【多选题】
Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
BCE
解析
暂无解析
相关试题
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
【多选题】
vMotion can be performed between which three physical boundaries? (Choose three.)___
A. Between two vCenter Server Systems
B. Between two vSphere Distributed Virtual Switches
C. Between two vCenter Server Datacenter objects
D. Between two VMware NSX Layer 4 segments
E. Between two NFS datastores
【多选题】
An administrator configures vSphere Replication for a virtual machine and enables multiple point in time (PIT) instances under the recovery settings in the Configure Replication wizard. Which two statements are correct for vSphere Replication with multiple point in time instances enabled? (Choose two.)___
A. vSphere Replication retains a number of snapshot instances of the virtual machine on the target site based on the retention policy that you specify.
B. vSphere Replication uses the virtual machine's snapshot instances to define the target site Point in Time instance based on the retention policy that you specify.
C. vSphere Replication does not support virtual machines with snapshots.
D. vSphere Replication supports virtual machines with snapshots.
【多选题】
An administrator is virtualizing a physical application server and adding it to an existing multi-tiered vApp. The application license is currently tied to the physical NIC's MAC address, so the administrator needs to ensure the license will function properly in the virtual machine. Which two actions can the administrator take to satisfy this task? (Choose two.)___
A. Set the MAC address for the vNIC in the guest operating system.
B. Install the physical server's NIC into the ESXi host.
C. Configure the MAC address for the vNIC using the vSphere Web Client.
D. Assign the physical server NIC's MAC address in the vSphere Distributed Switch.
【多选题】
Which two Fibre Channel zoning options are supported with vSphere 6.x? (Choose two.)___
A. Single-Initiator
B. Single-Initiator-Single-Target
C. Multiple-Initiators-Single-Target
D. Multiple-Initiators-Multiple-Targets
【多选题】
An administrator is attempting to remove an ESXi 6.x host from a vSphere Distributed Switch (vDS). When the administrator attempts to remove the host, the following error is observed: <The resource '16' is still in use.> What three steps are needed to successfully remove the host from the switch? (Choose three.)___
A. Select Manage Ports on the vDS for the host.
B. Locate all ports currently in use on the vDS for the host.
C. Migrate or delete any vmkernel or virtual machine adapters associated with the switch.
D. Remove all network cards from the switch before trying to remove the host.
E. Create a standard switch for everything to be automatically be migrated to.
【多选题】
Which two Virtual SAN related actions might start resynchronization of virtual machine objects? (Choose two.)___
A. Editing a virtual machine storage policy to increase the number of replicas.
B. Editing a virtual machine storage policy to reduce the number of replicas.
C. Editing a virtual machine storage policy to increase the number of disk stripes.
D. Editing a virtual machine storage policy to reduce the number of disk stripes.
【多选题】
An administrator is troubleshooting basic network connectivity issues. Which two scenarios are potential issues that this administrator might face? (Choose two.)___
A. The vSwitch is not attached to the correct physical network.
B. The portgroup is not configured to use correct VLAN.
C. Traffic shaping is configured incorrectly.
D. Jumbo frames is configured incorrectly.
【多选题】
Which three items should be validated prior to installing ESXi 6.x? (Choose three.)___
A. Remote Storage has been disconnected.
B. Installation media is available.
C. Server hardware clock is set to UTC.
D. Storage has been partitioned with a VMFS volume.
E. Network cards have been setup to use Jumbo
F. rames.
【多选题】
An administrator is performing an interactive installation of ESXi 6.x. Which three options are available for installation? (Choose three.)___
A. DVD
B. USB
C. PXE
D. Scripted
E. Auto Deploy
【多选题】
After installation of a host in your test environment, you need to move it to production. The only major change that needs to be made is that the hostname of the server needs to change. What are two ways that an administrator can change the host name without editing configuration files on the host directly? (Choose two.)___
A. Login to the Direct Console User Interface and change it from here.
B. Edit the Default TCP/IP Configuration from the vSphere Web Client.
C. Use the Ruby vSphere Client to send a script to the ESXi host that updates the hostname.
D. Update the information in DNS and the
E. SXi host will automatically update with these changes.
【多选题】
An administrator has unsuccessfully attempted several times to install an Operating System inside a virtual machine. The administrator finds that the installation fails at random intervals. Which two actions can be taken to resolve this issue? (Choose two.)___
