刷题
导入试题
【多选题】
Which three statements are true regarding Fault Tolerance? (Choose three.)___
A. Applications need to be continuously available to users.
B. Applications without native clustering capabilities can be protected.
C. Custom clustering solutions are complicated to configure and maintain.
D. Applications that have 16 vCPUs are supported.
E. Prevents application crashes by analyzing the workload and correcting problems.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
ABC
解析
暂无解析
相关试题
【多选题】
Which two statements are true regarding VMware vSphere Flash Read Cache (vFRC)? (Choose two.)___
A. Cache fills and cache evictions happen in the granularity of a cache block size.
B. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying storage.
C. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying cache data.
D. Cache fills and cache evictions happen in the granularity of the disk block size.
【多选题】
What are two possible causes of Storage Distributed Resource Scheduler (SDRS) being disabled on one or more virtual machine disks in a datastore cluster? (Choose two.)___
A. The virtual machine has vSphere Fault Tolerance disabled.
B. The virtual machine is a template.
C. The virtual machine swap file is on a shared datastore.
D. The disk is a CD-ROM/ISO file.
【多选题】
An administrator attempts to install vCenter Single Sign-On Server. The installer returns an error message indicating that the installation failed. Prior to the installation, all setup prerequisites were met. The administrator has generated a vCenter Server Single Sign-On support bundle. Which two files should the administrator analyze to determine the cause of the failure? (Choose two.)___
A. Server\utils\logs\imsTrace.log
B. Server\utils\logs\install.txt
C. %TEMP%\utils\logs\vminst.log
D. %TEMP%\vminst.log
【多选题】
An administrator is unable to remove an ESXi 6.x host from a vSphere Distributed Switch. What are two likely reasons for this issue? (Choose two.)___
A. Vmkernel interfaces on the switch are still in use.
B. VM Network port group adapters are connected to different switch.
C. Physical NICs are migrated to different switch.
D. VM Network adapters are connected to this switch.
【多选题】
Which two Identity Sources are available to add for vCenter Single Sign-On authentication? (Choose two.)___
A. LocalOS
B. OpenLDAP
C. NIS as an LDAP Server
D. VCMSDS
【多选题】
What are three goals of resource management within a cluster? (Choose three.)___
A. To prevent virtual machines from monopolizing resources and to guarantee predictable service rates.
B. To exploit undercommitted resources and overcommit with graceful degradation.
C. To provide solutions to potential problems that you might encounter when using vCenter Server.
D. To control the relative importance of virtual machines and provide flexible dynamic partitioning.
E. To provide additional network administration capabilities.
【多选题】
Which three actions can be taken as a result of executing the vSphere Update Manager 6.x scan and remediation wizards? (Choose three.)___
A. Install and upgrade software in virtual machines.
B. Upgrade the firmware on ESXi host devices.
C. Upgrade and Patch ESXi hosts.
D. Install and update third-party software on hosts.
E. Upgrade virtual machine hardware.
【多选题】
Which two statements are true about deploying and using vSphere Replication? (Choose two.)___
A. ESXi hosts managed by a single vCenter Server instance require a connection between the two vSphere Replication appliances.
B. Sites managed by different vCenter Server instances require a connection between the two vSphere Replication appliances.
C. Sites managed by different vCenter Server instances require the use of Site Recovery Manager and a connection between the two vSphere Replication appliances.
D. ESXi hosts managed by a single vCenter Server instance require a single vSphere Replication appliance.
【多选题】
An administrator is attempting to power on a virtual machine, but the task is hanging at 95%. What three scenarios best explain why this problem is happening? (Choose three.)___
A. A virtual machine question is currently being posed to the administrator.
B. Another task for the virtual machine or other component is already in progress.
C. The VMware High Availability cluster has insufficient resources to guarantee failover.
D. The host has lost access to the storage device containing the virtual machine files.
E. The host is under resource contention and unable to power on the virtual machine.
【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
【多选题】
Which two storage controller configurations can be used with Virtual SAN? (Choose two.)___
A. SAS controllers in Passthrough mode
B. SAS controllers in RAID0 mode
C. SAS controllers in RAID1 mode
D. SAS controllers in RAID10 mode
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
【多选题】
An administrator is deploying multiple Windows 2003 Virtual Machines from the same template. What two steps should be taken to avoid network conflicts? (Choose two.)___
A. Customize the guest operating system.
B. Install VMware Tools into the new virtual machines.
C. Copy the Microsoft Sysprep tools onto the vCenter Server system.
D. Ensure the e1000 vmnic is selected for each new virtual machine.
【多选题】
Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
推荐试题
【简答题】
能源方针的定义什么?简述其满足条件。
【简答题】
请描述能源管理体系的PDCA模式?
【简答题】
请简述组织应为建立、实施、保持并持续改进能源管理体系提供适宜的资源。
【简答题】
组织应对哪些方面进行监视、测量和评价?
