刷题
导入试题
【多选题】
An administrator is performing a scripted installation of ESXi 6.x. In which three locations does the script need to be? (Choose three.)___
A. PXE Server
B. HTTPS
C. FTP
D. NFS
E. VVOLs Datastore
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
BCD
解析
暂无解析
相关试题
【多选题】
In order for a company to meet regulatory requirements, all ESXi 6.x Hosts must be configured to direct logs to a syslog server. What are two ways ESXi hosts can configured for this action? (Choose two)___
A. Use the esxcli system syslog command.
B. Edit them in the ESXi host Advanced System Settings.
C. From the Syslog collector user interface of the Web Client.
D. Syslog logging is not available for
E. SXi Hosts.
【多选题】
Which three actions can be executed when an alarm is triggered? (Choose three.)___
A. Send an email.
B. Send an SNMP trap.
C. Run a script or command.
D. Run an Orchestrator workflow.
E. Send a trigger to syslog.
【多选题】
An administrator is attempting to power on a virtual machine, but is unable to do so. Which two reasons are probable causes of the failure? (Choose two.)___
A. Storage access to the virtual machine swap file has been lost.
B. One of the virtual machine VMDK files is locked.
C. Virtual machine is running CentOS 7.0 64-bit.
D. Virtual machine has Hyper-Threading enabled.
【多选题】
An administrator has configured a host profile so that ESXi 6.x hosts will point to the corporate NTP server for time synchronization. The NTP server is located at 10.0.30.213, but time has not been synchronized properly across the ESXi hosts. The administrator reviews Host Profile settings as shown in the Exhibit. Which two steps are required to resolve the issue? (Choose two.)___
A. Correct the NTP server IP address.
B. Check the host for host profile compliance.
C. Remediate the host based on the updated host profile.
D. Change the NTP server to the FQDN as IP Addresses are not supported.
【多选题】
An administrator is attempting to migrate a large Hadoop virtual machine using vMotion. The administrator notices a delay when the machine is quiesced. The Hadoop virtual machine is processing many transactions a second to an in-memory database. Which two actions would help reduce the amount of time needed to perform a vMotion on this virtual machine? (Choose two.)___
A. Use multiple NICs for the vMotion vmkernel port.
B. Use a 10Gbps Network card for the vMotion vmkernel port.
C. Add an additional management network to help transmit the data quicker.
D. Disable Fault Tolerance before performing the vMotion.
【多选题】
An administrator is installing a new network card in an ESXi 6.x host that is part of a vSphere cluster. When the host is placed into maintenance mode, the vSphere Web Client displays the progress bar at 2% for over 30 minutes. Which two are likely reasons for this occurrence? (Choose two.)___
A. Maintenance mode is unable to migrate all virtual machines from the host.
B. There is a large number of virtual machines that must be migrated from the host.
C. VMware High Availability is in the process of reconfiguring the cluster.
D. Each virtual machine on the
E. SXi host must be reconfigured to recognize the new adapter.
【多选题】
Which two events happen when Distributed Resource Scheduler (DRS) is disabled? (Choose two.)___
A. The cluster's resource pool heirarchy and affinity rules are re-established when DRS is turned back on.
B. The cluster's resource pool hierarchy and affinity rules are not re-established when DRS is turned back on.
C. The cluster's resource pools are removed from the cluster.
D. The cluster's resource pools are removed from the cluster and assigned to the hosts.
【多选题】
Which two networking connection types can be configured on a virtual switch? (Choose two.)___
A. Virtual machine portgroups
B. VMkernel services (such as NFS, iSCSI, or vMotion) to the physical network
C. Web services over the Management Network
D. NFS and FCoE storage services
【多选题】
An administrator creates a DRS cluster of eight ESXi 6.x hosts. There are 10 virtual machines balanced across the hosts. An attempt to place the first host into maintenance mode fails. What are two reasons that the host failed to enter maintenance mode? (Choose two.)___
A. The DRS cluster Automation Level is set to Partially Automated mode.
B. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Should run on hosts in group.
C. One of the virtual machines on the ESXi Host entering maintenance mode is configured with a DRS Host affinity rule Must run on hosts in group.
