【单选题】
7)Which of the following is not the characteristic of cells?___
A. They are bound by the plasma membrane
B. They have the ability to break down large molecules to smaller ones to Liberate energy for their activities
C. They possess a nucleus which contains genetic information in the form of deoxyribonucleicacid(DNA).
D. Living cells can not transform materials.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【单选题】
8)The breakdown of large molecules to smaller ones is called___
A. respiration
B. anabolism
C. catabolism
D. absorption
【单选题】
9) Which of the following descriptions about the characteristics of nervous regulation is wrong?___
A. It responds fast
B. It acts exactly
C. It responds slowly.D.
D. uration is short
【单选题】
10)Which of the following descriptions about the control of body function is wrong?___
A. Homeostasis is kept by feedback control.
B. Negative feedback minimizes the changes, leading to stability.
C. Positive feedback is not useful.
D. Feed-forward makes human body foresee and adapt itself to the environment promptly.
【单选题】
(1)Which of the following parts of knowledge of drugs should be included in pharmacology?___
A. The effects of drugs on man
B. The correlation of biological activity with chemical structure
C. The history, source, physical and chemical properties, compounding, biochemical and physiologicaleffects, mechanisms of action, absorption, distrilbution, biotransformation and excretion.
D. The prevention, recognition, and treatment of drug poisonings
【单选题】
(2)Which of the following is what a clinician is primarily interested in according to the text?___
A. Drugs which can be reasonably limited to those aspects that provide the basis for their rational clinical use
B. Chemical agents that are not used in therapy but are commonly responsible for household and industrial poisoning as well as environmental pollution
C. Drugs which are useful in the prevention,diagnosis and treatment of human disease,or in the prevention of pregnancy.
D. rugs which are useful in the prevention, diagnosis and treatment of human disease, or in the prevention of pregnancy.
【单选题】
(3)Why was the physician not interested in pharmacognosy?___
A. He didn't have to select the proper plants for his prescription
B. He had a broad botanical knowledge
C. Fewer drugs were obtained from natural sources
D. Natural drugs had little difference with synthetic ones
【单选题】
(4)Which of the following is the best way of studying pharmacology for medical students and practitioners?___
A. to have a broad botanical knowledge
B. to select a plant and its preparation
C. to have the ability to purify natural plants
D. to have curiosity that stimulates them to learn about sources of drugs
【单选题】
(5)What are the tasks related to medicines almost complete!y delegated to the pharmacists now?___
A. the physical and chemical properties of medicines
B. the preparing, compounding, and dispensing of medicines
C. dosage forms of medicines available
D. the therapeutic and other uses of medicines
【单选题】
(6) What is a main unique aspect of pharmacodynamics?___
A. Pharmacodynamics is an experimental medical science
B. Pharmacodynamics is focused on the characteristics of drugs
C. Pharmacodynamics borrows freely from both the subject matter and the experimenta techniques of physiology, biochemistry, microbiology, genetics and pathology
