刷题
导入试题
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
ABC
解析
暂无解析
相关试题
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
【多选题】
An administrator is deploying multiple Windows 2003 Virtual Machines from the same template. What two steps should be taken to avoid network conflicts? (Choose two.)___
A. Customize the guest operating system.
B. Install VMware Tools into the new virtual machines.
C. Copy the Microsoft Sysprep tools onto the vCenter Server system.
D. Ensure the e1000 vmnic is selected for each new virtual machine.
【多选题】
Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
【多选题】
vMotion can be performed between which three physical boundaries? (Choose three.)___
A. Between two vCenter Server Systems
B. Between two vSphere Distributed Virtual Switches
C. Between two vCenter Server Datacenter objects
D. Between two VMware NSX Layer 4 segments
E. Between two NFS datastores
【多选题】
An administrator configures vSphere Replication for a virtual machine and enables multiple point in time (PIT) instances under the recovery settings in the Configure Replication wizard. Which two statements are correct for vSphere Replication with multiple point in time instances enabled? (Choose two.)___
A. vSphere Replication retains a number of snapshot instances of the virtual machine on the target site based on the retention policy that you specify.
B. vSphere Replication uses the virtual machine's snapshot instances to define the target site Point in Time instance based on the retention policy that you specify.
C. vSphere Replication does not support virtual machines with snapshots.
D. vSphere Replication supports virtual machines with snapshots.
【多选题】
An administrator is virtualizing a physical application server and adding it to an existing multi-tiered vApp. The application license is currently tied to the physical NIC's MAC address, so the administrator needs to ensure the license will function properly in the virtual machine. Which two actions can the administrator take to satisfy this task? (Choose two.)___
A. Set the MAC address for the vNIC in the guest operating system.
B. Install the physical server's NIC into the ESXi host.
C. Configure the MAC address for the vNIC using the vSphere Web Client.
D. Assign the physical server NIC's MAC address in the vSphere Distributed Switch.
【多选题】
Which two Fibre Channel zoning options are supported with vSphere 6.x? (Choose two.)___
A. Single-Initiator
B. Single-Initiator-Single-Target
C. Multiple-Initiators-Single-Target
D. Multiple-Initiators-Multiple-Targets
【多选题】
An administrator is attempting to remove an ESXi 6.x host from a vSphere Distributed Switch (vDS). When the administrator attempts to remove the host, the following error is observed: <The resource '16' is still in use.> What three steps are needed to successfully remove the host from the switch? (Choose three.)___
A. Select Manage Ports on the vDS for the host.
B. Locate all ports currently in use on the vDS for the host.
C. Migrate or delete any vmkernel or virtual machine adapters associated with the switch.
D. Remove all network cards from the switch before trying to remove the host.
E. Create a standard switch for everything to be automatically be migrated to.
【多选题】
Which two Virtual SAN related actions might start resynchronization of virtual machine objects? (Choose two.)___
A. Editing a virtual machine storage policy to increase the number of replicas.
B. Editing a virtual machine storage policy to reduce the number of replicas.
C. Editing a virtual machine storage policy to increase the number of disk stripes.
D. Editing a virtual machine storage policy to reduce the number of disk stripes.
【多选题】
An administrator is troubleshooting basic network connectivity issues. Which two scenarios are potential issues that this administrator might face? (Choose two.)___
