刷题
导入试题
【多选题】
What are three valid disk configurations for the vSphere Data Protection 6.x Appliance? (Choose three.)___
A. 500GB
B. 1TB
C. 1.5TB
D. 2TB
E. 4TB
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
ABC
解析
暂无解析
相关试题
【多选题】
Which three connection types are available when configuring a vSwitch in the vSphere Web Client? (Choose three.)___
A. VMkernel Network Adapter
B. Physical Network Adapter
C. Virtual Machine Port Group for a Standard Switch
D. vMotion Network Adapter
E. vSAN Network Adapter
【多选题】
Which three features can be enabled for a new host cluster? (Choose three.)___
A. Storage Distributed Resource Scheduling
B. High Availability
C. Fault Tolerance
D. Distributed Resource Scheduling
E. Virtual SAN
【多选题】
An administrator receives a report that no real time statistics are available for a virtual machine in the vCenter Server inventory. Which two statements indicate likely causes of the problem? (Choose two.)___
A. The virtual machine is powered off.
B. The host containing the virtual machine is disconnected from vCenter Server.
C. There is insufficient real time data to display the information.
D. The vCenter Server service is not running.
【多选题】
Your manager has given you a bash script that retrieves data for ESXi 6.x host configurations. This data needs to be collected right after the installation of a host and must be run directly on the host. Which two actions can be used to run this script on an ESXi host? (Choose two.)___
A. Connect to the host with Ruby vSphere Console and run the script from there.
B. Enable SSH access from the Direct Console User Interface.
C. Enable the ESXi Shell from the
D. irect Console User Interface.
【多选题】
Which two are true about the Risk badge in vRealize Operations? (Choose two.)___
A. The Risk badge indicates potential future problems that may degrade the performance of the system.
B. Risks may require attention in the near future.
C. The Risk badge indicates problems that are degrading performance of the system.
D. Risks require attention now to correct system performance problems.
【多选题】
vSphere Update Manager allows which two virtual machine attributes to be upgraded? (Choose two.)___
A. Virtual machine firewall policies for NSX.
B. Software Packages in the virtual machine.
C. Virtual machine Hardware Version.
D. VMware Tools Upgrade.
【多选题】
What are two benefits of using NFS 4.1 with vSphere 6.x as compared to NFS 3? (Choose two.)___
A. NFS 4.1 supports Kerberos Authentication
B. NFS 4.1 supports multipathing
C. NFS 4.1 supports IPv6
D. NFS 4.1 supports hardware acceleration
【多选题】
Which three statements are true regarding Fault Tolerance? (Choose three.)___
A. Applications need to be continuously available to users.
B. Applications without native clustering capabilities can be protected.
C. Custom clustering solutions are complicated to configure and maintain.
D. Applications that have 16 vCPUs are supported.
E. Prevents application crashes by analyzing the workload and correcting problems.
【多选题】
Which two statements are true regarding VMware vSphere Flash Read Cache (vFRC)? (Choose two.)___
A. Cache fills and cache evictions happen in the granularity of a cache block size.
B. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying storage.
C. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying cache data.
D. Cache fills and cache evictions happen in the granularity of the disk block size.
【多选题】
What are two possible causes of Storage Distributed Resource Scheduler (SDRS) being disabled on one or more virtual machine disks in a datastore cluster? (Choose two.)___
A. The virtual machine has vSphere Fault Tolerance disabled.
B. The virtual machine is a template.
C. The virtual machine swap file is on a shared datastore.
D. The disk is a CD-ROM/ISO file.
【多选题】
An administrator attempts to install vCenter Single Sign-On Server. The installer returns an error message indicating that the installation failed. Prior to the installation, all setup prerequisites were met. The administrator has generated a vCenter Server Single Sign-On support bundle. Which two files should the administrator analyze to determine the cause of the failure? (Choose two.)___
A. Server\utils\logs\imsTrace.log
B. Server\utils\logs\install.txt
C. %TEMP%\utils\logs\vminst.log
D. %TEMP%\vminst.log
【多选题】
An administrator is unable to remove an ESXi 6.x host from a vSphere Distributed Switch. What are two likely reasons for this issue? (Choose two.)___
A. Vmkernel interfaces on the switch are still in use.
B. VM Network port group adapters are connected to different switch.
C. Physical NICs are migrated to different switch.
D. VM Network adapters are connected to this switch.
【多选题】
Which two Identity Sources are available to add for vCenter Single Sign-On authentication? (Choose two.)___
