【多选题】
An administrator receives a report that no real time statistics are available for a virtual machine in the vCenter Server inventory. Which two statements indicate likely causes of the problem? (Choose two.)___
A. The virtual machine is powered off.
B. The host containing the virtual machine is disconnected from vCenter Server.
C. There is insufficient real time data to display the information.
D. The vCenter Server service is not running.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【多选题】
Your manager has given you a bash script that retrieves data for ESXi 6.x host configurations. This data needs to be collected right after the installation of a host and must be run directly on the host. Which two actions can be used to run this script on an ESXi host? (Choose two.)___
A. Connect to the host with Ruby vSphere Console and run the script from there.
B. Enable SSH access from the Direct Console User Interface.
C. Enable the ESXi Shell from the
D. irect Console User Interface.
【多选题】
Which two are true about the Risk badge in vRealize Operations? (Choose two.)___
A. The Risk badge indicates potential future problems that may degrade the performance of the system.
B. Risks may require attention in the near future.
C. The Risk badge indicates problems that are degrading performance of the system.
D. Risks require attention now to correct system performance problems.
【多选题】
vSphere Update Manager allows which two virtual machine attributes to be upgraded? (Choose two.)___
A. Virtual machine firewall policies for NSX.
B. Software Packages in the virtual machine.
C. Virtual machine Hardware Version.
D. VMware Tools Upgrade.
【多选题】
What are two benefits of using NFS 4.1 with vSphere 6.x as compared to NFS 3? (Choose two.)___
A. NFS 4.1 supports Kerberos Authentication
B. NFS 4.1 supports multipathing
C. NFS 4.1 supports IPv6
D. NFS 4.1 supports hardware acceleration
【多选题】
Which three statements are true regarding Fault Tolerance? (Choose three.)___
A. Applications need to be continuously available to users.
B. Applications without native clustering capabilities can be protected.
C. Custom clustering solutions are complicated to configure and maintain.
D. Applications that have 16 vCPUs are supported.
E. Prevents application crashes by analyzing the workload and correcting problems.
【多选题】
Which two statements are true regarding VMware vSphere Flash Read Cache (vFRC)? (Choose two.)___
A. Cache fills and cache evictions happen in the granularity of a cache block size.
B. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying storage.
C. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying cache data.
D. Cache fills and cache evictions happen in the granularity of the disk block size.
【多选题】
What are two possible causes of Storage Distributed Resource Scheduler (SDRS) being disabled on one or more virtual machine disks in a datastore cluster? (Choose two.)___
A. The virtual machine has vSphere Fault Tolerance disabled.
B. The virtual machine is a template.
C. The virtual machine swap file is on a shared datastore.
D. The disk is a CD-ROM/ISO file.
【多选题】
An administrator attempts to install vCenter Single Sign-On Server. The installer returns an error message indicating that the installation failed. Prior to the installation, all setup prerequisites were met. The administrator has generated a vCenter Server Single Sign-On support bundle. Which two files should the administrator analyze to determine the cause of the failure? (Choose two.)___
A. Server\utils\logs\imsTrace.log
B. Server\utils\logs\install.txt
C. %TEMP%\utils\logs\vminst.log
D. %TEMP%\vminst.log
【多选题】
An administrator is unable to remove an ESXi 6.x host from a vSphere Distributed Switch. What are two likely reasons for this issue? (Choose two.)___
A. Vmkernel interfaces on the switch are still in use.
B. VM Network port group adapters are connected to different switch.
C. Physical NICs are migrated to different switch.
D. VM Network adapters are connected to this switch.
【多选题】
Which two Identity Sources are available to add for vCenter Single Sign-On authentication? (Choose two.)___
