刷题
导入试题
【单选题】
An administrator is unable to create the first group in a new vRealize Operations environment. What is the likely cause of the problem?___
A. There are no group types defined.
B. The group is not defined in SSO.
C. There are more than 32 group types defined.
D. The description for the group is not provided.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
A
解析
暂无解析
相关试题
【单选题】
A new vApp was built and tested in the corporate headquarters datacenter running vSphere 6.x. What condition would explain why the virtual machine is failing to boot in an offsite datacenter running on vSphere 5.5?___
A. The virtual machine was built with the default hardware version.
B. The VMFS 5 datastore is not compatible with virtual machines configured with vSphere 6.x.
C. a
D. RS 5.5 cluster cannot run virtual machines configured with vSphere 6.x.
【单选题】
An administrator is evaluating whether to deploy vCenter Server on a Windows server or on a vCenter Server appliance. The administrator has the following requirements: <A web browser will be utilized to manage the vSphere environment.> <16 ESXi hosts will be deployed.> <Licenses must be shared with a vCenter Server at another site.> <An external Oracle 10g database server will be used to host the vCenter Server database.> Why will the administrator need to deploy vCenter Server on a Windows server?___
A. Linked Mode is a requirement for the solution.
B. Oracle 10g is a requirement for the solution.
C. The vSphere web client is a requirement for the solution.
D. Management of more than 5 hosts is a requirement for the solution.
【单选题】
What is a benefit of using VMware Data Protection ?___
A. Provides support for guest-level backups and restores of Microsoft SQL Servers, Exchange Servers, and Share Point Servers.
B. Provides support for advanced storage services including replication, encryption, deduplication, and compression.
C. Provides direct access to VDP configuration integrated into the vSphere Client.
D. Reduces disk space consumed by virtual machine data using deduplication.
【单选题】
An administrator enables vSphere High Availability (HA) on an existing cluster with a large number of hosts and virtual machines. The administrator notices that the setup of vSphere HA on some of the hosts is failing. What step, if taken, might resolve this issue?___
A. Increase the value of the config.vpxd.das.electionWaitTimeSec setting.
B. Set the value of vpxd.das.aamMemoryLimit to 256.
C. Set the value of the das.useDefaultIsolationAddress setting to False.
D. Increase the value of the das.iostatsinterval setting.
【单选题】
An ESXi 6.x host consists of 24 logical cores. Hyperthreading is enabled on the host. What is the maximum number of vCPUs that can be assigned to a virtual machine on this host?___
A. 24
B. 48
C. 64
D. 128
【单选题】
By default, each ESXi 6.x host is provisioned with a certificate from which root certificate authority?___
A. RedHat Certificate Authority
B. VMware Certificate Authority
C. DigiCert Certificate Authority
D. Verisign Certificate Authority
【单选题】
An administrator is adding an NFS datastore as shown in the Exhibit. What is the purpose of the Servers to be added list?___
A. It contains the IP addresses of the NFS Storage Server to provide multipathing capability.
B. It contains the IP addresses of the ESXi hosts that mount the datastore.
C. It contains the IP addresses used for
D. ynamic Discovery of targets.
【单选题】
An administrator reports that the System Event log data is only available for 24 hours when reviewing the Hardware Status tab. Which condition could be responsible for the loss of data?___
