Which type of Adapter does not require vmkernel networking? ___
A. Independent Hardware iSCSI Adapter
B. Dependent Hardware iSCSI Adapter
C. Software iSCSI Adapter
D. Software FCoE Adapter
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【单选题】
During the installation of ESXi 6.0, the following error message is reported: Hardware Virtualization is not a feature of the CPU, or is not enabled in the BIOS. Which condition would generate this message? ___
A. LAHF/SAHF is not enabled in the BIOS.
B. NX/XD is not enabled in the BIOS.
C. SSE3 is not enabled in the BIOS.
D. Hyperthreading is not enabled in the BIOS.
【单选题】
An administrator is unable to login to vCenter Server when using the vSphere web client. The administrator successfully accessed vCenter Server using the client earlier the same day. What is the most appropriate first step the administrator should take to resolve this issue? ___
A. Verify the web browser being used has Adobe Flash plugin version 11.5 or later
B. Verify the vCenter Single Sign-On service is running on the vCenter Server
C. Verify the vSphere Web Server service is running on the vCenter Server
D. Verify the administrator has permissions configured in vCenter Server
【单选题】
An administrator has configured an alarm to be notified when a virtual machine meets two conditions: <high virtual CPU> <high active memory consumption> The alarm is malfunctioning and triggering when either condition is met instead of both. What can be done to correct the issue? ___
A. Edit the alarm and select Trigger if ALL of the following conditions are satisfied.
B. Edit the alarm and select Trigger if ANY of the following conditions are satisfied.
C. Create two separate alarms, one for CPU and one for memory.
D. Delete the existing alarm and create a new event based alarm.
【单选题】
What must be enabled to ensure that VM Component Protection (VMCP) works in a High Availability cluster? ___
A. VMware Tools Virtual Machine Communication Interface (VMCI)
B. Fault Tolerance
C. Atomic Test and Set (ATS)
D. All Paths Down (APD) Timeout
【单选题】
An administrator wants to add a web server to an existing multi-tier application consisting of three virtual machines: <A web server> <A database server An application server> The web server should be added to the application when the primary web server reaches: <70% vCPU utilization> <55% active memory> Which option will achieve this result? ___
A. Create a virtual machine alarm with an action to run a script that starts a new instance of the web server.
B. Create a host cpu and memory alarm with an action to run a script that starts a new instance of the webserver.
C. Configure HA application monitoring for the web server and set it to trigger deployment of a new instance of the web server.
D. Configure Fault Tolerance on the virtual machine and leave the secondary machine disabled until needed.
【单选题】
An administrator has an application that requires connection directly to PCI devices through a virtual machine. What is a limitation of this configuration? ___
A. Devices must be reserved for PCI passthrough on at least one host on which the virtual machine will run.
B. Snapshots are not supported with DirectPath I/O passthrough devices.
C. A maximum of 18 PCI vSphere
D. irectPath devices can be added to a virtual machine.
【单选题】
The vSphere administrator is configuring directory services for an ESXi host: What should the vSphere administrator do to configure the host to use CAM services? ___
A. Check the Use vSphere Authentication Proxy checkbox.
B. Set Select Directory Service Type to CAM services.
C. Specify CAM$ for the
D. omain.
【单选题】
Which statement is true regarding the licensing of vCenter Server? ___
A. The license for vCenter Server must be provided at the time of installation.
B. Changing the license assigned to vCenter Server requires a restart of the vCenter Server service.
C. Virtual machines can still be powered on if the vCenter Server license expires.
D. Licensing for a single vCenter Server installation is determined by the number of managed virtual machines.
【单选题】
When configuring vSphere Replication for a virtual machine, what is the lowest Recovery Point Objective (RPO) that can be selected? ___
A. 1 min
B. 5 min
C. 10 min
D. 15min
【单选题】
A developer needs to create a multi-tier development stack for a home lab. Which vSphere product will support the architecture required for the least software cost? ___
A. vSphere Hypervisor
B. vSphere Essentials
C. VMware Player
D. VMware Workstation
【单选题】
An administrator is installing Windows into a virtual machine. The DVD has been mounted on the Host and configured for the virtual machine as shown in the Exhibit. Based on the exhibit, when the virtual machine is booted, why would it attempt to search for a PXE server? ___
