【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
【多选题】
vMotion can be performed between which three physical boundaries? (Choose three.)___
A. Between two vCenter Server Systems
B. Between two vSphere Distributed Virtual Switches
C. Between two vCenter Server Datacenter objects
D. Between two VMware NSX Layer 4 segments
E. Between two NFS datastores
【多选题】
An administrator configures vSphere Replication for a virtual machine and enables multiple point in time (PIT) instances under the recovery settings in the Configure Replication wizard. Which two statements are correct for vSphere Replication with multiple point in time instances enabled? (Choose two.)___
A. vSphere Replication retains a number of snapshot instances of the virtual machine on the target site based on the retention policy that you specify.
B. vSphere Replication uses the virtual machine's snapshot instances to define the target site Point in Time instance based on the retention policy that you specify.
C. vSphere Replication does not support virtual machines with snapshots.
D. vSphere Replication supports virtual machines with snapshots.
【多选题】
An administrator is virtualizing a physical application server and adding it to an existing multi-tiered vApp. The application license is currently tied to the physical NIC's MAC address, so the administrator needs to ensure the license will function properly in the virtual machine. Which two actions can the administrator take to satisfy this task? (Choose two.)___
A. Set the MAC address for the vNIC in the guest operating system.
B. Install the physical server's NIC into the ESXi host.
C. Configure the MAC address for the vNIC using the vSphere Web Client.
D. Assign the physical server NIC's MAC address in the vSphere Distributed Switch.
【多选题】
Which two Fibre Channel zoning options are supported with vSphere 6.x? (Choose two.)___
A. Single-Initiator
B. Single-Initiator-Single-Target
C. Multiple-Initiators-Single-Target
D. Multiple-Initiators-Multiple-Targets
【多选题】
An administrator is attempting to remove an ESXi 6.x host from a vSphere Distributed Switch (vDS). When the administrator attempts to remove the host, the following error is observed: <The resource '16' is still in use.> What three steps are needed to successfully remove the host from the switch? (Choose three.)___
A. Select Manage Ports on the vDS for the host.
B. Locate all ports currently in use on the vDS for the host.
C. Migrate or delete any vmkernel or virtual machine adapters associated with the switch.
D. Remove all network cards from the switch before trying to remove the host.
E. Create a standard switch for everything to be automatically be migrated to.
【多选题】
Which two Virtual SAN related actions might start resynchronization of virtual machine objects? (Choose two.)___
A. Editing a virtual machine storage policy to increase the number of replicas.
B. Editing a virtual machine storage policy to reduce the number of replicas.
C. Editing a virtual machine storage policy to increase the number of disk stripes.
D. Editing a virtual machine storage policy to reduce the number of disk stripes.
【多选题】
An administrator is troubleshooting basic network connectivity issues. Which two scenarios are potential issues that this administrator might face? (Choose two.)___
A. The vSwitch is not attached to the correct physical network.
B. The portgroup is not configured to use correct VLAN.
C. Traffic shaping is configured incorrectly.
D. Jumbo frames is configured incorrectly.
【多选题】
Which three items should be validated prior to installing ESXi 6.x? (Choose three.)___
A. Remote Storage has been disconnected.
B. Installation media is available.
C. Server hardware clock is set to UTC.
D. Storage has been partitioned with a VMFS volume.
E. Network cards have been setup to use Jumbo
F. rames.
【多选题】
An administrator is performing an interactive installation of ESXi 6.x. Which three options are available for installation? (Choose three.)___
A. DVD
B. USB
C. PXE
D. Scripted
E. Auto Deploy
【多选题】
After installation of a host in your test environment, you need to move it to production. The only major change that needs to be made is that the hostname of the server needs to change. What are two ways that an administrator can change the host name without editing configuration files on the host directly? (Choose two.)___
A. Login to the Direct Console User Interface and change it from here.
B. Edit the Default TCP/IP Configuration from the vSphere Web Client.
C. Use the Ruby vSphere Client to send a script to the ESXi host that updates the hostname.
D. Update the information in DNS and the
E. SXi host will automatically update with these changes.
【多选题】
An administrator has unsuccessfully attempted several times to install an Operating System inside a virtual machine. The administrator finds that the installation fails at random intervals. Which two actions can be taken to resolve this issue? (Choose two.)___
A. Verify the md5sum and if invalid, download the installation files again.
B. Attempt the installation an additional time.
C. Attempt to use a different installation media or installation method.
D. Create a new virtual machine and attempt the installation with the existing media.
【多选题】
VMware tools is failing to install on a Microsoft Windows virtual machine. What are two possible situations that would prevent the installation? (Choose two.)___
