【多选题】
Which three VLAN Tagging modes are available in vSphere 6.x? (Choose three.)___
A. External Switch Tagging
B. Private VLAN Tagging
C. Virtual Switch Tagging
D. VXLAN Tagging
E. Virtual Guest Tagging
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【多选题】
Which two statements are true about VMFS5 datastores on ESXi 6.x? (Choose two.)___
A. Virtual Disk (VMDK) size can be larger than 2TB.
B. Datastore extent size can be larger than 2TB.
C. Only Physical Mode Raw
D. evice Map (Passthrough-RDM) can be larger than 2TB.
【多选题】
Which two statements are correct when turning off a Distributed Resource Scheduler (DRS) Cluster? (Choose two.)___
A. The resource pool hierarchy of the DRS cluster is maintained.
B. The resource pool hierarchy of the DRS cluster is removed.
C. The affinity settings of the
D. RS cluster are removed and not maintained when DRS is re-enabled.
【多选题】
An administrator is creating a new Virtual SAN cluster on a Layer 2 network. There is an existing Virtual SAN cluster on the same Layer 2 network. Which two actions would allow the new Virtual SAN cluster to coexist with the older cluster? (Choose two.)___
A. Change the default Multicast Address on the new Virtual SAN cluster.
B. Change the default Unicast Address on the new Virtual SAN Cluster.
C. Create a separate VLAN for each cluster.
D. Create an ARP Alias for the Virtual SAN VMkernel Network Adapter.
【多选题】
A vCenter Operations Manager 5.7 environment is upgraded to vRealize Operations. After the upgrade, the analytics services fail to start. Which three steps must be taken to resolve the problem? (Choose three.)___
A. Take the vRealize Operations cluster offline.
B. Delete the activity persistence files.
C. Bring the cluster back online.
D. Remove any unresponsive nodes.
E. Stop the CaSA service.
【多选题】
An organization has an ESXi 6.x host that contains two resource pools. The host is being relocated to a DRS cluster. What two actions can be taken to integrate the host into the cluster, and what would happen to the existing ESXi resource pool hierarchy as a result? (Choose two.)___
A. Place all of the host's virtual machines into the DRS cluster root resource pool. The resource pools present on the host will be deleted.
B. Create a resource pool for the ESXi host's virtual machines and resource pools. The resource pools present on the host will be deleted.
C. Place all of the host's virtual machines into the DRS cluster root resource pool. The resource pools present on the host will be preserved.
D. Create a resource pool for the
E. SXi host's virtual machines and resource pools. The resource pools present on the host will be preserved.
【多选题】
Which two parameters are required when adding an iSCSI target to an iSCSI Software Adapter using Dynamic Discovery? (Choose two.)___
A. The iSCSI device's IP Address or Fully Qualified Domain Name
B. The Port Number
C. The iSCSI device's iSCSI Qualified Name (IQN)
D. The Default Gateway IP Address
【多选题】
Which two SMTP Notification Event Details are specific to alarms triggered by events? (Choose two.)___
A. User Name
B. Summary
C. Old Status
D. Target
【多选题】
Which two High Availability ___ Cluster admission control policies can help avoid resource fragmentation? (Choose two.)(AC)
A. Define failover capacity by static number of hosts
B. Define failover capacity by reserving a percentage of the cluster resources
C. Use dedicated failover hosts
D. Use Virtual Machine Monitoring
【多选题】
An attempt to enable vSphere Fault Tolerance for a powered-on virtual machine fails. Which two scenarios would result in this failure? (Choose two.)___