D. One of the virtual machines on the
E. SXi Host entering maintenance mode is configured with an individual Automation Level set to Partially Automated.
【多选题】
When modifying a vApp, which two vSphere entities can be added? (Choose two.)___
A. A resource pool
B. A network pool
C. A vApp
D. A folder
【多选题】
From which two locations in the inventory hierarchy can you deploy a virtual machine using a template? (Choose two.)___
A. Directly from the template.
B. From a compute resource.
C. From an existing virtual machine.
D. From a Datastore.
【多选题】
A company has decided to implement Virtual SAN within their vSphere 6.x environment. The Virtual SAN cluster will be composed of three ESXi 6.x hosts that are on the Virtual SAN Ready Node list. Each ESXi host includes: <Two SAS Controllers that support Passthrough Mode> < Four Solid State Drives (SSDs) 1TB in size each> <20 SAS Magnetic Disks (MDs) 1TB in size each> <The SSDs and MDs are evenly split between the two SAS controllers>. The company will pilot a Virtual SAN cluster utilizing VMware best practices while maximizing storage capacity. The Virtual SAN cluster will use Manual Mode. Which two Disk Group configurations would meet the stated configuration requirements? (Choose two.)___
A. 4 disk groups with 1 SSD and 5 MDs each
B. 2 disk groups with 1 SSD and 7 MDs each
C. 2 disk groups with 2 SSDs and 7 MDs each
D. 2 disk groups with 1 SSD and 10 MDs each
【多选题】
A physical Windows 2008 R2 Server is converted to a virtual machine using VMware vCenter Converter. Upon completion of the conversion and subsequent power on operation, the virtual machine fails to boot and the message below is observed in the Console of the virtual machine: <STOP 0x0000007B INACCESSIBLE_BOOT_DEVICE>. Which two potential issues may be causing this boot failure? (Choose two.)___
A. An incorrect SCSI controller was selected during conversion.
B. Incompatible software drivers were migrated into the virtual machine from the source machine.
C. The vmdk file backing the virtual machine was thick provisioned.
D. A snapshot was taken immediately after the conversion completed.
【多选题】
An administrator is configuring the Failover Order option on a vSphere Distributed Switch. Which two options should be used with IP-hash load balancing? (Choose two.)___
A. Active Uplinks
B. Standby Uplinks
C. Unused Uplinks
D. Override Failover Order
【多选题】
An administrator is configuring the Maximum Transmission Unit value on a vSphere Distributed Switch. Which two options are typical values for ESXi networking? (Choose two.)___
A. 1492
B. 1500
C. 9000
D. 9089
【多选题】
Which two configurable options apply to both virtual machine CPU and memory allocation? (Choose two.)___
A. Reservation
B. Shares
C. Resource Pool
D. Reserve All
【多选题】
When attempting to power on a Virtual Machine you observe the following error: <Cannot open the disk '/vmfs/volumes/volume/vm/vm-000002.vmdk' or one of the snapshot disks it depends on.> Which three actions will be the best solutions to address this problem? (Choose three.)___
A. Verify that the virtual machine's disk files are present.
B. Investigate the host and virtual machine log files.
C. Verify the vmdk descriptor files and if required, recreate them.
D. Delete the disk file preventing the power on operation.
E. Migrate or register the virtual machine to a different host.
【多选题】
An administrator has been tasked with enabling High Availability ___ on a cluster in a vSphere 6.x environment with default settings. The cluster configures properly and there are no errors. The next day when powering on a virtual machine, an error is presented: <Not Enough Failover Resources>. Which three scenarios are likely causes of this error message? (Choose three.)(CDE)
A. The default VM Monitoring Sensitivity is set too high.
B. There are not enough datastore heartbeat datastores configured by default.
C. The default slot size in the cluster is set too high.
D. There are virtual machines with large CPU reservations.
E. A host is in maintenance mode for a replacement of a failed Hard Drive.
【多选题】
vMotion can be performed between which three physical boundaries? (Choose three.)___
A. Between two vCenter Server Systems
B. Between two vSphere Distributed Virtual Switches
C. Between two vCenter Server Datacenter objects
D. Between two VMware NSX Layer 4 segments
E. Between two NFS datastores
【多选题】
An administrator configures vSphere Replication for a virtual machine and enables multiple point in time (PIT) instances under the recovery settings in the Configure Replication wizard. Which two statements are correct for vSphere Replication with multiple point in time instances enabled? (Choose two.)___
A. vSphere Replication retains a number of snapshot instances of the virtual machine on the target site based on the retention policy that you specify.
B. vSphere Replication uses the virtual machine's snapshot instances to define the target site Point in Time instance based on the retention policy that you specify.
