【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【多选题】
Which two storage controller configurations can be used with Virtual SAN? (Choose two.)___
A. SAS controllers in Passthrough mode
B. SAS controllers in RAID0 mode
C. SAS controllers in RAID1 mode
D. SAS controllers in RAID10 mode
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
【多选题】
An administrator is deploying multiple Windows 2003 Virtual Machines from the same template. What two steps should be taken to avoid network conflicts? (Choose two.)___
A. Customize the guest operating system.
B. Install VMware Tools into the new virtual machines.
C. Copy the Microsoft Sysprep tools onto the vCenter Server system.
D. Ensure the e1000 vmnic is selected for each new virtual machine.
【多选题】
Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
【多选题】
vMotion can be performed between which three physical boundaries? (Choose three.)___
A. Between two vCenter Server Systems
B. Between two vSphere Distributed Virtual Switches
C. Between two vCenter Server Datacenter objects
D. Between two VMware NSX Layer 4 segments
E. Between two NFS datastores
【多选题】
An administrator configures vSphere Replication for a virtual machine and enables multiple point in time (PIT) instances under the recovery settings in the Configure Replication wizard. Which two statements are correct for vSphere Replication with multiple point in time instances enabled? (Choose two.)___
A. vSphere Replication retains a number of snapshot instances of the virtual machine on the target site based on the retention policy that you specify.
B. vSphere Replication uses the virtual machine's snapshot instances to define the target site Point in Time instance based on the retention policy that you specify.
C. vSphere Replication does not support virtual machines with snapshots.
D. vSphere Replication supports virtual machines with snapshots.
【多选题】
An administrator is virtualizing a physical application server and adding it to an existing multi-tiered vApp. The application license is currently tied to the physical NIC's MAC address, so the administrator needs to ensure the license will function properly in the virtual machine. Which two actions can the administrator take to satisfy this task? (Choose two.)___
A. Set the MAC address for the vNIC in the guest operating system.
B. Install the physical server's NIC into the ESXi host.
C. Configure the MAC address for the vNIC using the vSphere Web Client.
D. Assign the physical server NIC's MAC address in the vSphere Distributed Switch.
【多选题】
Which two Fibre Channel zoning options are supported with vSphere 6.x? (Choose two.)___
