【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
【多选题】
vMotion can be performed between which three physical boundaries? (Choose three.)___
A. Between two vCenter Server Systems
B. Between two vSphere Distributed Virtual Switches
C. Between two vCenter Server Datacenter objects
D. Between two VMware NSX Layer 4 segments
E. Between two NFS datastores
【多选题】
An administrator configures vSphere Replication for a virtual machine and enables multiple point in time (PIT) instances under the recovery settings in the Configure Replication wizard. Which two statements are correct for vSphere Replication with multiple point in time instances enabled? (Choose two.)___
A. vSphere Replication retains a number of snapshot instances of the virtual machine on the target site based on the retention policy that you specify.
B. vSphere Replication uses the virtual machine's snapshot instances to define the target site Point in Time instance based on the retention policy that you specify.
C. vSphere Replication does not support virtual machines with snapshots.
D. vSphere Replication supports virtual machines with snapshots.
【多选题】
An administrator is virtualizing a physical application server and adding it to an existing multi-tiered vApp. The application license is currently tied to the physical NIC's MAC address, so the administrator needs to ensure the license will function properly in the virtual machine. Which two actions can the administrator take to satisfy this task? (Choose two.)___
A. Set the MAC address for the vNIC in the guest operating system.
B. Install the physical server's NIC into the ESXi host.
C. Configure the MAC address for the vNIC using the vSphere Web Client.
D. Assign the physical server NIC's MAC address in the vSphere Distributed Switch.
【多选题】
Which two Fibre Channel zoning options are supported with vSphere 6.x? (Choose two.)___
A. Single-Initiator
B. Single-Initiator-Single-Target
C. Multiple-Initiators-Single-Target
D. Multiple-Initiators-Multiple-Targets
【多选题】
An administrator is attempting to remove an ESXi 6.x host from a vSphere Distributed Switch (vDS). When the administrator attempts to remove the host, the following error is observed: <The resource '16' is still in use.> What three steps are needed to successfully remove the host from the switch? (Choose three.)___
A. Select Manage Ports on the vDS for the host.
B. Locate all ports currently in use on the vDS for the host.
C. Migrate or delete any vmkernel or virtual machine adapters associated with the switch.
D. Remove all network cards from the switch before trying to remove the host.
E. Create a standard switch for everything to be automatically be migrated to.
【多选题】
Which two Virtual SAN related actions might start resynchronization of virtual machine objects? (Choose two.)___
A. Editing a virtual machine storage policy to increase the number of replicas.
B. Editing a virtual machine storage policy to reduce the number of replicas.
C. Editing a virtual machine storage policy to increase the number of disk stripes.
D. Editing a virtual machine storage policy to reduce the number of disk stripes.
【多选题】
An administrator is troubleshooting basic network connectivity issues. Which two scenarios are potential issues that this administrator might face? (Choose two.)___
A. The vSwitch is not attached to the correct physical network.
B. The portgroup is not configured to use correct VLAN.
C. Traffic shaping is configured incorrectly.
D. Jumbo frames is configured incorrectly.
【多选题】
Which three items should be validated prior to installing ESXi 6.x? (Choose three.)___
A. Remote Storage has been disconnected.
B. Installation media is available.
C. Server hardware clock is set to UTC.
D. Storage has been partitioned with a VMFS volume.
E. Network cards have been setup to use Jumbo
F. rames.
【多选题】
An administrator is performing an interactive installation of ESXi 6.x. Which three options are available for installation? (Choose three.)___
A. DVD
B. USB
C. PXE
D. Scripted
E. Auto Deploy
【多选题】
After installation of a host in your test environment, you need to move it to production. The only major change that needs to be made is that the hostname of the server needs to change. What are two ways that an administrator can change the host name without editing configuration files on the host directly? (Choose two.)___
A. Login to the Direct Console User Interface and change it from here.
B. Edit the Default TCP/IP Configuration from the vSphere Web Client.
C. Use the Ruby vSphere Client to send a script to the ESXi host that updates the hostname.
D. Update the information in DNS and the
E. SXi host will automatically update with these changes.
【多选题】
An administrator has unsuccessfully attempted several times to install an Operating System inside a virtual machine. The administrator finds that the installation fails at random intervals. Which two actions can be taken to resolve this issue? (Choose two.)___
A. Verify the md5sum and if invalid, download the installation files again.
B. Attempt the installation an additional time.
C. Attempt to use a different installation media or installation method.
D. Create a new virtual machine and attempt the installation with the existing media.
【多选题】
VMware tools is failing to install on a Microsoft Windows virtual machine. What are two possible situations that would prevent the installation? (Choose two.)___