A. A Reset event log was executed.
B. The statistical collection level was set to a value of 1.
C. The boot disk of the host is corrupt.
D. Syslog has been configured at the vCenter Server level.
【单选题】
During an upgrade, the ESXi 6.x installer finds an existing version of ESXi and a VMFS3 volume. No virtual machines exist on the host or VMFS3 volume. The requirement is to upgrade to VMFS5. Which option should be chosen to meet this requirement?___
A. Upgrade ESXi and preserve the VMFS datastore
B. Install ESXi and preserve the VMFS datastore
C. Install ESXi and overwrite the VMFS datastore
D. Upgrade
E. SXi and overwrite the VMFS datastore
【单选题】
A vSphere 6.x Standard Switch is configured with 4 virtual machine portgroups, as shown in the exhibit. Which portgroup would be utilized by default when creating a new virtual machine?___
A. Access Network
B. DMZ Network
C. VM Network
D. Virtual Machine Network
【单选题】
Which vSphere 6.x feature will allow an organization to utilize native snapshots?___
A. Virtual Volumes
B. Virtual SAN
C. VMFS3
D. VMFS5
【单选题】
An administrator is creating a new vSphere Distributed Switch that will be utilized with a specific vSphere Cluster. The cluster itself contains a mix of ESXi 5.x and 6.x Hosts. Which Distributed Switch version should be created to support this configuration?___
A. Distributed Switch: 6.0.0
B. Distributed Switch: 5.0.0
C. Distributed Switch: 5.1.0
D. Distributed Switch: 5.5.0
【单选题】
Which load balancing policy, previously limited to vSphere Distributed Switches, is now available on vSphere Standard Switches with vSphere 6.x?___
A. Route based on physical NIC workload
B. Route based on IP Hash
C. Route based on the originating virtual port
D. Route based on Source MAC Hash
【单选题】
A storage administrator is not seeing full utilization of all bandwidth from an ESXi host. The vSphere administrator observes the adapter details, as shown in the Exhibit. What is the probable cause of this issue?___
A. Another path needs to be used to allow full utilization of the bandwidth.
B. The array is not setup to use the correct multipathing policy.
C. There are no virtual machines on the host.
D. No traffic is being sent across it because a path failed.
【单选题】
A storage administrator is not seeing full utilization of all bandwidth from an ESXi host. The vSphere administrator observes the adapter details, as shown in the Exhibit. What is the probable cause of this issue?___
A. Another path needs to be used to allow full utilization of the bandwidth.
B. The array is not setup to use the correct multipathing policy.
C. There are no virtual machines on the host.
D. No traffic is being sent across it because a path failed.
【单选题】
An administrator has just completed performing an interactive installation of ESXi 6.x and is booting the host. How is the network initially configured?___
A. The network is configured by Automatic Private IP Addressing (APIPA).
B. The network is configured based on the settings detected in DNS.
C. The network is configured with the address as specified in the installer.
D. The network is automatically configured by DHCP.
【单选题】
You have just installed an ESXi 6.x Host. As part of your company security regulations, a security banner must be presented on the console of the host. How can this action be accomplished?___
A. Configure the Advanced Settings > Annotations screen of the ESXi host.
B. This is configured from the Direct Console User Interface configuration menu.
C. It is not possible to configure a security banner for the ESXi host.
D. From vCenter Server, this setting is configured globally in the vCenter Server configuration.
【单选题】
An administrator is only able to see the Health Badge when using the vRealize Operations user interface. What is the likely cause of this behavior?___
A. The vRealize Operations Foundation License is in use.
B. The vmware-sps service failed to start.
C. The vRealize Operations Standard License is in use.
D. The vmware-rbd-watchdog service failed to start.
【单选题】
An administrator has configured an alarm to be notified when a virtual machine meets either of these conditions: <High virtual CPU> <High active memory consumption.> <The alarm is only triggering when both of the conditions are met.> What can be done to correct the alarm behavior?___
A. Edit the alarm and select Trigger if ANY of the following conditions are satisfied.
B. Edit the alarm and select Trigger if ALL of the following conditions are satisfied.
C. Create two separate alarms, one for CPU and one for memory and link them together with ESXCLI.
D. Delete the existing alarm and create a new event based alarm.
【单选题】
An administrator creates an ESXi cluster using vSphere Auto Deploy. The ESXi hosts are configured to get a management IP address from a DHCP server. The administrator needs to troubleshoot the management network on one of the hosts. Which DCUI option should the administrator use to renew the DHCP lease? ___
A. Restart Management Network
B. Restore Network Settings
C. Test Management Network
D. Configure Management Network
【单选题】
An administrator is attempting to restore a number of files in a directory within the Operating System of a virtual machine. How can the administrator restore the files from a previous backup? ___
A. Use the File Level Restore option from the selected backup of the virtual machine in the vSphere Web Client.
B. Connect to the File Level Restore tool from a web browser in the virtual machine.
C. Connect to the File Level Restore tool from the VMware
D. ata Protection appliance.
【单选题】
After selecting an object in vRealize Operations, how can a user compare the badge values of related child objects? ___
A. Use the Scoreboard tab
B. Use the Relationship tab
C. Use the Members tab
D. Use the Overview tab
【单选题】
You want to deploy a vApp and dynamically assign IP addresses without a DHCP server on the network. Which action would you take to accomplish this task? ___
