【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
【多选题】
vMotion can be performed between which three physical boundaries? (Choose three.)___
A. Between two vCenter Server Systems
B. Between two vSphere Distributed Virtual Switches
C. Between two vCenter Server Datacenter objects
D. Between two VMware NSX Layer 4 segments
E. Between two NFS datastores
【多选题】
An administrator configures vSphere Replication for a virtual machine and enables multiple point in time (PIT) instances under the recovery settings in the Configure Replication wizard. Which two statements are correct for vSphere Replication with multiple point in time instances enabled? (Choose two.)___
A. vSphere Replication retains a number of snapshot instances of the virtual machine on the target site based on the retention policy that you specify.
B. vSphere Replication uses the virtual machine's snapshot instances to define the target site Point in Time instance based on the retention policy that you specify.
C. vSphere Replication does not support virtual machines with snapshots.
D. vSphere Replication supports virtual machines with snapshots.
【多选题】
An administrator is virtualizing a physical application server and adding it to an existing multi-tiered vApp. The application license is currently tied to the physical NIC's MAC address, so the administrator needs to ensure the license will function properly in the virtual machine. Which two actions can the administrator take to satisfy this task? (Choose two.)___
A. Set the MAC address for the vNIC in the guest operating system.
B. Install the physical server's NIC into the ESXi host.
C. Configure the MAC address for the vNIC using the vSphere Web Client.
D. Assign the physical server NIC's MAC address in the vSphere Distributed Switch.
【多选题】
Which two Fibre Channel zoning options are supported with vSphere 6.x? (Choose two.)___
A. Single-Initiator
B. Single-Initiator-Single-Target
C. Multiple-Initiators-Single-Target
D. Multiple-Initiators-Multiple-Targets
【多选题】
An administrator is attempting to remove an ESXi 6.x host from a vSphere Distributed Switch (vDS). When the administrator attempts to remove the host, the following error is observed: <The resource '16' is still in use.> What three steps are needed to successfully remove the host from the switch? (Choose three.)___
A. Select Manage Ports on the vDS for the host.
B. Locate all ports currently in use on the vDS for the host.
C. Migrate or delete any vmkernel or virtual machine adapters associated with the switch.
D. Remove all network cards from the switch before trying to remove the host.
E. Create a standard switch for everything to be automatically be migrated to.
【多选题】
Which two Virtual SAN related actions might start resynchronization of virtual machine objects? (Choose two.)___
A. Editing a virtual machine storage policy to increase the number of replicas.
B. Editing a virtual machine storage policy to reduce the number of replicas.
C. Editing a virtual machine storage policy to increase the number of disk stripes.
D. Editing a virtual machine storage policy to reduce the number of disk stripes.
【多选题】
An administrator is troubleshooting basic network connectivity issues. Which two scenarios are potential issues that this administrator might face? (Choose two.)___
A. The vSwitch is not attached to the correct physical network.
B. The portgroup is not configured to use correct VLAN.
C. Traffic shaping is configured incorrectly.
D. Jumbo frames is configured incorrectly.
【多选题】
Which three items should be validated prior to installing ESXi 6.x? (Choose three.)___
A. Remote Storage has been disconnected.
B. Installation media is available.
C. Server hardware clock is set to UTC.
D. Storage has been partitioned with a VMFS volume.
E. Network cards have been setup to use Jumbo
F. rames.
【多选题】
An administrator is performing an interactive installation of ESXi 6.x. Which three options are available for installation? (Choose three.)___
A. DVD
B. USB
C. PXE
D. Scripted
E. Auto Deploy
【多选题】
After installation of a host in your test environment, you need to move it to production. The only major change that needs to be made is that the hostname of the server needs to change. What are two ways that an administrator can change the host name without editing configuration files on the host directly? (Choose two.)___
A. Login to the Direct Console User Interface and change it from here.
B. Edit the Default TCP/IP Configuration from the vSphere Web Client.
C. Use the Ruby vSphere Client to send a script to the ESXi host that updates the hostname.
D. Update the information in DNS and the
E. SXi host will automatically update with these changes.
【多选题】
An administrator has unsuccessfully attempted several times to install an Operating System inside a virtual machine. The administrator finds that the installation fails at random intervals. Which two actions can be taken to resolve this issue? (Choose two.)___
