刷题
导入试题
【多选题】
An administrator attempts to install vCenter Single Sign-On Server. The installer returns an error message indicating that the installation failed. Prior to the installation, all setup prerequisites were met. The administrator has generated a vCenter Server Single Sign-On support bundle. Which two files should the administrator analyze to determine the cause of the failure? (Choose two.)___
A. Server\utils\logs\imsTrace.log
B. Server\utils\logs\install.txt
C. %TEMP%\utils\logs\vminst.log
D. %TEMP%\vminst.log
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
AD
解析
暂无解析
相关试题
【多选题】
An administrator is unable to remove an ESXi 6.x host from a vSphere Distributed Switch. What are two likely reasons for this issue? (Choose two.)___
A. Vmkernel interfaces on the switch are still in use.
B. VM Network port group adapters are connected to different switch.
C. Physical NICs are migrated to different switch.
D. VM Network adapters are connected to this switch.
【多选题】
Which two Identity Sources are available to add for vCenter Single Sign-On authentication? (Choose two.)___
A. LocalOS
B. OpenLDAP
C. NIS as an LDAP Server
D. VCMSDS
【多选题】
What are three goals of resource management within a cluster? (Choose three.)___
A. To prevent virtual machines from monopolizing resources and to guarantee predictable service rates.
B. To exploit undercommitted resources and overcommit with graceful degradation.
C. To provide solutions to potential problems that you might encounter when using vCenter Server.
D. To control the relative importance of virtual machines and provide flexible dynamic partitioning.
E. To provide additional network administration capabilities.
【多选题】
Which three actions can be taken as a result of executing the vSphere Update Manager 6.x scan and remediation wizards? (Choose three.)___
A. Install and upgrade software in virtual machines.
B. Upgrade the firmware on ESXi host devices.
C. Upgrade and Patch ESXi hosts.
D. Install and update third-party software on hosts.
E. Upgrade virtual machine hardware.
【多选题】
Which two statements are true about deploying and using vSphere Replication? (Choose two.)___
A. ESXi hosts managed by a single vCenter Server instance require a connection between the two vSphere Replication appliances.
B. Sites managed by different vCenter Server instances require a connection between the two vSphere Replication appliances.
C. Sites managed by different vCenter Server instances require the use of Site Recovery Manager and a connection between the two vSphere Replication appliances.
D. ESXi hosts managed by a single vCenter Server instance require a single vSphere Replication appliance.
【多选题】
An administrator is attempting to power on a virtual machine, but the task is hanging at 95%. What three scenarios best explain why this problem is happening? (Choose three.)___
A. A virtual machine question is currently being posed to the administrator.
B. Another task for the virtual machine or other component is already in progress.
C. The VMware High Availability cluster has insufficient resources to guarantee failover.
D. The host has lost access to the storage device containing the virtual machine files.
E. The host is under resource contention and unable to power on the virtual machine.
【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
【多选题】
Which two storage controller configurations can be used with Virtual SAN? (Choose two.)___
A. SAS controllers in Passthrough mode
B. SAS controllers in RAID0 mode
C. SAS controllers in RAID1 mode
D. SAS controllers in RAID10 mode
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
【多选题】
An administrator is deploying multiple Windows 2003 Virtual Machines from the same template. What two steps should be taken to avoid network conflicts? (Choose two.)___