A. The virtual machine has three vCPUs configured.
B. The host on which the virtual machine is running has insufficient memory resources.
C. The virtual machine has insufficient resources to accommodate full reservation plus the overhead memory.
D. VMware High Availability is enabled on the cluster of which this host is a member.
【多选题】
A vApp template recently added to a Content Library is not displayed. Which two actions could correct this problem? (Choose two.)___
A. Manually synchronize the library
B. Select the Download all library content immediately option
C. Select the Sync subscribed library option
D. Manually download the vApp template
【多选题】
What are three valid disk configurations for the vSphere Data Protection 6.x Appliance? (Choose three.)___
A. 500GB
B. 1TB
C. 1.5TB
D. 2TB
E. 4TB
【多选题】
Which three connection types are available when configuring a vSwitch in the vSphere Web Client? (Choose three.)___
A. VMkernel Network Adapter
B. Physical Network Adapter
C. Virtual Machine Port Group for a Standard Switch
D. vMotion Network Adapter
E. vSAN Network Adapter
【多选题】
Which three features can be enabled for a new host cluster? (Choose three.)___
A. Storage Distributed Resource Scheduling
B. High Availability
C. Fault Tolerance
D. Distributed Resource Scheduling
E. Virtual SAN
【多选题】
An administrator receives a report that no real time statistics are available for a virtual machine in the vCenter Server inventory. Which two statements indicate likely causes of the problem? (Choose two.)___
A. The virtual machine is powered off.
B. The host containing the virtual machine is disconnected from vCenter Server.
C. There is insufficient real time data to display the information.
D. The vCenter Server service is not running.
【多选题】
Your manager has given you a bash script that retrieves data for ESXi 6.x host configurations. This data needs to be collected right after the installation of a host and must be run directly on the host. Which two actions can be used to run this script on an ESXi host? (Choose two.)___
A. Connect to the host with Ruby vSphere Console and run the script from there.
B. Enable SSH access from the Direct Console User Interface.
C. Enable the ESXi Shell from the
D. irect Console User Interface.
【多选题】
Which two are true about the Risk badge in vRealize Operations? (Choose two.)___
A. The Risk badge indicates potential future problems that may degrade the performance of the system.
B. Risks may require attention in the near future.
C. The Risk badge indicates problems that are degrading performance of the system.
D. Risks require attention now to correct system performance problems.
【多选题】
vSphere Update Manager allows which two virtual machine attributes to be upgraded? (Choose two.)___
A. Virtual machine firewall policies for NSX.
B. Software Packages in the virtual machine.
C. Virtual machine Hardware Version.
D. VMware Tools Upgrade.
【多选题】
What are two benefits of using NFS 4.1 with vSphere 6.x as compared to NFS 3? (Choose two.)___
A. NFS 4.1 supports Kerberos Authentication
B. NFS 4.1 supports multipathing
C. NFS 4.1 supports IPv6
D. NFS 4.1 supports hardware acceleration
【多选题】
Which three statements are true regarding Fault Tolerance? (Choose three.)___
A. Applications need to be continuously available to users.
B. Applications without native clustering capabilities can be protected.
C. Custom clustering solutions are complicated to configure and maintain.
D. Applications that have 16 vCPUs are supported.
E. Prevents application crashes by analyzing the workload and correcting problems.
【多选题】
Which two statements are true regarding VMware vSphere Flash Read Cache (vFRC)? (Choose two.)___
A. Cache fills and cache evictions happen in the granularity of a cache block size.
B. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying storage.
C. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying cache data.
D. Cache fills and cache evictions happen in the granularity of the disk block size.
【多选题】
What are two possible causes of Storage Distributed Resource Scheduler (SDRS) being disabled on one or more virtual machine disks in a datastore cluster? (Choose two.)___
A. The virtual machine has vSphere Fault Tolerance disabled.
B. The virtual machine is a template.
C. The virtual machine swap file is on a shared datastore.
D. The disk is a CD-ROM/ISO file.
【多选题】
An administrator attempts to install vCenter Single Sign-On Server. The installer returns an error message indicating that the installation failed. Prior to the installation, all setup prerequisites were met. The administrator has generated a vCenter Server Single Sign-On support bundle. Which two files should the administrator analyze to determine the cause of the failure? (Choose two.)___
A. Server\utils\logs\imsTrace.log
B. Server\utils\logs\install.txt
C. %TEMP%\utils\logs\vminst.log
D. %TEMP%\vminst.log
【多选题】
An administrator is unable to remove an ESXi 6.x host from a vSphere Distributed Switch. What are two likely reasons for this issue? (Choose two.)___
