刷题
导入试题
【多选题】
Which three VLAN Tagging modes are available in vSphere 6.x? (Choose three.)___
A. External Switch Tagging
B. Private VLAN Tagging
C. Virtual Switch Tagging
D. VXLAN Tagging
E. Virtual Guest Tagging
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
ACE
解析
暂无解析
相关试题
【多选题】
Which two statements are true about VMFS5 datastores on ESXi 6.x? (Choose two.)___
A. Virtual Disk (VMDK) size can be larger than 2TB.
B. Datastore extent size can be larger than 2TB.
C. Only Physical Mode Raw
D. evice Map (Passthrough-RDM) can be larger than 2TB.
【多选题】
Which two statements are correct when turning off a Distributed Resource Scheduler (DRS) Cluster? (Choose two.)___
A. The resource pool hierarchy of the DRS cluster is maintained.
B. The resource pool hierarchy of the DRS cluster is removed.
C. The affinity settings of the
D. RS cluster are removed and not maintained when DRS is re-enabled.
【多选题】
An administrator is creating a new Virtual SAN cluster on a Layer 2 network. There is an existing Virtual SAN cluster on the same Layer 2 network. Which two actions would allow the new Virtual SAN cluster to coexist with the older cluster? (Choose two.)___
A. Change the default Multicast Address on the new Virtual SAN cluster.
B. Change the default Unicast Address on the new Virtual SAN Cluster.
C. Create a separate VLAN for each cluster.
D. Create an ARP Alias for the Virtual SAN VMkernel Network Adapter.
【多选题】
A vCenter Operations Manager 5.7 environment is upgraded to vRealize Operations. After the upgrade, the analytics services fail to start. Which three steps must be taken to resolve the problem? (Choose three.)___
A. Take the vRealize Operations cluster offline.
B. Delete the activity persistence files.
C. Bring the cluster back online.
D. Remove any unresponsive nodes.
E. Stop the CaSA service.
【多选题】
An organization has an ESXi 6.x host that contains two resource pools. The host is being relocated to a DRS cluster. What two actions can be taken to integrate the host into the cluster, and what would happen to the existing ESXi resource pool hierarchy as a result? (Choose two.)___
A. Place all of the host's virtual machines into the DRS cluster root resource pool. The resource pools present on the host will be deleted.
B. Create a resource pool for the ESXi host's virtual machines and resource pools. The resource pools present on the host will be deleted.
C. Place all of the host's virtual machines into the DRS cluster root resource pool. The resource pools present on the host will be preserved.
D. Create a resource pool for the
E. SXi host's virtual machines and resource pools. The resource pools present on the host will be preserved.
【多选题】
Which two parameters are required when adding an iSCSI target to an iSCSI Software Adapter using Dynamic Discovery? (Choose two.)___
A. The iSCSI device's IP Address or Fully Qualified Domain Name
B. The Port Number
C. The iSCSI device's iSCSI Qualified Name (IQN)
D. The Default Gateway IP Address
【多选题】
Which two SMTP Notification Event Details are specific to alarms triggered by events? (Choose two.)___
A. User Name
B. Summary
C. Old Status
D. Target
【多选题】
Which two High Availability ___ Cluster admission control policies can help avoid resource fragmentation? (Choose two.)(AC)
A. Define failover capacity by static number of hosts
B. Define failover capacity by reserving a percentage of the cluster resources
C. Use dedicated failover hosts
D. Use Virtual Machine Monitoring
【多选题】
An attempt to enable vSphere Fault Tolerance for a powered-on virtual machine fails. Which two scenarios would result in this failure? (Choose two.)___
A. The virtual machine has three vCPUs configured.
B. The host on which the virtual machine is running has insufficient memory resources.
C. The virtual machine has insufficient resources to accommodate full reservation plus the overhead memory.
D. VMware High Availability is enabled on the cluster of which this host is a member.
【多选题】
A vApp template recently added to a Content Library is not displayed. Which two actions could correct this problem? (Choose two.)___
A. Manually synchronize the library
B. Select the Download all library content immediately option
C. Select the Sync subscribed library option
D. Manually download the vApp template
【多选题】
What are three valid disk configurations for the vSphere Data Protection 6.x Appliance? (Choose three.)___
A. 500GB
B. 1TB
C. 1.5TB
D. 2TB
E. 4TB
【多选题】
Which three connection types are available when configuring a vSwitch in the vSphere Web Client? (Choose three.)___
A. VMkernel Network Adapter
B. Physical Network Adapter
C. Virtual Machine Port Group for a Standard Switch
D. vMotion Network Adapter
E. vSAN Network Adapter
【多选题】
Which three features can be enabled for a new host cluster? (Choose three.)___
A. Storage Distributed Resource Scheduling
B. High Availability
C. Fault Tolerance
D. Distributed Resource Scheduling
E. Virtual SAN
【多选题】
An administrator receives a report that no real time statistics are available for a virtual machine in the vCenter Server inventory. Which two statements indicate likely causes of the problem? (Choose two.)___