A. The VMware tools installation media is corrupt.
B. The incorrect Operating System was selected in the virtual machine options.
C. The software prerequisites have not been installed.
D. The prerequisite services have not been started.
【多选题】
As part of a multisite Single Sign-On (SSO) deployment what two steps are required to ensure that a change to one Single Sign-On instance is propagated to the other instances? (Choose two.)___
A. Schedule a Replication Task on the primary instance
B. Select the first instance during the installation of subsequent instances
C. During the installation of each instance choose Linked-Mode
D. Enable Synchronize to Active Directory on each instance
【多选题】
You need to add an object to an existing vApp using the vSphere Web Client. How is this accomplished?___
A. Create an Object Inside the vApp.
B. Add an Object to a vApp.
C. Add an Object to the
D. atastore the vApp is located in.
【多选题】
Which three steps must be taken to use vSphere Update Manager 6.x to upgrade an ESXi 5.5 host to vSphere 6.x? (Choose three.)___
A. Download an ESXi Image.
B. Configure the vSphere Update Manager Download Service.
C. Create a baseline and attach it to the ESXi Host.
D. Scan the vCenter Content Library for the
E. SXi Image.
【多选题】
Which two options would allow a database administrator, with no access to the vSphere infrastructure, to connect to a virtual machine? (Choose two.)___
A. Use the Virtual Machine Remote Console (VMRC).
B. Use Remote Desktop Protocol (RDP) to connect.
C. Ask the vSphere administrator to grant permission to access the console through vCenter Server.
D. Ask the vSphere administrator to grant permission to access with the Horizon View Direct Connect Client.
【多选题】
Which three are architecture components of vRealize Operations? (Choose three.)___
A. Identity Server
B. Administrative Server
C. Analytics Server
D. Database Server
E. Connection Broker
推荐试题
【单选题】
BXD3、为了估算项目,项目经理希望知道一项没有历史数据的关键活动持续时间。这项活动的专家位于不同国家,项目经理需要收集他们的反馈。应该使用哪种技术?___
A. 德尔菲技术
B. 根本原因分析
C. 焦点小组会议
D. 头脑风暴
【单选题】
BXD4、项目团队成员将因杰出工作和满足项目成本目标而获得奖励,高级经理向项目经理询问团队成员可用性和旅行偏好,项目经理可以在哪里获得此奖励的定义标准和频率?___
A. 责任分配矩阵(RAM)
B. 项目管理计划
C. 人员解散计划
D. 资源管理计划
【单选题】
BXD5、项目过程中,会形成项目文件和项目管理计划。其中,项目文件包括如下各项,除了:___
A. 工作绩效报告
B. 风险登记册
C. 需求跟踪矩阵
D. 商业论证
【单选题】
BXD6、项目经理正与一名承认未使用章程的同事讨论项目章程。为了向同事说明项目章程的重要性,项目经理表明项目章程很重要,因为项目章程的批准即意味着下列哪一项?___
