司30%的股份
C. A 公司通过融资机构向B 公司借款600000 元
D. 何某通过金融机构借入资金120000 元
【单选题】
下列不属于借款申请需明确内容的是。___
A. 基本情况
B. 贷款品种
C. 贷款利率
D. 贷款金额
【单选题】
下列关于贷款种类说法,错误的是___
A. 按照贷款币种可分为人民币贷款和外币贷款
B. 按照贷款期限可分为短期贷款和中长期贷款
C. 按照贷款对象可分为生产企业贷款和外商投资企业贷款
D. 按照贷款利率可分为浮动利率贷款和固定利率贷款
【单选题】
下列不属于间接融资的行为有___。
A. 文小姐向银行借款10 万元专门用于其房屋装修
B. A 公司购入B 公司20%的股权,价值80 万元
C. 赵小姐春节期间通过信用卡透支了2 万元购买年货
D. 郑先生通过银行贷款购买了一辆车
【单选题】
调查的基本要求:熟知客户和客户的业务,取得必要的客户信息资料和信贷业务信息资料,并核实资料的___。
A. 真实性
B. 完成性
C. 可操作性
D. 全面性
【单选题】
商业银行在信贷过程中保持贷款种类和期限的多样化是为了保持信贷的___。
A. 效益性
B. 流动性
C. 安全性
D. 自主性
【单选题】
企业向银行借款属于____,发行债券、股票属于____。___
A. 直接融资;间接融资
B. 间接投资;直接投资
C. 间接融资;直接融资
D. 直接投资;间接投资
【单选题】
关于商业银行“安全性、流动性和效益性原则”的说法,不正确的是___。
A. 为了保证贷款的安全性,商业银行需要合理安排贷款的种类和期限
B. 在信贷资金总量一定的情况下,资金的周转速度加快,效益性相应较差
C. 在贷款规模一定的情况下,一般贷款期限越长,收益越大
D. 贷款期限越长,安全性越高
【单选题】
按贷款用途划分,公司信贷的种类不包括___
A. 基本建设贷款
B. 技术改造贷款
C. 流动资金贷款
D. 自营贷款
【单选题】
___是指特定产品要素组合下的信贷服务方式,主要包括贷款、担保、承兑、信用支持、保函、信用证和承诺等。
A. 交易对象
B. 信贷产品
C. 信贷金额
D. 信贷期限
【单选题】
银行市场细分是根据___差异对市场进行的划分。
A. 信贷产品
B. 卖方银行
C. 买方客户
D. 信贷市场
【单选题】
贷放分控是指银行业金融机构将___作为两个独立的业务环节。
A. 贷前申请与贷款审批
B. 贷款审批与贷款发放
C. 贷款发放与贷款清偿
D. 贷款申请与贷款清偿
【单选题】
除贷款外,商业银行的资金一般主要用于___。
A. 结算业务
B. 代理业务
C. 存款业务
D. 资金业务
【单选题】
___是银行在商业汇票上签章承诺按出票人指示到期付款的行为。
A. 承兑
B. 担保
C. 贷款
D. 公司信贷
【单选题】
在银行流动资金贷前调查报告中,借款人财务状况不包括___。
A. 流动资金数额和周转速度
B. 主要客户、供应商和分销渠道
C. 资产负债比率
D. 存货净值和周转速度
【单选题】
公司信贷的借款人指___
A. 经工商行政管理机关(或主管机关)核准登记的自然人
B. 经行政机关核准登记的企(事)业法人
C. 经行政机关核准登记的自然人
D. 经工商行政管理机关(或主管机关)核准登记的企(事)业法人
【单选题】
贷前调查中最常用、最重要的方法,同时也是在一般情况下必须采用的方法是___。
A. 现场调研
B. 搜寻调查
C. 委托调查
D. 突击检查
【单选题】
影响行业的外部因素不包括___
A. 国民经济
B. 外部经济
C. 国家政策
D. 企业自身规模效益
【单选题】