A. The vSwitch is not attached to the correct physical network.
B. The portgroup is not configured to use correct VLAN.
C. Traffic shaping is configured incorrectly.
D. Jumbo frames is configured incorrectly.
推荐试题
【单选题】
CCB54、在项目进度周会上,一位产品支持经理表达了一项对于客户满意度很重要的担忧,但是这将需要进行一些产品设计变更,PM接下来应该怎么做?___
A. 将这种担忧记录在问题日志中
B. 更新项目管理计划
C. 更新风险登记册
D. 发起一项变更请求
【单选题】
CCB55、在项目完成几个月后,一位相关方的可交付成果遇到问题,结果该相关方拒绝项目验收。项目经理应该怎么做?___
A. 审查收尾阶段的签署同意文件
B. 与相关方开会,解决这个问题
C. 咨询项目团队
D. 检查所有批准的范围变更请求
【单选题】
CCB56、在项目执行过程中,项目团队发现可能影响项目成功的新风险,在进行定性和定量分析以及回顾风险应对计划后,项目经理确定该风险的总货币价值超过项目储备,项目经理应该怎么做?___
A. 将所有储备转换为修订的预算成本
B. 通知项目发起人
C. 修改风险管理计划
D. 运用龙卷风图执行敏感性分析
【单选题】
CCB57、在项目执行过程中,一位团队成员通知项目经理需要额外的活动来完成一项可交付成果,项目经理下一步应该怎么做?___
A. 推迟额外的活动
B. 估算对进度计划的影响
C. 向变更控制委员会提交一项变更请求
D. 更新范围管理计划
【单选题】
CCB58、在项目执行过程中,质量控制员生病并将请假两周时间,项目经理应该怎么做?___
A. 等待该质量控制员回来
B. 允许每位团队成员确认他们自己的可交付成果
C. 与来自另一家同类公司的质量控制员签订合同
D. 任命另一名团队成员在此期间控制质量
【单选题】
CCB59、在项目执行阶段,发起人请求一项不在原始计划中的功能,项目团队同意实施该功能将不会影响到项目进度计划,项目经理应该如何继续?___
A. 允许项目团队实施该项变更,并在完成变更后通知发起人
B. 审查需求跟踪矩阵以确定该功能未包含在范围内的原因
C. 拒绝该变更,因为未考虑到成本影响
D. 审查变更管理计划,并将该请求记录在变更日志中
【单选题】
CCB60、在项目执行阶段即将结束时,项目经理意识到没有与在项目早期识别的一个相关方做过任何一个通知。该相关方在项目的前几个阶段可能非常有帮助。项目经理应该怎么做?___
A. 查看需求追踪矩阵,以确定如何错过与此相关方的沟通
B. 向该相关者道歉并告知他们项目及其结果
C. 检查以前项目的经验教训,以确定这是否是一个重要的相关方
D. 从相关方登记册中移除该相关方,因为他对项目已不再重要
【单选题】
CCB61、在项目执行阶段进行状态审查期间,项目经理意识到没有可用的预算来解决一个项目可交付成果的偏差,若要解决这项偏差并将其与原始项目基准保持一致,项目经理下一步应该怎么做?___
A. 执行变更管理程序并更新变更日志
B. 审查偏差并更新项目管理计划
C. 确认过程并在问题日志中记录该偏差
D. 更新决策树以反映该偏差
【单选题】
CCB62、在项目执行期间出现一个问题,但未得到解决,这耽误了产品授权,项目经理事先应该怎么做?___
A. 遵循升级上报过程并让项目发起人参与
B. 将该问题分配给一位负责任的项目团队成员,并为其提供切合实际的截止日期
C. 修订进度基准以说明进度计划中的变更
D. 更新变更管理计划以允许在项目执行期间进行变更
【单选题】
CCB63、在一次工程设计会议上,项目发起人引入了一个范围的重大变更,让项目经理很震惊,此时项目经理首先应该怎么做?___
A. 分析变更整体影响
