【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
【多选题】
vMotion can be performed between which three physical boundaries? (Choose three.)___
A. Between two vCenter Server Systems
B. Between two vSphere Distributed Virtual Switches
C. Between two vCenter Server Datacenter objects
D. Between two VMware NSX Layer 4 segments
E. Between two NFS datastores
【多选题】
An administrator configures vSphere Replication for a virtual machine and enables multiple point in time (PIT) instances under the recovery settings in the Configure Replication wizard. Which two statements are correct for vSphere Replication with multiple point in time instances enabled? (Choose two.)___
A. vSphere Replication retains a number of snapshot instances of the virtual machine on the target site based on the retention policy that you specify.
B. vSphere Replication uses the virtual machine's snapshot instances to define the target site Point in Time instance based on the retention policy that you specify.
C. vSphere Replication does not support virtual machines with snapshots.
D. vSphere Replication supports virtual machines with snapshots.
【多选题】
An administrator is virtualizing a physical application server and adding it to an existing multi-tiered vApp. The application license is currently tied to the physical NIC's MAC address, so the administrator needs to ensure the license will function properly in the virtual machine. Which two actions can the administrator take to satisfy this task? (Choose two.)___
A. Set the MAC address for the vNIC in the guest operating system.
B. Install the physical server's NIC into the ESXi host.
C. Configure the MAC address for the vNIC using the vSphere Web Client.
D. Assign the physical server NIC's MAC address in the vSphere Distributed Switch.
【多选题】
Which two Fibre Channel zoning options are supported with vSphere 6.x? (Choose two.)___
A. Single-Initiator
B. Single-Initiator-Single-Target
C. Multiple-Initiators-Single-Target
D. Multiple-Initiators-Multiple-Targets
【多选题】
An administrator is attempting to remove an ESXi 6.x host from a vSphere Distributed Switch (vDS). When the administrator attempts to remove the host, the following error is observed: <The resource '16' is still in use.> What three steps are needed to successfully remove the host from the switch? (Choose three.)___
A. Select Manage Ports on the vDS for the host.
B. Locate all ports currently in use on the vDS for the host.
C. Migrate or delete any vmkernel or virtual machine adapters associated with the switch.
D. Remove all network cards from the switch before trying to remove the host.
E. Create a standard switch for everything to be automatically be migrated to.
【多选题】
Which two Virtual SAN related actions might start resynchronization of virtual machine objects? (Choose two.)___
A. Editing a virtual machine storage policy to increase the number of replicas.
B. Editing a virtual machine storage policy to reduce the number of replicas.
C. Editing a virtual machine storage policy to increase the number of disk stripes.
D. Editing a virtual machine storage policy to reduce the number of disk stripes.
【多选题】
An administrator is troubleshooting basic network connectivity issues. Which two scenarios are potential issues that this administrator might face? (Choose two.)___
A. The vSwitch is not attached to the correct physical network.
B. The portgroup is not configured to use correct VLAN.
C. Traffic shaping is configured incorrectly.
D. Jumbo frames is configured incorrectly.
【多选题】
Which three items should be validated prior to installing ESXi 6.x? (Choose three.)___
A. Remote Storage has been disconnected.
B. Installation media is available.
C. Server hardware clock is set to UTC.
D. Storage has been partitioned with a VMFS volume.
E. Network cards have been setup to use Jumbo
F. rames.
【多选题】
An administrator is performing an interactive installation of ESXi 6.x. Which three options are available for installation? (Choose three.)___
A. DVD
B. USB
C. PXE
D. Scripted
E. Auto Deploy
【多选题】
After installation of a host in your test environment, you need to move it to production. The only major change that needs to be made is that the hostname of the server needs to change. What are two ways that an administrator can change the host name without editing configuration files on the host directly? (Choose two.)___