D. Pharmacodynamics correlates the entire field of preclinical medicine
【单选题】
7) What time of history does pharmacodynamics date back to?___
A. the second half of the seventeenth century
B. the second half of the eighteenth century
C. the second half of the nineteenth century
D. the second half of the twentieth century
【单选题】
8)What does the research on pharmacodynamics focus on?___
A. study of clinical effect of drugs
B. study of the process of drugs in the body
C. study of the effect and the mechanism of drugs on the body
D. study of the correlation of the actions and effects of drugs with their chemical structure
【单选题】
(9)Which of the following is true when drugs are selected?___
A. It has to be based in part on legal reasons.
B. It has to be based in part on ethical reasons.
C. It has to be based in part on the pharmacological evaluation in man
D. It has to be based in part on the pharmacological evaluation in animals
【单选题】
(10)Why are chemotherapeutic agents useful in therapy?___
A. They stimulate or depress biochemical or physiological function in man in a sufficiently reproducible manner to provide relief of symptoms or, ideally, to alter favorably the course of disease
B. They can produce desired effects with only tolerable undesired effects
C. They have only minimal effects on man but can destroy or eliminate parasites
D. The selectivity of their effects is one of their most important characteristics
【单选题】
1)H. Mario Geysen initially used parallel synthesis as a quick way to identify which small_____ of any given large protein bound to an antibody.___
A. division
B. pieces
C. part
D. fragment
【单选题】
2)Chemists often start a combinatorial synthesis by attaching the first set of building blocks_____ to microscopic beads made of polystyrene.___
A. solid
B. inert
C. soft
D. active
【单选题】
3)The chemical reactions required to link compounds to the beads and later to detach them____ to the synthesis proces.___
A. induce complications
B. make easy
C. introduce complications
D. introduce easy
【单选题】
4)In a parallel synthesis, all the products are_____ separately in their own reaction vessels.___
A. combined
B. assembled
C. joined
D. assorted
【单选题】
(5)In many laboratories today, robots assist with the routine work of parallel synthesis, such as small___ amounts of reactive molecules into the appropriate wells.___
A. sending
B. transporting
C. delivering
D. giving
【单选题】
(6)Scientists can pull out from the mixture the beads that bear biologically active molecules and then,using sensitive detection techniques,___ the molecular makeup of the compound attached.___
A. determine
B. make sure
C. find
D. search
【单选题】
(7)Most pharmaceutical companies today continue to___ parallel synthesis. Which of the following is not appropriate to be filled in the blank?___
A. count in
B. count on
C. depend on
D. rely on
【单选题】
(8)Once they identify a promising substance, they___ make many one-at-a-time modifications to the structure.___
A. laboriously
B. hardly
C. easy
D. effectively
【单选题】
(9)Often these procedures yield a compound having acceptable___ and safety.___
A. strength
B. effect
C. potency
D. effort
【单选题】
10)In many laboratories today, robots___ the routine work of parallel synthesis.___
A. help
B. assist with
C. assist in
D. assist to
【单选题】
(1)Pharmaceutics is an interdisciplinary subject involving___
A. formulation, manufacturing, physical pharmacy, and biopharmaceutics
B. manufacturing
C. physical pharmacy
D. biopharmaceutics
【单选题】
(2)Formulation is about the design, development and evaluation of dosage forms,___
A. discovery of novel drugs
B. analytical methods
C. drug delivery systems and manufacturing process
D. dosing regimen
【单选题】
(3)Biopharmaceutics mainly studies the in vivo process of drugs and metabolites in humans, animals and tissue culture, which specifically involves___
A. absorption and distribution
B. absorption, distribution, metabolism, and excretion
C. metabolism and excretion
D. absorption and excretion
【单选题】
(4)Regarding the definition of bioavailability(BA), BA is related to___
A. total plasma drug concentration only
B. unbound drug concentration in the plasma
C. unbound drug concentration at the target site
D. total plasma drug concentration, and the administered drug dose
【单选题】
(5)Plasma drug concentration is affected by following factors such as___
A. rate of absorption
B. rate and extent of distribution
C. rate ofeli Imination
D. all ofabove
【单选题】
6)Which of the following routes of administration will involve the absorption of drugs?___
A. i.v.injection
B. i.v.infusion
C. Subcutaneous injection, transdermal and oral
D. None of above
【单选题】
(7)Which of the following factors may influence the time course of a drug in the plasma and hence at its site of action?___
A. Food
B. Disease state
C. Route of administration
D. All of above
【单选题】
(8)Please identify the potential biological barriers for an orally administered tablet to be absorbed into the systemic circulation___
A. Sk d dermis
B. Gastrointestinal epithelium
C. Oral mucosal membrane
D. All of above
【单选题】
(9) Given the same administration dose, which of the following will likely result in varying bioavailabilities for the same drug administered to the same person? ___
A. tablets (p.o. )vs. solutions(p0.)
B. solutions for injection(i v )vs oral solutions(p0.)
C. coated tablets (p.0. )vs hard gelatin capsules(p0.)
D. All ofabove
【单选题】
(10)Which of the following statements is true?___
A. Bioavailability is only related to the administered dose and the total drug concentration in the blood circulation.
B. Plasma protein binding does not affect the bioavailability of a specific drug.
C. A given drug in different dosage forms may show differences in bioavailability if given by the same route.
D. Biopharmaceutical studies do not involve animal experiment.
【判断题】
Much of our present physiological knowledge has been found from the experiments and studies on human beings.