A. Enable IP pools.
B. Configure a local DHCP server in the vApp.
C. Enable NAT on the vApp router.
D. Configure the guest OS for workgroup and WINS.
【单选题】
What is the optimal configuration when building a virtual machine for a single-threaded Windows application? ___
A. Deploy single-threaded applications on uniprocessor virtual machines.
B. Deploy single-threaded applications on symmetric multi-processor virtual machines.
C. Tune single-threaded applications to take advantage of symmetric multi-processor resources.
D. Tune Single-threaded applications at the hypervisor level.
【单选题】
An administrator has created the resource pool configuration shown in the Exhibit. Based on the exhibit, which virtual machine(s) can be successfully powered on? ___
A. VM-M1 only
B. VM-K1 only
C. VM-K1 and VM-K2 only
D. VM-K1, VM-K2, and VM-M1
【单选题】
Which vSphere 6 Enterprise Edition feature will allow an organization to ensure that critical multi-threaded applications have the maximum possible uptime? ___
A. Fault Tolerance
B. High Availability
C. Distributed Resource Scheduler
D. App HA
【单选题】
An administrator has a virtual machine that requires four times the compute resources than other virtual machines on the same ESXi 6.x host. How should the administrator configure the virtual machine settings, in order to be prepared for any resource contention? ___
A. Set the shares of the priority virtual machine to High and the rest to Low.
B. Set the shares of the priority virtual machine to High.
C. Set the shares of the priority virtual machine to High and the rest to Normal.
D. Set the shares of the priority virtual machine to Normal and the rest to Low.
【单选题】
Which type of Adapter does not require vmkernel networking? ___
A. Independent Hardware iSCSI Adapter
B. Dependent Hardware iSCSI Adapter
C. Software iSCSI Adapter
D. Software FCoE Adapter
【单选题】
During the installation of ESXi 6.0, the following error message is reported: Hardware Virtualization is not a feature of the CPU, or is not enabled in the BIOS. Which condition would generate this message? ___
A. LAHF/SAHF is not enabled in the BIOS.
B. NX/XD is not enabled in the BIOS.
C. SSE3 is not enabled in the BIOS.
D. Hyperthreading is not enabled in the BIOS.
【单选题】
An administrator is unable to login to vCenter Server when using the vSphere web client. The administrator successfully accessed vCenter Server using the client earlier the same day. What is the most appropriate first step the administrator should take to resolve this issue? ___
A. Verify the web browser being used has Adobe Flash plugin version 11.5 or later
B. Verify the vCenter Single Sign-On service is running on the vCenter Server
C. Verify the vSphere Web Server service is running on the vCenter Server
D. Verify the administrator has permissions configured in vCenter Server
【单选题】
An administrator has configured an alarm to be notified when a virtual machine meets two conditions: <high virtual CPU> <high active memory consumption> The alarm is malfunctioning and triggering when either condition is met instead of both. What can be done to correct the issue? ___
A. Edit the alarm and select Trigger if ALL of the following conditions are satisfied.
B. Edit the alarm and select Trigger if ANY of the following conditions are satisfied.
C. Create two separate alarms, one for CPU and one for memory.
D. Delete the existing alarm and create a new event based alarm.
【单选题】
What must be enabled to ensure that VM Component Protection (VMCP) works in a High Availability cluster? ___
A. VMware Tools Virtual Machine Communication Interface (VMCI)
B. Fault Tolerance
C. Atomic Test and Set (ATS)
D. All Paths Down (APD) Timeout
【单选题】
An administrator wants to add a web server to an existing multi-tier application consisting of three virtual machines: <A web server> <A database server An application server> The web server should be added to the application when the primary web server reaches: <70% vCPU utilization> <55% active memory> Which option will achieve this result? ___
A. Create a virtual machine alarm with an action to run a script that starts a new instance of the web server.
B. Create a host cpu and memory alarm with an action to run a script that starts a new instance of the webserver.
C. Configure HA application monitoring for the web server and set it to trigger deployment of a new instance of the web server.