A. Login to the Direct Console User Interface and change it from here.
B. Edit the Default TCP/IP Configuration from the vSphere Web Client.
C. Use the Ruby vSphere Client to send a script to the ESXi host that updates the hostname.
D. Update the information in DNS and the
E. SXi host will automatically update with these changes.
【多选题】
An administrator has unsuccessfully attempted several times to install an Operating System inside a virtual machine. The administrator finds that the installation fails at random intervals. Which two actions can be taken to resolve this issue? (Choose two.)___
A. Verify the md5sum and if invalid, download the installation files again.
B. Attempt the installation an additional time.
C. Attempt to use a different installation media or installation method.
D. Create a new virtual machine and attempt the installation with the existing media.
【多选题】
VMware tools is failing to install on a Microsoft Windows virtual machine. What are two possible situations that would prevent the installation? (Choose two.)___
A. The VMware tools installation media is corrupt.
B. The incorrect Operating System was selected in the virtual machine options.
C. The software prerequisites have not been installed.
D. The prerequisite services have not been started.
【多选题】
As part of a multisite Single Sign-On (SSO) deployment what two steps are required to ensure that a change to one Single Sign-On instance is propagated to the other instances? (Choose two.)___
A. Schedule a Replication Task on the primary instance
B. Select the first instance during the installation of subsequent instances
C. During the installation of each instance choose Linked-Mode
D. Enable Synchronize to Active Directory on each instance
【多选题】
You need to add an object to an existing vApp using the vSphere Web Client. How is this accomplished?___
A. Create an Object Inside the vApp.
B. Add an Object to a vApp.
C. Add an Object to the
D. atastore the vApp is located in.
【多选题】
Which three steps must be taken to use vSphere Update Manager 6.x to upgrade an ESXi 5.5 host to vSphere 6.x? (Choose three.)___
A. Download an ESXi Image.
B. Configure the vSphere Update Manager Download Service.
C. Create a baseline and attach it to the ESXi Host.
D. Scan the vCenter Content Library for the
E. SXi Image.
【多选题】