A. Vmkernel interfaces on the switch are still in use.
B. VM Network port group adapters are connected to different switch.
C. Physical NICs are migrated to different switch.
D. VM Network adapters are connected to this switch.
【多选题】
Which two Identity Sources are available to add for vCenter Single Sign-On authentication? (Choose two.)___
A. LocalOS
B. OpenLDAP
C. NIS as an LDAP Server
D. VCMSDS
【多选题】
What are three goals of resource management within a cluster? (Choose three.)___
A. To prevent virtual machines from monopolizing resources and to guarantee predictable service rates.
B. To exploit undercommitted resources and overcommit with graceful degradation.
C. To provide solutions to potential problems that you might encounter when using vCenter Server.
D. To control the relative importance of virtual machines and provide flexible dynamic partitioning.
E. To provide additional network administration capabilities.
【多选题】
Which three actions can be taken as a result of executing the vSphere Update Manager 6.x scan and remediation wizards? (Choose three.)___
A. Install and upgrade software in virtual machines.
B. Upgrade the firmware on ESXi host devices.
C. Upgrade and Patch ESXi hosts.
D. Install and update third-party software on hosts.
E. Upgrade virtual machine hardware.
【多选题】
Which two statements are true about deploying and using vSphere Replication? (Choose two.)___
A. ESXi hosts managed by a single vCenter Server instance require a connection between the two vSphere Replication appliances.
B. Sites managed by different vCenter Server instances require a connection between the two vSphere Replication appliances.
C. Sites managed by different vCenter Server instances require the use of Site Recovery Manager and a connection between the two vSphere Replication appliances.
D. ESXi hosts managed by a single vCenter Server instance require a single vSphere Replication appliance.
【多选题】
An administrator is attempting to power on a virtual machine, but the task is hanging at 95%. What three scenarios best explain why this problem is happening? (Choose three.)___
A. A virtual machine question is currently being posed to the administrator.
B. Another task for the virtual machine or other component is already in progress.
C. The VMware High Availability cluster has insufficient resources to guarantee failover.
D. The host has lost access to the storage device containing the virtual machine files.
E. The host is under resource contention and unable to power on the virtual machine.
【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
【多选题】
Which two storage controller configurations can be used with Virtual SAN? (Choose two.)___
A. SAS controllers in Passthrough mode
B. SAS controllers in RAID0 mode
C. SAS controllers in RAID1 mode
D. SAS controllers in RAID10 mode
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
【多选题】
An administrator is deploying multiple Windows 2003 Virtual Machines from the same template. What two steps should be taken to avoid network conflicts? (Choose two.)___
A. Customize the guest operating system.
B. Install VMware Tools into the new virtual machines.
C. Copy the Microsoft Sysprep tools onto the vCenter Server system.
D. Ensure the e1000 vmnic is selected for each new virtual machine.
【多选题】
Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
【多选题】
Which two allow for the disabling of Network Rollback operations? (Choose two.)___
A. Modifying the vpxd advanded configuration options and adding the config.vpxd.network.rollback key
B. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the<rollback> xml tag
C. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\vpxd.cfg file and adjusting the <networkrollback> xml tag
D. Modifying the C:\ProgramData\VMware\CIS\cfg\vmware-vpx\firstboot\vpxd-service- spec.prop file and adjusting the <rollback> xml tag
【多选题】
An administrator is tasked with performing a vMotion migration of a virtual machine. The virtual machine is configured as follows: <vSphere Flash Read Cache (vFRC) enabled> <Is part of a Distributed Resource Cluster (DRS) Cluster> Which two statements are true? (Choose two.)___
A. Each ESXi host in the cluster supports multiple virtual flash resources.
B. Each ESXi host in the cluster supports one virtual flash resource.
C. DRS treats powered-on virtual machines with Flash Read Cache as having a preferred affinity to their current host and moves them only for mandatory reasons.
D. DRS treats powered-on virtual machines with Flash Read Cache as having a required affinity to their current host and does not move them.
