【多选题】
Which two parameters are required when adding an iSCSI target to an iSCSI Software Adapter using Dynamic Discovery? (Choose two.)___
A. The iSCSI device's IP Address or Fully Qualified Domain Name
B. The Port Number
C. The iSCSI device's iSCSI Qualified Name (IQN)
D. The Default Gateway IP Address
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【多选题】
Which two SMTP Notification Event Details are specific to alarms triggered by events? (Choose two.)___
A. User Name
B. Summary
C. Old Status
D. Target
【多选题】
Which two High Availability ___ Cluster admission control policies can help avoid resource fragmentation? (Choose two.)(AC)
A. Define failover capacity by static number of hosts
B. Define failover capacity by reserving a percentage of the cluster resources
C. Use dedicated failover hosts
D. Use Virtual Machine Monitoring
【多选题】
An attempt to enable vSphere Fault Tolerance for a powered-on virtual machine fails. Which two scenarios would result in this failure? (Choose two.)___
A. The virtual machine has three vCPUs configured.
B. The host on which the virtual machine is running has insufficient memory resources.
C. The virtual machine has insufficient resources to accommodate full reservation plus the overhead memory.
D. VMware High Availability is enabled on the cluster of which this host is a member.
【多选题】
A vApp template recently added to a Content Library is not displayed. Which two actions could correct this problem? (Choose two.)___
A. Manually synchronize the library
B. Select the Download all library content immediately option
C. Select the Sync subscribed library option
D. Manually download the vApp template
【多选题】
What are three valid disk configurations for the vSphere Data Protection 6.x Appliance? (Choose three.)___
A. 500GB
B. 1TB
C. 1.5TB
D. 2TB
E. 4TB
【多选题】
Which three connection types are available when configuring a vSwitch in the vSphere Web Client? (Choose three.)___
A. VMkernel Network Adapter
B. Physical Network Adapter
C. Virtual Machine Port Group for a Standard Switch
D. vMotion Network Adapter
E. vSAN Network Adapter
【多选题】
Which three features can be enabled for a new host cluster? (Choose three.)___
A. Storage Distributed Resource Scheduling
B. High Availability
C. Fault Tolerance
D. Distributed Resource Scheduling
E. Virtual SAN
【多选题】
An administrator receives a report that no real time statistics are available for a virtual machine in the vCenter Server inventory. Which two statements indicate likely causes of the problem? (Choose two.)___
A. The virtual machine is powered off.
B. The host containing the virtual machine is disconnected from vCenter Server.
C. There is insufficient real time data to display the information.
D. The vCenter Server service is not running.
【多选题】
Your manager has given you a bash script that retrieves data for ESXi 6.x host configurations. This data needs to be collected right after the installation of a host and must be run directly on the host. Which two actions can be used to run this script on an ESXi host? (Choose two.)___
A. Connect to the host with Ruby vSphere Console and run the script from there.
B. Enable SSH access from the Direct Console User Interface.
C. Enable the ESXi Shell from the
D. irect Console User Interface.
【多选题】
Which two are true about the Risk badge in vRealize Operations? (Choose two.)___
A. The Risk badge indicates potential future problems that may degrade the performance of the system.
B. Risks may require attention in the near future.
C. The Risk badge indicates problems that are degrading performance of the system.
D. Risks require attention now to correct system performance problems.
【多选题】
vSphere Update Manager allows which two virtual machine attributes to be upgraded? (Choose two.)___
A. Virtual machine firewall policies for NSX.
B. Software Packages in the virtual machine.
C. Virtual machine Hardware Version.
D. VMware Tools Upgrade.
【多选题】
What are two benefits of using NFS 4.1 with vSphere 6.x as compared to NFS 3? (Choose two.)___
A. NFS 4.1 supports Kerberos Authentication
B. NFS 4.1 supports multipathing
C. NFS 4.1 supports IPv6
D. NFS 4.1 supports hardware acceleration
【多选题】
Which three statements are true regarding Fault Tolerance? (Choose three.)___
A. Applications need to be continuously available to users.
B. Applications without native clustering capabilities can be protected.
C. Custom clustering solutions are complicated to configure and maintain.
D. Applications that have 16 vCPUs are supported.
E. Prevents application crashes by analyzing the workload and correcting problems.
【多选题】
Which two statements are true regarding VMware vSphere Flash Read Cache (vFRC)? (Choose two.)___
A. Cache fills and cache evictions happen in the granularity of a cache block size.
B. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying storage.
C. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying cache data.