B. 调整项目管理计划和基线
C. 寻找变更的根源
D. 决定走变更控制流程
【单选题】
CCB64、在一次社交集会中,一位团队成员无意中告诉一位相关方项目已经落后于进度计划,并且构成重大延迟,与项目经理沟通该问题时,该相关方非常激动,此时项目经理应该怎么做?___
A. 同团队回顾风险管理计划
B. 创建相关方影响级别,如果是高级别,就让相关方一同参与讨论进度的延迟
C. 让发起人安排一个所有相关方的会议去讨论解决问题
D. 给所有相关方发邮件说明这件事将在下次会议讨论
【单选题】
CCB65、在一次项目状态会议期间,一位团队成员通知项目经理,执行进度计划中遗漏了一个后续任务所需的工具,项目经理应该怎么做?___
A. 查阅采购管理计划
B. 更新进度计划以反应新的基准
C. 创建减轻策略以不同的方式执行任务
D. 安排一次后续会议来讨论这个问题
【单选题】
CCB66、在一个关键测试阶段,项目经理识别到一个影响相关方预期交付进度计划的范围差距,该项目涉及各个职能部门的可交付成果,只能在提供所有可交付成果后才能视为成功完成该项目。若要避免这种情况,项目经理事先应该做什么?___
A. 识别所有关键相关方,以确保定义和批准正确的范围
B. 请求开发团队合作
C. 确保一位商业分析师同所有相关方一起工作确定需求
D. 建议开发团队在计划任务时参考已批准的需求
【单选题】
CCB67、在一个软件开发项目中,一名团队成员不能完成分配的任务,这阻碍了与其他软件的集成,并导致了错过里程碑。该团队成员未向项目经理告知有关其任务的任何问题,如果要向项目发起人沟通该问题,项目经理事先应该做什么?___
A. 在每周的项目状态报告里包含更新后的项目进度
B. 安排与发起人的会议告知这个事件以及恢复计划
C. 向发起人上报延误,并告知团队成员没有完成分配的任务
D. 添加到风险登记册,将更新后的风险登记册发送给发起人
【单选题】
CCB68、在一个项目的结束阶段,项目经理和供应商对所交付的工作是否符合要求存在冲突,若要解决这一问题。项目经理应该查阅哪份文件?___
A. 项目章程
B. 建议邀请书
C. 工作说明书
D. 工作分解结构
【单选题】
CCB69、在一个项目的执行阶段,许多相关方请求他们各自认为优先级最高的变更,变更控制委员会尚未正式成立,项目经理应该如何处理这些请求?___
A. 在不询问项目团队的情况下对这些变更进行优先级排序
B. 与相关方开会,以便更好地了解哪些变更是重要的
C. 获得团队成员的意见,对这些变更进行优先级排序
D. 使用变更日志管理这些请求
【单选题】
CCB70、在一个项目的最终阶段,客户不同意某些已实施可交付成果的准确性,为了避免这个问题,项目经理应该事先做什么?___
A. 实施需求确认
B. 执行变更管理程序和变更控制委员会的审查
C. 实行质量管理规划
D. 与客户一起执行测试脚本情景评审
【单选题】
CCB71、在一个项目地施工阶段,项目经理发生了一起意外事故,导致其无法工作两个月时间,发起人任命一名团队成员来担任代理项目经理,但团队的的整体绩效下降,可以做些什么来帮助项目团队?___
A. 代理项目经理应该举行团队建设会议
B. 发起人应该让别人来管理团队
C. 代理项目经理应进行绩效审查并奖励相应的团队成员
D. 正在休假的项目经理应该远程管理团队
【单选题】
CCB72、在一个新产品开发项目中,项目经理发现需求是概念性的,并且很获得的所有相关方的共识。因为要获得对项目要求的共识,项目经理可以怎么做?___
A. 创造一个愿景
B. 与其他组织进行标杆对照
C. 进行需求巡检
D. 与相关方一起召开头脑风暴会议
【单选题】
CCB73、在一位团队成员发现一个环境敏感区域后,该施工项目停工,但是项目发起人仍然希望在原始时间范围内完成任务,项目经理下一步应该怎么做?___
A. 完全停止施工,并通知项目发起人,该请求是不可能的
B. 向环保部门提交一项变更请求,并在未受影响的区域继续施工
