【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
【多选题】
vMotion can be performed between which three physical boundaries? (Choose three.)___
A. Between two vCenter Server Systems
B. Between two vSphere Distributed Virtual Switches
C. Between two vCenter Server Datacenter objects
D. Between two VMware NSX Layer 4 segments
E. Between two NFS datastores
【多选题】
An administrator configures vSphere Replication for a virtual machine and enables multiple point in time (PIT) instances under the recovery settings in the Configure Replication wizard. Which two statements are correct for vSphere Replication with multiple point in time instances enabled? (Choose two.)___
A. vSphere Replication retains a number of snapshot instances of the virtual machine on the target site based on the retention policy that you specify.
B. vSphere Replication uses the virtual machine's snapshot instances to define the target site Point in Time instance based on the retention policy that you specify.
C. vSphere Replication does not support virtual machines with snapshots.
D. vSphere Replication supports virtual machines with snapshots.
【多选题】
An administrator is virtualizing a physical application server and adding it to an existing multi-tiered vApp. The application license is currently tied to the physical NIC's MAC address, so the administrator needs to ensure the license will function properly in the virtual machine. Which two actions can the administrator take to satisfy this task? (Choose two.)___
A. Set the MAC address for the vNIC in the guest operating system.
B. Install the physical server's NIC into the ESXi host.
C. Configure the MAC address for the vNIC using the vSphere Web Client.
D. Assign the physical server NIC's MAC address in the vSphere Distributed Switch.
【多选题】
Which two Fibre Channel zoning options are supported with vSphere 6.x? (Choose two.)___
A. Single-Initiator
B. Single-Initiator-Single-Target
C. Multiple-Initiators-Single-Target
D. Multiple-Initiators-Multiple-Targets
【多选题】
An administrator is attempting to remove an ESXi 6.x host from a vSphere Distributed Switch (vDS). When the administrator attempts to remove the host, the following error is observed: <The resource '16' is still in use.> What three steps are needed to successfully remove the host from the switch? (Choose three.)___
A. Select Manage Ports on the vDS for the host.
B. Locate all ports currently in use on the vDS for the host.
C. Migrate or delete any vmkernel or virtual machine adapters associated with the switch.
D. Remove all network cards from the switch before trying to remove the host.
E. Create a standard switch for everything to be automatically be migrated to.
【多选题】
Which two Virtual SAN related actions might start resynchronization of virtual machine objects? (Choose two.)___
A. Editing a virtual machine storage policy to increase the number of replicas.
B. Editing a virtual machine storage policy to reduce the number of replicas.
C. Editing a virtual machine storage policy to increase the number of disk stripes.
D. Editing a virtual machine storage policy to reduce the number of disk stripes.
【多选题】
An administrator is troubleshooting basic network connectivity issues. Which two scenarios are potential issues that this administrator might face? (Choose two.)___
A. The vSwitch is not attached to the correct physical network.
B. The portgroup is not configured to use correct VLAN.
C. Traffic shaping is configured incorrectly.
D. Jumbo frames is configured incorrectly.
【多选题】
Which three items should be validated prior to installing ESXi 6.x? (Choose three.)___
A. Remote Storage has been disconnected.
B. Installation media is available.
C. Server hardware clock is set to UTC.
D. Storage has been partitioned with a VMFS volume.
E. Network cards have been setup to use Jumbo
F. rames.
【多选题】
An administrator is performing an interactive installation of ESXi 6.x. Which three options are available for installation? (Choose three.)___
A. DVD
B. USB
C. PXE
D. Scripted
E. Auto Deploy
【多选题】
After installation of a host in your test environment, you need to move it to production. The only major change that needs to be made is that the hostname of the server needs to change. What are two ways that an administrator can change the host name without editing configuration files on the host directly? (Choose two.)___