A. Single-Initiator
B. Single-Initiator-Single-Target
C. Multiple-Initiators-Single-Target
D. Multiple-Initiators-Multiple-Targets
【多选题】
An administrator is attempting to remove an ESXi 6.x host from a vSphere Distributed Switch (vDS). When the administrator attempts to remove the host, the following error is observed: <The resource '16' is still in use.> What three steps are needed to successfully remove the host from the switch? (Choose three.)___
A. Select Manage Ports on the vDS for the host.
B. Locate all ports currently in use on the vDS for the host.
C. Migrate or delete any vmkernel or virtual machine adapters associated with the switch.
D. Remove all network cards from the switch before trying to remove the host.
E. Create a standard switch for everything to be automatically be migrated to.
推荐试题
【多选题】
和 适用本城市轨道交通服务质量评价规范。 ___
A. 城市轨道交通线路
B. 运营单位
C. 城市线网服务质量评价工作
D. 集团子公司
【多选题】
城市轨道交通服务质量评价包括 和 。 ___
A. 乘客调查度评价
B. 乘客满意度评价
C. 服务保障能力评价
D. 运营服务关键指标评价
【多选题】
城市轨道交通服务质量评价包括乘客满意度评价、服务保障能力评价和运营服务关键指标评价,基准分值 分。其中,乘客满意度评价分值 分,服务保障能力评价分值300分,运营服务关键指标评价分值 分。 ___
A. 1000
B. 300
C. 400
D. 500
【多选题】
城市轨道交通乘客满意度评价包括 、咨询、投诉、安全感7个评价指标。___
A. 进出站
B. 环境与秩序
C. 设施运行
D. 换乘
【多选题】
城市轨道交通乘客满意度评价包括进出站、环境与秩序、设施运行、 7个评价指标。 ___
【多选题】
出现以下情形的(因地震、洪涝、气象灾害等自然灾害及其他不可抗力因素导致的除外),应进行核减扣分,以下正确的是: 。 ___
A. 发生5分钟以上(含)15分钟以下延误事件的,每起减5分
B. 发生5分钟以上(含)15分钟以下延误事件的,每起减10分
C. 发生15分钟以上(含)30分钟以下延误事件的,每起减10分
D. 发生15分钟以上(含)30分钟以下延误事件的,每起减20分
【多选题】
出现以下情形的(因地震、洪涝、气象灾害等自然灾害及其他不可抗力因素导致的除外),应进行核减扣分,以下正确的是: 。 ___
A. 连续中断行车(指线路中有2个及以上车站或区间发生行车中断)30分钟以上(含)2小时以下的,每起减20分;
B. 连续中断行车(指线路中有2个及以上车站或区间发生行车中断)30分钟以上(含)2小时以下的,每起减30分;
C. 发生一般运营突发事件的,每起减20分;
D. 发生一般运营突发事件的,每起减50分;
【多选题】
出现以下情形的(因地震、洪涝、气象灾害等自然灾害及其他不可抗力因素导致的除外),应进行核减扣分,以下正确的是:___
A. 发生5分钟以上(含)15分钟以下延误事件的,每起减5分;
B. 发生15分钟以上(含)30分钟以下延误事件的,每起减10分;
C. 连续中断行车(指线路中有2个及以上车站或区间发生行车中断)30分钟以上(含)2小时以下的,每起减20分;
D. 发生一般运营突发事件的,每起减50分;
【多选题】
根据乘客满意度评价内容设计调查问卷。调查问卷采用 3级文字量表,分值系数分别对应1、0.5、0。___
A. 非常满意
B. 满意
C. 一般
D. 不满意
【多选题】
根据乘客满意度评价内容设计调查问卷。调查问卷采用满意、一般、不满意3级文字量表,分值系数分别对应 。 ___
【多选题】
乘客满意度调查样本量应综合 和 等因素合理确定。 ___
A. 乘客总体特征
B. 调查结果精度
C. 调查时间
D. 费用
【多选题】
城市轨道交通服务保障能力评价包括 乘车和基础保障等6个一级指标。___
A. 进出站
B. 问询
C. 购检票
D. 候车
【多选题】
城市轨道交通服务保障能力评价包括进出站、问询、购检票、候车、 和 等6个一级指标。 ___
A. 刷卡
B. 出闸
C. 乘车
D. 基础保障
【多选题】
城市轨道交通服务保障能力评价包括6个一级指标,其中进出站一级指标包括 指标。 ___
A. 标志标识
B. 乘车信息
C. 客流组织
D. 人员
【多选题】
城市轨道交通服务保障能力评价包括6个一级指标,其中购检票一级指标包括 指标。 ___
【多选题】
开展服务保障能力评价工作应组成不少于 人的评价组,评价组成员应当与被评价对象无隶属关系或利害关系,其中至少 人具有 年以上(含)城市轨道交通运营管理相关工作经历。 ___
【多选题】
服务保障能力评价应设计抽样方案,车站样本量不应少于该线路站点总数的 ,并覆盖该线路换乘车站、常态化限流车站以及日均进站量最大车站等;列车样本量不应少于 列次。 ___
【多选题】
城市轨道交通运营服务关键指标包括 等3个类别。 ___
A. 客运组织