C. 重新开始施工,以遵守项目发起人的要求
D. 根据当地法律提出一项变更请求,以改造施工现场,并通知环保部门
【单选题】
CCB74、在最终项目报告中,项目经理宣布项目取得成功,但是两位相关方都不同意,因为他们的个人需求没有得到满足。项目经理应该怎么做?___
A. 与项目团队合作得出一个解决方案,使项目可行
B. 忽略相关方,因为项目按照时间.成本和预算交付。
C. 承诺相关方他们的个人需求将会尽快得到交付
D. 让相关方参考原始验收标准,并且讨论如何实现他们的个人需求
【单选题】
CCB75、早期在项目中安装的产品尺寸不正确,在计划停产期间,一项更换产品的变更获得批准,但是停产日期太快,导致无法采购新产品,作为替代,团队以较低的成本安装有内部找到的改造产品,项目经理应该怎么做?___
A. 将团队集中在一起巩固约定的变更管理计划,以确保未来不会发生类似的变更
B. 根据变更管理过程将变更记录为改造后的产品及成本
C. 告知客户保留或更换产品的效益和影响,然后记录客户的决定
D. 提交一项变更请求以使用符合客户规格的产品进行更换
【单选题】
CCB76、最近任命的项目经理与一位高级经理不断发生冲突,由于这对团队来说是个不利的现象,项目经理想要解决这个问题,项目经理应该怎么做?___
A. 将问题上报给项目发起人
B. 寻求第三方介入调解
C. 请求和高级经理有议程的面对面会议
D. 从其他项目经理处获取指导
【单选题】
CCB77、一个改造生产设施效率的项目正在进行中,运营团队提出一个重大变更,该变更应该会提升生产设施效率,但也会对项目的成本和进度计划造成负面影响。项目经理应该做什么?___
A. 确定预算会如何变化
B. 审查相关方案与评估矩阵
C. 遵循变更管理计划
D. 确定项目测量指标会如何变化
【单选题】
CCB78、项目经理收到一名经验丰富的同事所提交的变更请求,这些变更请求包含有效的建设性建议,但需要额外的时间和资源才能完成。项目经理应该做什么?___
A. 将这些建议存档在经验教训数据库中
B. 按照变更管理计划行事
C. 按请求实施变更
D. 在项目管理办公室(PMO)会议期间讨论这些建议,以确保适当的行动
【单选题】
CCB79、项目经理与相关方召开一次会议,分享项目需要如何遵守新的政府法规,这方面的一位关键相关方正在休假,但后来对商业论证的制定补充了他们的意见。项目经理应该更新哪一份文件?___
A. 变更日志
B. 问题日志
C. 相关方登记册
D. 新的信息日志
【单选题】
CCB80、一个矩阵型组织中的项目经理遇到一个问题,一名团队成员不断错过时限,并且交付的分配任务质量不佳,对该团队成员多次讨论这个问题但没有看到改善之后,项目经理下一步应该做什么?___
A. 帮助该团队成员执行其分配到的任务
B. 让另一名团队成员帮助该成员完成其分配到的任务
C. 从团队成员的职能经理那里请求一个更好的资源
D. 同项目发起人讨论方案以决定下一步行动
【单选题】
CCB81、一家保安公司正在免费为当地的避难所实施门禁控制,营销团队计划进行善意的宣传活动,确保媒体覆盖一包括广播和电视广告,并让避难所及其发起人参与。这概述的是哪一项风险应对策略?___
A. 风险开拓
B. 风险增强
C. 风险接受
D. 风险分摊
【单选题】
CCB82、在对项目及其过程进行内部审计之后,进行了一些变更,必须更新哪份文件来反映这些变更?___
A. 项目管理计划和组织过程资产
B. 工作绩效报告和风险管理计划
C. 项目管理计划和风险登记册
D. 组织过程资产和风险登记册
【单选题】
CCB83、在项目规划期间,项目经理收到一项建议,通过使用质量较低的材料可以显著地降低成本,并且材料仍然可以满足基本的质量要求,但是,一位关键相关方却表达出担忧。项目经理应该做什么?___
A. 与项目管理办公室(PMO)重新评估该建议
B. 立即更新质量管理计划,并分发以活动批准
C. 向该相关方保证会有一个筛选建议的质量过程