A. Login to the Direct Console User Interface and change it from here.
B. Edit the Default TCP/IP Configuration from the vSphere Web Client.
C. Use the Ruby vSphere Client to send a script to the ESXi host that updates the hostname.
D. Update the information in DNS and the
E. SXi host will automatically update with these changes.
【多选题】
An administrator has unsuccessfully attempted several times to install an Operating System inside a virtual machine. The administrator finds that the installation fails at random intervals. Which two actions can be taken to resolve this issue? (Choose two.)___
A. Verify the md5sum and if invalid, download the installation files again.
B. Attempt the installation an additional time.
C. Attempt to use a different installation media or installation method.
D. Create a new virtual machine and attempt the installation with the existing media.
【多选题】
VMware tools is failing to install on a Microsoft Windows virtual machine. What are two possible situations that would prevent the installation? (Choose two.)___
A. The VMware tools installation media is corrupt.
B. The incorrect Operating System was selected in the virtual machine options.
C. The software prerequisites have not been installed.
D. The prerequisite services have not been started.
【多选题】
As part of a multisite Single Sign-On (SSO) deployment what two steps are required to ensure that a change to one Single Sign-On instance is propagated to the other instances? (Choose two.)___
A. Schedule a Replication Task on the primary instance
B. Select the first instance during the installation of subsequent instances
C. During the installation of each instance choose Linked-Mode
D. Enable Synchronize to Active Directory on each instance
【多选题】
You need to add an object to an existing vApp using the vSphere Web Client. How is this accomplished?___
A. Create an Object Inside the vApp.
B. Add an Object to a vApp.
C. Add an Object to the
D. atastore the vApp is located in.
【多选题】
Which three steps must be taken to use vSphere Update Manager 6.x to upgrade an ESXi 5.5 host to vSphere 6.x? (Choose three.)___
