刷题
导入试题
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
BC
解析
暂无解析
相关试题
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
【多选题】
An administrator is using the Host Failures to Tolerate Admission Control Policy for a vSphere High Availability ___ cluster. When configuring this setting on the cluster, the administrator sees this error message: <Insufficient resources to satisfy HA failover level on cluster > What are two likely causes for the error? (Choose two.)(AB)
A. The hosts in the cluster are disconnected.
B. A host in the cluster is displaying an HA error.
C.
D. istributed Resource Scheduler has not been configured on the cluster.
【多选题】
What are two ways to identify TCP/IP stack information? (Choose two.)___
A. Using the vSphere Web Client
B. Using esxcli network ip netstack
C. Using esxcfg-netstack
D. Using the vSphere Client
【多选题】
Which two actions are required when enabling vFlash Read Cache for a virtual machine's virtual disk? (Choose two.)___
A. A value in the Virtual Flash Read Cache text box must be entered.
B. A Flash Resource Pool for Cache size reservation must be entered.
C. The Device backing and the block size must be configured.
D. The
E. nable virtual flash host swap cache check box must be selected.
【多选题】
What two IT infrastructure components are virtualized by vSphere Essentials? (Choose two.)___
A. Networks
B. Applications
C. Storage
D. Management
【多选题】
When attempting to access a virtual machine, an administrator is unable to login using the vSphere credentials. What two options are probable causes of the authentication failure? (Choose two.)___
A. The vSphere credentials have not been granted permissions.
B. The vSphere credentials are granted read-only permissions.
C. The vSphere credentials are granted no-access permissions.
D. The vSphere credentials are not a member of the local administrator group.
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
【多选题】
vMotion can be performed between which three physical boundaries? (Choose three.)___
A. Between two vCenter Server Systems
B. Between two vSphere Distributed Virtual Switches
C. Between two vCenter Server Datacenter objects
D. Between two VMware NSX Layer 4 segments
E. Between two NFS datastores
【多选题】
An administrator configures vSphere Replication for a virtual machine and enables multiple point in time (PIT) instances under the recovery settings in the Configure Replication wizard. Which two statements are correct for vSphere Replication with multiple point in time instances enabled? (Choose two.)___
A. vSphere Replication retains a number of snapshot instances of the virtual machine on the target site based on the retention policy that you specify.
B. vSphere Replication uses the virtual machine's snapshot instances to define the target site Point in Time instance based on the retention policy that you specify.
C. vSphere Replication does not support virtual machines with snapshots.
D. vSphere Replication supports virtual machines with snapshots.
【多选题】
An administrator is virtualizing a physical application server and adding it to an existing multi-tiered vApp. The application license is currently tied to the physical NIC's MAC address, so the administrator needs to ensure the license will function properly in the virtual machine. Which two actions can the administrator take to satisfy this task? (Choose two.)___
A. Set the MAC address for the vNIC in the guest operating system.
B. Install the physical server's NIC into the ESXi host.
C. Configure the MAC address for the vNIC using the vSphere Web Client.
D. Assign the physical server NIC's MAC address in the vSphere Distributed Switch.
【多选题】
Which two Fibre Channel zoning options are supported with vSphere 6.x? (Choose two.)___
A. Single-Initiator
B. Single-Initiator-Single-Target
C. Multiple-Initiators-Single-Target
D. Multiple-Initiators-Multiple-Targets
【多选题】
An administrator is attempting to remove an ESXi 6.x host from a vSphere Distributed Switch (vDS). When the administrator attempts to remove the host, the following error is observed: <The resource '16' is still in use.> What three steps are needed to successfully remove the host from the switch? (Choose three.)___
A. Select Manage Ports on the vDS for the host.
B. Locate all ports currently in use on the vDS for the host.
C. Migrate or delete any vmkernel or virtual machine adapters associated with the switch.
D. Remove all network cards from the switch before trying to remove the host.
E. Create a standard switch for everything to be automatically be migrated to.
【多选题】
Which two Virtual SAN related actions might start resynchronization of virtual machine objects? (Choose two.)___
A. Editing a virtual machine storage policy to increase the number of replicas.
B. Editing a virtual machine storage policy to reduce the number of replicas.
C. Editing a virtual machine storage policy to increase the number of disk stripes.
D. Editing a virtual machine storage policy to reduce the number of disk stripes.
【多选题】
An administrator is troubleshooting basic network connectivity issues. Which two scenarios are potential issues that this administrator might face? (Choose two.)___
A. The vSwitch is not attached to the correct physical network.
B. The portgroup is not configured to use correct VLAN.
C. Traffic shaping is configured incorrectly.
D. Jumbo frames is configured incorrectly.
【多选题】
Which three items should be validated prior to installing ESXi 6.x? (Choose three.)___
