【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
【多选题】
vMotion can be performed between which three physical boundaries? (Choose three.)___
A. Between two vCenter Server Systems
B. Between two vSphere Distributed Virtual Switches
C. Between two vCenter Server Datacenter objects
D. Between two VMware NSX Layer 4 segments
E. Between two NFS datastores
【多选题】
An administrator configures vSphere Replication for a virtual machine and enables multiple point in time (PIT) instances under the recovery settings in the Configure Replication wizard. Which two statements are correct for vSphere Replication with multiple point in time instances enabled? (Choose two.)___
A. vSphere Replication retains a number of snapshot instances of the virtual machine on the target site based on the retention policy that you specify.
B. vSphere Replication uses the virtual machine's snapshot instances to define the target site Point in Time instance based on the retention policy that you specify.
C. vSphere Replication does not support virtual machines with snapshots.
D. vSphere Replication supports virtual machines with snapshots.
【多选题】
An administrator is virtualizing a physical application server and adding it to an existing multi-tiered vApp. The application license is currently tied to the physical NIC's MAC address, so the administrator needs to ensure the license will function properly in the virtual machine. Which two actions can the administrator take to satisfy this task? (Choose two.)___
A. Set the MAC address for the vNIC in the guest operating system.
B. Install the physical server's NIC into the ESXi host.
C. Configure the MAC address for the vNIC using the vSphere Web Client.
D. Assign the physical server NIC's MAC address in the vSphere Distributed Switch.
【多选题】
Which two Fibre Channel zoning options are supported with vSphere 6.x? (Choose two.)___
A. Single-Initiator
B. Single-Initiator-Single-Target
C. Multiple-Initiators-Single-Target
D. Multiple-Initiators-Multiple-Targets
【多选题】
An administrator is attempting to remove an ESXi 6.x host from a vSphere Distributed Switch (vDS). When the administrator attempts to remove the host, the following error is observed: <The resource '16' is still in use.> What three steps are needed to successfully remove the host from the switch? (Choose three.)___
A. Select Manage Ports on the vDS for the host.
B. Locate all ports currently in use on the vDS for the host.
C. Migrate or delete any vmkernel or virtual machine adapters associated with the switch.
D. Remove all network cards from the switch before trying to remove the host.
E. Create a standard switch for everything to be automatically be migrated to.
【多选题】
Which two Virtual SAN related actions might start resynchronization of virtual machine objects? (Choose two.)___
A. Editing a virtual machine storage policy to increase the number of replicas.
B. Editing a virtual machine storage policy to reduce the number of replicas.
C. Editing a virtual machine storage policy to increase the number of disk stripes.
D. Editing a virtual machine storage policy to reduce the number of disk stripes.
【多选题】
An administrator is troubleshooting basic network connectivity issues. Which two scenarios are potential issues that this administrator might face? (Choose two.)___
A. The vSwitch is not attached to the correct physical network.
B. The portgroup is not configured to use correct VLAN.
C. Traffic shaping is configured incorrectly.
D. Jumbo frames is configured incorrectly.
【多选题】
Which three items should be validated prior to installing ESXi 6.x? (Choose three.)___
A. Remote Storage has been disconnected.
B. Installation media is available.
C. Server hardware clock is set to UTC.
D. Storage has been partitioned with a VMFS volume.
E. Network cards have been setup to use Jumbo
F. rames.
【多选题】
An administrator is performing an interactive installation of ESXi 6.x. Which three options are available for installation? (Choose three.)___
A. DVD
B. USB
C. PXE
D. Scripted
E. Auto Deploy
【多选题】
After installation of a host in your test environment, you need to move it to production. The only major change that needs to be made is that the hostname of the server needs to change. What are two ways that an administrator can change the host name without editing configuration files on the host directly? (Choose two.)___
A. Login to the Direct Console User Interface and change it from here.
B. Edit the Default TCP/IP Configuration from the vSphere Web Client.
C. Use the Ruby vSphere Client to send a script to the ESXi host that updates the hostname.
D. Update the information in DNS and the
E. SXi host will automatically update with these changes.
【多选题】
An administrator has unsuccessfully attempted several times to install an Operating System inside a virtual machine. The administrator finds that the installation fails at random intervals. Which two actions can be taken to resolve this issue? (Choose two.)___