A. The virtual machine is powered off.
B. The host containing the virtual machine is disconnected from vCenter Server.
C. There is insufficient real time data to display the information.
D. The vCenter Server service is not running.
【多选题】
Your manager has given you a bash script that retrieves data for ESXi 6.x host configurations. This data needs to be collected right after the installation of a host and must be run directly on the host. Which two actions can be used to run this script on an ESXi host? (Choose two.)___
A. Connect to the host with Ruby vSphere Console and run the script from there.
B. Enable SSH access from the Direct Console User Interface.
C. Enable the ESXi Shell from the
D. irect Console User Interface.
【多选题】
Which two are true about the Risk badge in vRealize Operations? (Choose two.)___
A. The Risk badge indicates potential future problems that may degrade the performance of the system.
B. Risks may require attention in the near future.
C. The Risk badge indicates problems that are degrading performance of the system.
D. Risks require attention now to correct system performance problems.
【多选题】
vSphere Update Manager allows which two virtual machine attributes to be upgraded? (Choose two.)___
A. Virtual machine firewall policies for NSX.
B. Software Packages in the virtual machine.
C. Virtual machine Hardware Version.
D. VMware Tools Upgrade.
【多选题】
What are two benefits of using NFS 4.1 with vSphere 6.x as compared to NFS 3? (Choose two.)___
A. NFS 4.1 supports Kerberos Authentication
B. NFS 4.1 supports multipathing
C. NFS 4.1 supports IPv6
D. NFS 4.1 supports hardware acceleration
【多选题】
Which three statements are true regarding Fault Tolerance? (Choose three.)___
A. Applications need to be continuously available to users.
B. Applications without native clustering capabilities can be protected.
C. Custom clustering solutions are complicated to configure and maintain.
D. Applications that have 16 vCPUs are supported.
E. Prevents application crashes by analyzing the workload and correcting problems.
【多选题】
Which two statements are true regarding VMware vSphere Flash Read Cache (vFRC)? (Choose two.)___
A. Cache fills and cache evictions happen in the granularity of a cache block size.
B. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying storage.
C. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying cache data.
D. Cache fills and cache evictions happen in the granularity of the disk block size.
【多选题】
What are two possible causes of Storage Distributed Resource Scheduler (SDRS) being disabled on one or more virtual machine disks in a datastore cluster? (Choose two.)___
A. The virtual machine has vSphere Fault Tolerance disabled.
B. The virtual machine is a template.
C. The virtual machine swap file is on a shared datastore.
D. The disk is a CD-ROM/ISO file.
【多选题】
An administrator attempts to install vCenter Single Sign-On Server. The installer returns an error message indicating that the installation failed. Prior to the installation, all setup prerequisites were met. The administrator has generated a vCenter Server Single Sign-On support bundle. Which two files should the administrator analyze to determine the cause of the failure? (Choose two.)___
A. Server\utils\logs\imsTrace.log
B. Server\utils\logs\install.txt
C. %TEMP%\utils\logs\vminst.log
D. %TEMP%\vminst.log
【多选题】
An administrator is unable to remove an ESXi 6.x host from a vSphere Distributed Switch. What are two likely reasons for this issue? (Choose two.)___
A. Vmkernel interfaces on the switch are still in use.
B. VM Network port group adapters are connected to different switch.
C. Physical NICs are migrated to different switch.
D. VM Network adapters are connected to this switch.
【多选题】
Which two Identity Sources are available to add for vCenter Single Sign-On authentication? (Choose two.)___
A. LocalOS
B. OpenLDAP
C. NIS as an LDAP Server
D. VCMSDS
【多选题】
What are three goals of resource management within a cluster? (Choose three.)___
A. To prevent virtual machines from monopolizing resources and to guarantee predictable service rates.
B. To exploit undercommitted resources and overcommit with graceful degradation.
C. To provide solutions to potential problems that you might encounter when using vCenter Server.
D. To control the relative importance of virtual machines and provide flexible dynamic partitioning.
E. To provide additional network administration capabilities.
【多选题】
Which three actions can be taken as a result of executing the vSphere Update Manager 6.x scan and remediation wizards? (Choose three.)___
A. Install and upgrade software in virtual machines.
B. Upgrade the firmware on ESXi host devices.
C. Upgrade and Patch ESXi hosts.
D. Install and update third-party software on hosts.
E. Upgrade virtual machine hardware.
【多选题】
Which two statements are true about deploying and using vSphere Replication? (Choose two.)___
A. ESXi hosts managed by a single vCenter Server instance require a connection between the two vSphere Replication appliances.