A. LocalOS
B. OpenLDAP
C. NIS as an LDAP Server
D. VCMSDS
【多选题】
What are three goals of resource management within a cluster? (Choose three.)___
A. To prevent virtual machines from monopolizing resources and to guarantee predictable service rates.
B. To exploit undercommitted resources and overcommit with graceful degradation.
C. To provide solutions to potential problems that you might encounter when using vCenter Server.
D. To control the relative importance of virtual machines and provide flexible dynamic partitioning.
E. To provide additional network administration capabilities.
【多选题】
Which three actions can be taken as a result of executing the vSphere Update Manager 6.x scan and remediation wizards? (Choose three.)___
A. Install and upgrade software in virtual machines.
B. Upgrade the firmware on ESXi host devices.
C. Upgrade and Patch ESXi hosts.
D. Install and update third-party software on hosts.
E. Upgrade virtual machine hardware.
【多选题】
Which two statements are true about deploying and using vSphere Replication? (Choose two.)___
A. ESXi hosts managed by a single vCenter Server instance require a connection between the two vSphere Replication appliances.
B. Sites managed by different vCenter Server instances require a connection between the two vSphere Replication appliances.
C. Sites managed by different vCenter Server instances require the use of Site Recovery Manager and a connection between the two vSphere Replication appliances.
D. ESXi hosts managed by a single vCenter Server instance require a single vSphere Replication appliance.
【多选题】
An administrator is attempting to power on a virtual machine, but the task is hanging at 95%. What three scenarios best explain why this problem is happening? (Choose three.)___
A. A virtual machine question is currently being posed to the administrator.
B. Another task for the virtual machine or other component is already in progress.
C. The VMware High Availability cluster has insufficient resources to guarantee failover.
D. The host has lost access to the storage device containing the virtual machine files.