D. Configure Fault Tolerance on the virtual machine and leave the secondary machine disabled until needed.
【单选题】
An administrator has an application that requires connection directly to PCI devices through a virtual machine. What is a limitation of this configuration? ___
A. Devices must be reserved for PCI passthrough on at least one host on which the virtual machine will run.
B. Snapshots are not supported with DirectPath I/O passthrough devices.
C. A maximum of 18 PCI vSphere
D. irectPath devices can be added to a virtual machine.
【单选题】
The vSphere administrator is configuring directory services for an ESXi host: What should the vSphere administrator do to configure the host to use CAM services? ___
A. Check the Use vSphere Authentication Proxy checkbox.
B. Set Select Directory Service Type to CAM services.
C. Specify CAM$ for the
D. omain.
【单选题】
Which statement is true regarding the licensing of vCenter Server? ___
A. The license for vCenter Server must be provided at the time of installation.
B. Changing the license assigned to vCenter Server requires a restart of the vCenter Server service.
C. Virtual machines can still be powered on if the vCenter Server license expires.
D. Licensing for a single vCenter Server installation is determined by the number of managed virtual machines.
【单选题】
When configuring vSphere Replication for a virtual machine, what is the lowest Recovery Point Objective (RPO) that can be selected? ___
A. 1 min
B. 5 min
C. 10 min
D. 15min
【单选题】
A developer needs to create a multi-tier development stack for a home lab. Which vSphere product will support the architecture required for the least software cost? ___
A. vSphere Hypervisor
B. vSphere Essentials
C. VMware Player
D. VMware Workstation
【单选题】
An administrator is installing Windows into a virtual machine. The DVD has been mounted on the Host and configured for the virtual machine as shown in the Exhibit. Based on the exhibit, when the virtual machine is booted, why would it attempt to search for a PXE server? ___
A. The CD/DVD device is not connected.
B. The ISO is in the incorrect storage location.
C. The OS minimum requirements have not been met.
D. The CD/DVD device is not set to Client Device.
【单选题】
What component must be installed prior to deploying a vCenter Server in vSphere 6.x? ___
A. vCenter Identity Services
B. Platform Services Controller
C. vCenter Single Sign-On
D. Client Integration Plug-In
推荐试题
【单选题】
三维可视化施工应力应变动态监测是属于BIM技术在___中的应用。
A. 安全管理
B. 进度管理
C. 成本管理
D. 绿色施工管理
【单选题】
在场地分析过程中,基于BIM技术结合___可对现场及拟建建筑物空间进行建模分析,结合场地使用条件和特点,做出最理想的现场规划及交通流线组织。
A. 物联网
B. 云技术
C. 智能全站仪
D. GIS
【单选题】
下列选项不属于BIM在竣工交付阶段的应用的是___。
A. 验收人员根据设计、施工BIM模型可对整个工程进行直观掌控
B. 验收过程中借助三维可视化BIM模型可对现场实际施工情况进行精细校核
C. BIM的协调性为建设项目的竣工验收提供了可视化基础
D. 通过竣工模型的搭建,可将建设项目的设计、经济、管理等信息融合到一个模型中,以便于后期运维管理单位的使用
【单选题】
设施管理简称___。
A. DM
B. PM
C. CM
D. FM
【单选题】
下列选项中属于维护管理的是___。
A. 安全防范
B. 转移使用
C. 维护计划
D. 消防管理
【单选题】
下列选项关于BIM的运维系统架构流程说法正确的是___。
A.
B.
C.
D.