A. Verify the md5sum and if invalid, download the installation files again.
B. Attempt the installation an additional time.
C. Attempt to use a different installation media or installation method.
D. Create a new virtual machine and attempt the installation with the existing media.
【多选题】
VMware tools is failing to install on a Microsoft Windows virtual machine. What are two possible situations that would prevent the installation? (Choose two.)___
A. The VMware tools installation media is corrupt.
B. The incorrect Operating System was selected in the virtual machine options.
C. The software prerequisites have not been installed.
D. The prerequisite services have not been started.
【多选题】
As part of a multisite Single Sign-On (SSO) deployment what two steps are required to ensure that a change to one Single Sign-On instance is propagated to the other instances? (Choose two.)___
A. Schedule a Replication Task on the primary instance
B. Select the first instance during the installation of subsequent instances
C. During the installation of each instance choose Linked-Mode
D. Enable Synchronize to Active Directory on each instance
【多选题】
You need to add an object to an existing vApp using the vSphere Web Client. How is this accomplished?___
A. Create an Object Inside the vApp.
B. Add an Object to a vApp.
C. Add an Object to the
D. atastore the vApp is located in.
【多选题】
Which three steps must be taken to use vSphere Update Manager 6.x to upgrade an ESXi 5.5 host to vSphere 6.x? (Choose three.)___
A. Download an ESXi Image.
B. Configure the vSphere Update Manager Download Service.
C. Create a baseline and attach it to the ESXi Host.
D. Scan the vCenter Content Library for the
E. SXi Image.
【多选题】
Which two options would allow a database administrator, with no access to the vSphere infrastructure, to connect to a virtual machine? (Choose two.)___
A. Use the Virtual Machine Remote Console (VMRC).
B. Use Remote Desktop Protocol (RDP) to connect.
C. Ask the vSphere administrator to grant permission to access the console through vCenter Server.
D. Ask the vSphere administrator to grant permission to access with the Horizon View Direct Connect Client.
【多选题】