A. The VMware tools installation media is corrupt.
B. The incorrect Operating System was selected in the virtual machine options.
C. The software prerequisites have not been installed.
D. The prerequisite services have not been started.
【多选题】
As part of a multisite Single Sign-On (SSO) deployment what two steps are required to ensure that a change to one Single Sign-On instance is propagated to the other instances? (Choose two.)___
A. Schedule a Replication Task on the primary instance
B. Select the first instance during the installation of subsequent instances
C. During the installation of each instance choose Linked-Mode
D. Enable Synchronize to Active Directory on each instance
【多选题】
You need to add an object to an existing vApp using the vSphere Web Client. How is this accomplished?___
A. Create an Object Inside the vApp.
B. Add an Object to a vApp.
C. Add an Object to the
D. atastore the vApp is located in.
【多选题】
Which three steps must be taken to use vSphere Update Manager 6.x to upgrade an ESXi 5.5 host to vSphere 6.x? (Choose three.)___
A. Download an ESXi Image.
B. Configure the vSphere Update Manager Download Service.
C. Create a baseline and attach it to the ESXi Host.
D. Scan the vCenter Content Library for the
E. SXi Image.
【多选题】
Which two options would allow a database administrator, with no access to the vSphere infrastructure, to connect to a virtual machine? (Choose two.)___
A. Use the Virtual Machine Remote Console (VMRC).
B. Use Remote Desktop Protocol (RDP) to connect.
C. Ask the vSphere administrator to grant permission to access the console through vCenter Server.
D. Ask the vSphere administrator to grant permission to access with the Horizon View Direct Connect Client.
【多选题】
Which three are architecture components of vRealize Operations? (Choose three.)___
A. Identity Server
B. Administrative Server
C. Analytics Server
D. Database Server
E. Connection Broker
【单选题】
金克拉金克拉撒旦蒂萨里大儿童家爱丽丝打开就撒开绿灯技术的()
A. 手动阀手动阀
B. 撒旦
C. 反对法
D. 第三方
【单选题】
金克拉金克拉撒退热贴开绿灯技术的()
A. 是否
B. 阿斯顿
C. 撒旦
D. 感到反感
【单选题】
而非热舞法国会开绿灯技术的()
A. 撒的
B. 热个股分化
C. 返回
D. 而我认为
【单选题】
十大富豪不给发货返回返回返回()
A. dfdfgd
B. 梵蒂冈梵蒂冈
C. 广泛大概
D. 热
【多选题】
马克思主义哲学所讲的静止是指___
A. 运动的一种特殊形式
B. 绝对不动
C. 排斥运动
D. 事物处于量变状态
E. 事物在特定参考系中未发生位置变动
【多选题】
物质和运动的关系是___
A. 运动是物质的固有属性
B. 物质是运动的承担者
C. 运动是物质的存在方式
D. 运动不一定是物质的运动
E. 物质不一定都在运动
【多选题】
社会的物质性体现在___
A. 劳动是社会产生和存在的决定性因素
B. 在社会中不存在精神的现象和活动
C. 物质资料的产生是社会历史的前提
D. 全部社会生活在本质上是实践的
E. 社会生活中不存在物质关系以外的其他关系
【多选题】
意识的能动作用表现在___
A. 反映客观世界
B. 创造物质世界
C. 通过实践改造客观世界
D. 创造理论体系
E. 为自然界创造秩序
【多选题】
金克拉金克拉撒旦蒂萨里大儿童家爱丽丝打开就撒开绿灯技术的()
A. 手动阀手动阀
B. 撒旦