D. 将该建议转交给项目质量部门做决定
【单选题】
CCB84、项目经理准备结束项目,此时项目经理应该做什么?___
A. 管理质量验证可交付成果满足标准
B. 用项目章程衡量项目成果,请求客户接受
C. 解决所有项目风险确保项目成果得到接受
D. 回顾项目管理计划确保项目成果得到接受
【单选题】
CCB85、一家公司变更控制委员会(CCB)每俩周开一次会,项目将在下周交付,项目经理必须在交付之前会进行重大的系统更换,控制变更委员会未来俩周都不会开会。若要确保项目按时交付,项目经理应该会做什么?___
A. 提交紧急变更请求。
B. 向变更控制委员会提交变更请求,以便下一次会议上审查该变更
C. 向发起人发生电子邮件请求变更批准
D. 将该问题升级上报给技术副总裁
【单选题】
CCB86、虽然团队成员都在努力工作,但项目却落后于进度,项目经理拥有超额预算并有权使用该预算。项目发起人不会容忍进度超期。项目经理应该做什么?___
A. 将一部分可交付成果外包给外部承包商
B. 用绩效奖金激励团队成员
C. 减少范围确保进度回到正轨
D. 通知发起人新的进度预期
【单选题】
CCB87、项目经理正在执行一个项目,该项目中包含简短的任务以及技能非常熟练的人员,在测试阶段,项目经理注意到很高的失败率和很多缺陷。为了避免这个问题,项目经理应该做什么?___
A. 实施质量保证计划
B. 要求所有人员都遵循质量保证
C. 在测试阶段执行质量控制任务
D. 在所有任务中执行六西格玛程序
【单选题】
CCB88、项目可交付成果已完成,但客户和相关方尚未签署验收,若要结束项目,项目经理应该做什么?___
A. 与相关方开会审查可交付成果
B. 创建一份检查核对名单
C. 执行绩效审查
D. 记录在问题日志中
【单选题】
CCB89、项目团队识别到一家优选供应商不能够满足某项给定任务所需资源的可能性很高,这项任务很关键,不能延迟,必须达到所要求的质量标准,团队决定寻找拥有相应能力和技术专业知识的另一个供应商来满足这些要求。这使用的是什么风险应对策略?___
A. 接受
B. 减轻
C. 规避
D. 转移
【单选题】
CCB90、在一个敏捷项目开发的后期阶段,客户要求进行一些变更,从而为其产品带来显著的竞争优势。项目团队不愿意进行变更,因为他们不确定这些变更的商业价值以及会对项目带来什么影响。项目经理应该做什么?___
A. 加速变更控制过程
B. 在当前开发期间添加变更
C. 帮助团队了解变更影响及商业价值之间的平衡
D. 遵循敏捷变更管理计划
【单选题】
CCB91、一个关键项目资源的职能经理通知项目经理,该资源对项目的方向和进度表示严重关切,这个信息让项目经理感到很意外,因为在最近的任何团队会议都没有表达存在这个问题。项目经理应该怎么做?___
A. 跟该资源强调遵循沟通管理计划的重要性,以有效解决问题
B. 采取行动以便更好了解该资源担忧的问题,并制定计划来解决该问题
C. 将该担忧添加进问题日志,在下一次项目团队会议上进行讨论
D. 同该关键项目资源以及职能经理会面讨论该担忧
【单选题】
CCB92、项目经理完成了项目管理计划的初稿,并打算将其提交给相关方进行批准,但是,项目管理计划篇幅很长,相关方分散在各地,项目经理获得批准的时间有限。___
A. 安排一次与所有相关方的会议,并在会议前发送该计划以供审查
B. 将该计划分发给每位相关方,要求他们添加他们的评论并返回以供更新
C. 将该计划划分成若干部分,并要求选定相关方根据其专业领域审查特定部分
D. 安排只与关键相关方召开单独会议,以便他们完成该计划的走查
【单选题】
CCB93、一个大型项目包含将由分包商执行的许多阶段,团队成员各自负责一个阶段,项目经理使用什么来执行质量管理计划?___
A. 质量测量指标
B. 质量审计
C. 根本原因分析
D. 因果分析
欢迎使用我爱刷题
×
微信搜索我爱刷题小程序
温馨提示
×
请在电脑上登陆“www.woaishuati.com”使用