A. Download an ESXi Image.
B. Configure the vSphere Update Manager Download Service.
C. Create a baseline and attach it to the ESXi Host.
D. Scan the vCenter Content Library for the
E. SXi Image.
【多选题】
Which two options would allow a database administrator, with no access to the vSphere infrastructure, to connect to a virtual machine? (Choose two.)___
A. Use the Virtual Machine Remote Console (VMRC).
B. Use Remote Desktop Protocol (RDP) to connect.
C. Ask the vSphere administrator to grant permission to access the console through vCenter Server.
D. Ask the vSphere administrator to grant permission to access with the Horizon View Direct Connect Client.
【多选题】
Which three are architecture components of vRealize Operations? (Choose three.)___
A. Identity Server
B. Administrative Server
C. Analytics Server
D. Database Server
E. Connection Broker
【单选题】
金克拉金克拉撒旦蒂萨里大儿童家爱丽丝打开就撒开绿灯技术的()
A. 手动阀手动阀
B. 撒旦
C. 反对法
D. 第三方
【单选题】
金克拉金克拉撒退热贴开绿灯技术的()
A. 是否
B. 阿斯顿
C. 撒旦
D. 感到反感
【单选题】
而非热舞法国会开绿灯技术的()
A. 撒的
B. 热个股分化
C. 返回
D. 而我认为
【单选题】
十大富豪不给发货返回返回返回()
A. dfdfgd
B. 梵蒂冈梵蒂冈
C. 广泛大概
D. 热
【多选题】
马克思主义哲学所讲的静止是指___
A. 运动的一种特殊形式
B. 绝对不动
C. 排斥运动
D. 事物处于量变状态
E. 事物在特定参考系中未发生位置变动
【多选题】
物质和运动的关系是___
A. 运动是物质的固有属性
B. 物质是运动的承担者
C. 运动是物质的存在方式
D. 运动不一定是物质的运动
E. 物质不一定都在运动
【多选题】
社会的物质性体现在___
A. 劳动是社会产生和存在的决定性因素
B. 在社会中不存在精神的现象和活动
C. 物质资料的产生是社会历史的前提
D. 全部社会生活在本质上是实践的
E. 社会生活中不存在物质关系以外的其他关系
【多选题】
意识的能动作用表现在___
A. 反映客观世界
B. 创造物质世界
C. 通过实践改造客观世界
D. 创造理论体系
E. 为自然界创造秩序
【多选题】
金克拉金克拉撒旦蒂萨里大儿童家爱丽丝打开就撒开绿灯技术的()
A. 手动阀手动阀
B. 撒旦
C. 反对法
D. 第三方
【多选题】
金克拉金克拉撒退热贴开绿灯技术的()
A. 是否
B. 阿斯顿
C. 撒旦
D. 感到反感
【多选题】
而非热舞法国会开绿灯技术的()
A. 撒的
B. 热个股分化
C. 返回
D. 而我认为
【多选题】
十大富豪不给发货返回返回返回()
A. dfdfgd
B. 梵蒂冈梵蒂冈
C. 广泛大概
D. 热
【判断题】
金克拉金克拉撒旦蒂萨里大儿童家爱丽丝打开就撒开绿灯技术的()
推荐试题
【判断题】
根据《中国中铁工程项目成本管理指导意见》的通知(中铁股份成本﹝2018﹞211号),中国中铁范围内所有工程施工项目都必须执行经济承包责任制度。
【填空题】
1 《中国中铁股份有限公司投资管理办法》___中规定,股份公司整体投资预算以符合、满足国资委债务风险管控___要求为原则,各二级单位投资预算以满足、实现股份公司要求的【有息负债、‘两金’控制、总资产周转率】控制目标为基本原则。
【填空题】
2 根据《中国中铁股份有限公司投资管理办法》___中规定的投资原则,应履行党和国家赋予中央企业的【政治责任、经济责任、社会责任】。
【填空题】