B. Sites managed by different vCenter Server instances require a connection between the two vSphere Replication appliances.
C. Sites managed by different vCenter Server instances require the use of Site Recovery Manager and a connection between the two vSphere Replication appliances.
D. ESXi hosts managed by a single vCenter Server instance require a single vSphere Replication appliance.
【多选题】
An administrator is attempting to power on a virtual machine, but the task is hanging at 95%. What three scenarios best explain why this problem is happening? (Choose three.)___
A. A virtual machine question is currently being posed to the administrator.
B. Another task for the virtual machine or other component is already in progress.
C. The VMware High Availability cluster has insufficient resources to guarantee failover.
D. The host has lost access to the storage device containing the virtual machine files.
E. The host is under resource contention and unable to power on the virtual machine.
【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
【多选题】
Which two storage controller configurations can be used with Virtual SAN? (Choose two.)___
A. SAS controllers in Passthrough mode
B. SAS controllers in RAID0 mode
C. SAS controllers in RAID1 mode
D. SAS controllers in RAID10 mode
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
【多选题】
An administrator is deploying multiple Windows 2003 Virtual Machines from the same template. What two steps should be taken to avoid network conflicts? (Choose two.)___
A. Customize the guest operating system.
B. Install VMware Tools into the new virtual machines.
C. Copy the Microsoft Sysprep tools onto the vCenter Server system.
D. Ensure the e1000 vmnic is selected for each new virtual machine.
【多选题】
Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
推荐试题
【单选题】
当应急滑梯待命、从外部开门时:___
A. 待命解除;
B. 滑梯释放;
C. SLIDEARMED灯闪亮。
D.
【单选题】
对于紧急出口门,当从那侧打开时会自动释放应急滑梯。___
A. 仅内侧;
B. 仅外侧;
C. 内侧和外侧。
D.
【单选题】
飞机断电、客舱门锁定且待命解除,余压指示灯:___
A. 不会亮;
B. 余压指示灯的压力电门断路指示灯;
C. 余压指示灯的压力电门感受压力>25mb时仍会亮。
D.
【单选题】
货舱门控制系统中电控选择valve在下列情况通电:___
A. 手柄和隔框接近电门目标块在"远离";
B. 只要隔框接近电门目标块在"远离";
C. 锁轴接近电门目标块在"远离"并操纵人工选择valve时。
D.
【单选题】
货舱门上共有接近电门:___
A. 2个;
B. 3个;
C. 4个。
D.
【单选题】
货舱门液压控制系统包括:___
A. 双向作动器,人工选择valve,电控选择valve;
B. 双向作动器,人工选择valve,单向阀;
C. 双向作动器,电控选择valve,单向阀。
D.
【单选题】
货舱门作动器供压由:___
A. 兰系统;
B. 黄系统;
C. 兰系统和黄系统。
D.
【单选题】
客舱门承受的压力负荷由:___
A. 门锁传递到机身;
B. 止挡块传递到机身;
C. A+B。
D.
【单选题】
旅客门封严条上开有小孔,目的是:___
A. 排水;
B. 平衡压力;
C. 封严。
D.
【单选题】
旅客门外部手柄不在收藏位,从内部关门则外部手柄:___
A. 收藏;
B. 不动;
C. 不能关门。
D.
【单选题】
旅客门外部手柄在收藏位,从内部开门则外部手柄:___
A. 随动;
B. 不动;
C. 打开。
D.
【单选题】
前后货舱门上的通风门的作用是:___
A. 通风;
B. 平衡压差;
C. 安全锁。
D.
【单选题】
前后货舱门允许保持于:___
A. 全开/全关位;
B. 任意位;
C. A+B。
D.
【单选题】
人工开货舱门顺序:___
A. 手摇泵增压,门锁手柄放开位,保持人工选择手柄在"开位";
B. 人工选择手柄在"开位"手摇泵增压,门锁手柄放开位;
C. 门锁手柄放开位,人工选择手柄在"开位",手摇泵增压。
D.
【单选题】
如果门开锁,在ECAM页面上门的指示为:___
A. 红色;
B. 琥珀色;
C. 绿色。
D.
【单选题】
维护需要打开全部应急出口门时,对滑梯释放机构:___
A. 须逐个解除;
B. 相应侧解除一个(A320);
C. 只须解除一个。
D.