【判断题】
Living cells break down glucose and fats to provide energy for other activities, which is called.
【判断题】
The right atriapumps deoxygenated blood to the lungs where it absorbs oxygen from the air.
【判断题】
The nervous system uses electrical signals to transmit information very rapidly to specific cells.
【判断题】
With the level of sodium increasing extracelular fruid. the cardiac muscle cells become too excitable and may contract.
【判断题】
A negative feedback loop is a control system that acts to maintain the level of some variables within a given range following a disturbance
【判断题】
(1)Pharmacodynamics, which is concerned with the study of the biochemical and physiological effects of drugs and their mechanisms of action, Is an experimental medical science.
推荐试题
【单选题】
CCC171.一家公司必须实施一项产品来解决监管问题。项目经理必须让来自几个国家的不同团队参与进来,并使他们与承诺的里程碑保持一致。项目发起人要求项目经理在本周创建并分发项目进度计划。项目经理应该怎么做?___
A. 根据所需的里程碑创建进度计划并发布
B. 要求团队提供意见,并根据团队可用性创建进度计划
C. 获得团队的估算,并使用进度计划工具来调整和满足里程碑
D. 使用暂定日期分发活动清单和相应属性
【单选题】
CCC172.财务部门正在实施一个预算规划和预测的新系统。关于新系统如何令部门更加分散和效率低下的传言正在流传。项目经理应该如何处理这个问题?___
A. 更新沟通管理计划,以在系统开发期间包含财务部门员工
B. 确保组织变更在变更管理计划中得到说明,并以可接受的速度引入
C. 与财务部门员工一起审查变更管理计划,以确保正确记录过程变更
D. 向财务部门保证变更管理计划将考虑他们的担心
【单选题】
CCC173.一家公司准备重新启动一个暂停的项目。遗憾的是,整个项目团队均已解散。项目经理应该使用什么来重新制定项目计划?___
A. 经验教训储存库
B. 项目发起人的意见
C. 商业论证
D. 可行性研究
【单选题】
CCC174.项目经理一直在努力安排与项目人员的第一次会议。若要确保人员合作,项目经理应该怎么做?___
A. 获得总经理的授权
B. 与每位相关方举行面对面会议
C. 获得项目章程批准
D. 与相关方分享工作说明书(SOW)
【单选题】
CCC175.在与产品负责人交谈后,一位项目团队开发人员为当前迭代添加了一项关键功能,以确保新的销售。该团队成员已经开始开发该功能。项目经理下一步应该怎么做?___
A. 指示团队成员停止开发该功能,直到遵循变更控制程序
B. 建议开发人员主动添加该功能,并告知产品负责人该功能在当前迭代后可用
C. 如果不影响当前正在进行的任何其他功能交付,指导团队完成该功能的开发
D. 将该问题上报给人力资源部门,以确保产品负责人将来不会绕过命令链
【单选题】
CCC176.在项目执行规划研讨会后,所有相关方均讨论、细化了项目范围并达成一致意见。在审査文档之后,项目经理发现在项目生命周期中没有与范围变更相关的参考。若要解决这个问题,项目经理应该怎么做?___