E. The host is under resource contention and unable to power on the virtual machine.
【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
【多选题】
Which two storage controller configurations can be used with Virtual SAN? (Choose two.)___
A. SAS controllers in Passthrough mode
B. SAS controllers in RAID0 mode
C. SAS controllers in RAID1 mode
D. SAS controllers in RAID10 mode
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
【多选题】
An administrator is deploying multiple Windows 2003 Virtual Machines from the same template. What two steps should be taken to avoid network conflicts? (Choose two.)___
A. Customize the guest operating system.
B. Install VMware Tools into the new virtual machines.
C. Copy the Microsoft Sysprep tools onto the vCenter Server system.
D. Ensure the e1000 vmnic is selected for each new virtual machine.
【多选题】
Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
推荐试题
【多选题】
下列各项中,可能引起固定资产账面价值与计税基础不一致的有___
A. 折旧方法不同
B. 折旧年限不同
C. 预计净残值不同
D. 计提固定资产减值准备
【多选题】
甲公司2016年12月31日购入一项固定资产,其初始入账价值为300万元,会计上采用双倍余额递减法计提折旧,预计使用年限为10年,预计净残值为0;税法规定对该类固定资产采用年限平均法计提折旧,预计使用年限及净残值与会计相同。2017年12月31日,甲公司对该项固定资产进行减值测试,计提固定资产减值准备60万元。假定计提减值准备后该项固定资产会计上的折旧年限、折旧方法及净残值均没有发生变化。2018年12月31日该项固定资产没有发生进一步的减值,则下列说法中正确的有___。
A. 2017年12月31日该项固定资产的账面价值为240万元
B. 2017年12月31日该项固定资产的计税基础为270万元
C. 2018年12月31日该项固定资产的账面价值为140万元
D. 2018年12月31日该项固定资产的计税基础为225万元
【多选题】
在不考虑其他影响因素的情况下,企业发生的下列交易或事项中,期末可能会引起递延所得税资产增加的有___。
A. 本期计提固定资产减值准备
B. 本期转回存货跌价准备
C. 企业购入交易性金融资产,当期期末公允价值小于其初始确认金额
D. 实际发生产品售后保修费用,冲减已计提的预计负债
【多选题】
2018年1月1日,甲公司为开发新技术开始自行研发某项专利技术,研发过程中共发生研发支出30万元,其中符合资本化条件的支出为24万元,不符合资本化条件的支出为6万元。2018年7月1日甲公司该项专利技术研发成功达到预定可使用状态并立即投入使用,甲公司预计该项专利技术的使用年限为30年,对其采用直线法计提摊销,预计净残值为0;税法规定该类无形资产的摊销年限、摊销方法及净残值与会计相同。2018年年末该项无形资产未发生减值,则下列说法中不正确的有___。
A. 2018年7月1日该项无形资产的账面价值为30万元
B. 2018年7月1日该项无形资产的计税基础为24万元
C. 2018年12月31日该项无形资产的账面价值为23.6万元
D. 2018年12月31日该项无形资产的计税基础为23.6万元
【多选题】
下列项目中,应确认递延所得税负债的有___。
A. 固定资产账面价值大于其计税基础
B. 可供出售金融资产账面价值大于其计税基础
C. 预计负债账面价值大于其计税基础
D. 预收账款账面价值大于其计税基础
【多选题】
下列各项有关负债计税基础的说法中,正确的有___。
A. 预收账款项目的账面价值与计税基础相等,不产生暂时性差异