推荐试题
【单选题】
路由协议中“STP”的中文名称是_______。[311000000]___
A. 普通路径协议
B. 增强型内部网关路由协议
C. 热备份路由协议
D. 生成树协议
【单选题】
路由配置提示符“Router>”说明目前在_______模式。[322000000]___
A. 特权EXEC
B. 用户EXEC
C. 全局配置
D. 接口配置
【单选题】
路由配置提示符“Router#”说明目前在_______模式。[322000000]___
A. 特权EXEC
B. 用户EXEC
C. 全局配置
D. 接口配置
【单选题】
一般车站中在TDCS站机屏幕上可以看见相邻_______站站场情况。[311000000]___
【单选题】
当与调度所通信中断中,TDCS站机屏幕右下角表示灯 _______ 。[333010201]___
A. 闪绿灯
B. 亮绿灯
C. 闪红灯
D. 亮红灯
【单选题】
TYJL-Ⅱ型计算机联锁系统,可点压电务维修机显示屏菜单栏的“_______切换”按钮来切换所调用的记录数据文件,进行主备监控机各种信息的查询。[322000000]___
A. A机
B. B机
C. C机
D. A/B机
【单选题】
TYJL-Ⅱ型计算机联锁系统运用过程中,若系统停电不超过_______就恢复供电,微机房不做信息存盘处理。[331000000]___
A. 3min
B. 4min
C. 5min
D. 6min
【单选题】
TYJL—Ⅱ型计算机联锁系统,每个I/O板最多控制_______采集板或驱动板。[32212000000]___
A. 4个
B. 8个
C. 16个
D. 32个
【单选题】
TYJL—Ⅱ型计算机联锁系统,采集电路采集设备状态在有信息时,采集点与采集地的直流电压应大于_______。[332010102]___
A. 10V
B. 16V
C. 18V
D. 24V
【单选题】
TYJL-ECC型计算机系统,每块INOM板提供_______信息点。[332000000]___
A. 24路
B. 32路
C. 40路
D. 48路
【单选题】
计算机联锁应按联锁图表进行_______一次的联锁试验。[312030204]___
【单选题】
计算机联锁采用_______结构的实质在于用增加相同性能的模块来换取系统的可靠性和安全性的。[332000000]___
【单选题】
当计算机联锁系统备机停机或备机仅处于_______时,禁止关闭主机电源或人为干预主机切换到备机。[332000000]___
A. 停机状态
B. 热备状态
C. 主机状态
D. 同步校核状态
【单选题】
下列设备中_______不需要UPS供电。[311000000]___
A. 联锁主机
B. 监控子系统打印机
C. 控制台分机 C输入分机
【单选题】
计算机联锁系统联锁机的故障一安全性是指_______。[322000000]___
A. 联锁机不发生危险侧输出的功能
B. 联锁机平均危险侧输出的间隔时间
C. 联锁机在规定的时间和条件下完成联锁功能的概率
D. 联锁机不发生危险侧输出概率
【单选题】
JD-1A型微机联锁系统控制台,区段空闲时,构成区段的发光二极管_______。[311010201]___
A. 不点亮
B. 发白色光
C. 发红色光
D. 闪白色光
【单选题】
JD-1A型微机联锁系统控制台,区段锁闭时,构成区段的发光二极管_______。[331010201]___
A. 不点亮
B. 发白色光
C. 发红色光
D. 闪白色光
【单选题】
JD-1A型微机联锁系统控制台,区段占用时,二极管_______。[331010201]___
A. 不点亮
B. 发白色光
C. 发红色光
D. 闪白色光
【单选题】
JD-1A型微机联锁系统控制台,进站信号机红白灯表示_______。[331010201]___
A. 信号关闭
B. 引导信号
C. 信号开放
D. 灯丝断丝
【单选题】
JD-1A型微机联锁系统控制台,进站信号机闪红灯表示_______。[331010201]___
A. 信号关闭
B. 引导信号
C. 信号开放
D. 灯丝断丝
【单选题】
JD-1A型微机联锁系统控制台,出站兼调车信号机绿灯表示_______。[311010201]___
A. 信号关闭
B. 列车信号开放
C. 调车信号开放
D. 灯丝断丝
【单选题】
JD-1A型微机联锁系统控制台,出站兼调车信号机白闪表示_______。[331010201]___
A. 信号关闭
B. 列车信号开放
C. 调车信号开放
D. 灯丝断丝
【单选题】