3 《中铁四局集团有限公司PPP项目投资经营管理办法》___中规定,非经营性PPP项目指不具有明确合法的收费基础,项目建成后自身不产生经营收入,按照【政府付费】的回报机制进行投资建设的项目。
【填空题】
4 《中铁四局集团有限公司PPP项目投资经营管理办法》___中规定,经营性PPP项目指具有明确合法的收费基础,且在一定运营期内运营收入能够覆盖投资建设成本、运营维养成本、税费及合理收益,按照【使用者付费】的回报机制进行投资建设的项目。
【填空题】
5 《中铁四局安全生产费用管理办法》___中规定,安全生产费用按照【确保需要,专款专用】的原则规范使用,安全费用管理按照不同形式实行分级管理,各级单位及相关部门分工负责。
【填空题】
6 《中铁四局集团直、代管工程项目目标利润率确定办法》___,工程项目责任成本预算编制实行【零利润】原则。
【填空题】
7 《中铁四局集团工程项目合同价款分劈与验工计价管理办法》___责任成本计价是经理部的当期责任成本预算收入,与【当期对业主___验工计价收入】对比,反映其效益情况。是进行成本控制、分析、资金拨付的依据。
【填空题】
8 《中铁四局集团工程项目合同价款分劈与验工计价管理办法》___,合同外增加的变更索赔和材料价差调整等费用应及时签订补充合同。分劈时应公开透明,按【谁工作,谁受益】的原则进行分劈。
【填空题】
9 《中国中铁工程项目成本管理指导意见》___中规定,当出现实际成本偏离责任预算成本较大情况时,公司应按责任成本偏离程度确定预警等级,分级对项目部责任成本执行情况进行预警并【发出成本管理预警通知书】。
【填空题】
10 《中国中铁工程项目成本管理指导意见》___中规定,管理者对各项可控成本,采取组织、技术、经济等手段,通过事前合理预测、过程实时控制、期中期末及时考核等方法,抓好【两预控一策划一调整】,完成预期成本控制目标,最大限度地实现降本增效的管理活动。
【填空题】
11 《中国中铁工程项目成本管理指导意见》___中规定,成本管理体系及职责中项目部是项目成本管理的【执行层】,负责执行各项成本管理制度,落实成本过程控制责任,实现项目成本管理目标。
【填空题】
12 《中国中铁工程项目成本管理指导意见》___中规定,成本管理体系及职责中二级公司是项目成本管理的【管控层】,负责落实股份公司成本管理政策、建立二级公司成本管理体系,负责所属各单位成本管理的组织、推进、督导、监控工作,促进成本管理工作的改善与提高。
【填空题】
13 《中国中铁工程项目成本管理指导意见》___中规定,成本管理体系及职责中股份公司是工程项目成本管理的【指导层】,负责构建股份公司成本管理组织体系和制度体系,负责全股份公司成本管理的指导、督查工作。
【填空题】
14 《中国中铁股份有限公司工程施工劳务___分包管理指导意见》___中规定,项目部必须使用成本管理信息系统办理分包结算,且务必做到“三统一”、“四不结算”、“五不付款”,其中“五不付款”主要为签发的白条不付款、【结算签认手续不完善不付款】、结算依据不明确不付款、不使用统一规定格式不付款、不符合财务规定的签字不付款。
【填空题】
15 《中国中铁股份有限公司工程施工劳务___分包管理指导意见》___中规定,为满足“营改增”条件下降低税负的需要,在分包方选择上优先选用【一般纳税人】。
【填空题】
16 《中国中铁股份有限公司工程施工劳务___分包管理指导意见》___中规定,劳务___分包方依据现行国家有关法律、法规、工程项目所在地的地方政府有关规定及股份公司相关制度办法,通过招标或【竞争谈判】的方式来选择。
【填空题】
17 《中铁四局集团有限公司境内PPP项目经济利益分配办法》___中规定,为明确局与子分公司在境内PPP投资项目上的经济利益关系,促进PPP投资业务健康发展,建立了【利益共享、风险共担】的经济利益分配机制。
【填空题】
18 《中铁四局集团有限公司PPP项目投资经营管理办法》___中规定,工程类子分公司跟踪的PPP项目立项申请,须由区域主责投资开发类公司审核后,由投资开发类公司作为项目立项申请主体,报局投资发展部。局投资发展部收到《投资项目立项申请表》___后,组织局财务部、法律合规部等部门对项目情况进行初步评估,依据投资项目准入条件进行逐项打分,若得分大于【 80 】分以上即视为通过,否则不予通过。
【填空题】
19 《中国中铁股份有限公司PPP项目财务管理暂行办法》___中规定,PPP项目移交完成后,按照股份公司投资项目【后评价】管理制度的规定执行。
【填空题】
20 《中国中铁股份有限公司境外投资财务管理暂行办法》___中规定,境外投资项目应建立健全成本费用管理制度。合理确定成本的【核算对象】,正确划分各项成本和费用。及时落实成本管理责任制,建立成本、费用控制体系。
【填空题】
21 《中国中铁工程项目责任成本预算文件编制质量评比办法》___中规定,中国中铁工程项目责任成本预算文件编制质量评比对象是各工程局【三级公司】国内基建工程施工项目的责任成本预算编制文件。