C. vSphere Replication does not support virtual machines with snapshots.
D. vSphere Replication supports virtual machines with snapshots.
【多选题】
An administrator is virtualizing a physical application server and adding it to an existing multi-tiered vApp. The application license is currently tied to the physical NIC's MAC address, so the administrator needs to ensure the license will function properly in the virtual machine. Which two actions can the administrator take to satisfy this task? (Choose two.)___
A. Set the MAC address for the vNIC in the guest operating system.
B. Install the physical server's NIC into the ESXi host.
C. Configure the MAC address for the vNIC using the vSphere Web Client.
D. Assign the physical server NIC's MAC address in the vSphere Distributed Switch.
【多选题】
Which two Fibre Channel zoning options are supported with vSphere 6.x? (Choose two.)___
A. Single-Initiator
B. Single-Initiator-Single-Target
C. Multiple-Initiators-Single-Target
D. Multiple-Initiators-Multiple-Targets
【多选题】
An administrator is attempting to remove an ESXi 6.x host from a vSphere Distributed Switch (vDS). When the administrator attempts to remove the host, the following error is observed: <The resource '16' is still in use.> What three steps are needed to successfully remove the host from the switch? (Choose three.)___
A. Select Manage Ports on the vDS for the host.
B. Locate all ports currently in use on the vDS for the host.
C. Migrate or delete any vmkernel or virtual machine adapters associated with the switch.
D. Remove all network cards from the switch before trying to remove the host.
E. Create a standard switch for everything to be automatically be migrated to.
【多选题】
Which two Virtual SAN related actions might start resynchronization of virtual machine objects? (Choose two.)___
A. Editing a virtual machine storage policy to increase the number of replicas.
B. Editing a virtual machine storage policy to reduce the number of replicas.
C. Editing a virtual machine storage policy to increase the number of disk stripes.
D. Editing a virtual machine storage policy to reduce the number of disk stripes.
【多选题】
An administrator is troubleshooting basic network connectivity issues. Which two scenarios are potential issues that this administrator might face? (Choose two.)___
A. The vSwitch is not attached to the correct physical network.
B. The portgroup is not configured to use correct VLAN.
C. Traffic shaping is configured incorrectly.
D. Jumbo frames is configured incorrectly.
【多选题】
Which three items should be validated prior to installing ESXi 6.x? (Choose three.)___
A. Remote Storage has been disconnected.
B. Installation media is available.
C. Server hardware clock is set to UTC.
D. Storage has been partitioned with a VMFS volume.
E. Network cards have been setup to use Jumbo
F. rames.
【多选题】
An administrator is performing an interactive installation of ESXi 6.x. Which three options are available for installation? (Choose three.)___
A. DVD
B. USB
C. PXE
D. Scripted
E. Auto Deploy
【多选题】
After installation of a host in your test environment, you need to move it to production. The only major change that needs to be made is that the hostname of the server needs to change. What are two ways that an administrator can change the host name without editing configuration files on the host directly? (Choose two.)___
A. Login to the Direct Console User Interface and change it from here.
B. Edit the Default TCP/IP Configuration from the vSphere Web Client.
C. Use the Ruby vSphere Client to send a script to the ESXi host that updates the hostname.
D. Update the information in DNS and the
E. SXi host will automatically update with these changes.
【多选题】
An administrator has unsuccessfully attempted several times to install an Operating System inside a virtual machine. The administrator finds that the installation fails at random intervals. Which two actions can be taken to resolve this issue? (Choose two.)___
A. Verify the md5sum and if invalid, download the installation files again.
B. Attempt the installation an additional time.
C. Attempt to use a different installation media or installation method.
D. Create a new virtual machine and attempt the installation with the existing media.
【多选题】
VMware tools is failing to install on a Microsoft Windows virtual machine. What are two possible situations that would prevent the installation? (Choose two.)___
A. The VMware tools installation media is corrupt.
B. The incorrect Operating System was selected in the virtual machine options.
C. The software prerequisites have not been installed.
D. The prerequisite services have not been started.
【多选题】
As part of a multisite Single Sign-On (SSO) deployment what two steps are required to ensure that a change to one Single Sign-On instance is propagated to the other instances? (Choose two.)___
A. Schedule a Replication Task on the primary instance
B. Select the first instance during the installation of subsequent instances
C. During the installation of each instance choose Linked-Mode
D. Enable Synchronize to Active Directory on each instance
【多选题】
You need to add an object to an existing vApp using the vSphere Web Client. How is this accomplished?___