【单选题】
基于BIM技术的垂直交通管理主要指的是___。
A. 电梯管理
B. 走廊管理
C. 阳台管理
D. 大厅管理
【单选题】
基于BIM技术的火灾消防的应用不包括___。
A. 疏散控制
B. 消防电梯控制
C. 疏散预演
D. 电量控制
【单选题】
___指的是为了从项目实施组织之外获得所需资源或服务所采取的一系列管理措施。
A. 项目范围管理
B. 项目质量管理
C. 项目采购管理
D. 项目时间管理
【单选题】
一般将建筑全生命周期划分为四个阶段,其中不包括___。
A. 规划阶段
B. 设计阶段
C. 施工阶段
D. 改造阶段
【单选题】
下列选项关于建筑全生命周期管理中的一些常用术语说法不正确的是___。
A. “三控”指的是工程进度控制、工程质量控制、工程安全控制
B. “三管”指的是合同管理、职业健康安全与环境管理、信息管理
C. “一协调”指全面组织协调(协调的范围分为内部协调和外部协调)
D. 建筑工程五方责任主体项目负责人是指承担建筑工程项目建设的建设单位项目负责人、勘察单位项目负责人、设计单位项目负责人、施工单位项目经理、监理单位总监理工程师
【单选题】
VDC模式指的是___。
A. 建筑全生命周期一体化管理模式
B. 虚拟设计建设模式
C. 建筑虚拟建造模式
D. 虚拟设计管理模式
【单选题】
下列___是建设工程生产过程的总集成者,也是建设工程生产过程的总组织者。
A. 业主
B. 设计单位
C. 政府部门
D. 施工单位
【单选题】
下列哪个选项不属于协同平台的功能___。
A. 建筑模型信息存储功能
B. 具有图形编辑平台
C. 兼容建筑专业应用软件
D. 质量控制功能
【单选题】
___的引入,将对造价咨询单位在整个建设全生命期项目管理工作中对工程量的管控发挥质的提升。
A. 广联达算量
B. 鲁班算量
C. BIM技术
D. 清华斯维尔算量
【单选题】
设计阶段BIM管理者通过___对项目进度实施有效的动态管理。
A. 网络协同工作方式
B. 链接的方式
C. 参照的方式
D. 二维协同方式
【单选题】
业主单位在设计阶段通过组织___,可以提前发现概念设计.方案设计中潜在的风险和问题,便于及时进行方案调整和决策。
A. 参加各方人员
B. 设计人员
C. BIM技术应用
D. Revit技术应用
【单选题】
方案设计阶段BIM应用主要方面不包括___。
A. 利用BIM技术进行概念设计
B. 利用BIM技术进行场地规划
C. 利用BIM技术进行方案比选
D. 利用BIM技术进行性能分析
【单选题】
在设计阶段项目管理工作中应用___的最终目的是提高项目设计自身的效率,提高设计质量,强化前期决策的及时性和准确度,减少后续施工期间的沟通障碍和返工,保障建设周期,降低项目总投资。
A. ERP管理平台
B. BIM技术
C. P6平台
D. Revit软件
【单选题】
下来关于BIM技术在施工图设计阶段的应用说法正确的是___。
A. 施工图设计阶段的BIM应用是单专业模型构建并进行二次设计的过程
B. 施工图设计阶段的BIM应用是各专业模型构建并进行优化设计的复杂过程
C. 施工图设计阶段的BIM应用的价值就是碰撞检查
D. 施工图设计阶段的BIM应用的价值就是管线综合
【单选题】
下列关于基于BIM的采光模拟分析说法不正确的是___。
A. 按照模拟对象及状态的不同,建筑采光模拟软件大致可分为静态和动态两大类
B. 静态采光模拟软件可以模拟某一时间点建筑采光的静态图像和光学数据
C. 动态采光模拟软件可以依据项目所属区域的全年气象数据逐时计算工作面的天然光照度,以此为基础,可以得出全年人工照明产生的能耗,为照明节能控制策略的制定提供数据支持
D. BIM模型与EcotectAnalysis软件之间的信息交换是完全双向的
【单选题】
《绿色建筑评价标准》(GB/T50378-2014)条文中4.1.4“建筑规划布局应满足日照标准,且不得降低周边建筑的日照标准”对应的BIM实现途径是下列哪项___。
A. 基于BIM模拟分析土地利用率
B. 基于BIM的CFD分析
C. 基于BIM的日照模拟分析
D. 基于BIM的通风模拟
【单选题】
工程变更管理属于BIM技术在___中的应用内容。
A. 施工招投标阶段
B. 深化设计阶段
C. 建造准备阶段