A. 要求项目发起人更新范围,以保护这项变更
B. 确保范围变更得到管理层的批准
C. 继续执行项目并根据需要讨论任何范围变更
D. 讨论遗漏范围变更程序的主题并制定范围变更流程
【单选题】
CCC177.由于财务问题,客户取消了一个接近完成的项目。项目经理下一步应该怎么做?___
A. 立即解散所有项目资源
B. 请求项目发起人批准停止工作
C. 记录经验教训
D. 完成剩余任务
【单选题】
CCC178.一位关键相关方没有空批准项目定义。项目经理下一步应该怎么做? ___
A. 跟进该相关方以获得批准
B. 审查相关方参与计划
C. 暂停所有项目活动
D. 更新批准过程以删除此相关方的要求
【单选题】
CCC179.在项目测试期间,识别到多个缺陷。由于团队还在解决积压的缺陷,测试将会超支的风险现在已经增加。项目经理应该怎么做?___
A. 将该问题上报给项目发起人
B. 采用冲突管理技术来审查和确定缺陷的优先级
C. 提交更变请求来解决缺陷
D. 请求额外的资源来处理缺陷积压
【单选题】
CCC180.项目经理与生产支持经理开会,将新应用的所有权转移给应用支持团队。会议期间,生产支持经理表达了担忧,指出所提供文件不足以让他们承担支持。项目经理应该怎么做?___
A. 收尾项目并在经验教训中收集该问题
B. 要求生产支持经理让技术文件作者在项目之外更新文件
C. 请技术文件作者修改文件,并重新安排支持转移会议
D. 在对文件进行任何变更之前,请求更变控制委员会(CCB)的批准
【单选题】
CCC181.在一个时间紧迫的项目期间,项目经理注意到两名团队成员之间的冲突让项目进度停滞不前。项目经理应该做些什么来恢复工作和管理冲突?___
A. 将这两名团队成员分开以防止冲突影响项目
B. 请求相关方帮助团队成员达成妥协
C. 要求双方通过分析情况来解决冲突,并与他们合作找到共同解决方案
D. 指示团队成员采取一致观点并继续项目
【单选题】
CCC182.法律要求一个新项目进行环境影响研究后才可以继续执行,这将导致进度延误和成本超支。若要避免这个问题,项目经理应该事先做什么?___
A. 将使用实施整体变更控制过程活动的结果纳入到执行计划中
B. 将该风险纳入风险登记册中,然后在该风险变成现实时重定进度基准
C. 请求作为例外情况按现状实施项目,然后考虑在未来项目的范围内增加此环境影响研宄
D. 执行风险分析以指出这种可能性,并记录当风险变成现实时需要遵循的方法
【单选题】
CCC183.项目经理得知,因为未得到足够的支持,一位团队成员无法满足指定的截止日期。原计划由另一个部门的职能经理直接管理的一位人员能支持该团队成员,但因其超负荷无法完成,组织内没有其他资源可用。项目经理应该怎么做?___
A. 联系该超负荷人员的职能经理,并审查资源进度计划
B. 要求该团队成员与该超负荷人员联系,以解决该问题
C. 要求该超负荷人员的职能经理解决该问题
D. 与团队开会,以解决该问题
【单选题】
CCC184.—个项目的团队成员位于不同国家。由于团队必须审査大量信息,应该采用什么方法进行沟通?___
A. 内部网站、知识库和经验教训数据库
B. 即时通讯和会议
C. 视频会议和电话会议
D. 电子邮件、信件和备忘录
【单选题】
CCC185.在与新组建的团队启动项目后不久,项目经理发现团队成员对意见分歧极为直言不讳。若要在团队建设过程中鼓励进展,项目经理应该怎么做?___
A. 要求团队成员专注于完成任务
B. 营造一个反馈和肯定的环境,巩固支持团队的习惯
C. 强调团队成员之间达成共识以尽量减少冲突的重要性
D. 经常审查并评团队和项目绩效
【单选题】
CCC186.在系统升级后,客户向支持团队抱怨他们无法使用该系统。支持团队没有接受过从事升级工作的项目团队的培训。若要解决这个问题,项目经理应该怎么做?___
A. 查看支持团队的培训计划,并安排培训课程
B. 应将问题升级上报给项目发起人,并建议项目团队接管支持职能