Which two options would allow a database administrator, with no access to the vSphere infrastructure, to connect to a virtual machine? (Choose two.)___
A. Use the Virtual Machine Remote Console (VMRC).
B. Use Remote Desktop Protocol (RDP) to connect.
C. Ask the vSphere administrator to grant permission to access the console through vCenter Server.
D. Ask the vSphere administrator to grant permission to access with the Horizon View Direct Connect Client.
【多选题】
Which three are architecture components of vRealize Operations? (Choose three.)___
A. Identity Server
B. Administrative Server
C. Analytics Server
D. Database Server
E. Connection Broker
【单选题】
金克拉金克拉撒旦蒂萨里大儿童家爱丽丝打开就撒开绿灯技术的()
A. 手动阀手动阀
B. 撒旦
C. 反对法
D. 第三方
【单选题】
金克拉金克拉撒退热贴开绿灯技术的()
A. 是否
B. 阿斯顿
C. 撒旦
D. 感到反感
【单选题】
而非热舞法国会开绿灯技术的()
A. 撒的
B. 热个股分化
C. 返回
D. 而我认为
【单选题】
十大富豪不给发货返回返回返回()
A. dfdfgd
B. 梵蒂冈梵蒂冈
C. 广泛大概
D. 热
【多选题】
马克思主义哲学所讲的静止是指___
A. 运动的一种特殊形式
B. 绝对不动
C. 排斥运动
D. 事物处于量变状态
E. 事物在特定参考系中未发生位置变动
【多选题】
物质和运动的关系是___
A. 运动是物质的固有属性
B. 物质是运动的承担者
C. 运动是物质的存在方式
D. 运动不一定是物质的运动
E. 物质不一定都在运动
推荐试题
【单选题】
当用晶体三极管做调制型直流放大器的调制器时,有人把管子的e反接,这种作法是_______。[332010102]___
A. 不正确的,易于损坏晶体管
B. 调制器时,e正接和反接均可
C. 正确的,可减少残余电压
D. 无关紧要
【单选题】
IP地址是_______。[232000000]___
A. Internet中的子网地址
B. 接入Internet的主机地址
C. 接入Internet的局域网编号
D. Internet中网络资源的地理位置
【单选题】
个人计算机申请了帐号并采用PPP拨号方式接入Internet网后,该机_______。[212000000]___
A. 拥有固定的IP地址
B. 没有自己的IP地址
C. 拥有独立的IP地址
D. 拥有Internet服务商主机的P地址
【单选题】
ZD9型电动转辙机转换时间不大于_______。[321010204]___
A. 3.8S
B. 5.5S
C. 8S
D. 9S
【单选题】
ZD9型电动转辙机电源电压为直流_______。[322010102]___
A. 160V
B. 180V
C. 200V
D. 220V
【单选题】
ZD9型电动转辙机工作电流不大于_______。[322010102]___
【单选题】
ZD9-170/4k型电动转辙机摩擦电流为_______。[323010102]___
A. 1.9A~2.3A
B. 2.0A~2.5A
C. 2.2A~2.6A
D. 2.3A~2.9A
【单选题】
ZD9-A220/2.5k型电动转辙机摩擦电流为_______。[323010102]___
A. 1.9A~2.3A
B. 2.0A~2.5A
C. 2.2A~2.6A
D. 2.3A~2.9A
【单选题】
ZD9转辙机自动开闭器的动接点在静接点片内的接触深度不小于_______。[322010204]___
A. 1mm
B. 2mm
C. 3mm
D. 4mm
【单选题】
ZD9转辙机用手扳动自动开闭器动接点,其摆动量不大于_______。[333010204]___
A. 1mm
B. 2mm
C. 3.5mm
D. 4mm
【单选题】
ZD9转辙机自动开闭器动接点与静接点座间隙不小于_______。[333010204]___
A. 1mm
B. 2mm
C. 3mm
D. 4mm
【单选题】
ZD9转辙机速动爪落下前,动接点在静接点内有窜动时,应保证接点接触深度不少于_______。[333010204]___
A. 1mm
B. 2mm
C. 3mm
D. 4mm
【单选题】
ZD9转辙机当检查柱因故落在杆上平面时,动接点环的断电距离应大于_______。[332010204]___
A. 1mm
B. 2.5mm
C. 3.5mm
D. 4mm
【单选题】
ZD9-B、D、E转辙机检查柱与表示杆检查块缺口之间间隙之和为_______。[331010204]___
A. 1mm
B. 2.5mm
C. 4mm
D. 8mm
【单选题】
ZD9-A转辙机检查柱与表示杆检查块缺口之间间隙之和为_______。[331010204]___
A. 1mm
B. 2.5mm