A. Create an Object Inside the vApp.
B. Add an Object to a vApp.
C. Add an Object to the
D. atastore the vApp is located in.
【多选题】
Which three steps must be taken to use vSphere Update Manager 6.x to upgrade an ESXi 5.5 host to vSphere 6.x? (Choose three.)___
A. Download an ESXi Image.
B. Configure the vSphere Update Manager Download Service.
C. Create a baseline and attach it to the ESXi Host.
D. Scan the vCenter Content Library for the
E. SXi Image.
【多选题】
Which two options would allow a database administrator, with no access to the vSphere infrastructure, to connect to a virtual machine? (Choose two.)___
A. Use the Virtual Machine Remote Console (VMRC).
B. Use Remote Desktop Protocol (RDP) to connect.
C. Ask the vSphere administrator to grant permission to access the console through vCenter Server.
D. Ask the vSphere administrator to grant permission to access with the Horizon View Direct Connect Client.
【多选题】
Which three are architecture components of vRealize Operations? (Choose three.)___
A. Identity Server
B. Administrative Server
C. Analytics Server
D. Database Server
E. Connection Broker
【单选题】
金克拉金克拉撒旦蒂萨里大儿童家爱丽丝打开就撒开绿灯技术的()
A. 手动阀手动阀
B. 撒旦
C. 反对法
D. 第三方
【单选题】
金克拉金克拉撒退热贴开绿灯技术的()
A. 是否
B. 阿斯顿
C. 撒旦
D. 感到反感
【单选题】
而非热舞法国会开绿灯技术的()
A. 撒的
B. 热个股分化
C. 返回
D. 而我认为
【单选题】
十大富豪不给发货返回返回返回()
A. dfdfgd
B. 梵蒂冈梵蒂冈
C. 广泛大概
D. 热
【多选题】
马克思主义哲学所讲的静止是指___
A. 运动的一种特殊形式
B. 绝对不动
C. 排斥运动
D. 事物处于量变状态
E. 事物在特定参考系中未发生位置变动
推荐试题
【判断题】
在10kV明清街线北门#4台区支线#0-#9杆更换导线工作中,#1杆无需打临时拉线。
A. 对
B. 错
【判断题】
若在此项工作中,#2-#3杆放线时新导线与跨越10kV线路接触地方时,可不采取任何安全措施,直接从该线上拖拽。
A. 对
B. 错
【判断题】
使用工作任务单时,工作票的工作班组成员栏内,可只填写各工作任务单的小组负责人姓名。工作任务单上应填写各工作任务单的工作班成员姓名。
A. 对
B. 错
【判断题】
在更换#0—#9导线进行牵引时,在确认杆根、拉线牢固、完好的前提下,可以用工程车进行缓慢牵引。
A. 对
B. 错
【判断题】
作业人员应在接地线的保护范围内作业。禁止在无接地线或接地线装设不齐全的情况下进行高压检修作业。
A. 对
B. 错
【判断题】
在第一小组工作已结束,现场已清理,人员已撤离,由其完成的安全措施已拆除,小组负责人立即向工作负责人汇报完工办理终结手续。
A. 对
B. 错
【判断题】
在此项工作中,#12杆施工作业时应设专人监护。
A. 对
B. 错
【判断题】
在此项工作中, 对#0-#9杆上导线进行撤线时,在确认杆根、拉线非常牢固,导线弧垂相对较大的情况下,可通知地面人员全部离开后,直接剪断导线。