【填空题】
22 《关于明确工程项目合同价款分劈有关费用标准的通知》___761号)中规定,T梁的捆扎和加固由【装梁】单位负责,所需支撑架、钢丝绳、垫木等易耗材料由运梁单位承担,费用各自承担。
【填空题】
23 《关于明确工程项目合同价款分劈有关费用标准的通知》___761号)中规定,预制箱梁中的防落梁、防排水、伸缩缝、声屏障、接触网等预埋件费用,若含在桥面系单价中,按【投标报价原则】从桥面系中扣除,分劈给制梁单位。
【填空题】
24 《中铁四局集团亏损项目治理管理办法》___381号)中规定,子分公司负责组织制定管辖范围内亏损项目治理方案,结合局下达的亏损项目治理目标,明确本单位治亏目标,落实责任,明确措施安排并组织实施,并按照【“一项一策”】原则建立相关治亏档案。
【填空题】
25 《中铁四局集团亏损项目治理管理办法》___381号)中规定,子分公司负责管辖范围内___亏损项目治理工作,子分公司【分管成本管理的副总经理】是本单位亏损项目治理的分管领导。
【填空题】
26 《中铁四局集团亏损项目治理管理办法》___381号)中规定,对于中标即亏损的项目___,按“三项指标管理办法”___中的【目标利润率】来界定是否为原始亏损项目。确定为原始亏损项目的,其原始亏损额不属于项目经理责任,在考核时等额扣除,不纳入问责范畴。
【填空题】
27 《中铁四局集团工程经济管理综合考评办法》___723号)中规定,新开工项目【半年以内】___不参与局工程经济管理综合考评考核。
【填空题】
28 《关于授权投资运营公司成立PPP项目管理办公室的通知》___1032号)中规定,项目管理办公室以投资运营公司派驻到项目公司的人员为基础组建,项目管理办公室主任由投资运营公司派驻到项目公司的【总经理或负责人】兼任。
【填空题】
29 《关于加快推进PPP投资项目融资工作的通知》___中规定,投资项目由于原方案无法落地,需要办理变更的,投资运营公司要按照【局PPP项目投融资管理办法】的规定,及时向局申请办理变更。
【填空题】
30 《中国中铁工程项目责任成本预算编制指导意见》的通知___中规定,责任预算包括【收入预算、责任成本预算、责任成本利润额___、变更索赔创效额___、综合利润率】。
【填空题】
31 《中国中铁工程项目责任成本预算编制指导意见》___中规定,项目部现场经费预算,包括项目部定员定编人员的工资、五险一金、工会经费、职工教育经费、办公设备及生活用品购置费、日常办公费、生产指挥车辆费、差旅费、通讯费、固定资产折旧和使用费、业务招待费、财务费用、印花税、车船税、【城市建设维护税】、教育费附加、水电费等现场管理服务所发生的费用;
【填空题】
32 《中国中铁工程项目责任成本预算编制指导意见》___中规定,责任成本预算利润率=【责任成本预算利润额/项目合同收入】*100%
【填空题】
33 《中国中铁工程项目责任成本预算编制指导意见》___中规定,临时和过渡工程数量:根据临时设施标准的要求,本着布局紧凑、设计合理,【尽量利用永久征地】,减少临时用地费和复耕费为原则进行设置。
【填空题】
34 《中国中铁工程项目责任成本预算编制指导意见》___中规定,当项目符合责任成本预算调整的情况时,项目部应及时将发生变化的时间、【原因】、内容、数量及相关佐证材料以书面形式报三级公司成本___部
【填空题】
35 《中国中铁工程项目责任成本预算编制指导意见》___中规定,材料数量及单价:数量根据施工图设计和施工规范要求进行计算确定,损耗率按有关要求确定,混凝土、砂浆按配合比进行计算确定;单价根据集中招标采购价、发布的指导价___,并结合市场实际情况确定。但以下情形除外:甲供料以甲供材料单价为准。与业主合同约定可以调差的材料可按【投标编制期】单价计列,调差部分计入责任成本调整范围。
【填空题】
36 《中国中铁工程项目责任成本预算编制指导意见》___中规定,变更索赔预算包括变更设计,【施工图量差】、人工、材料及运费政策性调差,因自然灾害、不可抗力、停工损失、地方收费等非承包人因素引起的费用补偿、合同索赔及保险理赔。
【填空题】
37 《中铁四局工程项目责任成本预算文件编制质量评比细则》___中规定,工程项目责任成本预算文件编制质量评比内容包括:【责任成本预算管理体系】、责任成本预算管理责任矩阵和流程、责任成本预算编制、责任成本预算调整和成本管理信息系统V2.0运用,共五项指标
【填空题】
38 根据中铁四局集团工程项目“三项指标”管理办法___中规定,【投标基准利润率】___是评价中标项目市场营销质量的最低合格标准。
【填空题】
39 《中铁四局集团工程项目“三项指标”管理办法》___中规定,由业主或地方委托代建的工程项目新增合同额,以及本在建项目的补充合同额可纳入【市场营销指标】考核体系,其创造的利润列入二次经营考核体系。