A. Verify the md5sum and if invalid, download the installation files again.
B. Attempt the installation an additional time.
C. Attempt to use a different installation media or installation method.
D. Create a new virtual machine and attempt the installation with the existing media.
【多选题】
VMware tools is failing to install on a Microsoft Windows virtual machine. What are two possible situations that would prevent the installation? (Choose two.)___
A. The VMware tools installation media is corrupt.
B. The incorrect Operating System was selected in the virtual machine options.
C. The software prerequisites have not been installed.
D. The prerequisite services have not been started.
推荐试题
【单选题】
MKA161在项目执行阶段,供应商选择团队收集评估资料,做出选择客户关系管理体系的决策。对于这项工作,项目经理会采取下面那个方法呢?___
A. 建议评估表
B. 自制或外购表
C. 采购工作描述
D. 挣值分析
【单选题】
MKA162一家公司以1公斤每包的价格销售咖啡。在质量管理计划阶段,项目经理发现装包机器的历史标准偏差为1克。控制图应该使用哪一个控制限制?___
A. 1,000-1,006克
B. 994-1,0001克
C. 996-1,006克
D. 997-1,003克
【单选题】
MKA163职能经理雇佣了一名新团队成员,项目经理认定其为一名优秀的项目人员,但是项目经理在后来认识到这名新成员缺乏一些让项目成功所必须的技术专业知识。项目经理下一步该怎么做?___
A. 释放该人员,并将该人员分配到另一个项目上
B. 确保新团队成员获得必要的技术培训
C. 要求职能经理确保团队成员获得必要培训
D. 更新项目管理计划,修订项目范围,以适应技术技能缺乏的情况
【单选题】
MKA164项目团队主管通知项目经理一个阶段已经完成,项目经理下一步应该怎么做?___
A. 更新项目计划,并继续下一个阶段
B. 向客户提供阶段可交付成果
C. 接受可交付成果
D. 验证可交付成果
【单选题】
MKA165委员会将要从提交的一份清单中选择项目,应该使用下列哪一项选择标准?___
A. 战略一致性需求,成本效率和可行性。
B. 根据首席执行官的决定排列项目的优先顺序。
C. 启动具有最佳文件计划的项目。
D. 解决主要相关方的需求。
【单选题】
MKA166项目经理向PMO团队呈交项目团队报告。PMO团队的一名高级成员认为当地政府机构未参与到该项目中。因此,公司可能必须支付罚款。项目经理疏漏于下面的哪项工作?___
A. 项目相关方识别
B. 沟通计划
C. 项目相关方管理战略
D. 需求计划
【单选题】
MKA167审查项目章程之后,项目经理下一步应该做什么?___
A. 制定项目进度表
B. 收集需求
C. 定义产品范围
D. 制定项目范围说明书
【单选题】
MKA168一个新项目需要一名关键项目人员的支持,该人员是有多个项目共用的,项目经理联系人力主管,希望获得该人员的参与,但却收到了负面答复。项目经理下一步该怎么做?___
A. 与其他项目经理协商,提前让出该项目人员。
B. 聘用一名拥有类似技能集的外部承包商来支持实施。
C. 利用管理层的影响来获得这名项目人员的时间。
D. 在项目风险登记册中记录该风险,并制定一份风险减轻计划。
【单选题】
MKA169当新进公司的发起人B替代A时,项目已接近完工,项目经理首先应该怎么做?___
A. 与发起人B会面,确定是否需要任何项目变更
B. 根据发起人A的目标完成项目
C. 开始变更控制
D. 更新相关方登记册
【单选题】
MKA170在项目执行阶段之前,一名新项目经理被任命管理项目,前任项目经理在完成交接工作之前就已辞职,新项目经理需要了解项目开展的目的和理由。下列哪一份文件将为新项目经理提供该信息?___
A. 商业文件
B. 项目管理计划