B. 税法对于合理的职工薪酬基本允许税前扣除,相关应付职工薪酬负债的账面价值等于计税基础
C. 罚款和滞纳金税法规定不允许税前扣除,其账面价值与计税基础相等
D. 提供债务担保确认的预计负债的计税基础为0,其账面价值与计税基础的差异产生可抵扣暂时性差异
【多选题】
以下各项关于所得税税率发生变化对递延所得税影响的表述中正确的有___。
A. 因适用税率发生变化,导致企业在某一会计期间适用的所得税税率发生变化的,企业应对已确认的递延所得税资产和递延所得税负债进行重新计算
B. 因适用税率发生变化,导致企业在某一会计期间适用的所得税税率发生变化的,企业当期确认的递延所得税资产和负债应按变化后的税率计算,但无需对以前期间的递延所得税资产和递延所得税负债进行调整
C. 递延所得税资产和递延所得税负债的金额代表的是有关可抵扣暂时性差异或应纳税暂时性差异在未来期间转回时,导致应交所得税金额的减少或增加的情况
D. 适用所得税税率的变化必然导致应纳税暂时性差异或可抵扣暂时性差异在未来期间转回时产生增加或减少应交所得税金额的变化
【多选题】
下列项目中不会产生可抵扣暂时性差异的有___。
A. 超标的业务招待费
B. 国债利息收入
C. 超过当年销售收入15%部分的广告费和业务宣传费支出
D. 期末固定资产的账面价值大于计税基础
【多选题】
下列关于递延所得税的会计处理中,正确的有___。
A. 自行研发无形资产税法按照150%进行摊销使得其账面价值小于计税基础产生的可抵扣暂时性差异,不确认相关递延所得税的影响
B. 与直接计入所有者权益的交易或者事项相关的递延所得税,应当计入留存收益
C. 与直接计入所有者权益的交易或者事项相关的递延所得税,应当计入所有者权益
D. 预收账款如不符合会计准则规定的收入确认条件,但税法规定应计入当期应纳税所得时,其计税基础为0,应当确认相应的递延所得税负债
【多选题】
下列各项中,会产生应纳税暂时性差异的有___。
A. 因提供债务担保而确认的预计负债
B. 交易性金融资产公允价值上升
C. 外购无形资产的账面价值大于计税基础
D. 超过税法税前列支标准的应付职工薪酬
【多选题】
下列各项有关递延所得税资产的说法中,正确的有___。
A. 资产负债表日,企业应当对递延所得税资产的账面价值进行复核
B. 递延所得税资产能计提减值准备
C. 企业递延所得税不一定作为所得税费用或收益计入当期损益
D. 满足确认条件的递延所得税资产可以进行折现
【多选题】
下列关于递延所得税资产确认的说法中,正确的有___。
A. 递延所得税资产的确认应以未来期间很可能取得的应纳税所得额为限
B. 递延所得税资产的确认应采用下一年的所得税适用税率来核算
C. 递延所得税资产的确认应采用当期的所得税税率来核算
D. 税率发生变化时,应考虑所得税税率发生变化的影响
【多选题】
下列各项中,按税法规定在计算应纳税所得额时应予以调整的项目有___。
A. 处置固定资产产生的损益
B. 国债的利息收入
C. 长期股权投资持有期间获得的投资收益
D. 自行研发无形资产费用化支出
【多选题】
长江公司采用资产负债表债务法核算其所得税,适用的所得税税率为25%。2018年12月31日,长江公司将一幢自用办公楼转换为投资性房地产,并采用公允价值模式进行后续计量。20118年12月31日,该办公楼的账面原值为6000万元,已计提折旧1200万元,未计提减值准备,预计尚可使用年限为10年,无残值。转换日该办公楼的公允价值为5500万元。长江公司转换前对自用办公楼采用年限平均法计提折旧、预计净残值为0,税法计提折旧的方法、年限和预计净残值,与会计一致。则该事项下列相关的说法中正确的有___。
A. 2011年年末该投资性房地产形成应纳税暂时性差异900万元
B. 2011年年末该投资性房地产形成应纳税暂时性差异700万元
C. 转换日该项交易应确认递延所得税负债175万元
D. 转换日该项交易应确认资本公积700万元
【多选题】
下列各项中,可能造成本期所得税费用大于当期应交所得税的有___。
A. 递延所得税负债贷方发生额
B. 递延所得税资产贷方发生额
C. 递延所得税负债借方发生额
D. 无暂时性差异,但是发生了不得税前扣除的费用
【多选题】
列有关借款费用资本化的表述中,正确的有___。
A. 所建造固定资产的支出基本不再发生,应停止借款费用资本化
B. 固定资产建造中发生正常中断且连续超过3个月的,应暂停借款费用资本化
C. 固定资产建造中发生非正常中断且连续超过1个月的,应暂停借款费用资本化
D. 所建造固定资产基本达到设计要求,不影响正常使用,应停止借款费用资本化
【多选题】
借款费用资本化必须同时满足的条件有___。
A. 资产支出已经发生
B. 借款费用已经发生
C. 为使资产达到预定可使用或者可销售状态所必要的购建或者生产活动已经开始
D. 已赊购入工程物资
【多选题】