JD-1A型微机联锁系统,在控制台上对应每一台上下位机均有一对表示灯表示该机的联机状态,两个灯均点亮表示该机处于_______。[333010201]___
A. 主用状态
B. 热备状态
C. 脱机
D. 死机
【单选题】
JD-1A型微机联锁系统,在控制台上对应每一台上下位机均有一对表示灯表示该机的联机状态,仅有左侧的一个灯点亮表示该机处于_______。[333010201]___
A. 主用状态
B. 热备状态
C. 脱机
D. 死机
【单选题】
JD-1A型微机联锁系统,实现联锁机的主、备用,即完成本机3个倒机继电器和邻机的3个倒机继电器的采集和驱动的是_______。[322000000]___
A. 多功能匹配板
B. 机箱控制板
C. 驱动板
D. 采集板
【单选题】
JD-1A型微机联锁系统,与单线半自动闭塞结合电路中采集KTJ的_______。[322010103]___
A. 前接点
B. 后接点
C. 中接点
D. 前后接点
【单选题】
JD-1A型微机联锁系统,当备机启动后首先进入_______。[333000000]___
A. 停机状态
B. 主用状态
C. 热备状态
D. 同步校核状态
【单选题】
JD-1A型微机联锁系统,当备机和主机动态信息一致后,备机进入_______。[312000000]___
A. 停机状态
B. 主用状态
C. 热备状态
D. 同步校核状态
【单选题】
JD-1A型微机联锁系统,只有在另一台联锁机处于_______的情况下,才能人工倒机。[312000000]___
A. 停机状态
B. 主用状态
C. 热备状态
D. 同步校核状态
【单选题】
EI32-JD型计算机联锁系统,具有进行联锁运算功能,并根据运算结果,产生控制命令的是_______。[332000000]___
A. 联锁机
B. 操作表示机
C. 驱采机
D. 电务维修机
【单选题】
EI32-JD型计算机联锁系统,电务维修机不具备的功能是_______。[323000000]___
A. 接收操作表示机传来的站场状态信息、操作信息、提示信息、故障信息等
B. 显示站场运行状况、车站值班员操作信息、故障信息、系统运行状况等
C. 记录一个月的历史信息,可查看一个月内站场运行状况、车站值班员操作信息、故障信息等
D. 通过LAN通信,接收联锁机传送的控制命令;并根据控制命令控制相应驱动电路
【单选题】
在DS6-11计算机联锁系统中由于工作机A机发生硬件故障造成死机故障或人工关机,_______落下。[322010104]___
A. AYUJ
B. BYUJ
C. AGZJ
D. BGZJ
【单选题】
在DS6-11计算机联锁系统中当A机发生错误开放信号的危险性故障,或人工在监测机上输入双机切换命令,_______落下。[322010104]___
A. AYUJ
B. BYUJ
C. AGZJ
D. BGZJ
【单选题】
DS6-K5B在计算机联锁,系统各设备间采用光缆连接,下列说法正确的是_______。[331010103]___
A. 不得用手摸光缆接头的光端口,光缆接头不用时,应带上防尘帽
B. 可以用手摸光缆接头的光端口
C. 光缆接头不用时,不用带上防尘帽
D. 不得用手摸光缆接头的光端口,但光缆接头不用时,不用带上防尘帽
【单选题】
DS6-K5B在计算机联锁,光缆的弯曲半径应在_______以上。[331000000]___
A. 5mm
B. 10mm
C. 15mm
D. 20mm
【单选题】
DS6-K5B在计算机联锁,当系统运行正常,面板指示灯D2灯亮表示_______。[323010201]___
A. 两系不同步
B. 两系同步
C. 执行控制功能
D. 控制功能停止
【单选题】
DS6-K5B在计算机联锁,当系统运行正常,面板指示灯D3灯亮表示_______。[323010201]___
A. 两系不同步
B. 两系同步
C. 执行控制功能
D. 控制功能停止
【单选题】
DS6-K5B在计算机联锁,当系统运行正常,面板指示灯D4灯亮表示_______。[323010201]___
A. APL开始执行
B. APL停止执行
C. 数据连接成功
D. 数据连接失败
【单选题】
DS6-K5B在计算机联锁,当系统运行正常,面板指示灯D6灯灭表示_______。[323010201]___
A. APL开始执行
B. APL停止执行
C. 数据连接成功
D. 数据连接失败
【单选题】
VPI型计算机联锁系统,采集电源由联锁机送到各个组合内部,经过所需采集的继电器的_______,通过接口架送至DI板。[333010104]___
A. 前接点
B. 后接点
C. 中接点
D. 继电器线圈