C. 遵循变更管理计划,采取必要的纠正措施以满足客户的期望
D. 与部署团队合作,安排修复升级问题
【单选题】
CCC187.团队成员对问题日志中大量未解决的技术问题感到不满。项目经理应该怎么做? ___
A. 解释说这些问题应通过让主题专家(SMEs)参与解决
B. 请求更多时间来分析未完成的事项
C. 将该情况上报给项目发起人,获得支持
D. 提交变更请求,替换项目经理
【单选题】
CCC188..项目经理正在管理一个由跨职能团队执行的软件重新设计项目。该公司正在进行敏捷转型,项目管理办公室(PMO)发布了更新后的政策和程序,要求当前项目迭代开发整合到项目管理方法中。若要确保每次迭代交付都考虑质量,项目经理应该怎么做?___
A. 与相关方以及和项目团队合作,以确保有明确定义的“已完成”定义(DoD)
B. 将测试和验证活动分配给具有功能背景的团队成员
C. 安排该项目最后一次迭代的所有测试活动,以便整个团队可以关注与同一目标
D. 分配专门的软件测试人员,以确保在整个项目生命周期中进行测试
【单选题】
CCC189.承包商正在根据固定总价(FFP)合同执行一个翻新项目。在项目期间,承包商进行了多项仍在项目范围内的小变更,此外,一些相关方要求进行变更。项目经理应该怎么做?___
A. 修改合同以纳入这些变更
B. 将这些超范围变更添加到变更日志
C. 查阅沟通管理计划
D. 查阅变更管理计划
【单选题】
CCC190.在一个软件项目章程获得批准后,项目管理计划收集相关方、解决方案以及产品需求。两位关键相关方离开项目,由位于不同时区的人员取代。若要完成需求跟踪矩阵,项目经理应该怎么做?___
A. 使用名义小组技术收集多个地区的意见
B. 安排一次联合应用设计(JAD)研讨会
C. 举行多次虚拟会议
D. 执行站点顺序需求审查
【单选题】
CCC191.一家保安公司正在免费为当地的避难所实施门禁控制。营销团队计划通过善意的宣传活动,确保整体覆盖,包括广播和电视广告,并让避难所及其发起人参与。这描述的是哪一项风险应对策略?___
A. 风险分析
B. 风险增强
C. 风险接受
D. 风险分摊
【单选题】
CCC192.项目经理正在为新项目确定项目章程。此时一名关键项目相关方提出与原先略有不同的新需求。项目经理应该怎么做?___
A. 要求项目发起人增加额外资金以适应新需求,并对其他方案召开头脑风暴
B. 审查项目相关方登记册,重新分类项目相关方,并根据新的需求更新项目章程
C. 审查谅解备忘录(MOU),重新定义项目的初始意图,并将新需求包含进项目章程中
D. 与项目相关方和项目发起人开会,讨论新需求的影响,并获得一致意见
【单选题】
CCC193.在将项目投入生产之前,一名新项目经理加入团队,项目经理了解到,运营问题妨碍任务按时完成。项目经理应该审査哪个过程?___
A. 控制风险
B. 控制范围
C. 控制质量
D. 控制进度
【单选题】
CCC194.不确定项目开发时间时,必须避免预算偏差方面的风险。这应该使用哪一个合同类型?___
A. 总价加经济价格调整合同(FP-EPA)
B. 工料合同(T&M)
C. 总价加激励费用合同(FPIF)
D. 成本加激励费用合同(CPIF)
【单选题】
CCC195.在项目规划期间,项目经理识别到多个风险。为减轻这些风险的影响,项目经理应该怎么做?___
A. 将风险规避视为风险应对策略
B. 遵循先前项目的风险管理计划
C. 执行储备分析
D. 执行决策树分析并让相关方参与应对措施选择过程
【单选题】
CCC196.在一个IT项目的第二个交付里程碑中执行了质量评估。由于提出了许多问题,项目经理希望了解质量趋势以及是否存在相关变量。项目经理应该使用哪一项工具?___
A. 石川图
B. 散点图
C. 帕累托图
D. 统计分析
【单选题】
CCC197.项目团队正通过估算每个工作包来制定项目预算。团队使用过往项目的统计值和历史数据。这使用的是什么估算工具或技术?___
A. 储备分析