A. Customize the guest operating system.
B. Install VMware Tools into the new virtual machines.
C. Copy the Microsoft Sysprep tools onto the vCenter Server system.
D. Ensure the e1000 vmnic is selected for each new virtual machine.
【多选题】
Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
推荐试题
【单选题】
XG59、你在与外部项目利害关系者一起工作时将使用的主要的沟通技能是___
A. 问题解决
B. 谈判
C. 团队建设
D. 公关
【单选题】
XG60、你是一个项目经理,负责完成一个新的计算机系统。管理层希望项目能在低成本的情况下实现高收益。你希望能够将时间成本和产品的功能很好地结合起来,这样从长远角度来看是增加了项目的价值。但是,项目的一个承包商雇佣了高级的编程员,这使得该承包商比其他几个承包商的成本高。当与相关方一起工作时,你应该___
A. 把相关方分成容易识别的几类
B. 对于那些会给项目带来反面影响的相关方,提早对其行为进行干预
C. 要认识到不同的相关方往往持有不同的目标,而这也使得相关方的管理工作非常艰难
D. 认识到角色和责任可能会出现重叠
【单选题】
XG61、你和一群来自英格兰的商业伙伴共进午餐。所有人都点了汤作为开胃菜。在你开始喝汤时,你听见10个人同时大声地喝汤,感到很不舒服。因为你们国家的人从来不这样喝汤,你们习惯于安静地进食。然而当你坐下,你发现你的生意伙伴的吃饭习惯和你的完全不同。你对自己说:这是我第一次面对文化差异的问题。接着你也开始大声地喝汤。你已经放下个人的偏见并向前走了一步,这步是___
A. 把别人的世界统一到你的世界中
B. 以宏观的角度寻找新的观点
C. 以开发的态度对待变更
D. 理解并尊重别人
【单选题】
XG62、在其他国家配备一个项目时,你发现那个国家的项目由项目领导和他的很多家庭成员组成,你第一个要采取的行动应该是___
A. 询问一下在这个项目领导人的国家,通过家庭关系进行雇佣是否是一个常见的行为
B. 回顾一下每个人的简历,看他们是否合格
C. 要求项目经理提供额外的和他/她不相干的人名
D. 使用一名别的项目领导人,以防今后在项目中出现问题
【单选题】
XG63、开工会后,两名团队成员随便聊起了项目目标和可交付成果,很明显,他们对会上听到的信息有不同的理解。一个成员非常坚定,以至于另一个成员放弃了与他争论。在问了项目经理后,第二个成员确信是第一个成员误解了。在这时候,最佳的行动路径是什么?___
A. 第二个团队成员应给另一个团队成员发一封电子邮件,把他所发现的告诉他。
B. 在下次项目会议上,第二个团队成员应请有误解的团队成员介绍他的理解,使项目经理可以让所有人都有相同的理解。
C. 项目经理应给团队发一封电子邮件,重申项目目标可交付成果。
D. 在下次项目会议上,项目经理应花点时间回顾一下范围说明文件,目的是确定这个分歧以及其他错误的假设
【单选题】
CG1、关于合同和卖方评估的信息可以在下列哪一份文件中找到?___——(第六版最新全套机密真题及详细解释,请私加微信yoyosun2019)
A. 项目整体计划
B. 变更管理计划
C. 采购管理计划
D. 项目计划
【单选题】
CG2、有关如何处理多个供应商的信息可以从哪里找到?___
A. 采购管理计划
B. 变更管理计划
C. 项目整体计划
D. 项目计划
【单选题】
CG3、在加入一个新项目时,项目经理了解到与多个供应商签订合同,提供项目服务,若要收集有关供应商的具体信息以及识别相关方,项目经理应该怎么做?___
A. 审查项目章程
B. 审查采购文件
C. 与供应商高级管理层会面
D. 咨询之前与这些供应商合作过的项目经理
【单选题】
CG4、一家公司必须为他们的软件实施项目选择一个卖家。项目经理不能准确估算工作范围或成本。项目经理应该考虑哪种合同类型?___
A. 工料合同
B. 固定总价合同
C. 总价加激励费用合同
D. 成本加固定费用合同
【单选题】
CG5、公司决定使用外部供应商来推出一项新产品。应该提供下列哪一项给处于候选名单中的供应商?___
A. 详细的项目计划
B. 工作说明书
C. 意向书
D. 供应商管理计划
【单选题】
CG6、项目经理认识到可交付成果必须经过一名网络设计专家审查,但该专家目前不在公司。项目经理需要搜集一名提供商来协助这项任务。若要说明这些项目需求,建议邀请书中应包含下列哪一项?___
A. 风险分解结构
B. 工作说明书
C. 组织分解结构
D. 工作分解结构
【单选题】
CG7、评估一份建议书时,下列哪一项是有效评估标准?___
A. 验收标准