C. 反对法
D. 第三方
【多选题】
金克拉金克拉撒退热贴开绿灯技术的()
A. 是否
B. 阿斯顿
C. 撒旦
D. 感到反感
推荐试题
【判断题】
核准类账户预留印鉴卡的启用日期为办理预留印鉴卡的当天。
【判断题】
非核准类基本户开户手续完成后,应交给开户单位的印鉴卡、基本存款账户信息表、机构信用代码证,需填制移交清单,一律直接交给有权人,由其当场签字确认,并在移交清单注明“已收妥”字样,严禁由他人代领。
【判断题】
《综合服务协议签署表》对于未勾选协议,需在选项前打“X”,并用横线划去。有特别约定事项的在特别约定栏中填写。
【判断题】
军队、武警保密单位在银行办理支付结算时,可免填用途。
【判断题】
当单位客户在同一开户行撤销银行结算账户后重新开立银行结算账户,重新开立的银行结算账户三个工作日后方可办理付款业务。
【判断题】
基本存款账户是单位客户的主办账户。单位客户日常经营活动的资金收付及其工资、奖金和现金的支取,应通过该账户办理。
【判断题】
中央预算单位按有关规定开立的预算收入汇缴专用存款账户资金只能按规定及时上缴中央国库或中央财政专户,不得用于本单位支出。
【判断题】
单位银行卡的资金必须由其基本存款账户转账存入,该账户不得办理现金收付业务。
【判断题】
印鉴变更中存款人更换预留印鉴中有权签字人的个人签章同时需提供原有权签字人出具签名确认的书面申请,若无法提供,则存款人需出具正式公函,承诺承担由此所造成的一切经济、法律责任。
【判断题】
临时存款账户用于办理单位客户各项专用资金的收付。
【判断题】
业务支出账户除从其基本存款账户拨入款项外,只付不收,其现金支取必须按照国家现金管理的规定办理。
【判断题】
农民工工资账户按专用账户性质开立,总承包公司账户名称为总承包+承包项目名称,分包公司账户名称为总承包+承包项目名称+分包公司名称。其账户名称必需与预留公章相一致。
【判断题】
持有基本存款账户编号的企业申请开立一般存款账户、专用存款账户、临时存款账户时,开户行应当通过账户管理系统查询企业基本存款账户“经营范围”是否含有“取消开户许可证核发”字样,核实企业是否持有开户许可证。如经营范围含有“取消开户许可证核发”字样的,需出具基本存款账户开户许可证原件。
【判断题】
基本账户开户企业遗失或损毁取消许可前基本存款账户开户许可证的,可通过开户银行向中国人民银行申请补发。而取消开户许可之后遗失的应出具情况说明,由基本户开户申请补发《基本存款账户信息》。
【判断题】
开户行为企业开立一般存款账户、专用存款账户后,应于账户开立之日起2个工作日内通过账户管理系统向中国人民银行当地分支机构备案。
【判断题】
存款人变更预留印鉴中的授权代理人签章的,可不提供营业执照,但必须提供法定代表人出具的撤销原授权并对新的代理人授权的授权文件。
【判断题】
开户行对单位客户的变更通知和证明文件审核无误后,为单位客户办理变更手续,于5个工作日内向中国人民银行当地分支行报告。
【判断题】
如客户申请变更账户性质,应按照开销户手续提供相应证明文件并填写撤销原银行结算账户申请书、开立银行结算账户申请书。
【判断题】
工作人员应对联网核查获得的公民身份信息进行保密,非依法律规定,不得向任何单位和个人提供。不得将联网核查获得的公民身份信息用于办理银行业务外的其他目的
【判断题】
单位提供相关开户资料原件,让客户填写开立单位银行结算账户申请书,盖上公章,开立单位银行结算账户申请书一式三联第三联作为柜员传票。
【判断题】
对公信息建立1703可由主办会计授权。
【判断题】
对账户变更性质涉及核准类账户的,则须报人民银行核准通过,退回/换发/新发许可证后,方可以在核心系统中维护账户性质。
【判断题】
户名变更,客户当天一起办理户名变更和印鉴变更的,《更换银行预留印鉴申请书》中账户名称填写填写旧户名,盖新公章。
【判断题】
客户在账户名称变更后 ,再次单独进行印鉴变更时,《更换银行预留印鉴申请书》中账户名称填写新户名。
【判断题】
变更银行结算账户申请书前四行内容为变更前信息,开户许可证(基本存款账户信息)核准号为旧的核准号。
【判断题】
预留印鉴卡资料须按规定的项目填写,内容准确、完整。其中:签章式样、账户名称、账号、启用日期为不可更改要素,其他要素在预留时需要更改的,必须由营业机构经办人员在更改处签章,经换人审核并签章确认。
【判断题】
预留印章时必须使用朱红印油,印鉴的字迹和轮廓要圆润清晰、印油均匀、没有断笔。图章轮廓以内和附近没有与印鉴内容无关的干扰或杂质。不得使用原子印章预留印鉴,其签章为篆体字的,不予受理。
【判断题】
办理新印鉴预留手续时,存款人在新印鉴卡背面加盖旧印鉴及新公章后,由经办柜员在新印鉴卡正面注明启用日期。印鉴启用日期为印鉴变更手续完成后的次日,特殊情况需在当日启用的,应由客户出具加盖公章的公函说明,原印鉴注销日期为新印鉴启用日期。
【判断题】
撤销一般存款账户,销户后账户资金转账划入法定代表人账户。
【判断题】
核准类账户撤销,柜员在审核相关资料无误后,在核心系统中办理销户,并在2个工作日内,将销户手续报送至当地人行。
【判断题】
基本存款账户“转户”,是指存款人因迁址或其他需要,在原基本存款账户开户银行撤销基本存款账户后,选择其他银行,申请重新开立基本存款账户的行为。
【判断题】
账户销户前需先将支票核销,支票核销需要当面加盖作废或剪角处理.作附件上附时,需要截角+附件章或作废章+附件章。
【判断题】
账户属性为“正常、普通存款、财政存款、政府背景、休眠--正常、无人申领--正常”时,销户时需要去做删除。
【判断题】
账户结清后仅允许将款项一次性划出,不允许发生其他金融交易。
【判断题】
客户存在未结清事项的,不能办理销户手续。
【判断题】
办理销户时,需验证客户交回的印鉴卡是否真实,与本行留存的印鉴卡、验印系统的印章记录、编号是否相符;开户许可证是否原人行核发的许可证.
【判断题】
当日结清允许冲账,不支持结清的隔日冲账。结清后可以隔日销户,但结清日至销户日之间不再计算利息。
【判断题】
一般账户结清余额必须划入同名基本账户。