Which three are architecture components of vRealize Operations? (Choose three.)___
A. Identity Server
B. Administrative Server
C. Analytics Server
D. Database Server
E. Connection Broker
【单选题】
金克拉金克拉撒旦蒂萨里大儿童家爱丽丝打开就撒开绿灯技术的()
A. 手动阀手动阀
B. 撒旦
C. 反对法
D. 第三方
【单选题】
金克拉金克拉撒退热贴开绿灯技术的()
A. 是否
B. 阿斯顿
C. 撒旦
D. 感到反感
【单选题】
而非热舞法国会开绿灯技术的()
A. 撒的
B. 热个股分化
C. 返回
D. 而我认为
【单选题】
十大富豪不给发货返回返回返回()
A. dfdfgd
B. 梵蒂冈梵蒂冈
C. 广泛大概
D. 热
【多选题】
马克思主义哲学所讲的静止是指___
A. 运动的一种特殊形式
B. 绝对不动
C. 排斥运动
D. 事物处于量变状态
E. 事物在特定参考系中未发生位置变动
【多选题】
物质和运动的关系是___
A. 运动是物质的固有属性
B. 物质是运动的承担者
C. 运动是物质的存在方式
D. 运动不一定是物质的运动
E. 物质不一定都在运动
【多选题】
社会的物质性体现在___
A. 劳动是社会产生和存在的决定性因素
B. 在社会中不存在精神的现象和活动
C. 物质资料的产生是社会历史的前提
D. 全部社会生活在本质上是实践的
E. 社会生活中不存在物质关系以外的其他关系
【多选题】
意识的能动作用表现在___
A. 反映客观世界
B. 创造物质世界
C. 通过实践改造客观世界
D. 创造理论体系
E. 为自然界创造秩序
【多选题】
金克拉金克拉撒旦蒂萨里大儿童家爱丽丝打开就撒开绿灯技术的()
A. 手动阀手动阀
B. 撒旦
C. 反对法
D. 第三方
【多选题】
金克拉金克拉撒退热贴开绿灯技术的()
A. 是否
B. 阿斯顿
C. 撒旦
D. 感到反感
【多选题】
而非热舞法国会开绿灯技术的()
A. 撒的
B. 热个股分化
C. 返回
D. 而我认为
【多选题】
十大富豪不给发货返回返回返回()
A. dfdfgd
B. 梵蒂冈梵蒂冈
C. 广泛大概
D. 热
【判断题】
金克拉金克拉撒旦蒂萨里大儿童家爱丽丝打开就撒开绿灯技术的()
推荐试题
【单选题】
"车站相关人员应严格把关,杜绝非标准币流入。车站收取非标准币应遵循( )的原则。如有特殊情况,可经站务中心、票务处、财务处另行讨论决定。
A. “谁收取,谁上交”
B. “谁收取,谁填写”
C. “谁收取,谁补还”
D. “谁填写,谁补还”"
【单选题】
"第一级客流控制为( )。
A. 站台客流控制
B. 付费区客流控制
C. 非付费区客流控制
D. 出入口客流控制"
【单选题】
"第二级客流控制为( )。
A. 站台客流控制
B. 付费区客流控制
C. 非付费区客流控制
D. 出入口客流控制"
【单选题】
"客流控制需做到“三早”,哪“三早”:( )。
A. 早预想
B. 早准备
C. 早控制
D. 以上都是"
【单选题】
"特大伤亡事故是指一次事故死亡( )。
A. 2人以上(含2人)
B. 3人以上(含3人)
C. 4人以上(含2人)
D. 5人以上(含2人)"
【单选题】
"发生责任客运伤亡事故后,相关部门应于事发后( )日内上报安全监察处。
A. 两个工作日
B. 两日
C. 三个工作日
D. 三日"
【单选题】
"在工作时间和工作岗位,突发疾病死亡或者在( )之内经抢救无效死亡的视同工伤。
A. 12小时
B. 24小时
C. 36小时
D. 48小时"
【单选题】
"客运伤亡事故发生后,、目击证人至少挽留( )名,证人尽量不要选地铁员工、当事人的亲属或有利害关系及其他特殊关系的人。
【单选题】
"客伤处理金在( )以内,经站长同意后,方可从应急基金中支取。
A. 300
B. 400
C. 500
D. 600"
【单选题】
"学龄前儿童、行动不便的老人、残疾人、弱智人士、精神病人、突发病人和酗酒者等,应由( )陪同进站乘车。
A. 同伴
B. 家人
C. 成人
D. 健康成人"
【单选题】
微型消防站负责人是( )。
A. 车站站长
B. 值班员
C. 安全工程师
D. 车站站务员
【单选题】
微型消防站训练要求车站( )开展一次灭火疏散预案实战演练,熟悉掌握本站点制定的灭火应急疏散预案内容。
A. 每一年
B. 每半年
C. 每季度
D. 每个月
【单选题】
"《分公司临时动火许可证》--的动火时间一般不超过( )天。
【单选题】
" 各级义务消防队组织机构应包括:灭火行动组、通讯联络组、疏散引导组、安全防护救护组,按照正常当班每班人员不少于( )人组建。如人数不够( )人,则应全员参加。
【单选题】
"根据消防法规的有关规定,分公司建立义务消防队,实行( )的原则。
A. 集中领导,统一指挥
B. 安全第一,预防为主
C. 统一领导,分级管理
D. 预防为主,防消结合"
【单选题】
"下列哪一项不是安全生产责任制中的“三新人员”
A. 晋升人员
B. 新入职人员