A. Verify the md5sum and if invalid, download the installation files again.
B. Attempt the installation an additional time.
C. Attempt to use a different installation media or installation method.
D. Create a new virtual machine and attempt the installation with the existing media.
【多选题】
VMware tools is failing to install on a Microsoft Windows virtual machine. What are two possible situations that would prevent the installation? (Choose two.)___
A. The VMware tools installation media is corrupt.
B. The incorrect Operating System was selected in the virtual machine options.
C. The software prerequisites have not been installed.
D. The prerequisite services have not been started.
【多选题】
As part of a multisite Single Sign-On (SSO) deployment what two steps are required to ensure that a change to one Single Sign-On instance is propagated to the other instances? (Choose two.)___
A. Schedule a Replication Task on the primary instance
B. Select the first instance during the installation of subsequent instances
C. During the installation of each instance choose Linked-Mode
D. Enable Synchronize to Active Directory on each instance
【多选题】
You need to add an object to an existing vApp using the vSphere Web Client. How is this accomplished?___
A. Create an Object Inside the vApp.
B. Add an Object to a vApp.
C. Add an Object to the
D. atastore the vApp is located in.
【多选题】
Which three steps must be taken to use vSphere Update Manager 6.x to upgrade an ESXi 5.5 host to vSphere 6.x? (Choose three.)___
A. Download an ESXi Image.
B. Configure the vSphere Update Manager Download Service.
C. Create a baseline and attach it to the ESXi Host.
D. Scan the vCenter Content Library for the
E. SXi Image.
推荐试题
【多选题】
不合格品控制,关键要点是及时:___
A. 记录和标识
B. 隔离
C. 评审
D. 处置
【多选题】
下列数据_______是计量数据___
A. 工时利用率
B. 开箱合格率
C. 轴长
D. 一个总成上有2个外观缺陷
【多选题】
下列特性中,属于软件质量特性的有___
A. 可靠性
B. 保证性
C. 可维护性
D. 易使用性
【多选题】
在批量生产阶段,企业可以采用 等方法对供应商进行质量控制。___
A. 监控供应商的过程能力指数和过程性能指数
B. 监控供应商的测量系统
C. 评价供应商生产能力
D. 进货质量检验
【多选题】
记录控制的主要目的是为了___
A. 提供证据
B. 实现“可追溯性”
C. 易于识别和检索