【简答题】
请简述标准GB/T23331对生产和服务提供过程的控制的要求。
【多选题】
为满足产品和服务提供的要求,并实施第6章所确定的措施,组织应通过以下哪些措施对所需的过程进行策划、实施和控制? ___ 。
A. 确定产品和服务的要求
B. 确定所需的资源以使产品和服务符合要求
C. 按照准则实施过程控制
【多选题】
组织与顾客沟通时,除了获取有关产品和服务的顾客反馈外,还包括 ___ 。
A. 提供有关产品和服务的信息
B. 关系重大时,制定有关应急措施的特定要求
C. 处置或控制顾客财产
D. 以上都是
【多选题】
以下哪些活动是组织设计和开发过程控制的目的? ___ 。
A. 实施评审活动,以评价设计和开发的结果满足要求的能力
B. 实施验证活动,以确保设计和开发输出的满足输入的要求
C. 实施确认活动,以确保形成的产品和服务能够满足规定的使用要求或预期用途要求
【多选题】
组织应确定所要求的交付后活动的覆盖范围和程度时,应考虑下列哪些活动 ___ 。
A. 家电产品的三包协议
B. 家电产品中有毒化学物残留
C. 一次性PET饮水瓶废弃后的回收
D. 以上都不是
【多选题】
根据ISO9001:2015标准,除非 ___ ,否则在策划的安排已圆满完成之前,不应向顾客放行产品和将会服务。
A. 得到有关授权人员的批准
B. 适用时得到顾客的批准
C. 必须得到顾客批准
【多选题】
确定审核范围时应考虑 ___ 。
A. 组织的实际位置与组织单元
B. 覆盖的时期
C. 组织的活动和过程
【多选题】
实施ISO9001:2015版标准并非意味着需要 ___ 。
A. 统一不同质量管理体系的架构
B. 在组织内使用新版标准的特定术语
C. 形成与新版标准条款相一致的文件
D. 必须形成质量手册
【多选题】
ISO9001:2015标准采用的过程方法,该方法结合了 ___ 。
A. “策划-实施-检查-处置” (PDCA) 循环
B. 风险管理
C. 基于风险的思维
D. 管理的系统方法
【多选题】
ISO9001:2015标准为下列 ___ 组织规定了质量管理体系要求。
A. 需要证实其具有稳定提供满足顾客要求和适用法律法规要求的产品和服务的能力
B. 通过体系的有效应用,包括体系改进的过程,以及保证符合顾客和适用的法律法规要求,旨在增强顾客满意
C. 需要证实其具有稳定提供满足相关方要求和适用法律法规要求的产品和服务的能力
D. 通过体系的有效应用,包括体系改进的过程,以及保证符合相关方和适用的法律法规要求,旨在增强顾客和相关方满意
【多选题】
关于理解组织环境的基本概念,以下哪些说法是正确的 ___ 。
A. 理解组织的环境是一个过程,这个过程确定了影响组织的宗旨,目标和可持续性的各种因素
B. 组织环境需要考虑内部因素,还需要考虑外部因素
C. 组织的宗旨可被表达为其愿景、使命、方针和目标
D. 组织的宗旨可被表达为价值观和信仰
【多选题】
ISO9001:2015标准中8.4.1条对下列哪些情况做出了控制规定 ___ 。
A. 外部供方的产品和服务将构成组织自身的产品和服务的一部分
B. 外部供方代表组织直接将产品和服务提供给顾客
C. 组织决定由外部供方提供的过程或部分过程
D. 组织自身的产品和服务
【多选题】
按照ISO9001:2015标准要求,组织应确保在与外部供方沟通之前,所确定的要求是 ___ 。
A. 有效的
B. 充分的
C. 适宜的
D. 可信的
【多选题】
根据ISO9001:2015标准,组织应在受控条件下进行生产和服务提供。适用时,下列哪些是受控条件 ___ 。
A. 确定产品和服务的要求
B. 配备胜任的人员,包括所要求的资格
C. 可获得成文信息,以规定拟生产的产品、提供的服务或进行的活动的特性
D. 采取措施防止人为错误
【多选题】
下列哪些是组织应保留有关产品和服务放行的成文信息 ___ 。
A. 符合接收准则的证据
B. 可追溯到授权放行人员的信息
C. 描述获得的让步
D. 描述所采取的措施
【多选题】
组织应通过下列哪种途径处置不合格输出 ___ 。
A. 纠正
B. 隔离、限制、退货或暂停对产品和服务的提供
C. 获得顾客批准
D. 获得让步接收的授权
【多选题】
组织在确定向顾客提供的产品和服务的要求时,应满足下列哪些要求 ___ 。
A. 产品和服务的要求得到规定
B. 提供的产品和服务能够满足所声明的要求
C. 获取有关产品和服务的顾客反馈,包括顾客投诉
D. 关系重大时的应急准备和响应
【多选题】
组织应确保有能力向顾客提供满足要求的产品和服务。在承诺向顾客提供产品和服务之前,组织应评审下列哪些要求 ___ 。