C. 项目进度基准
D. 项目章程
【单选题】
MKA171什么时候应该寻求项目可接受成果的正式验收?___
A. 在交付成果安装在客户系统之前
B. 在可交付成果安装在客户系统之后,
C. 在项目经理证明所有客户需求均已满足之后。
D. 在项目经理汇报所有客户需求均已满足之后。
【单选题】
MKA172项目经理接管一个执行阶段的项目,在对项目进度进行初步审查期间,项目经理注意到与特定关键路径活动有关的信息不完整,有些活动还存在风险。项目经理如何才能确定每项活动的责任?___
A. 工作分解结构
B. 责任分配矩阵
C. 组织分解结构
D. 风险登记册
【单选题】
MKA173下面哪一个选项最好的描述了属性样本以及变量样本?___
A. 属性样本与预防有关,而变量样本与监督有关
B. 属性样本与一致性有关,而变量样本与一致性的程度有关
C. 属性样本与具体原因有关,而变量样本与任何原因有关
D. 两者是同一概念
【单选题】
MKA174为了创建项目进度计划,项目经理估算资源活动制约因素。全球项目团队成员在不同的时区并遵循不同的节假日。另外,团队成员被分配到多个不同项目。若要更好的理解资源制约因素以及对项目的影响,项目经理应该怎么做?___
A. 创建资源分解结构。
B. 执行蒙特卡洛分析。
C. 执行资源储备分析。
D. 创建资源日历。
【单选题】
MKA175一家公司的组织形式是每个职能经理负责各自的项目部分。在这种类型的组织中,项目经理的典型角色是什么?___
A. 协调员和联络员
B. 分包商
C. 主管
D. 项目组合经理
【单选题】
MKA176在执行一个实施法规变更的项目时,根据专业技术专家的建议,项目经理发现新流程不符合法规指导方针。一个项目变更要求额外的资源,否则项目会受到的负面影响。项目经理首先应该怎么做?___
A. 更新项目质量管理计划
B. 评估变更,并提交更新的资源计划以供批准。
C. 修改沟通管理计划
D. 进行成本效益分析
【单选题】
MKA177两个互不相关的低影响风险同时发生,使项目进度受到了危害。项目经理接下来应该怎么做?___
A. 赶工
B. 创建一份项目变更请求
C. 上报给项目发起人
D. 查阅风险管理计划
【单选题】
MKA178一项目经理正在解决两名团队成员间的纠纷。一个人说系统应在测试之前集成,另一个说每个系统应该在集成之前分别测试。该项目包含30个人,要集成12个系统。出资人要求集成要按时。项目经理应该怎么说能够最好的解决这个冲突?___
A. 按我说的方法做
B. 让我们冷静下来,把工作做完
C. 我们先都冷静一下,下周再来处理
D. 让我们集成之前先部分测试,集成之后再全部测试
【单选题】
MKA179完成定义范围过程后,项目经理应该使用哪项技术来生成可靠估算并管理成本和活动历时。___
A. 分解
B. 紧前关系绘图法
C. 挣值管理
D. 确立基准
【单选题】
MKA180项目A的交付取决于项目B,项目A的项目经理发现项目B提交了一项变更请求,这会使项目B推迟两个月。项目A的项目经理下一步该怎么做?___
A. 与项目B的项目经理协商拒绝项目B的变更请求。
B. 审查项目A的风险应对计划,获得风险减轻措施。
C. 创建一项变更请求,反映项目A后续的进度偏移。
D. 要求项目A的项目发起人干预
【单选题】
MKA181项目经理正在向管理层汇报,确定出一个负的进度偏差和正的成本偏差。下列哪一项结论是合理的?___
A. 项目落后于进度,但是可以通过增加资源赶上进度
B. 项目超前于进度,但是超出预算,需要进一步调查
C. 项目落后于进度,超出预算,并引发特别关注
D. 项目超前于进度,低于预算,进展无明显事件
【单选题】
MKA182询问团队成员各自工作活动的时间估算,以及为每项活动讨论日历日期协议包含在哪一项?___
A. 制定进度计划
B. 控制进度
C. 定义活动
D. 估算活动持续时间
【单选题】
MKA183你负责一两年期的项目,该项目已经进行了一半,要在全国的外地办事处部署新技术。升级马上要完成时,一飓风造成了停电。当电力恢复时,所有的项目报告和历史数据都丢失了,没有办法找回。应该怎么做以减轻该风险?___
A. 买保险
B. 计划储备基金
C. 监测气象,建立应急计划
D. 在飓风期外安排安装工作
【单选题】
MKA184分包商的公司不能根据合同条款执行服务。项目经理接下来应该怎能做?___
A. 查看采购协议中的提前终止条款。
B. 与团队成员头脑风暴。
C. 更新风险管理计划。
D. 请求与项目发起人开会获得建议。
【单选题】
MKA185在以下哪种合同中,更容易进行合同范围变更?___
A. 固定价
B. 固定价加激励费
C. 成本加酬金
D. 以上都不是
【单选题】