B. 采购过程
C. 财务能力
D. 采购保证计划
【单选题】
CG8、一个具体、定义明确的可交付成果正由一家公司位于某个成本较低国家的机构开发,管理层决定将该部分公司出售给另一家组织。项目经理被认为是替换该机构所提供的资源,完成可交付成果。若要按预算且将风险保持在较低水平的情况下交付,项目经理应该怎么做?___
A. 获得新的项目资源参与项目,开发可交付成果
B. 与一家外部公司签订固定总价合同,开发可交付成果
C. 以工料合同方式雇佣分包商,完成可交付成果
D. 培训前被分配到其它任务的项目资源,开发可交付成果
【单选题】
CG9、项目经理打算向供货商采购服务。服务范围具有清晰定义。但是,项目经理希望在后续阶段服务范围的变更较小。项目经理应该采用下列哪一项合同类型?___
A. 固定总价合同
B. 工料合同
C. 成本加激励酬金合同
D. 成本加奖励费合同
【单选题】
CG10、一份成本加激励费用合同(CPIF)包含:-$100,000的目标成本。-$20,000的目标费用。-$30,000的最高费用。-$15,000的最低费用。-80/20的分配比率。项目的实际成本为$150,000。项目完工时,买方应该支付的最终价格是多少?___
A. $150,000
B. $165,000
C. $170,000
D. $180,000
【单选题】
CG11、目前有两家公司要签署一个固定价格加奖金的合同。双方已经谈妥:合同的目标成本是200,000美元,目标费是30,000美元,因此合同的目标价格是230,000美元。买方还设定了270,000美元的最高价以及七三开的分成比率。如果卖方以170,000美元的实际成本完成了合同,除了合同的成本外,买方还要付给卖方多少费用?___
A. 21,000美元
B. 35,000美元
C. 39,000美元
D. 51,000美元
【单选题】
CG12、买方和卖方商定了一个总价加激励的合同,合同的目标成本是200000美元,目标利润是30000美元,目标价格是230000美元,双方还商定了最高价格为270000美元,分享比率为70/30,如果卖方完成合同的实际成本为170000美元,那么买方要向卖方支付多少利润?___
A. 21000美元
B. 35000美元
C. 39000美元
D. 51000美元
【单选题】
CG13、你目前正从事一项复杂的采购工作。你必须在签订合同前和对方在许多方面上达成共识,主要包括权力与义务、适用性条款和条件、合同融资、技术和商业管理方法以及合同价格。你为谈判会议制定了日程。对方将有8名代表到会,而你将派出10名代表出席。由于这项采购于过于复杂,合同谈判应该如何处理___
A. 借助于第三方的力量来解决
B. 提出多种选择条件以供抉择
C. 将此次合同管理作为一项有着特定的投入和产出的独立过程来处理
D. 通过与供应商建立一种伙伴协定来解决
【单选题】
CG14、卖方被授予一个管道建设合同。合同条款规定要在开始工作之前发布工作计划以取得买方的批准,但是卖方未能提供工作计划。下列哪项是买方的项目经理最好的做法?___
A. 记录意向书
B. 开发工作计划并向卖方发布
C. 发布违约信
D. 向卖方发布中止工作表,直到编制完工作计划
【单选题】
CG15、合同一旦签订,就有法律效力,除非:___
A. 一方不能履行。
B. 一方不能为其工作融资。
C. 它违反了法律。
D. 任何一方的法律顾问宣告其无效
【单选题】
CG16、合同的三个主要部分是什么?___
A. 要约、承诺和议价
B. 增值、议价和伦理应答
C. 议价、诚实和要约
D. 可交付成果、义务承诺和法律目标
【单选题】
CG17、采购审计已经结束,合同收尾也已完成。作为合同收尾的组成部分,项目经理应该利用下列哪一项工具来管理合同文件?___
A. 利用记录管理系统来存档合同文件
B. 利用PMIS来更新组织过程资产
C. 利用互联网来发布文件
D. 利用采购文档,这是一整套索引化的合同
【单选题】
CG18、作为记录管理系统的一部分,你试图确保所有的采购记录都已记入文件并加上了索引。下列哪项你不必担忧?___
A. 建议书
B. 工作声明
C. 条款
D. 谈判过程
【单选题】
CG19、签约公司未达到质量标准,并且可交付成果频繁延迟,项目经理发现有合同条款无法确保卖方提高绩效,为避免卖方降低绩效,项目经理本应采取何种行动?___
A. 让项目经理团队执行影响分析
B. 实施采购绩效审查
C. 实施风险再评估
D. 参与合同的详细拟定
【单选题】
CG20、由于之前类似项目的经验,一名供应商被选择来执行工作说明书。在项目执行期间,供应商宣布他们无法履行其责任。为了确保在选择供应商时进行正式评估审查,项目经理应完成哪一项工作?___
A. 定义并利用加权标准
B. 组织投标人会议
C. 准备独立估算
D. 利用德尔菲技术
【单选题】