A. 对
B. 错
【判断题】
放线、紧线、撤线时,禁止作业人员应站在受力的牵引绳导线的内角侧,展放的导线圈内以及牵引绳或架空线的垂直下方。
A. 对
B. 错
【判断题】
在交通道路口采取无跨越架施工时,应采取措施防止车辆挂碰施工线路。
A. 对
B. 错
【判断题】
在此项工作中吊车司机应作为工作班成员,但不需对他进行危险点告知及签名确认。
A. 对
B. 错
【判断题】
使用链条葫芦起吊时,应检查吊钩、链条、转动装置及制动装置。
A. 对
B. 错
【判断题】
因吊车需进入现场工作,短时移动或拆除遮栏(围栏)、标示牌时,应有人监护。完毕后应立即恢复。
A. 对
B. 错
【判断题】
在更换变压器时上下无法避免垂直交叉作业,应做好防落物伤人的措施,作业时要相互照应,密切配合。
A. 对
B. 错
【判断题】
在更换变压器时使用梯子或临时工作平台,应将两端与固定物可靠连接,一般应由两人在其上作业。
A. 对
B. 错
【判断题】
在起吊变压器使用钢丝绳时,钢丝绳端部用绳卡固定连接时绳卡压板可以正反交叉设置。
A. 对
B. 错
【判断题】
在起吊变压器工作中 ,所用的钢丝绳套其插接长度应不小于钢丝绳直径的15倍,且不准小于200mm。
A. 对
B. 错
【判断题】
钢丝绳的钢丝磨损或腐蚀达到钢丝绳实际直径比其公称直径减少5%或者更多者应报废。
A. 对
B. 错
【判断题】
在起吊、牵引清江花园#1变压器过程中,受力钢丝绳的周围、上下方、转向滑车内角侧、吊臂和起吊物的下面,禁止有人逗留和通过。
A. 对
B. 错
【判断题】
在本项工作中,工作结束后,工作负责人应检查杆上无遗漏工具材料,全部工作完毕后,全部人员下杆,向工作许可人报告完工。
A. 对
B. 错
【判断题】
禁止使用弯曲和变形严重的钢质地锚。
A. 对
B. 错
【判断题】
在操作柱01开关时应先拉开#011刀闸后再断开断路器开关。
A. 对
B. 错
【判断题】
本次工作若使用链条(手板)葫芦的制动装置禁止沾染水分。
A. 对
B. 错
【判断题】
在10kV大方坪#1台区支线#10杆验电时,应使用0.4kV验电器分别对线路进行验电。
A. 对
B. 错
【判断题】
在10kV大方坪#1台区支线#10杆装设围栏时应向内悬挂“止步,高压危险!”。
A. 对
B. 错
【判断题】
钢丝绳的钢丝磨损或腐蚀达到钢丝绳实际直径比其公称直径减少5%或更多者应报废。
A. 对
B. 错
【判断题】
现场所装设的接地线应与工作票所列位置和编号保持一致。
A. 对
B. 错
【判断题】
验电器在每次使用前都必须认真检查,主要检查绝缘部分有无 污垢、损伤、裂纹;检查声、光信号是否正常。
A. 对
B. 错
【判断题】
在此项工作中,在10kV大方坪#1台区支线#10杆收线时所选卡线器的规格、材质应与线材的规格、材质相匹配。
A. 对
B. 错
【判断题】
在10kV大方坪#1台区跌落式熔断器高压引线验电接地环处验电装设接地线时应设专人监护。
A. 对
B. 错
【判断题】
盛泰华庭一回支线电缆试验时,试验高压引线应尽量缩短,并采用专用的高压试验线。
A. 对
B. 错
【判断题】
此次电缆试验工作票应由10kV运维许可人朱XX审核,手工或电子签发后方可执行。
A. 对
B. 错
【判断题】
电缆试验需拉开分019地刀时,应在征得工作负责人冯XX的同意。工作完毕后应立即恢复。
A. 对
B. 错
【判断题】
电缆施工在10kV运行设备附近使用喷灯作业,火焰与带电部分的安全距离应大于1m。
A. 对
B. 错
【判断题】
电缆试验加压前应在被试电缆周围设置遮拦并悬挂警告标示牌,防止人员误入试验场所。
A. 对
B. 错
【判断题】
电缆试验过程中需更换试验引线时,作业人员应先穿好绝缘手套对被试电缆充分放电。
A. 对
B. 错
【判断题】
电动工具使用前,应检查确认电线、接地或接零完好;
A. 对
B. 错
【判断题】
兆欧表测量绝缘电阻摇动时要忽快忽慢,否则会影响测量精度。
A. 对
B. 错
【判断题】
各工作许可人发出许可命令后,工作负责人冯XX在设置完围栏后,向工作班人员进行“三交待”和危险点告知并确认签名。
A. 对
B. 错
【判断题】
10kV长渠I回线#26杆T盛泰华庭一回支线电缆试验,变更接线时,应将升压设备的高压部分放电、短路接地。
A. 对
B. 错
欢迎使用我爱刷题
×
微信搜索我爱刷题小程序
温馨提示
×
请在电脑上登陆“www.woaishuati.com”使用