银行在对客户进行借款需求分析时,不需要关注的是___。
A. 企业的借款需求原因,即所借款项的用途
B. 企业的还款来源
C. 企业还款的可靠程度
D. 公司的治理结构
【单选题】
以下导致企业流动资产增加的因素不包括___。
A. 季节性销售增长
B. 长期销售增长
C. 资产效率下降
D. 债务重构
【单选题】
主营业务指标通常指主营业务收入占___的比重。
A. 营业额
B. 总资本
C. 全部利润
D. 销售收入总额
【单选题】
以下关于流动比率和企业资产的变现能力关系的说法中,正确的是___
A. 流动比率越高,说明企业资产的变现能力越强
B. 流动比率越高,说明企业资产的变现能力越弱
C. 流动比率越低,说明企业资产的变现能力越强
D. 流动比率与企业资产的变现能力没有关系
【单选题】
以下各项中不能反映应收账款的营运能力的是___。
A. 应收账款周转率
B. 应收账款回收期
C. 应收账款账龄
D. 应收账款余额
【单选题】
以下不属于所有者权益项目的是___
A. 未分配利润
B. 资本公积
C. 盈余公积
D. 流动资产
【单选题】
法人贷款业务,申请信贷业务的客户应当是经___核准登记的企业(事业)法人其他经济组织。
A. 工商行政管理机关(或主管机关)
B. 国税局
C. 人民银行
D. 农村信用社
【单选题】
下列因素与借款人的偿债能力无关的是___。
A. 盈利能力
B. 营运能力
C. 资本结构
D. 产品竞争力
【单选题】
下列关于资产负债率的论述中,错误的是___
A. 资产负债率=负债合计÷资产合计×100%
B. 资产负债率=资产合计÷负债合计×100%
C. 资产负债率反映项目各年负债水平、财务风险及偿债能力
D. 银行从债权安全的角度考虑,总希望借款人的负债水平低一点
【单选题】
下列公式中,不能反映存货周转速度的是___
A. 销货成本/平均存货余额×100%
B. 存货平均余额×计算期天数/销货成本
C. 计算期天数/存货周转次数
D. (期初存货余额+期末存货余额)/2
【单选题】
下列不属于资产负债表的基本内容的是___
A. 资产
B. 负债
C. 资本结构
D. 所有者权益
【单选题】
下列不属于企业财务状况风险的是___
A. 借款人在银行的存款有较大幅度下降
B. 应收账款异常增加
C. 流动资产占总资产比重下降
D. 短期负债增加适当,长期负债大量增加
【单选题】
所有者权益代表投资者对企业___所有权。
A. 全部资产
B. 全部负债
C. 净资产
D. 流动资产
【单选题】
商业银行对借款人最关心的就是其现在和未来的___。
A. 技术水平
B. 销售业绩
C. 偿债能力
D. 信息披露
【单选题】
一般企业贷款操作流程:___
A. 建立正式客户-评级-授信-申请贷款-发放贷款
B. 建立正式客户-授信-评级-申请贷款-发放贷款
C. 建立正式客户-申请贷款-评级-授信-发放贷款
D. 建立正式客户-申请贷款-授信-评级-发放贷款
【单选题】
借款人盈利能力的比率通过___反映。
A. 效率比率
B. 杠杆比率
C. 流动比率
D. 营业利润率
【单选题】
借款人还款能力的主要标志就是___。
A. 借款人的现金流量是否充足
B. 借款人的资产负债比率是否足够低
C. 借款人的管理水平是否很高
D. 借款人的销售收入和利润是否足够高
【单选题】
到的比率。___
A. 平均存货余额,销货收入
B. 销货收入,平均存货余额
C. 销货成本,平均存货余额
D. 平均存货余额,销货成本
【单选题】
反映客户长期偿债能力的比率是___
A. 流动比率
B. 资产负债率
C. 净利润率
D. 速动比率