D. 控制记录的版本
【多选题】
在Xbar-R图中,_______被判定为异常情况___
A. 1界外----点子出界
B. 7单侧---连续7点落在中心线同一侧
C. 6连串---连续6点递增或递减
D. 12交替---连续12点相邻点上下交替
【多选题】
探伤道序中,________对探伤的有效性有影响。___
A. 探伤液浓度
B. 电流强度
C. 紫外线强度
D. 喷淋的范围
【多选题】
三销轴叉花键有效长度短会引起以下哪些问题___
A. 移动节(变速箱端)脱落
B. 传动轴固定节端异响
C. 传动轴移动节端无法装配到位
D. 移动节三销轴叉花键断裂
【多选题】
换产品生产时,外星轮回火后硬度偏高,可采取以下哪些措施调整再确认___
A. 提高回火温度
B. 降低回火温度
C. 增加回火时间
D. 重新首件检验
【多选题】
以下关于“纠正”和“纠正措施”的理解正确的是___
A. 纠正措施是为消除已发现的不合格或其它不期望情况的原因所采取的措施
B. 纠正是为消除已发现的不合格所采取的措施
C. 纠正是为消除已发生的不合格并就其产生的原因所采取的措施
D. 纠正和纠正措施是有区别的
【多选题】
以下关于预防措施的理解正确的是:___
A. 为消除潜在不合格或其它潜在不期望情况的原因所采取的措施
B. 采取预防措施是为了防止再发生
C. 采取预防措施是为了防止发生
D. 预防措施和纠正措施没有区别
【多选题】
和管理评审都是组织建立自我评价、促进自我改进机制的手段。___
A. 分层审核
B. 第二方审核
C. 多方审核
D. 内部审核
【多选题】
质量管理体系要求所有从事影响产品质量工作的人员应有能力胜任所在岗位的工作,这种能力是基于适当的___
【多选题】
关于“内部审核”,下列说法正确的是___
A. 内部审核是组织自我评价、促进自我改进的一个重要手段
B. 内部审核程序应该形成文件
C. 内部审核程序应包括审核的策划、实施、结果报告和记录
D. 组织可随意实施内部审核
【多选题】
“PDCA”也叫做“戴明环”,它循环的特点是___
A. 不断提高的循环
B. 大环套小环
C. 小环分离大环
D. 四个阶段缺一不可
【多选题】
变化点管理项目中的“方法变更”包括以下哪些项目___
A. 作业标准变更
B. 加工工序变更
C. 设备维修变更
D. 工具变更
【多选题】
PPAP是指生产零件的批准程序,下列何状态变化需要向主机厂用户重新提交并认可___
A. 产品设计发生变化
B. 加工工艺发生变化
C. 生产场地发生变化
D. 分供方发生变化
【多选题】
PPAP过程流程图中顾客的要求主要包括 ,供方需要向顾客提交的PPAP批准中得到体现。___
A. 顾客的采购订单/特殊要求
B. 顾客零件设计要求
C. 顾客过程设计要求
D. 顾客的规范和顾客物流要求
【多选题】
关于生产件样品与标准样件的说法正确的是___
A. 生产件样品和标准样件均是在PPAP有效的生产条件下生产的
B. 标准样件取自于生产件样品
C. 标准样件是从全尺寸检测件中抽取的一件样件
D. 标准样件与生产件样品是同一件,只是说法不一而已
【多选题】
对于标准样件的要求有___
A. 与生产件批准的记录保存相同的时间
B. 在标准样品上必须作出标识,标出顾客批准的日期
C. 必须得到顾客书面批准,才能改变或放弃对标准样品的保留要求
D. 直到生产出一个用于顾客批准,而且是相同顾客零件编号的新的标准样件为止
【多选题】
标准样件的作用是___
A. 帮助确定生产标准
B. 特别用于数据含糊的情况,或缺乏充分的细节来完全再现初始批准状态下的零件时
C. 在设计记录、控制计划或检验准则要求的地方,存放标准样件,作为参考或标准
D. 以上均不是
【多选题】
PPAP担保书中零件的重量(质量)的理解是___
A. 要发运的零件重量
B. 除非另有规定,否则以千克为单位,小数点后保留4位
C. ,零件重量不包括运输时的保护装置、包装材料和装配辅具
D. 随机选取10件的平均值重量
【多选题】
对顾客的PPAP批准状态的理解正确的是___
A. 批准、临时批准和拒收三种状态
B. 批准、拒绝二种状态
C. 临时批准是在有限时间、有限数量内交付生产需要的零件,要达到批准状态,需要再次提交PPAP
D. ,拒收是不符合顾客要求,零件不能交运。必须得到纠正,得到顾客的批准
【多选题】
关于控制计划的理解正确的是___
A. 零件和过程控制系统的书面描述,不同的控制计划覆盖三个不同的阶段
B. 样件:在样件制造过程中,对尺寸测量,材料和性能测试的描述
C. 试生产:在样件之后,批量生产之前,对尺寸测量,材料和性能测试的描述
D. 大量生产过程中,对产品/过程特性,过程控制,测试,测量系统的综合描述
【多选题】
APQP先期产品质量策划5个关键阶段___
A. 策划与定义