【单选题】
要解除客舱门撤离装置,将待命控制手柄向上抬起后:___
A. 确定目视指示器显示"DISARMED";
B. 扣上安全销;
C. A+B。
D.
【单选题】
应急出口门滑梯释放机构:___
A. 不能被脱开;
B. 可人工脱开;
C. 断电后脱开。
D.
【单选题】
应急出口是嵌入式向内开舱们,打开门可从:___
A. 内侧;
B. 外侧;
C. 内侧和外侧。
D.
【单选题】
应急开门系统包括:___
A. GIRTBAR控制手柄、应急滑梯/筏指示、作动筒;
B. GIRTBAR控制手柄、应急滑梯/筏、安全装置;
C. GIRTBAR控制手柄、应急滑梯/筏、阻尼/应急作动筒。
D.
【单选题】
余压指示灯的压力电门的触发值是:___
A. 压差>25mb;
B. 压差>45mb;
C. 压差>10mb。
D.
【单选题】
指示系统是:___
A. 机械指示;
B. 电气指示;
C. A+B。
D.
【单选题】
阻尼/应急作动筒的阻尼功能是由谁来实现的:___
A. 负荷弹簧;
B. 节流器;
C. 蓄压器。
D.
【单选题】
关于开启CARGODOOR___
A. 风速和开货舱门没有关系
B. 风速过大不能开启货仓门
C. 任何情况下都可以人工开启货仓门
D. 周围无障碍物就可以开
【单选题】
ECAME上DOOR页显示门为绿色说明___
A. 门在打开位
B. 门在关闭位
C. 门滑梯释放
D. 门在正常状态
【单选题】
WhathappensifEECchannelAfails?___
A. A.TheEIUtakesover
B. B.TheEECswitchesfromthefaultychanneltochannelB
C. C.TheEECpoweriscutoff
D. D.Theengineshutdown
【单选题】
WhereistheTLAsignaldirectlysentto?___
A. A.TheEIU
B. B.TheECB
C. C.TheFMGC
D. D.TheEEC
【单选题】
WhatistheFADEC?___
A. A.AnElectronicEngineControlbox
B. B.Athrustcontrolunit
C. C.TheEEC,sensorsandperipheralcomponents
D. D.Atransducer
【单选题】
WhichofthefollowingcontrolstheBoosterStageBleedValves?___
A. A.TheBSBVmasteractuator
B. B.TheFMU
C. C.TheEEC
D. D.TheEIU
【单选题】
WhereisairtakentocoolNo4bearingcompartment?___
A. A.5thstage
B. B.7thstage
C. C.10thstage
D. D.12thstage
【单选题】
HowistheengineLPfuelshutoffvalvecontrolled?___
A. A.BytheEnginefirepushbutton
B. B.Automaticallywhenafireisdetected
C. C.BytheMASTERlever
D. D.AorC
【单选题】
Theaccesspanelforstartvalveislocatedat:___
A. A.RHfancowl
B. B.RHfancowlforLHENG,LHfancowlforRHENG
C. C.LHfancowl
D. D.Therightsideofinletcowl
【单选题】
Whatconditionwillcausecontinuousrelight?___
A. A.EIUfailure
B. B.manualstart
C. C.reselectthemodeSWtoIGN/STARTwithenginerunning
D. D.autostart
【单选题】
3#气动站位在何处?___
A. 高压压气机进口;
B. 高压压气机出口;
C. 燃烧室出口。
D.
【单选题】
CFM56-5B发动机的平台推力是在什么条件下计算的?___
A. ISA+15℃;
B. ISA+30℃;
C. ISA+59℃。
D.
【单选题】
FADEC控制发动机的起动程序,它监控何参数?___
A. N1和N2;
B. N1、N2和EGT;
C. EGT。
D.
【单选题】
HCU中压力探测器向ECU传递何信号?___
A. 系统已增压;
B. 作动筒已作动;
C. 门已上锁。
D.
【单选题】
HMU的关断valve送什么关断信号到燃油回油valve?___
A. 燃油压力信号;
B. 直流电信号;
C. 通过ECU送一个电信号。
D.
【单选题】
HPTCC系统由何处引气?___
A. 风扇引气;
B. 5级高压压气机引气;
C. 4级和9级高压压气机引气。
D.
【单选题】
IDG滑油冷却系统中,ECU使用何温度作为参考?___
A. 发动机滑油温度;
B. IDG滑油温度;
C. 燃油温度。
D.
欢迎使用我爱刷题
×
微信搜索我爱刷题小程序
温馨提示
×
请在电脑上登陆“www.woaishuati.com”使用