A. Remote Storage has been disconnected.
B. Installation media is available.
C. Server hardware clock is set to UTC.
D. Storage has been partitioned with a VMFS volume.
E. Network cards have been setup to use Jumbo
F. rames.
【多选题】
An administrator is performing an interactive installation of ESXi 6.x. Which three options are available for installation? (Choose three.)___
A. DVD
B. USB
C. PXE
D. Scripted
E. Auto Deploy
【多选题】
After installation of a host in your test environment, you need to move it to production. The only major change that needs to be made is that the hostname of the server needs to change. What are two ways that an administrator can change the host name without editing configuration files on the host directly? (Choose two.)___
A. Login to the Direct Console User Interface and change it from here.
B. Edit the Default TCP/IP Configuration from the vSphere Web Client.
C. Use the Ruby vSphere Client to send a script to the ESXi host that updates the hostname.
D. Update the information in DNS and the
E. SXi host will automatically update with these changes.
【多选题】
An administrator has unsuccessfully attempted several times to install an Operating System inside a virtual machine. The administrator finds that the installation fails at random intervals. Which two actions can be taken to resolve this issue? (Choose two.)___
A. Verify the md5sum and if invalid, download the installation files again.
B. Attempt the installation an additional time.
C. Attempt to use a different installation media or installation method.
D. Create a new virtual machine and attempt the installation with the existing media.
【多选题】
VMware tools is failing to install on a Microsoft Windows virtual machine. What are two possible situations that would prevent the installation? (Choose two.)___
A. The VMware tools installation media is corrupt.
B. The incorrect Operating System was selected in the virtual machine options.
C. The software prerequisites have not been installed.
D. The prerequisite services have not been started.
【多选题】
As part of a multisite Single Sign-On (SSO) deployment what two steps are required to ensure that a change to one Single Sign-On instance is propagated to the other instances? (Choose two.)___
A. Schedule a Replication Task on the primary instance
B. Select the first instance during the installation of subsequent instances
C. During the installation of each instance choose Linked-Mode
D. Enable Synchronize to Active Directory on each instance
【多选题】
You need to add an object to an existing vApp using the vSphere Web Client. How is this accomplished?___
A. Create an Object Inside the vApp.
B. Add an Object to a vApp.
C. Add an Object to the
D. atastore the vApp is located in.
推荐试题
【单选题】
闭路电视监控系统___为控制中心调度管理人员、(B)、列车司机等对车站的站厅、站台、出入口等主要区域提供监视服务。
A. 站务员
B. 车站值班员
C. 乘客
D. 值勤人员
【单选题】
上海轨道交通供电系统电压等级有两种降压模式:其中一种是___的二级降压供电模式。
A. 110kV/35kV/380V