D. Cache fills and cache evictions happen in the granularity of the disk block size.
【多选题】
What are two possible causes of Storage Distributed Resource Scheduler (SDRS) being disabled on one or more virtual machine disks in a datastore cluster? (Choose two.)___
A. The virtual machine has vSphere Fault Tolerance disabled.
B. The virtual machine is a template.
C. The virtual machine swap file is on a shared datastore.
D. The disk is a CD-ROM/ISO file.
【多选题】
An administrator attempts to install vCenter Single Sign-On Server. The installer returns an error message indicating that the installation failed. Prior to the installation, all setup prerequisites were met. The administrator has generated a vCenter Server Single Sign-On support bundle. Which two files should the administrator analyze to determine the cause of the failure? (Choose two.)___
A. Server\utils\logs\imsTrace.log
B. Server\utils\logs\install.txt
C. %TEMP%\utils\logs\vminst.log
D. %TEMP%\vminst.log
【多选题】
An administrator is unable to remove an ESXi 6.x host from a vSphere Distributed Switch. What are two likely reasons for this issue? (Choose two.)___
A. Vmkernel interfaces on the switch are still in use.
B. VM Network port group adapters are connected to different switch.
C. Physical NICs are migrated to different switch.
D. VM Network adapters are connected to this switch.
【多选题】
Which two Identity Sources are available to add for vCenter Single Sign-On authentication? (Choose two.)___
A. LocalOS
B. OpenLDAP
C. NIS as an LDAP Server
D. VCMSDS
【多选题】
What are three goals of resource management within a cluster? (Choose three.)___
A. To prevent virtual machines from monopolizing resources and to guarantee predictable service rates.
B. To exploit undercommitted resources and overcommit with graceful degradation.
C. To provide solutions to potential problems that you might encounter when using vCenter Server.
D. To control the relative importance of virtual machines and provide flexible dynamic partitioning.
E. To provide additional network administration capabilities.
【多选题】
Which three actions can be taken as a result of executing the vSphere Update Manager 6.x scan and remediation wizards? (Choose three.)___
A. Install and upgrade software in virtual machines.
B. Upgrade the firmware on ESXi host devices.
C. Upgrade and Patch ESXi hosts.
D. Install and update third-party software on hosts.
E. Upgrade virtual machine hardware.
【多选题】
Which two statements are true about deploying and using vSphere Replication? (Choose two.)___
A. ESXi hosts managed by a single vCenter Server instance require a connection between the two vSphere Replication appliances.
B. Sites managed by different vCenter Server instances require a connection between the two vSphere Replication appliances.
C. Sites managed by different vCenter Server instances require the use of Site Recovery Manager and a connection between the two vSphere Replication appliances.
D. ESXi hosts managed by a single vCenter Server instance require a single vSphere Replication appliance.
【多选题】
An administrator is attempting to power on a virtual machine, but the task is hanging at 95%. What three scenarios best explain why this problem is happening? (Choose three.)___
A. A virtual machine question is currently being posed to the administrator.
B. Another task for the virtual machine or other component is already in progress.
C. The VMware High Availability cluster has insufficient resources to guarantee failover.
D. The host has lost access to the storage device containing the virtual machine files.
E. The host is under resource contention and unable to power on the virtual machine.
【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
【多选题】
Which two storage controller configurations can be used with Virtual SAN? (Choose two.)___
A. SAS controllers in Passthrough mode
B. SAS controllers in RAID0 mode
C. SAS controllers in RAID1 mode
D. SAS controllers in RAID10 mode
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
【多选题】
An administrator is deploying multiple Windows 2003 Virtual Machines from the same template. What two steps should be taken to avoid network conflicts? (Choose two.)___