C. 转岗人员
D. 借调人员"
【单选题】
"分公司的运营安全生产工作在轨道公司和分公司安全生产委员会的领导下,按照( )和“网络化、细分化”的原则,建立安全管理网络,实行分级管理,逐级负责,全员逐级签订安全责任状。
A. “谁主管、谁负责”
B. “谁使用、谁负责”
C. 谁借谁还
D. “谁负责,谁担责”"
【单选题】
以下哪些情况不属于《安全生产责任制》所称非正常运营状态是指因设备设施故障、人员操作不当等可控因素导致运营秩序破坏而转入的运营状态。
A. 信号设备故障、
B. 牵引供电故障
C. 列车故障
D. 突发火灾
【单选题】
"以下不属于客运处安全生产职责的是( )。
A. 组织分公司有关人员跟进新线施工、安装、调试、验收等工作时,发现的安全隐患应及时报告有关部门,协调、督促安全隐患及时整改。
B. 负责本处室办公区域的消防、综治管理工作。
C. 负责编制分公司突发事件应急预案,定期参与和组织开展各类突发事件运营演练。
D. 负责与本处室工作职责有关的其它安全工作。"
【单选题】
" 以下不属于班组(车站)级安全教育培训应当包括的内容的是( )。
A. 本班组(车站)的生产特点、作业环境、危险区域、设备状
B. 本公司安全预案制定程序。
C. 安全生产的相关要求,如正确使用劳动保护用品的方法等。
D. 安全规范操作示范。"
【单选题】
"( )负责车站级车站级 PIS 设备和广播设备的使用操作。
A. 行车设备处
B. 客运处
C. 机电设备处
D. 调度处"
【单选题】
"发生重伤事故,事故部门应立即报分公司领导、工会主席、安全监察处处长,并在事故发生后( )小时内填写“职工伤亡事故报告表”报送安全监察处。
【单选题】
"重大事故的直接经济损失在( )。
A. 5000万元以上1亿元以下
B. 1000万元以上5000万元以下
C. 500万元以上1000万元以下
D. 1亿元以上"
【单选题】
"分公司安全生产管理,必须坚持( )的方针
A. 安全第一、预防为主
B. 安全第一、预防为主、综合治理
C. 谁主管谁负责
D. 管生产必须管安全"
【单选题】
"车站冷水系统原则上仅在()开启
A. 春季
B. 秋季
C. 夏季
D. 空调季"
【单选题】
"故障发生后,A、B类故障原则上()完成修复
A. 48小时
B. 24小时
C. 12小时
D. 72小时"
【单选题】
( )负责对收益审核和清分管理工作进行监督和检查。
A. 安全监察处
B. 票务处
C. 客运处
D. 车站
【单选题】
"任何时间,票卡除特殊原因,不得放在( )。
A. 车站票务室
B. 客服中心
C. TVM
D. 车控室"
【单选题】
"以下哪种票卡的发票提供方式与其他票卡不同。( )
A. APP二维码过闸
B. 储值票
C. 纪念票
D. 计次票"
【单选题】
"除当班票务相关岗位人员、票务管理人员、上门收款人员及AFC维修人员外,其他人员必须得到( )的许可后方可进入车站票务室。
A. 当班值班站长或以上级别人员
B. 当班值班站长
C. 当班客运值班员
D. 站长"
【单选题】
"以下哪一条属于二类票务事故( )。
A. 工作中违反相关规定,导致系统数据或监控录像等重要取证资料缺失或不全,影响票务事故嫌疑的调查取证。
B. 丢失自动售票机维修门钥匙、钱箱钥匙、补币箱钥匙等涉及票务收益安全的钥匙
C. 变造账目、报表或其他虚假行为填平帐目,未造成票务收益损坏或流失的行为。
D. 没有按规定要求设置或修改AFC系统EOD参数,给票务正常工作造成严重影响的。"
【单选题】
"票务处负责预赋值单程票的回收,双方以加封信息为准,若回收后发现预赋值单程票金额、数量与加封信息不一致,由 ( )负责
A. 车站
B. 票务中心
C. 值班站长
D. 加封人"
【单选题】
"出闸线网最高单程票价指( )至本站的最高单程票价。
A. 该线路最远车站
B. 线网其他车站
C. 相邻车站
D. 以上均不是"
【单选题】
"行车值班员不保管以下哪种钥匙?
A. TVM门钥匙
B. 纸币找零钱箱钥匙
C. 纸币找零箱解锁钥匙
D. 硬币补币箱钥匙"
【单选题】
"以下哪些是四不放过的内容( )。
A. 事故原因未查清不放过
B. 责任人员未处理不放过
C. 整改措施未落实不放过
D. 以上均是
【单选题】
以下是AFC系统故障的票务处理原则的是( )。
A. 付费区优先
B. 非付费区优先
C. 快速处理
D. 避免纠纷
【单选题】
"以下哪项不是三类票务事故的处理( )。
A. 对当事人给予警告处分
B. 在分公司范围内通报
C. 扣发当月绩效工资50%
D. 由其承担全部或部分经济损失"
【单选题】
"公务票遗失后( )未及时挂失而被他人使用均按转借他人使用处理。
A. 五日内
B. 五个工作日内
C. 三日内
D. 三个工作日内"
【单选题】
"操作人员使用点钞机 、硬币清点机、( ) 前后,均需检查是否有遗留现金。
A. 收银钱箱
B. 票盒
C. 票卡清点机
D. 纸币清分机"
【单选题】
"公务票换领申请表,( )判断换领原因,人为损坏的需至财务处缴纳换卡费用。
A. 站务中心
B. 票务处
C. 票卡工班
D. 个人"