A. 顾客规定的要求,包括对交付及交付后活动的要求
B. 顾客虽然没有明示,但规定的用途或已知的预期用途所必需的要求
C. 组织规定的要求和适用于产品和服务的法律法规要求
D. 由产品和服务性质所导致潜在的失效后果
【多选题】
在创建和更新成文信息时,组织应确保适当的 ___ 。
A. 标识和符号
B. 格式
C. 评审和批准
D. 标识和说明,确保适宜性和充分性
【多选题】
在策划质量管理体系时,组织应考虑到 ___ 。
A. 组织的环境
B. 相关方的要求
C. 需要应对的风险和机遇
D. 组织的产品和服务类别
【多选题】
组织应确保在控制范围内的工作人员知晓 ___ 。
A. 质量方针和相关质量目标
B. 他们对质量管理体系有效性的贡献,包括改进绩效的益处
C. 不符合质量管理体系要求的后果
D. 应对风险的措施
【多选题】
关于审核证据的获取,说法正确的 ___ 。
A. 导致审核发现的审核证据应予以记录
B. 只有验证的信息方可作为审核证据
C. 信息获取的方法应包括:面谈、观察、文件评审
D. 对过程之间的接口有关的信息不必收集
【多选题】
5S现场管理起源于日本丰田公司,5个S分别代表 ___ 。
A. 整理、整顿
B. 清扫、清洁、素养
C. 速度、节约、素养
D. 安全、服务ab
【多选题】
标准哪些条款与战略有关? ___ 。
A. 4.1理解组织及其环境
B. 5.1领导作用和承诺
C. 5.2.1制定质量方针
D. 9.3管理评审
【多选题】
如果组织确定有必要对质量管理体系做出变更,则变更应 ___ 进行。
A. 按计划进行
B. 随意、随时
C. 重新策划后
D. 以系统的方式
【多选题】
ISO9001:2015标准中,关于质量管理原则的描述,以下哪一个不是正确的? ___
A. 循证决策
B. 关系管理
C. 与供方互利的关系
D. 基于事实的决策方法
【多选题】
关于组织的环境描述准确的是 ___ 。
A. 组织环境的概念、除了适用于赢利性组织,还同样能适用于非赢利或公共服务组织
B. 对建立、实施预期结果的方法有影响的内外部结果的组合
C. 对策划、实现质量方针的方法有影响的内外部结果的组合
D. 了解基础设施对确定组织环境会有影响
【多选题】
下列哪些是ISO9001:2015标准基本结构示意的PDCA循环图中输入的要求? ___ 。
A. 相关方的需求和期望
B. 组织及其环境
C. 质量管理体系的结果
D. 顾客要求
【多选题】
下列哪些术语是有关结果的术语? ___
A. 产品
B. 风险
C. 创新
D. 输出
【多选题】
下列针对应对风险和机遇的选项描述正确的是 ___
A. 分担风险或基于信息而做出决策的维持风险
B. 改变风险发生的可能性或结果
C. 消除风险源
D. 为寻求机遇而承担风险
【多选题】
最高管理者应证明其对质量管理体系的领导作用和承诺,以下说法正确的是 ___ 。
A. 确保质量管理体系要求与组织的业务过程相结合
B. 积极参与,指导和支持员工努力提高质量管理体系的有效性
C. 使用管理的系统方法
D. 对质量管理体系的有效性负责,推动改进
【多选题】
应对风险和机遇的选项可包括 ___ 。
A. 规避风险
B. 接收风险以利用机遇
C. 消除风险源
D. 无条件保留风险
【多选题】
对监视和测量资源描述正确的 ___ 。
A. 得到适当的维护,以确保持续适合其用途
B. 当存在测量溯源标准时,可以不保留作为标准或依据的形成文件的信息
C. 适合特定类型的监视和测量活动
D. 保留作为监视和测量资源适合其用途的证据的形成文件的信息
【多选题】
关于创新,下列描述正确的是 ___ 。
A. 创新通常具有重要影响
B. 创新是新的或变更的实体实现或重新分配价值
C. 通常,以创新为结果的活动需要管理
D. 创新通常是改进的一种形式之一
【多选题】
下列关于“根据ISO9001:2015标准实施质量管理体系具有潜在益处”的最不恰当的描述是 ___ 。
A. 稳定提供符合顾客要求以及适用的法律法规要求的产品和服务的能力
B. 稳定提供符合顾客要求以及适用的法律法规要求的产品能力
C. 统一了不同质量管理体系的基本结构
D. 实现了组织使用术语与标准特定术语的一致性
【多选题】
过程运行环境中的社会因素,表述正确的是 ___ 。
A. 无对抗
B. 保护个人情感
C. 和谐稳定
D. 无歧视
欢迎使用我爱刷题
×
微信搜索我爱刷题小程序
温馨提示
×
请在电脑上登陆“www.woaishuati.com”使用