在确定借款费用暂停资本化的期间时,应当区别正常中断和非正常中断,下列各项中,属于非正常中断的有___。
A. 质量纠纷导致的中断
B. 安全事故导致的中断|
C. 劳动纠纷导致的中断
D. 资金周转困难导致的中断
【多选题】
下列有关借款费用的论断中,正确的是___。
A. 符合资本化条件的资产构建中占用一般借款,企业此时一般借款达到两笔或两笔以上时均需加权计算资本化率
B. 一般借款费用资本化的计算需考虑闲置资金收益
C. 当专门借款和一般借款混合使用时,应区分二者并分别按各自处理原则进行核算
D. 无论是专门借款还是一般借款只要达到两笔或两笔以上时均需加权计算平均利率
【多选题】
在资本化期间内,下列有关借款费用会计处理的表述中,正确的有___。
A. 所建造固定资产的支出基本不再发生,应停止借款费用资本化
B. 为购建固定资产取得的外币专门借款本金发生的汇兑差额,应予以资本化
C. 固定资产建造中发生正常中断且连续超过3个月的,应暂停借款费用资本化
D. 为购建固定资产取得的外币专门借款利息发生的汇兑差额,全部计入当期损益
【多选题】
下列表述中,表明资产达到预定可使用或可销售状态的有___
A. 符合资本化条件的资产的实体建造(包括安装)或者生产活动已经全部完成或者实质上已经完成
B. 所购建或者生产的符合资本化条件的资产与设计要求、合同规定或者生产要求相符或者基本相符,即使有极个别与设计、合同或者生产要求不相符的地方,也不影响其正常使用或者销售
C. 符合资本化条件的资产已经办理竣工决算手续
D. 继续发生在所购建或生产的符合资本化条件的资产上的支出金额很少或者几乎不再发生
【多选题】
关于因外币借款而发生的汇兑差额,下列说法正确的有___。
A. 在资本化期间内,外币专门借款本金及利息的汇兑差额,应当予以资本化,计入符合资本化条件的资产成本
B. 在资本化期间内,外币专门借款本金及利息的汇兑差额的计算不与资产支出相挂钩
C. 在资本化期间内,外币一般借款本金及利息的汇兑差额,应当予以资本化,计入符合资本化条件的资产成本
D. 在资本化期间内,外币一般借款本金及利息的汇兑差额,应当予以费用化
【多选题】
企业在建工程发生的下列情形中,相关借款费用需要暂停资本化的有___。
A. 施工过程中发生了安全事故停工20天
B. 发生劳动纠纷停工95天
C. 安全检查3个月
D. 因资金周转困难停工半年
【多选题】
某公司于2018年1月5日起动工兴建厂房,建造过程中发生的下列支出或费用中,属于规定的资产支出的有___。
A. 工程领用企业自产产品
B. 计提建设工人的职工福利费
C. 发生的业务招待费支出
D. 用银行存款购买工程物资
【多选题】
甲公司为扩大生产于2018年1月1日开始建造一栋厂房,预计工期为3年。甲公司为建造厂房占用的借款包括一笔专门借款和两笔一般借款:(1)2017年12月1日,为建造厂房,按面值发行公司债券,面值为2 000万元,票面利率为4%;(2)2017年7月1日借入一般借款3 000万元,期限为3年,利率为6%;(3)2018年1月1日借入一般借款2 000万元,期限为2年,利率为5%。甲公司2018年有关建造支出情况如下:1月1日,支付工程款1 000万元;3月31日,支付工程款1 500万元;6月30日,支付工程款1 800万元。甲公司将闲置专门借款存入银行的月收益率为0.5%。不考虑其他因素,下列说法正确的是___。
A. 2018年甲公司专门借款资本化金额65万元
B. 2018年甲公司一般借款资本化率5.6%
C. 2018年甲公司一般借款利息费用资本化金额71.4万元
D. 2018年甲公司该生产线建造工程应予以资本化的借款利息费用是136.4万元
【多选题】
关于借款费用资本化的暂停或停止,下列表述中正确的有___。
A. 购建固定资产过程中发生非正常中断,并且非连续中断时间累计达3个月,应当暂停借款费用资本化
B. 在所购建固定资产过程中,某部分固定资产已达到预定可使用状态,即使该部分固定资产可供独立使用,也应在整体完工后停止借款费用资本化
C. 在所购建固定资产过程中,某部分固定资产已达到预定可使用状态,且该部分固定资产可供独立使用,则应停止该部分固定资产的借款费用资本化
D. 在所购建固定资产过程中,某部分固定资产虽已达到预定可使用状态,但必须待整体完工后方可使用,则需待整体完工后停止借款资用资本化
【多选题】
不考虑其他因素,甲公司下列经济业务所涉及的借款费用可能予以资本化的有___。
A. 2018年1月1日,向银行借入的专门借款用于开工建设办公楼,预计在2018年9月底完工
B. 2018年1月1日,向银行借入资金用于生产A产品,该产品属于大型发电设备,生产时间较长,为1年零3个月
C. 2018年为了扩大企业的经济规模,于2018年4月1日开始建造一条生产线,预计在2019年2月底完工