A. Customize the guest operating system.
B. Install VMware Tools into the new virtual machines.
C. Copy the Microsoft Sysprep tools onto the vCenter Server system.
D. Ensure the e1000 vmnic is selected for each new virtual machine.
【多选题】
Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
推荐试题
【单选题】
列车在区间被迫停车后,对于邻线上妨碍行车地点,应从两方面___处防护,如确知列车开来方向时,仅对来车方面防护。J368
A. 不小于300m
B. 不小于800 m
C. 按线路最大速度等级规定的列车紧急制动距离位置
【单选题】
列车运行途中司机发现客车车辆轮轴故障、车体下沉(倾斜)、车辆剧烈振动等危及行车安全的情况时,须立即采取停车措施,停车后由___负责检查处理。J371
A. 机车乘务员
B. 车辆乘务员
C. 车站(助理)值班员
【单选题】
遇有施工引导接车并正线通过时,准许列车司机凭特定引导手信号的显示,以不超过___km/h速度进站。J381
【单选题】
进站预告信号机以显示___信号为定位。J411
【单选题】
进站信号机均以显示___信号为定位。J411
【单选题】
引导信号应在列车___越过信号机后及时关闭。J412
【单选题】
出站信号机的灯光熄灭、显示不明或显示不正确时,均视为___信号。J413
【单选题】
进站预告信号机灯光熄灭时,视为进站信号机显示为___信号。J413
【单选题】
三显示自动闭塞区段的进站色灯信号机显示一个绿色灯光时,表示出站及进路信号机在___,进路上的道岔均开通直向位置。J415
【单选题】
四显示自动闭塞区段的进站色灯信号机显示一个黄色闪光和一个黄色灯光,准许列车经过18号及以上道岔___位置,进入站内越过次一架已经开放的信号机。J415
【单选题】
进站信号机的引导信号显示一个红色灯光和一个月白色灯光时,列车进站的速度不超过___km/h,并须准备随时停车。J416
【单选题】
半自动闭塞区段,出站色灯信号机显示___灯光,准许列车由车站出发,开往次要线路。J417
【单选题】
三显示自动闭塞区段,出站色灯信号机显示一个___灯光,准许列车由车站出发,表示运行前方有一个闭塞分区空闲。J417
【单选题】
三显示自动闭塞区段的发车进路色灯信号机显示一个___灯光,准许列车运行到次一架信号机之前准备停车。J418
【单选题】
三显示自动闭塞区段通过色灯信号机显示一个绿色灯光,准许列车按规定速度运行,表示运行前方至少有___闭塞分区空闲。J419
【单选题】
四显示自动闭塞区段,通过色灯信号机显示一个___灯光,要求列车减速运行,按规定限速要求越过该信号机,表示运行前方有一个闭塞分区空闲。J419
【单选题】
四显示自动闭塞区段,通过色灯信号机显示一个绿色灯光和一个黄色灯光,准许列车按规定速度运行,要求注意准备减速,表示运行前方有___个闭塞分区空闲。J419
【单选题】
容许信号显示一个___灯光——准许列车在通过色灯信号机显示红色灯光的情况下不停车,以不超过20 km/h的速度通过,运行到次一架通过信号机,并随时准备停车。J421
【单选题】
预告色灯信号机(不含遮断信号机的预告信号机)显示一个___灯光,表示主体信号机在关闭状态。J423
【单选题】
当进站信号机开放一个绿色灯光和一个黄色灯光时,其接近信号机将会显示___灯光。J424
A. 一个绿色
B. 一个黄色灯光
C. 一个绿色灯光和一个黄色灯光
【单选题】
调车色灯信号机显示一个___灯光时,准许越过该信号机调车。J426
【单选题】
驼峰色灯信号机显示一个红色闪光灯光,指示机车车辆自驼峰___。J427
【单选题】
驼峰色灯信号机显示___——指示机车车辆加速向驼峰推进。J427
A. 一个绿色
B. 一个绿色闪光灯光
C. 一个绿色灯光和一个黄色灯光
【单选题】
驼峰色灯辅助信号机及其复示信号机显示一个黄色灯光,指示机车车辆向驼峰___推送。J428
【单选题】
进站信号机的色灯复示信号机无显示表示主体信号机在___状态。J429
【单选题】
发车进路信号机的色灯复示信号机显示一个绿色灯光——表示主体信号机在___状态。J429
【单选题】
在自动闭塞区段,当列车接近的通过信号机显示容许信号时,机车信号机显示一个___灯光。J435
【单选题】
三显示自动闭塞区段机车信号机显示一个黄色灯光,要求列车注意运行,表示列车接近的地面信号机显示一个___灯光。J435
【单选题】
无线调车灯显信号显示绿灯闪数次后熄灭,表示___信号。J439
【单选题】
无线调车灯显信号显示绿、黄灯交替后绿灯长亮,表示___信号。J439
【单选题】
列车运行中,遇昼间两臂高举头上向两侧急剧摇动,夜间白色灯光上下急剧摇动,司机应立即___。J440
【单选题】
列车运行中,遇昼间展开的___信号旗,司机需将列车降低到要求的速度。J440
【单选题】
调车手信号指挥机车向显示人反方向去的信号,昼间用展开的绿色信号旗、夜间用绿色灯光___。J441
A. 在下部左右摇动
B. 上下摇动
C. 上下小动
【单选题】
调车手信号指挥机车向显示人方向稍行移动的信号,昼间为拢起的红色信号旗直立平举,再用展开的绿色信号旗___。J441
【单选题】
联系用手信号显示股道号码时,夜间白色灯光左右摇动后,从左下方向右上方高举,表示股道开通___道。J442
【单选题】
联系用手信号显示股道号码时,夜间白色灯光作圆形转动,表示股道开通___道。J442
【单选题】
联系用手信号显示股道号码时,昼间右臂向右平伸,左臂向右下斜45°角,表示股道开通___道。J442
【单选题】
联系用手信号显示股道号码时,夜间白色灯光作圆形转动后,再高举头上左右小动,表示股道开通___道。J442
【单选题】
联系用手信号显示十、五、三车距离信号中的“十车”(约110米)信号时,昼间的显示方式为展开的绿色信号旗单臂平伸连续下压 ___次。J442
【单选题】
夜间机车出入段时的道岔开通信号为:___灯光高举头上左右摇动。J442