A. LocalOS
B. OpenLDAP
C. NIS as an LDAP Server
D. VCMSDS
【多选题】
What are three goals of resource management within a cluster? (Choose three.)___
A. To prevent virtual machines from monopolizing resources and to guarantee predictable service rates.
B. To exploit undercommitted resources and overcommit with graceful degradation.
C. To provide solutions to potential problems that you might encounter when using vCenter Server.
D. To control the relative importance of virtual machines and provide flexible dynamic partitioning.
E. To provide additional network administration capabilities.
【多选题】
Which three actions can be taken as a result of executing the vSphere Update Manager 6.x scan and remediation wizards? (Choose three.)___
A. Install and upgrade software in virtual machines.
B. Upgrade the firmware on ESXi host devices.
C. Upgrade and Patch ESXi hosts.
D. Install and update third-party software on hosts.
E. Upgrade virtual machine hardware.
【多选题】
Which two statements are true about deploying and using vSphere Replication? (Choose two.)___
A. ESXi hosts managed by a single vCenter Server instance require a connection between the two vSphere Replication appliances.
B. Sites managed by different vCenter Server instances require a connection between the two vSphere Replication appliances.
C. Sites managed by different vCenter Server instances require the use of Site Recovery Manager and a connection between the two vSphere Replication appliances.
D. ESXi hosts managed by a single vCenter Server instance require a single vSphere Replication appliance.
【多选题】
An administrator is attempting to power on a virtual machine, but the task is hanging at 95%. What three scenarios best explain why this problem is happening? (Choose three.)___
A. A virtual machine question is currently being posed to the administrator.
B. Another task for the virtual machine or other component is already in progress.
C. The VMware High Availability cluster has insufficient resources to guarantee failover.
D. The host has lost access to the storage device containing the virtual machine files.
E. The host is under resource contention and unable to power on the virtual machine.
【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
【多选题】
Which two storage controller configurations can be used with Virtual SAN? (Choose two.)___
A. SAS controllers in Passthrough mode
B. SAS controllers in RAID0 mode
C. SAS controllers in RAID1 mode
D. SAS controllers in RAID10 mode
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
【多选题】
An administrator is deploying multiple Windows 2003 Virtual Machines from the same template. What two steps should be taken to avoid network conflicts? (Choose two.)___
A. Customize the guest operating system.
B. Install VMware Tools into the new virtual machines.
C. Copy the Microsoft Sysprep tools onto the vCenter Server system.
D. Ensure the e1000 vmnic is selected for each new virtual machine.