MKA186项目范围已经核实,而且可交付成果已完成,并获得相关方的验收。根据这些可交付成果,组织过程资产和项目计划,项目经理接下来该做什么?___
A. 结束项目或阶段
B. 将绩效报告给团队
C. 安排项目启动大会
D. 开展质量保证审查
【单选题】
MKA187执行项目时,项目经理认识到其中一项任务的期限估计不足,下列哪项工具可以用来尽量减少影响?___
A. 规划风险应对
B. 快速跟进
C. 预测
D. 失效模式和影响分析
【单选题】
MKA188项目经理向客户提交可交付成果以供批准,客户称可交付成果没有达到验收标准,并要求项目经理对可交付成果进行返工,客户还希望查看返工进度的相关信息,项目经理接下来应该执行哪一项活动? ___
A. 配置识别
B. 配置状态记录
C. 配置控制
D. 配置核实与审计
【单选题】
MKA189项目经理接管了一个项目,该项目曾在范围管理方面存在挑战,项目变更控制计划要求项目发起人决定是否将变更纳入项目,若要减少当前项目范围的问题,项目经理应该建议下列哪一项?___
A. 由变更控制委员会来对变更做出最终决定
B. 由项目经理和发起人对变更做出最终决定
C. 由整个项目团队对变更做出最终决定
D. 仍由发起人对变更做出最终决定
【单选题】
MKA190在一个多阶段项目的中途,由于对该项目不再有组织上的需求,发起人终止了项目工作。下列哪种情况可以避免这个现象?___
A. 在制定项目管理计划时多花些精力
B. 正确制定项目商业论证
C. 在项目开始时分析法律要求
D. 更为详细地描述项目工作说明书
【单选题】
MKA191你的项目曾经很难获得项目管理计划的正式批准,因为项目相关方太多了,他们的要求不能放在项目里。这些项目相关方拖延项目,他们一次次的讨论他们的要求。项目最终得到了批准,于6个月前启动。下列哪项不是好的预防措施?___
A. 记录哪些要求没有放在项目里
B. 确实项目相关方没有用变更控制过程作为手段把之前的要求加回项目里
C. 使用问题登记簿
D. 会见项目相关方,重申不能放在项目里的工作
【单选题】
MKA192卖方角度,在下述哪种情况下,合同被视为已经收尾。___
A. 工作范围已经完成
B. 经验教训已经完成
C. 档案已经完成
D. 最终付款已经支付
【单选题】
MKA193项目经理确定应聘者,主要是基于他们的能力是否能够完成既定的项目。那么接下来项目经理应怎么做呢?___
A. 与职能经理协商,为项目分配资源
B. 与确定的资源协商让其加入项目
C. 立即将资源需求上报给项目发起人
D. 将能力需求更新到风险管理日志中
【单选题】
MKA194在近期项目状态会议上,一名相关方表示未收到近期会议上提出的某个问题的根本原因分析。项目经理发现该名相关方没有包含在报告分发名单中。项目经理首先应该怎么做?___
A. 参考风险登记册
B. 更新沟通管理计划
C. 执行变更请求
D. 更新相关方登记册
【单选题】
MKA195已获批准的项目章程能为项目经理提供从事下列哪一项的职权?___
A. 与客户就项目范围进行谈判
B. 定义项目的商业论证
C. 将资源应用到项目活动中
D. 与子供应商签署合同
【单选题】
MKA196项目团队在项目规划阶段收集需求。客户的信息技术团队所提交的某些需求与客户的商务部提出的需求相冲突。应使用下列哪一项来与相关方解决这个问题?___
A. 开展访谈
B. 引导式研讨会
C. 召集焦点小组会议
D. 执行需求头脑风暴
【单选题】
MKA197一名新项目经理被任命管理一个目前落后于进度的项目,新项目经理应使用挣值技术来确定下列哪一项?___
A. 资源分解结构
B. 与进度延迟有关的风险
C. 项目中的范围蔓延
D. 基准偏差
【单选题】
MKA198产品已经试验性地推出市场。但客户报告存在一些问题。用于纠正这些问题的成本应归为下列哪一类成本?___
A. 预防成本
B. 修复成本
C. 内部损失成本
D. 外部损失成本
【单选题】
MKA199你正负责为世界银行的一个大项目准备成本估计。因为你的估计需要尽可能的准确,所以你决定准备一个自下而上的估计。你的第一步是:___
A. 确定在进程中需要的计算工具
B. 利用前面的项目成本估计来帮助准备这个成本估计
C. 确定并且估计每一个工作条目的成本
D. 向这个方面的专家咨询,并且将他们的建议作为你的估计的基础
【单选题】
MKA200项目经理确定项目可交付成果延迟。项目落后于进度,并超过预算5%。在审查文件和状态报告之后,项目经理下一步该怎么做?___
A. 执行风险再评估,作为监督风险过程的组成部分。
B. 更改进度基准,作为控制进度过程的组成部分。
C. 通过执行整体变更控制流程启动变更。
D. 继续项目执行,并在后一阶段中解决这个问题。