B. 类比估算
C. 专家判断
D. 参数估算
【单选题】
CCC198.项目经理加入一个项目,该项目要求在两年内更换现有的IT系统。项目经理下一步应该做?___
A. 与相关方一起执行效益分析
B. 确定商业需求和预期效益
C. 根据与相关方的讨论执行单项评估
D. 制定项目管理计划
【单选题】
CCC199.项目经理通过每周一次的电子邮件与相关方沟通。在接下来的委员会管理会议上,一名相关方得知项目的状态感到很惊讶,并表明其从未收到任何更新。若要在将来避免这种情况,项目经理应该怎么做?___
A. 查阅项目章程
B. 确保遵循沟通管理计划
C. 邀请该相关方参加未来的项目会议
D. 密切管理该相关方
【单选题】
CCC200.髙级管理层希望在管理项目相关方的期望时提高项目经理的人际关系技能,应推荐哪种类型的培训?___
A. 商业头脑
B. 组织行为
C. 冲突解决
D. 沟通技能
【单选题】
CCD1、一个关键的项目团队成员由于自然灾害影响其所在的城市无法上班,客户期待着可交付成果,且合同中包含着惩罚条款。项目经理应该怎么做?___
A. 检查合同中是否有由于自然灾害而免于处罚的条款
B. 与客户协商处罚例外情况
C. 在不受自然灾害影响的城市聘请一位新成员
D. 更新风险登记册,包括对自然灾害的减轻
【单选题】
CCD2、一家组织的经验教训数据库表明过去的重大项目问题是质量失败,为确保质量,项目经理制定质量保证计划时决定做的更彻底,项目经理应该怎么做?___
A. 根据项目的范围和需求制定质量管理计划
B. 将所有质量控制过程纳入项目中
C. 在项目核对单中包含来自过往项目所有的经验教训
D. 在风险登记册中添加一个新风险
【单选题】
CCD3、在开始进行一个已经批准工作包的工作之后,一名团队成员了解到项目管理计划未更新,该团队成员应该怎么做?___
A. 提交变更请求,以更新项目管理计划
B. 推迟工作,直到项目经理更新项目管理计划
C. 继续工作,并要求项目经理更新项目管理计划
D. 请求发起人许可在等待项目管理计划更新的同时继续工作
【单选题】
CCD4、一名团队成员不清楚项目经理的主要职责和权限。以下哪一份文件可以帮助他清晰了解这项信息?___
A. 项目章程
B. 项目管理计划
C. 组织结构
D. 资源管理计划
【单选题】
CCD5、项目管理办公室的经理在审查项目状态指示图,发现其中一个项目的SPI为0.5,CPI为0.3.以下哪份项目文件应包含导致该绩效的原因?___
A. 实际成本报告
B. 挣值管理报告
C. 已更新的项目甘特图
D. 问题日志
【单选题】
CCD6、一个新项目被认为具有高风险因素和制约因素,尽管其他项目经理提出了警告,项目经理仍然决定管理该项目。项目经理应该将项目的高风险性记录在哪里?___
A. 项目章程
B. 相关方管理计划
C. 问题日志
D. 项目管理计划
【单选题】
CCD7、在项目的最后一个星期,一场飓风导致影响项目的交付日期,项目经理应该怎么做?___
A. 使用储备分析技术
B. 更新风险登记册
C. 提交变更请求
D. 将其报告给项目发起人
【单选题】
CCD8、项目执行6个月后,项目经理确定CPI为0.9,且趋势分析显示CPI呈下降趋势,项目经理下一步应该怎么做?___
A. 提交更改成本基准的变更请求
B. 请求额外的资源
C. 对项目进度赶工
D. 使用管理储备
【单选题】
CCD9、一名积极参与产品规划的主管要求全部的可交付成果提高产量,该主管的权利利益水平分类是哪一项?___
A. 监督
B. 令其满意
C. 紧密关注
D. 令其知悉
【单选题】
CCD10、一家咨询公司主张,由于项目经理要求的报告不包含在原始范围内,所以会产生额外费用,项目经理应该怎么做?___
A. 报告发起人并审查项目范围,工作说明书和项目管理计划
B. 接受该主张,然后更新范围,工作说明书和工作分解结构
C. 审查采购管理计划,查询合同报告和合同
D. 与该咨询公司开会,协商需要完成的额外工作,并提出变更请求