【多选题】
Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
推荐试题
【单选题】
在什么地方检查人工设置着陆标高的正确与否?___
A. 从起落架高度电门选择器上的刻度;
B. 在ECAM客舱压力页面;
C. 因为是自动设置的,所以无需检查。
【单选题】
冲压空气按钮在ON位时,则:___
A. PACK冲压空气进口风门开;
B. PACK冲压空气出口风门开;
C. 应急冲压空气进口风门开。
【单选题】
在PACK超温时,哪个传感器气动关闭PACK流量控制活门。___
A. 引气温度传感器;
B. 压气机超温传感器;
C. 压气机气动超温传感器。
【单选题】
什么情况下混合器风门开?___
A. 热空气活门在“OFF”位;
B. PACK 2在“OFF”位;
C. PACK 1在OFF位。
【单选题】
放气活门和安全活门的数量是?___
A. 一个放气活门、一个安全活门;
B. 一个放气活门、二个安全活门;
C. 二个放个活门、二个安全活门;
【单选题】
从客舱压力面板可控制哪个马达?___
A. 马达3;
B. 马达2和1;
C. 马达1。
【单选题】
两个PACK提供的冷空气温度相同吗?___
A. 相同;
B. 不相同。
【单选题】
正常情况下,PACK1供气给哪些区域?___
A. 前、后客舱;
B. 驾驶舱;
C. 驾驶舱、前、后客舱。
【单选题】
PACK流量控制活门在何种情况下会开始气动关闭?___
A. PACK压气机出口温度230℃;
B. 管道温度大于88℃;
C. PACK压气机出口温度达260℃。
【单选题】
发动机起动时,PACK流量控制活门是否会自动关闭?___
A. 是;
B. 否。
【单选题】
PACK控制器失效后,防冰活门气动控制PACK出口温度为多少?___
A. 15 ℃;
B. 18℃;
C. 12℃。
【单选题】
给厕所和厨房通风的空气来自哪里?___
A. 驾驶舱;
B. 客舱;
C. 单独的风扇。
【单选题】
在起飞和着陆期间,冲压空气风门处于什么状态?___
A. 全打开;
B. 半开;
C. 全关闭。
【单选题】
座舱失压时,PACK流量控制活门处于什么状态?___
A. 保持打开;
B. 保持关闭。
【单选题】
应急冲压空气进气门位于什么位置?___
A. 机身右下部;
B. 机身左下部;
C. 垂尾处。
【单选题】
增压主要通过什么来完成?___
A. 流量活门;
B. PACK控制器;
C. 外流活门。
【单选题】
当座舱增压使用人工模式时,放气活门的信号如何反馈?___
A. 只反馈给CPC1;
B. 只反馈给CPC2;
C. 反馈给CPC1和CPC2。
【单选题】
安全活门何时打开?___
A. △P=8.6PSI;
B. △P=7.8PSI;
C. △P=9.0PSI。
【单选题】
混合器混合何处来的空气?___
A. PACK1和PACK2出口空气;
B. 热空气压力调节活门出口和客舱再循环风扇来的空气;
C. PACK出口和客舱再循环风扇来的空气。
【单选题】
混合器风门的功用:___
A. 确保客舱有足够的空气;
B. 确保驾驶舱有足够的空气;
C. 确保货舱通气。
【单选题】
热空气压力调节活门调节后的空气压力为多少?___
A. 4PSI;
B. 比客舱压力高4PSI;
C. 比客舱压力高2PSI。
【单选题】
水分离器的功用:___
A. 收集水分;
B. 将水分冷凝;
C. 将水分喷射到冲压管道上。
【单选题】
电子舱通风系统有几种工作状态?___
A. 二种;
B. 三种;
C. 四种。
【单选题】
当电子舱通风系统处于开环路状态时,蒙皮空气进口和出口活门处于什么位置?___
A. 全部打开;
B. 进口活门打开,出口活门关闭;
C. 全部关闭。
【单选题】
外流活门上装有几个马达?___
A. 三个自动马达;
B. 两个自动马达和一个人工马达;
C. 一个自动马达和二个人工马达。
【单选题】
水引射器引出的水送到何处?___
A. 机外;
B. PACK进口;
C. 冲压空气。
【单选题】
当两个PACK失效时,应急冲压空气进气门如何工作?___
A. 自动;
B. 须人工将冲压空气按钮置ON位。
【单选题】
在起飞和着陆阶段,PACK冲压空气进气风门会自动关闭,这从那儿来的信号?___
A. 油门杆;
B. 空地电门;
C. 轮速信号。
【单选题】
冲压空气按钮控制:___
A. 冲压空气进气门;
B. 冲压空气出口气门;
C. 应急冲压空气进气门。
【单选题】
热配平空气活门主要用于:___
A. 调节PACK出口温度;
B. 通过增加热空气以使相应区域的温度理想化;
C. 调节混合器出来的空气。
【单选题】
后货舱的通风空气从何处排出机外?___
A. 外流活门;
B. 蒙皮上的文氏管;
C. 单独的排气口。
【单选题】
货舱通风控制器控制:___
A. 隔离活门;
B. 抽风扇;
C. 隔离活门和抽风扇。
【单选题】
模式电门置MAN位,将人工升降速率电门保持在向下位时,放气活门将:___
A. 关闭;
B. 打开;
C. 不动。
【单选题】
空气循环机的组成:___
A. 涡轮、风扇;
B. 涡轮、压气机;
C. 涡轮、压气机、风扇。
【单选题】
当电子舱通风系统处于中间环路状态时,蒙皮空气出口活门上的小风门打开条件:___
A. 飞机在空中,蒙皮温度大于34℃;
B. 飞机在地面,蒙皮温度小于27℃;
C. 飞机在空中 ,蒙皮温度小于27℃。
【单选题】
PACK出口气动传感器的功用:___
A. 用于ECAM显示;
B. 用于把温度信号送到CFDIU(三级故障);
C. 用于PACK控制器失效时,气动操纵防冰活门。
【单选题】
压气机过热气动传感器的功用:___
A. 探测到过热时,气动关闭流量控制活门;
B. 用于过热探测和在ECAM上显示;
C. 用于过热探测和把高温信号送给CFDIU。
【单选题】
当座舱高度达到多少时,将会触发座舱高度过高警告?___
A. 8800英尺;
B. 9550英尺;
C. 10000英尺。
【单选题】
空调系统安全活门的作用是?___
A. A.防止反压超压
B. B.代替外流活门
C. C.防止正,反压超压
D. D.组件失效时给客舱供气
【单选题】
有关外流活门错误的是?___
A. A.应急冲压门开且客舱内外压差<1PSI时,外流活门半开
B. B.当外流活门采用人工方式时,按DITCHING电门不能将它关闭
C. C.当外流活门采用人工方式时,将MANV/S电门扳到UP位并保持,外流活门将逐渐关闭
D. D.此航班使用1号马达,下一航班使用2号
欢迎使用我爱刷题
×
微信搜索我爱刷题小程序
温馨提示
×
请在电脑上登陆“www.woaishuati.com”使用