C. 4mm
D. 8mm
【单选题】
ZD9转辙机挤脱器挤脱力应调整为_______。[331010204]___
A. 25kN±1kN
B. 25kN±2kN
C. 28kN±1kN
D. 28kN±2kN
【单选题】
ZD9转辙机挤岔时,表示接点动接点环的断电距离应大于_______。[331010204]___
A. 1.5mm
B. 2.5mm
C. 3mm
D. 4mm
【单选题】
道岔集中修周期一般为_______,由铁路局确定。[211010203]___
【单选题】
ZYJ4-200型电液转辙机一动动程为_______。[331010204]___
A. 150mm
B. 200mm
C. 250mm
D. 280mm
【单选题】
ZYJ4-200型电液转辙机一动额定转换力为_______。[321010204]___
A. 9800N
B. 1470N
C. 1800N
D. 2552N
【单选题】
ZYJ4-200型电液转辙机工作电流不大于_______。[322010102]___
A. 3.8A
B. 3.4A
C. 3.3A
D. 1.8A
【单选题】
ZYJ4-200型电液转辙机动作时间大于_______。[321010204]___
A. 7.5s
B. 9.3s
C. 10.2s
D. 11.2s
【单选题】
ZY(J)6型电液转辙机道岔在任一极限位置,挤岔组斜面与挤岔板上滚轮间隙应为_______。[321010204]___
A. 0.3mm~0.8mm
B. 0.5mm~1.7mm
C. 0.3mm~1.3mm
D. 2mm~4mm
【单选题】
ZY(J)6型电液转辙机锁闭柱与锁闭杆缺囗两侧的间隙外锁闭为_______。[322010204]___
A. 1.5mm
B. 1.5mm±0.5mm
C. 2mm
D. 2mm±0.5mm
【单选题】
ZY(J)6型电液转辙机锁闭柱与锁闭杆缺囗两侧的间隙内锁闭为_______。[332010204]___
A. 1.5mm
B. 1.5mm±0.5mm
C. 2mm
D. 2mm±0.5mm
【单选题】
ZY(J)6型电液转辙机检查柱与表示杆检查块缺囗两侧的间隙为_______。[332010204]___
A. 1.5mm
B. 1.5mm±0.5mm
C. 2mm±0.5mm
D. 4mm±1.5mm
【单选题】
ZY(J)6型电液转辙机,SH5、SH6型转换锁闭器挤脱器挤脱力应调整为_______,并铅封。[331010204]___
A. 25kN~27kN
B. 27kN~29kN
C. 27kN~30kN
D. 28kN~32kN
【单选题】
放电管的直流点火电压,应不低于回路工作电压的_______。[322010102]___
A. 1.5倍
B. 2倍
C. 2.5倍
D. 3倍
【单选题】
JWXC-1700型继电器工作值不大于_______。[321010102]___
A. 16.8V
B. 17V
C. 17.4V
D. 17.8V
【单选题】
JZXC-480型继电器工作值不大于_______。[321010102]___
A. AC8.5V
B. AC9.2V
C. AC9.4V
D. DC9.2V
【单选题】
在继电器铭牌上标有JWJXC-H125/0.44,它表示_______型继电器。[321030101]___
A. 无极加强接点
B. 无极加强接点缓放插入式
C. 无极加强接点时间
D. 无极加强接点插入式
【单选题】
JPXC-1000型继电器的工作值不大于_______。[321010102]___
A. 16V
B. 16.4V
C. 16.8V
D. 17V
【单选题】
JSBXC-850型继电器的前圈电阻是_______。[321010103]___
A. 370Ω
B. 425Ω
C. 850Ω
D. 925Ω
【单选题】
JSBXC-850型时间继电器连接端子51-52时,动作时间为_______。[331010103]___
A. 180s±27s
B. 180s±9s
C. 180s±18s
D. 180s±10s
【单选题】
向继电器线圈供以规定的电压或电流后,切断电源,从断开电源时起至全部动接点离开前接点的时间为_______。[331010103]___
A. 吸起时间
B. 缓放时间
C. 缓吸时间
D. 缓动时间
【单选题】
JSBXC-850型时间继电器在单结晶体管和电容已固定的情况下,不同的时间是靠调整_______的阻值确定缓吸时间。[321030101]___
A. R6-R13
B. R6-R11
C. R6-R7
D. R6-R9
【单选题】
_______为半波整流型继电器。[321010103]___
A. JZXC-0.14
B. JZXC-480
C. JZXC-H18
D. JZXC-20000
【单选题】
整流式继电器当一个整流元件开路时,其工作值_______。[321010103]___
A. 不变
B. 降低一倍
C. 增加一倍
D. 增加二倍
【单选题】
JZXC-480型继电器中的桥式整流器有一个整流元件短路,全波整流变成半波整流、整流效率降低一半,故继电器工作值_______。[321010103]___
A. 不变
B. 高出一倍
C. 减小
D. 为零
【单选题】
继电器的同种类接点应同时接触或同时断开,普通接点与普通接点之间误差不大于_______。[321010103]___
A. 0.05mm
B. 0.1mm
C. 0.2mm
D. 0.3mm