B. 110kV/35kV/0.4kV
C. 110kV/0.4kV/220V
D. 110kV/380V/220V
【单选题】
世界各国城市电气化交通的直流供电电压都在550~1500VDC之间,上海地铁目前采用的是___。
A. 1000VAC
B. 1000VDV
C. 1500VAC
D. 1500VDC
【单选题】
迷流又称为___。
A. 直流电流
B. 杂散电流
C. 交流电流
D. 流动电流
【单选题】
在夏季使用空调时,一般把室温设置在___为宜。
A. 27℃
B. 25℃
C. 23℃
D. 29℃
【单选题】
“管建并举、管理为重、安全运营为本”是网络运营安全的___。
A. 总体目标
B. 指导思想
C. 原则
D. 方针
【单选题】
火灾时,除了疏散乘客外,如果消防人员还未到达,应该___。
A. 作好灭火准备,等待消防人员前来救火
B. 使用一切灭火器材进行灭火
C. 召集一切可以动员的人力(包括站内所有工作人员、清洁工、保安等),先行救火
D. 坚持等待
【单选题】
申通地铁集团的共同___:申城地铁,通向都市新生活。
A. 责任
B. 义务
C. 纲领
D. 使命
【单选题】
上海轨道交通标志外圈圆形状为“S”是___的代表。
A. 地铁
B. 城轨
C. 上海
D. 交通
【单选题】
申通地铁集团员工的行为准则:服从全局、爱岗敬业、___。
A. 服从领导
B. 尊重同事
C. 注意礼仪
D. 严于律已
【单选题】
申通地铁集团员工的行为准则:服从全局、___、严于律已。
A. 服从领导
B. 尊重同事
C. 爱岗敬业
D. 注重礼仪
【单选题】
集团的氛围要像军队般有序:严格遵守企业的___和工作规范,服从并参与团队的决策,守纪有序,令行禁止。
A. 规章制度
B. 员工守则
C. 令行禁止
D. 发展目标
【单选题】
轨道交通是城市的重要基础设施,是社会___事业。
A. 大众性
B. 生产型
C. 服务型
D. 公益性
【单选题】
74.集团的内部氛围要做到:像家庭般温馨、像学校般育人、___。
A. 像军队般有序
B. 像亲人般和蔼
C. 像兄弟般和睦
D. 像朋友般互助
【单选题】
___是申通地铁集团的管理目标。
A. 运行列车正点率达到100﹪
B. 有责行车重大、大事故为0
C. 乘客满意度达到100分
D. 员工因私死亡事故为0
【单选题】
上海地铁服务品牌追求内涵是:___。
A. 上海地铁,您的出行首选
B. 安全快捷舒适
C. 申城地铁,通向都市新生活
D. 城市让生活更美好
【单选题】
守信就是信守诺言,讲信誉,重信用,忠实履行自己承担的___。
A. 义务
B. 工作
C. 担子
D. 权力
【单选题】
无论你从事的工作有多么特殊,但是对岗位约束最不大的是___。
A. 岗位责任
B. 家庭美德
C. 规章制度
D. 职业道德
【单选题】
一个普通的从业者,既是别人服务的___,又是为别的群众服务的主题。
A. 对象
B. 目标
C. 客商
D. 主体
【单选题】
受记过处分,次月起六个月内岗位绩效工资下降___。
A. 30%
B. 50%
C. 80%
D. 100%
【单选题】
发生事故或突发事件时,未能履行职责及时作出处理的;故意拖延上报、瞒报、弄虚作假或推卸责任的,造成事故升级或危害扩大的,可给予___处分。
A. 记大过
B. 记过
C. 严重警告
D. 警告
【单选题】
承担经济赔偿责任的应一次性缴付,对确有困难的可从薪酬中扣缴、缴清为止。但每月扣缴金额不得超过本人月实际收入总金额的___。
A. 15%
B. 20%
C. 25%
D. 30%
【单选题】
职工累计工作已满10年不满20年的,年休假___天。
A. 5天
B. 10天
C. 15天
D. 20天
【单选题】
公务票仅限本人使用,不得转让、出借。违规使用、冒用、借予他人使用的,一经查获,公务票当场没收停用___个工作日,由所在单位给予行政警告处分并扣款1500元人民币。
A. 50
B. 100
C. 150
D. 200
【单选题】
城市轨道交通的线路,正线采用___钢轨。
A. 43kg/m
B. 50kg/m
C. 60kg/m
D. 75kg/m
【单选题】
___的作用是固定钢轨,阻止钢轨纵向和横向位移,防止钢轨倾斜,并能提供适当的弹性,将钢轨承受的力传递给轨枕或道床承轨台。
A. 板块
B. 支撑块
C. 道床
D. 扣件
【单选题】
一般无缝线路长度约为___左右。
A. 100~200米
B. 500~1000米
C. 1500~2000米
D. 10000~20000米
【单选题】
城市轨道交通正线线路大多采用混凝土短枕、混凝土___以及混凝土长枕。
A. 板块
B. 支撑块
C. 道床
D. 枕木
【单选题】
限界主要分为车辆限界、___、建筑限界、受电弓限界等。
A. 站台
B. 电机
C. 车体
D. 设备限界
【单选题】
每组道岔都有两个位置:___。
A. 锁闭和解锁
B. 定位和反位
C. 释放和吸起
D. 连接和断开
【单选题】
___之间的相互制约的关系,称为联锁关系。
A. 轨道、道岔和信号机
B. 进路、道岔和信号机
C. 控制台、进路和道岔
D. 控制台、轨道和道岔
【单选题】
信号设备设计原则是___原则。
A. 缺点—正常
B. 障碍—正常
C. 故障—运转
D. 故障—安全
【单选题】
发车站值班员必须在办好闭塞手续的基础上才能开放出站信号,列车出发后信号机自动关闭,这种方法,既要用人工操纵,又需要依靠列车的作用自动动作,所以叫做___。
A. 自动闭塞
B. 半自动闭塞
C. 移动闭塞
D. 准移动闭塞
【单选题】
进站引导信号显示为___。
A. 一个红色灯光
B. 一个月白色灯光
C. 一个红色灯光和一个月白色灯光
D. 一个黄色灯光一个绿色灯光
【单选题】
车站控制台在道岔被挤时会给出___。
A. 定位表示
B. 反位表示
C. 报警
D. 取消进路表示
【单选题】
列车自动监控系统英文缩写是___。
A. ATP
B. ATO
C. ATS
D. ATC
【单选题】
按供电重要性区分,信号系统电源的负荷属于___。
A. 一级负荷
B. 二级负荷
C. 三级负荷
D. 弱电负荷
【单选题】
车站___一般不设置生活用房。
A. 站厅层
B. 站台层
C. 收费区
D. 非收费区
【单选题】
正常情况下,不属于行车值班员的工作是___。
A. 监护列车运行状态
B. 播放人工广播
C. 乘客投诉
D. 车站登记工作
【单选题】
列车正线运营时,排除列车故障的主体是___。
A. 列车驾驶员
B. 运营调度
C. 指导司机
D. 车辆检修人员
欢迎使用我爱刷题
×
微信搜索我爱刷题小程序
温馨提示
×
请在电脑上登陆“www.woaishuati.com”使用