B. 行车服务
C. 客运设施可靠性
D. 乘客投诉回应
【多选题】
城市轨道交通运营服务关键指标行车服务包括哪些评价指标? ___
A. 列车运行图兑现率(%)
B. 列车正点率(%)
C. 列车服务可靠度(万列公里/次)
D. 客运强度(万人次/公里·日)
【多选题】
城市轨道交通运营服务关键指标客运设施可靠性包括哪些评价指标? ___
A. 列车运行图兑现率
B. 列车正点率
C. 列车服务可靠度(万列公里/次)
D. 客运强度(万人次/公里·日)
【多选题】
城市轨道交通运营服务关键指标乘客投诉回应包括哪些评价指标? ___
A. 百万乘客有效投诉率(次/百万人次)
B. 百万乘客无效投诉率(次/百万人次)
C. 有效乘客投诉回复率(%)
D. 无效乘客投诉回复率(%)
【多选题】
列车服务可靠度统计期内,全部列车总行车里程与 (有轨电车 )及以上延误次数之比,单位为万列公里/次。 ___
A. 3min
B. 5min
C. 8min
D. 10min
【多选题】
正点列车是指在执行列车运行图过程中,列车到达终到站的时刻与列车运行图计划时刻相比误差不大于 (市域快速轨道交通系统和有轨电车除外)的列车次数。对市域快速轨道交通系统,正点的时间界限值是指列车到达终到站的时刻与列车运行图计划时刻相比误差不大于 。对有轨电车,正点的时间界限值是指列车到达终到站的时刻与列车计划时刻相比误差不大于 。___
A. 2min
B. 3min
C. 5min
D. 10min
【多选题】
以下说法正确的是: 。 ___
A. 运营单位获得省级及以上人民政府或交通运输部表彰表扬的,每项加10分
B. 获得城市人民政府或省级交通运输主管部门表彰表扬的,每项加5分
C. 获得城市轨道交通运营主管部门表彰表扬的,每项加3分
D. 班组和个人因运营管理工作突出,获得省级及以上人民政府或交通运输部表彰表扬的,每项加1分
【多选题】
得分为各评价指标得分之和。各评价指标得分为全部有效乘客问卷中该指标得分的算术 。 ___
A. 乘客服务度
B. 乘客满意度
C. 平均值
D. 总和
【多选题】
标志标识评分规则中以下说法正确的是: 。 ___
A. 车站出入口附近主要路段没有城市轨道交通导向标志,或没有站名、线路名称、出入口编号等进出站引导标识标志的,扣5分;
B. 车站出入口附近主要路段没有城市轨道交通导向标志,或没有站名、线路名称、出入口编号等进出站引导标识标志的,扣10分;
C. 导向标志或者站名、线路名称、出入口编号等进出站引导标识标志,未满足清晰、醒目、连续、规范要求的,每处扣1分。
D. 导向标志或者站名、线路名称、出入口编号等进出站引导标识标志,未满足清晰、醒目、连续、规范要求的,每处扣2分。
【多选题】
城市轨道交通服务保障能力评价二级指标人员说法正确的是: 。 ___
A. 答复询问时,未使用普通话的,每次扣1分(乘客提问时使用方言或外语的除外);
B. 答复询问时,未使用文明用语或使用服务忌语的,每次扣2分;
C. 工作人员在岗期间从事与工作无关的事项,每次扣2分;
D. 服务人员态度恶劣或答复敷衍的,每次扣2分。
【多选题】
以下说法正确的是: 。 ___
A. 列车运行图兑现率:统计期内,实际开行列车次数与列车运行图规定的计划开行列车次数之比。
B. 列车正点率:统计期内,正点列车次数与实际开行列车次数之比。
C. 列车退出正线运营故障率:统计期内,列车因发生车辆故障而必须退出正线运营的故障次数与全部列车总行车里程比值,单位为次/万列公里。
D. 客运强度:统计期内,运营线路中单位运营里程上平均每日承担的客运量,为线路日均客运量与线路运营里程的比值,单位为万人次/公里·日。
【多选题】
运营单位对行业管理政策执行、重大活动保障等职责不履行或履行不到位的,每发生 ,在运营单位当年服务质量评价得分中核减 。 ___
【多选题】
城市轨道交通服务保障能力评价二级指标自动扶梯说法正确的是: 。 ___
A. 自动扶梯无故不能正常运行的,每处扣2分;
B. 自动扶梯没有明确的运行方向指示的,每处扣1分;
C. 自动扶梯两端未配备紧急停止开关的,每处扣1分;
D. 自动扶梯旁没有安全提醒的,每处扣1分。
【多选题】
隐患分为( )和( )隐患两个等级___
【多选题】
以下属于运行环境类风险:___
A. 生产环境
B. 自然环境
C. 保护区环境
D. 作业环境
【多选题】
一般隐患整改完成后,由( )或( )复核确认销号。___
A. 运营单位部门负责人
B. 班组负责人
C. 相关专业技术人员
D. 排查人员
【多选题】
基于城市轨道交通技术特点和行业经验,运营安全风险按照业务板块分为( )、客运组织、运行环境等___
A. 设施监测养护
B. 设备运行维修
C. 行车组织
D. 风险管理
【多选题】
运营单位应对重大风险编制( )和( ),并对重大风险影响区域的相关人员组织开展安全防范、应急逃生避险和应急处置等的宣传、培训和演练;___
A. 监控方案
B. 专项应急措施
C. 隐患排查表
D. 应急处置方式
【多选题】
对于( )风险及( )风险,应由班组负责人组织制定管控措施。___
【多选题】
城市轨道交通所在地城市交通运输主管部门或者城市人民政府指定的城市轨道交通运营主管部门(以下统称城市轨道交通运营主管部门)对本行政区域内运营单位( )和( )实施监督管理。___
A. 人的不安全行为
B. 生产过程的不当
C. 运营安全风险分级管控
D. 隐患排查治理工作
【多选题】
运营单位应建立隐患排查治理工作台账,记录隐患排查治理情况,内容至少包括:( )等。___
A. 隐患内容、排查人员
B. 排查时间隐患等级、主要治理措施
C. 责任人、治理期治理结果
D. 未能立即消除时的临时措施
【多选题】
城市轨道交通运营安全风险分级管控和隐患排查治理工作坚持___
A. 目标导向
B. 全面覆盖
C. 科学施策
D. 闭环管理
【多选题】
基于城市轨道交通技术特点和行业经验,运营安全风险按照业务板块分为设施监测养护、 、 、 、 等___
A. 设备运行维修
B. 行车组织
C. 客运组织
D. 运行环境