D. 建造阶段
【单选题】
基于BIM技术的___功能可对技术标的表现带来很大的提升,能够更好地实现对技术方案的展示。
A. 信息化
B. 集成
C. 3D
D. 协同
【单选题】
土建结构深化设计属于___
A. 专业性深化设计
B. 综合性深化设计
C. 特殊性深化设计
D. 集成性深化设计
【单选题】
下列选项属于钢深化设计内容的是___
A. 杆件连接节点深化
B. 管线支吊架设计
C. 门窗等构件深化
D. 钢筋绑扎位置及绑扎顺序深化
【单选题】
下列选项关于BIM技术在建造准备阶段中的应用说法不正确的是___
A. 基于建立的BIM三维模型及搭建的各种临时设施,可以对施工场地进行布置,合理安排塔吊.库房.加工厂地和生活区等的位置,解决现场施工场地平面布置问题
B. 基于BIM技术的虚拟施工管理在项目实施过程中带来的好处主要体现在施工方法可视化.施工方法验证过程化及施工组织控制化等三个方面
C. BIM技术在建造准备阶段的应用内容主要包括施工方案管理.关键工艺展示及物料跟踪管理
D. 针对钢结构部分,因其关键构件及部位安装相对复杂,采用BIM技术对其安装过程进行模拟能够有效帮助指导施工
【单选题】
基于BIM技术的施工方案管理不包括___。
A. 碰撞检查方案管理
B. 土方开挖方案管理
C. 场地布置方案管理
D. 预应力张拉方案管理
【单选题】
下列选项关于碰撞检查中管线优化设计原则说法不正确的是___
A. 在非管线穿梁.碰柱.穿吊顶等必要情况下,尽量不要改动
B. 管线避让原则为:无压管让有压管;大管线让小管线;施工简单管让施工复杂管;冷水管道避让热水管道;附件少的管道避让附件多的管道;临时管道避让永久管道。
C. 在需满足建筑业主要求时,对没有发生碰撞但不满足净高要求的部位需要进行优化设计。
D. 管线优化设计时,应预留安装.检修空间。
【单选题】
大体积混凝土测温是属于BIM技术在___中的应用。
A. 施工质量管理
B. 施工安全管理
C. 施工物料管理
D. 虚拟施工管理
【单选题】
下列选项属于BIM在工程项目施工安全管理中的应用的是___
A. 碰撞检查
B. 模型试验
C. 三维技术交底
D. 建筑性能分析
【单选题】
5D模型的组成内容不包括___。
A. 三维建筑几何模型
B. 施工组织方案
C. 荷载及其作用力学性能
D. 成本及造价
【单选题】
基于BIM的物料管理通过建立___,使项目部各岗位人员及企业不同部门都可以进行数据的查询和分析,为项目部材料管理和决策提供数据支撑。
A. 三维可视化建筑几何模型
B. 安装材料BIM模型数据库
C. 碰撞检查BIM模型数据库
D. BIM模型变更数据库
【单选题】
运维与设施管理中空间管理的内容不包括___
A. 空间分配
B. 空间规划
C. 消防管理
D. 租赁管理
【单选题】
下列选项体现的是运维与设施管理的服务性的是___
A. 随着管理水平和企业信息化的进程,设施管理逐渐演变成综合性.多职能的管理工作
B. FM管理的多个职能归根到底都是为了给所管理建筑的使用者.所有者提供满意的服务
C. 无论是机电设备.设施的运营.维护,结构的健康监控,和建筑环境的监测和管理都需要FM人员具有一定水平的专业知识
D. 无论是组织自持的不动产性质的建筑,还是由专业FM机构运营管理用的建筑,其能耗管理都是关系到组织经济利益和社会环境可持续性发展的重大课题
【单选题】
下列选项不属于BIM技术在空间管理中的应用的是___。
A. 车库管理
B. 租赁管理
C. 垂直交通管理
D. 家具管理
【单选题】
BIM技术和___的结合完美的解决了可视化资产监控.查询.定位管理。
A. 物联网技术
B. 3D扫面技术
C. 3D打印技术
D. 云计算
【单选题】
BIM技术在温度监测中,BIM运维平台中可以获取建筑中___的相关信息数据。
A. 模型整体
B. BIM模型中任意一点
C. 温度测点
D. 空调位置点
【单选题】
项目管理的特点不包括___。
A. 目的性
B. 集成性
C. 独特性
D. 随意性
【单选题】
___是为了保证完成项目的实际成本、费用不超过预算成本、费用的管理过程。它包括资源的配置,成本、费用的预算以及费用的控制等工作。
A. 项目成本管理
B. 项目采购管理
C. 项目工程量管理
D. 项目质量管理