D. 2018年1月1日,用银行借款开工建设一幢简易厂房,预计厂房于次年2月15日完工,达到预定可使用状态
【多选题】
下列项目中,会使借款费用资本化金额增加的有___。
A. 在建一年的厂房占用的专门借款产生汇兑损失
B. 符合资本化条件的无形资产研发支出占用的一般借款资本化期间的借款费用
C. 工期超过一年的存货专门借款闲置资金产生投资收益
D. 折价或溢价的摊销
【多选题】
下列各项中,不应暂停借款费用资本化的有___。
A. 因重大安全事故导致固定资产建造活动连续中断超过3个月
B. 因事先无法预见的不可抗力因素导致固定资产建造活动连续中断超过3个月
C. 因施工质量例行检查导致固定资产建造活动连续中断超过3个月
D. 因可预见的不可抗力因素导致固定资产建造活动连续中断超过3个月
【多选题】
在计算所占用一般借款的资本化率时,应考虑的因素有___。
A. 借款的时间
B. 溢折价的摊销
C. 资产支出
D. 借款的利率
【多选题】
按照借款费用准则规定,在借款费用资本化期间内,为购建或者生产符合资本化条件的资产占用了一般借款的,其资本化金额的计算处理方法正确的有___。
A. 应当根据累计资产支出加权平均数乘以所占用一般借款的资本化率,计算确定一般借款应予资本化的利息金额
B. 应当根据累计资产支出超过专门借款部分的资产支出加权平均数乘以所占用一般借款的资本化率,计算确定一般借款应予资本化的利息金额
C. 一般借款加权平均利率=所占用一般借款当期实际发生的利息之和÷所占用一般借款本金加权平均数
D. 一般借款属外币借款的,其本金和利息所产生的汇兑差额应作为财务费用,计入当期损益
【多选题】
企业发生的如下情形中,一般属于会计差错的有___。
A. 计算错误
B. 应用会计政策错误
C. 疏忽或曲解事实以及舞弊产生的影响
D. 固定资产盘盈
【多选题】
下列各项中,不需要采用追溯调整法进行会计处理的有___。
A. 无形资产因预计使用年限发生变化而变更其摊销年限
B. 低值易耗品摊销方法的改变
C. 固定资产因预期经济利益实现方式发生变化而变更其折旧方法
D. 采用成本模式计量的投资性房地产改按公允价值模式计量
【多选题】
下列关于会计政策、会计估计及其变更的表述中,正确的有___。
A. 会计政策是企业在会计确认、计量和报告中所采用的原则、基础和会计处理方法
B. 会计估计以最近可利用的信息或资料为基础,不会削弱会计确认和计量的可靠性
C. 企业应当在会计准则允许的范围内选择适合本企业情况的会计政策,但一经确定,不得随意变更
D. 按照会计政策变更和会计估计变更划分原则难以对某项变更进行区分的,应将该变更作为会计估计变更处理
【多选题】
A公司执行具体企业会计准则,该公司2017年发生或发现的下列交易或事项中(均具有重大影响),应采用未来适用法的有___。
A. 在首次执行日,分期付款购买固定资产由原来采用历史成本计量,现在改为公允价值计量
B. 2016年应确认为资本公积的5 000万元计入了2016年的投资收益
C. 在首次执行日,将某项固定资产的折旧年限由15年改为11年
D. 在2017年变更投资性房地产的后续计量模式
【多选题】
下列各项中,应采用未来适用法处理会计政策变更的情况有___。
A. 企业因账簿超过法定保存期限而销毁,引起会计政策变更累积影响数只能确定账簿保存期限内的部分
B. 企业账簿因不可抗力而毁坏,引起会计政策变更累积影响数无法确定
C. 会计政策变更累积影响数能够确定,但法律或行政法规要求对会计政策变更采用未来适用法
D. 会计政策变更累积影响数能够合理确定,法律或行政法规要求对会计政策变更采用追溯调整法
【多选题】
下列各事项中,需进行追溯调整或追溯重述的有___。
A. 投资性房地产由成本计量模式改为公允价值计量模式
B. 固定资产经济利益实现方式发生变化从而改变折旧方法
C. 因减少投资使得长期股权投资由成本法改为权益法核算
D. 本期发现前期重要差错
【多选题】
关于企业会计政策的选择和运用,下列说法中不正确的有___
A. 实务中某项交易或者事项的会计处理,具体准则或应用指南未作规范的,企业可根据自身情况对该事项或交易做出任何处理
B. 企业应在国家统一的会计制度规定的会计政策范围内选择适用的会计政策
C. 会计政策应当保持前后各期的一致性
D. 会计政策所指的会计原则包括一般原则和特定原则
【多选题】
下列各项中,年度财务报表附注中应当披露的信息有___。
A. 重要的会计政策
B. 会计政策变更
C. 重要的会计估计
D. 会计估计变更
【多选题】
下列各事项中,属于会计政策变更的有___
A. 无形资产摊销方法由直线法改为生产总量法
B. 因执行会计准则将建造合同收入的确认方法由完成合同法改为完工百分比法
C. 因执行会计准则将分期收款销售商品(超过3年)由原分期确认收入改为按现值确认收入
D. 将自用房地产转为采用公允价值模式计量的投资性房地产