CG21、一家组织收到五家资格预审合格的项目服务供应商的建议书,供应商的选择将以多项指定标准的评估为基础,现在要求根据提交的建议书缩减到二名供应商若要获得缩减名单,项目经理应该使用下列哪项工具或技术?___
A. 供应商分级系统
B. 加权系统
C. 合同谈判
D. 独立估算
【单选题】
CG22、合同履行期间,你发现供方的一个子承包商按照一个错误的规范进行工作。为了保证你的项目进度,你直接为这个子承包商提供了正确的规范。你的行为是:___
A. 对的,因为你必须控制进度
B. 不对,因为这个子承包商不会遵循你的要求
C. 对的,因为你的供方没有采取行动
D. 不对,根据合同惯例,这个纠正措施应该由你的供方发布
【单选题】
CG23、分包商的公司不能根据合同条款执行服务。项目经理接下来应该怎能做?___
A. 查看采购协议中的提前终止条款。
B. 与团队成员头脑风暴。
C. 更新风险管理计划。
D. 请求与项目发起人开会获得建议。
【单选题】
CG24、买方利用许多方法激励卖方尽早完成或者按照合同规定的时间表完成项目工作。其中一个方法是清偿损失额。从卖方的角度看,清偿损失额是什么形式的激励:___
A. 积极
B. 消极
C. 名义上的
D. 造成风险的
【单选题】
CG25、你在选择某种评估标准来评估供应商建议书,其中有一条标准是要求供应商的资源要有民用建筑工程学位,以及至少三年以上经验。这一评估技术是:___
A. 加权系统
B. 采购谈判
C. 独立估算
D. 筛选系统
【单选题】
CG26、作为项目整合管理人员,你的主要工作是协调大量承包商的工作。你目前的项目是用完全依靠全球卫星定位的空中交通控制系统替代老的系统。项目已经接近尾声。你有15个承包商和大量的其它供货商。其中几个承包商非常容易共事。你的组织未来还将再次雇佣他们。其中一个承包商每隔一周就提出变更请求,要求增加经费。另一个从来没有提出过变更要求。两个公司在遵守管理规定方面遇到了困难,但是都还够按时交货。在项目结束阶段你应该:___
A. 进行趋势分析
B. 通过挣值评估在本项目中获得的经验
C. 要求每个承包商与你单独见面,费用由他们自己承担
D. 进行采购审核
【单选题】
CG27、采购审计指对从规划采购过程到控制采购过程的整个采购过程的结构性回顾。采购审计的主要目标是什么?___
A. 测定你目前的合同问题,以便对合同条款进行更改和修正
B. 鉴别成功和失败从而能借鉴到此项目或执行组织的其他项目的采购事项
C. 确保卖方按照合同所列条款执行
D. 确保买方按照合同所列条款执行
【单选题】
CG28、项目经理终止一份包含两部分设计报告的合同,因为第一部分不能满足工作说明书中的标准,在新一轮提议申请后,选择委员会将新合同授予另外一个设计师。在合同收尾过程中,项目经理应进行下列哪一项?___
A. 审查采购过程。
B. 更新项目管理计划。
C. 将终止合同包含进经验教训文档中。
D. 为终止的合同准备一份完工证明。
【单选题】
CG29、一家施工公司为一个建筑项目部件采购召开投标人会议。受到投标人的建设书并评审。其中一个供应商提出非常优惠的价格,但是根据内部专家判断,该价格对于开展持续性的业务是不现实的。项目经理接下来应该怎么做?___
A. 让供应商提供成本结构的补充信息
B. 让采购部门迅速签订合同
C. 在合同中增加处罚条款,确保供应商履行义务。
D. 相应地更改成本基准
【单选题】
CG30、项目经理获得供应商回复,并选择了一名供应商提供项目的其中一个关键组成部分。项目经理完成的是下列哪一个过程?___
A. 管理采购
B. 指导和管理项目工作
C. 规划采购管理
D. 实施采购
【单选题】
CG31、下列哪一项与实施采购过程相关?___
A. 获取卖方答复,选择卖方并授予合同的过程
B. 制定项目购买决议,确定方法和识别潜在卖方的过程
C. 完成每个项目采购的过程
D. 管理采购关系,监督合同履行以及做出所需变更和更正的过程
【单选题】
CG32、一家信息技术(IT)公司正在竞争一份合同。IT公司必须准备一份建议书,然而,买方的需求没有明确定义。下列那一项将有助于IT公司定义买方的需求?___
A. 自制或外购解决方案
B. 参与投标人会议
C. 采购谈判
D. 编制工作说明书
【单选题】
CG33、过去承包商承诺过度,但却往往不能交付,若要在采购过程中澄清对潜在的承包商的要求,使用下列哪一项?___
A. 投标人会议
B. 加权评分模型
C. 专家判断
D. 合格卖方清单
【单选题】
CG34、实施采购阶段中召开的投标人会议的结果是:___
A. 合同工作说明书
B. 建议书
C. 对所需工作有了一个清晰的、共同的理解
D. 合同
【单选题】
CG35、人力资源总监开展书面形式的员工绩效审查,希望将这种低效率过程替换为一种在线自动化解决方案,下一步将制定___
A. 项目管理计划
B. 项目章程
C. 工作分解结构
D. 招标书
欢迎使用我爱刷题
×
微信搜索我爱刷题小程序
温馨提示
×