A. 启动阶段可以开始
B. 执行阶段正式开始
C. 详细需求清单的正式批准
D. 项目的正式授权
【单选题】
BXD7、某个新项目将使用特定软件发布。在项目启动大会上,一名团队成员记起在之前的一个项目他们已经使用了该软件工具的第一版,但该软件造成许多问题。该项目经理接下来应该怎么做?___
A. 项目团队成员解释说,自上一个项目后,技术已经发生了很大变化,以后不会发生问题
B. 查看过往项目的经验教训说明,识别新项目中的类似风险
C. 立即将潜在风险上报给项目发起人,以便能够获得额外的资金
D. 结束项目并收集经验教训,让未来的项目可以从该经验教训中获益
【单选题】
BXD8、—个项目在开始时共有10名项目相关方。后来,3个成员被解散了,又增加了5名成员。现在沟通渠道有多少个?___
A. 12
B. 66
C. 132
D. 154
【单选题】
BXD9、关于项目相关方,如下说法都是正确的,除了___
A. 相关方可能影响项目决策、活动或结果的个人、群体或组织
B. 相关方可能会受或自认为会受项目决策、活动或结果影响
C. 项目相关方来自项目内部
D. 相关方可能主动或被动参与项目,甚至完全不了解项目
【单选题】
BXD10、某项目出现跨项目资源使用问题及高层面临变更风险,项目经理应该采用哪种风险应对方法?___
【单选题】
BXD11、风险管理的一个常见错误是:关注形式上的记录,而忽略执行风险应对计划。实施风险应对计划的目的有很多,包括如下各项,除了___
A. 管理整体项目风险敞口
B. 最小化单个项目威胁
C. 最大化单个项目机会
D. 量化统计项目整体风险的基本情况
【单选题】
BXD12、客户希望增加股东权益的总和,提高其在全球市场的品牌知名度。客户的主要目标是什么?___
A. 为组织战略改善整体业务支持
B. 增加营销预算
C. 提高商业价值
D. 通过重新投资其他业务组合提高市场份额
【单选题】
BXD13、一名关键项目相关方希望在产品中包含一个新的软件程序。该软件的集成需要变更一些配置,可能会影响项目的成本和进度计划。项目经理应该怎么做?___
A. 请求项目发起人批准该更改
B. 分析应急储备
C. 创建变更需求
D. 修改项目范围
【单选题】
BXD14、一名有影响力的项目相关方直接要求项目团队添加产品功能,而团队也遵守该要求,项目经理在项目状态会议上获悉这些变更。由于这些变更导致成本超支,项目经理首先应该怎么做?___
A. 使用应急储备支付额外成本,保持该项目相关方的参与
B. 要求该相关方提交变更请求供批准
C. 更新范围说明书,包含新的功能
D. 与项目发起人讨论该情况
【单选题】
BXD15、已经宣布发布新产品,但在验收测试期间,识别到几个缺陷,项目经理应该怎么做?___
A. 建议延迟发布新产品
B. 在发布之前,尽可能减少缺陷
C. 分析缺陷并提出纠正措施计划
D. 修改测试-验收标准
【单选题】
BXD16、重要材料需要运输供应商。如果该材料不能按时交付,项目预算将严重受到影响。为降低这个风险,项目经理购买了保险。项目经理采用了哪一种消极风险策略?___
【单选题】
BXD17、项目经理正在实施一个预算紧张的项目,为确保项目成功,项目经理在制定项目章程时应使用什么?___
A. 经验教训
B. 质量测量指标
C. 战略计划
D. 成本基准
【单选题】
BXD18、项目经理发现公司的质量保证(QA)部门可能没有足够的人员根据合同约定的进度计划测试项目产品。项目经理首先应该怎么做?___
A. 审查问题日志
B. 更新风险登记册
C. 取消一些非关键测试
D. 压缩进度计划
【单选题】
BXD19、—个项目已经支出350万美元,现在已完成400万美元的工作,该项目的计划价值(PV)为800万美元。主题专家(SME)估算还需要600万美元来完成该项目,完成该项目的技术方法不再有效,当前的完工估算(EAC)是多少?___
A. 500万美元
B. 950万美元
C. 1000万美元
D. 1150万美元
【单选题】
BXD20、一个软件开发项目的项目章程已获批准,项目经理召集会议准备项目管理计划。项目经理得知开发团队成员对他们的角色和职责感到困惑。若要避免这个问题,项目经理应该事先做什么?___
A. 创建一份相关方登记册
B. 分享工作分解结构(WBS)
C. 审查沟通管理计划
D. 制定资源管理计划
【单选题】
BXD21、在开发的最后一天,软件开发团队的项目主管宣布由于意外停电可能导致延期。由于测试时间有限,软件开发主管和测试主管之间展开激烈的讨论。下列哪一项冲突解决技术将提供长期解决方案?___
A. 妥协/调解
B. 合作/解决问题
C. 缓解/包容
D. 强迫/命令
【单选题】
BXD22、项目经理收到项目相关方针对项目范围提供的信息,可用于快速定义跨职能需求并协调相关方的需求差异是以下哪种收集需求的技术?___
A. 会议和群体创新技术
B. 引导技术和研讨会
C. 行业标准和历史信息
D. 项目相关方识别的迭代
【单选题】
BXD23、新项目经理意识到项目团队和项目相关方不清楚项目状态,项目经理感到困惑,因为每天已经发送电子邮件沟通给这两个群体。造成这种情况的原因是什么?___
A. 团队成员收到太多电子邮件,无法阅读并错过一些重要更新
B. 沟通管理计划缺乏有关如何联系项目相关方和团队成员的足够详情
C. 在项目相关方分析中没有明确识别项目相关方
D. 相关方管理计划定义不正确
【单选题】