B. 产品设计与开发、过程设计与开发
C. 产品和过程确认
D. 反馈、评估和纠正措施
【多选题】
APQP策划与定义阶段产品可靠性研究是考虑___
A. 指定时间段内部件的修理和更换频次
B. 长期可靠性/耐久性的测试结果
C. 可靠性的衡量指标和目标
D. 只是可靠性研究,没有实质意义
【多选题】
FMEA中识别和评估风险,正确的说法是___
A. 评估包括严重度、发生频度、探测度三个方面
B. 严重度是评估失效对顾客的影响等级
C. 发生频度是指一个失效模式可能的发生频率
D. 探测度是评估产品和过程控制对失效原因或失效模式的探测能力
【多选题】
FMEA中识别和评估风险,正确的说法是___
A. 评估包括严重度、发生频度、探测度三个方面
B. 严重度是评估失效对顾客的影响等级
C. 发生频度是指一个失效原因可能的发生频率
D. 探测度是评估产品和过程控制对失效原因或失效模式的探测能力
【多选题】
关于FMEA中建议措施,正确的说法是___
A. 目的在于降低整体风险和失效模式发生的可能性
B. 目的是降低严重度、发生频率、探测度
C. 需要记录完成建议措施的时间和职责人员
D. 一旦完成措施,获得结果,需要重新评估并记录严重度、发生频率和探测度的等级
【多选题】
DFMEA是一个动态文件,因此应当___
A. 在概念设计最终确定之前开始
B. 在产品开发过程中,一旦有变更发生或获取到额外信息时,及时更新DFMEA
C. 在生产设计发布前,基本完成DFMEA
D. 作为一种经验积累,为将来的设计作准备
【多选题】
框(边界)图伴随着DFMEA的开发过程,具有以下功用___
A. 显示的是产品零部件之间的物理、逻辑的关系
B. 显示了在设计范围内零部件和子系统的相互作用,包括信息、能量、力和液体的流
C. 目的在于理解对系统的要求或输入、基于输入或所实施的功能产生的活动、以及交付物或输出
D. 此图是由代表零部件的框和连接框的线组成,线反映产品零部件间如何关联或接口的
【多选题】
DFMEA关注的是将要发送给最终顾客(使用者)的产品的设计。对一个产品有效分析的首要任务是___
A. 建立小组
B. 确定范围
C. 建立描述产品功能和要求的框图或参数图
D. 清楚定义失效模式的RPN值
【多选题】
DFMEA中,对于潜在失效模式的理解是___
A. 零部件、子系统、系统可能潜在地不能满足或实现描述的预期功能的状态
B. 要用专业技术术语描述,不必描述成顾客能够注意到的现象
C. 一个功能可能有多个失效模式
D. 可能只有在特定的运行条件或特定的使用状态下发生
【多选题】
对于潜在的设计失效影响的理解是___
A. 指由顾客感受到的失效模式对功能的影响
B. 需要用顾客可能察觉或经历到的现象来描述失效影响
C. 顾客可以是内部顾客,也可以是最终使用者
D. 当失效模式可能会造成安全方面和不符合法律条例,必须清楚说明该影响
【多选题】
严重度是指___
A. 一个特定的失效模式的最严重的影响后果的评价等级
B. 要建立一个评估标准和评级系统
C. 严重度评价为1的失效模式不应该再进一步的分析
D. 评估标准是由小组同意建立的,所以即使严重度10或9的评价标准也是可以更改的
【多选题】
关于DFMEA发生频度,正确的理解是___
A. 是指一个特定原因/机制的发生可能性
B. 可以参照相似件的使用历史或经验数据
C. 用1-10级来评估
D. 没有先期历史的新产品/新技术,发生频率10为最小
【多选题】
关于DFMEA探测度,正确的理解是___
A. 现行的设计控制发现栏内,最佳的探测控制相关的等级
B. 不要因为发生频度等级低,就理所应当认为探测度等级也一定会低
C. 评价等级1专用作已证实的设计方案的失效预防
D. 等级范围1-10,等级10是指几乎不可能探测发现
【多选题】
下列决定措施的优先级别,正确的顺序是___
A. 严重等级最高的失效模式,当严重度等级为10-9时,小组确保风险已有控制措施或推荐的措施
B. 严重等级≤8的失效模式,小组考虑有最高发生频度和探测度等级的原因
C. 按风险顺序数RPN阀值来决定优先级别
D. 优先级别的选取建立在严重度、发生频度和探测度的分析上
【多选题】
PFMEA是一个动态文件,它是___
A. 在可行性认证阶段或之前启动
B. 在生产工具装备之前启动
C. 从单个零部件到总成的所有制造操作
D. 包括所有可能影响制造和装配操作的过程,发运、接收、材料运输、存储、传送或标签
【多选题】
DFMEA与PFMEA的联系在于___
A. DFMEA和PFMEA分析过程中识别的特性之间
B. 潜在的设计原因与潜在的过程失效模式之间
C. 所有过程相关的失效模式(会导致影响产品方面影响的)要保持DFMEA和PFMEA的一致
D. 潜在的设计失效模式等同于潜在的过程失效模式