BXD24、项目经理执行一次分析,并获知挣值(EV)为60000美元、计划价值(PV)为75000美元。实际成本为(AC)为60000美元。项目目前的状态是什么?___
A. 符合进度,但超出预算
B. 落后于进度,但符合预算
C. 落后于进度,并超出预算
D. 符合进度,并符合预算
【单选题】
BXD25、项目收尾时,项目经理审查上一个阶段收尾信息,已验证所有项目工作是否完成。项目经理还需要做什么?___
A. 集合团队,认可他们对项目付出的努力
B. 通知项目发起人项目已收尾
C. 在组织过程资产中更新经验教训
D. 执行偏差分析
【单选题】
BXD26、虽然前两个可交付成果是完整的,但由于财务原因,项目被取消。项目经理应该做?___
A. 向管理层解释项目应该继续下去
B. 迅速进入收尾阶段
C. 进行资源遣散
D. 内部分析原因,并提交相关的建议
【单选题】
BXD27、制定项目工作分解结构(WBS)时,项目经理应查阅哪一份管理计划?___
A. 采购管理计划
B. 范围管理计划
C. 风险管理计划
D. 资源管理计划
【单选题】
BXD28、在一个复杂的长期项目上,项目经理采用一种方法,详细规划近期工作,并在更高的层次规划未来工作,这描述的是什么?___
A. 分解
B. 滚动式规划
C. 解决方案行动规划
D. 调整时间提前量和时间滞后量
【单选题】
BXD29、批准项目章程之后,人力资源总监要求增加项目范围。一名项目团队成员在没有通知项目经理的情况下增加了这些范围。项目经理应该怎么做?___
A. 与该团队成员讨论该问题
B. 执行实施整体变更控制过程
C. 寻求项目发起人的指导
D. 与项目管理办公室(PMO)一起审查范围变更
【单选题】
BXD30、项目经理与项目相关方开会,获得关于如何最好地向施工现场输送用品的信息和知识。这使用的是哪种沟通方法类别?___
A. 交互式沟通
B. 内部沟通
C. 拉式沟通
D. 推式沟通
【单选题】
BXD31、项目经理需要快速批准项目计划,为了估算获得批准所需的时间,项目经理必须决定哪些批准人可能需要特别注意。下面哪一项将帮助项目经理决定这个问题?___
A. 检查绩效报告
B. 执行相关方分析
C. 应用分析技术
D. 参与观察和对话
【单选题】
BXD32、团队被分配到去完成一项关键路径上的活动,但可交付成果延迟了。团队成员包括来自项目经理以及客户公司的个人。为确保项目保持进度计划,项目经理应该使用哪一项来修订进度计划?___
A. 滚动式规划
B. 进度压缩
C. 假设情景分析
D. 分解
【单选题】
BXD33、项目经理需要从不同职能经理那里招募团队成员。项目经理应使用什么?___
A. 资源日历
B. 协商
C. 募集
D. 技能图
【单选题】
BXD34、项目经理从一个符合进度和预算的项目中辞职。在聘用替代的新项目经理后,团队反对新项目经理提出的意见。团队处于下列哪一个发展阶段?___
A. 形成
B. 规范
C. 成熟阶段
D. 震荡阶段
【单选题】
BXD35、项目经理应在哪里存档所有相关项目文件和经验教训?___
A. 工作授权系统
B. 项目管理信息系统(PMIS)
C. 项目数据管理系统
D. 配置管理系统
【单选题】
BXD36、在项目执行期间,一名团队成员识别到由以前未被识别为项目相关方的职能经理提交了新需求。项目经理应该怎么做?___
A. 与项目发起人开会,获得反馈
B. 启动实施整体变更控制过程
C. 对需求执行成本效益分析
D. 将该职能经理添加进沟通管理计划
【单选题】
BXD37、在编制项目章程用于批准时,项目经理发现有两名相关方对关键可交付成果的期望有冲突。若要解决期望冲突问题并完成项目章程,项目经理应该首先做什么?___
A. 与关键相关方一起召开一个问题解决会
B. 将该问题上报给项目发起人
C. 使用专家判断来决定可交付成果
D. 在章程中减少可交付成果用于后期定义
【单选题】
BXD38、下列哪一项表明缺少沟通管理计划?___
A. 项目相关方接受会议通知,但未参加
B. 项目发起人批准项目范围说明,但没有表达他们对一个关键假设的担忧
C. 项目发起人抱怨说,他们没有收到每周状态更新,虽然项目经理已通过短信发送传达这些更新
D. 由于一个意外事件未能被识别为风险,项目进度计划需要延期
【单选题】
BXD39、项目经理聘用一名供应商交付关键部件。供应商未能按期交付,项目经理根据合同条款提出索赔,供应商拒绝接受该索赔。项目经理能够如何解决这种情况?___
A. 寻求调解员的帮助
B. 将该问题上报给项目发起人
C. 与该供应商谈判
D. 将问题提交给法律部门
【单选题】
BXD40、为了节省一个项目的费用,公司管理层希望复制之前一个项目的需求,项目经理应使用什么工具或技术来制定项目需求?___
A. 头脑风暴
B. 原型法
C. 标杆对照
D. 文件分析
【单选题】
BXD41、项目经理指岀,一名位于另一个地点的团队成员总是错过最后期限。由于这会影响到项目进度,项目经理应该怎么做?___
A. 将该团队成员的工作重新分配给本地成员
B. 考虑将该成员的工作承包给本地供应商
C. 管理没有该成员的项目,并将此标记为项目相关方的风险
D. 与该成员沟通,了解其情况,并提供指导和支持
【单选题】
BXD42、项目经理举行项目启动会议,宣布项目开始。项目经理应期望在这个会议中实现什么目标?___
A. 授权项目经理以及对项目的理解
B. 项目发起人对项目范围、进度计划和预算的批准
C. 项目相关方对项目管理计划的正式批准
D. 制定风险管理计划供项目相关方审查