A. The CD/DVD device is not connected.
B. The ISO is in the incorrect storage location.
C. The OS minimum requirements have not been met.
D. The CD/DVD device is not set to Client Device.
【单选题】
What component must be installed prior to deploying a vCenter Server in vSphere 6.x? ___
A. vCenter Identity Services
B. Platform Services Controller
C. vCenter Single Sign-On
D. Client Integration Plug-In
【单选题】
What is a valid plug-in status for a plug-in that has been added to a vSphere client? ___
A. Disabled
B. Unknown
C. Stopped
D. Installed
【单选题】
Users of an application are reporting performance issues. The following performance values are observed in the vSphere Web Client: <Host CPU utilization is 90%> <Virtual Machine memory utilization is consistently greater than 90% CPU Ready values are higher than 20%> What could be the cause of the application performance issue? ___
A. The host is lacking the CPU resources required to meet the demand.
B. The host is lacking the memory resources required to meet the demand.
C. The virtual machine is lacking the CPU resources required to meet the demand.
D. The virtual machine is lacking the memory resources required to meet the demand.
【单选题】
An administrator creates an ESXi cluster using vSphere Auto Deploy. The ESXi hosts are configured to get a management IP address from a DHCP server. The administrator needs to troubleshoot the management network on one of the hosts. Which DCUI option should the administrator use to renew the DHCP lease? ___
A. Restart Management Network
B. Restore Network Settings
C. Test Management Network
D. Configure Management Network
【单选题】
An administrator is re-provisioning an ESXi host and moving it to another datacenter. Which DCUI option should the administrator use to revert the system configuration to the default settings? ___
A. Reset System Configuration
B. Rebuild Default System Configuration
C. Revert System Configuration
D. Renew Default System Configuration
【单选题】
An administrator has just completed installing an ESXi 6.x host, but doesn't know what address has been configured. Where is the ESXi host IP address configured? ___
A. RVC console
B. Direct Console User Interface
C. vSphere Web Client
D. vSphere Client
【单选题】
When is it possible to place a VMFS5 datastore in maintenance mode? ___
A. When it is a member of a Storage DRS cluster
B. When it is a member of Virtual SAN cluster
C. When it is a member of a multi-extent datastore
D. When it is a member of a Virtual Volume
【单选题】
Immediately after installing ESXi, an administrator observes that the Configure Lockdown Mode option is grayed out in the Direct Console User Interface (DCUI). What is the most likely explanation? ___
A. The host has not yet been added to a vCenter Server.
B. The BIOS on the host does not have NX/XD enabled.
C. The ESXi host is running in evaluation mode.
D. The host requires a reboot before this feature is available.
【单选题】
Immediately after installing ESXi, an administrator observes that the Configure Lockdown Mode option is grayed out in the Direct Console User Interface (DCUI). What is the most likely explanation? ___
A. The host has not yet been added to a vCenter Server.
B. The BIOS on the host does not have NX/XD enabled.
C. The ESXi host is running in evaluation mode.
D. The host requires a reboot before this feature is available.
【单选题】
Which Single Sign-On deployment mode should an administrator use for two 6.x vCenter Servers configured with linked mode? ___
A. Basic Single Sign-On with vCenter Server Heartbeat
B. Multisite Single Sign-On
C. Basic Single Sign-On
D. Single Sign-On with Linked Mode
【单选题】
What is required when changing a virtual machine name using the vSphere Web Client? ___
A. Verify connectivity to the ESXi host where the virtual machine is running and its inventory list is accessible.
B. Verify in which datastore the virtual machine resides and that you have access and its inventory list is accessible.
C. Verify that virtual machine files are stored in the same datastore and can be accessed in the datastore browser list.
D. Verify the virtual machine is not running in Fault Tolerant mode and that it is not in a Distributed Resource Scheduler cluster.
【单选题】
An administrator deploys vRealize Operations into a vSphere 6.x environment. After the deployment, the administrator notices that badges are not appearing. What is a likely cause of this behavior? ___
A. Badges do not appear until you register vRealize Operations with vCenter Server.
B. Badges do not appear until you register a vCenter Server in vRealize Operations.
C. The vRealize Operations appliance needs to be redeployed.
D. The vCenter Server appliance needs to be redeployed.
【单选题】
How are ports scaled on vSphere Standard Switches (vSS)? ___
A. Ports on a vSS can be dynamically scaled up and down.
B. Ports on a vSS can only be statically scaled up or down.
C. Ports on a vSS can only be dynamically scaled down.
D. Ports on a vSS can only be dynamically scaled up.
【单选题】
A High Availability (HA) cluster is configured to respond to a given number of host failures. The cluster contains virtual machines configured with these settings: VM1 has a 1GHz CPU reservation and no Memory reservation VM2 has a 2GHz CPU reservation and no Memory reservation VM3 has no CPU reservation and no Memory reservation . Given this information, what is the correct slot size for the cluster? ___
A. The CPU Reservation should be set to 32MHz and the memory reservation should be set to 32MB plus memory overhead.
B. The CPU reservation should be set to 1 GHz and the memory reservation should be set to 0MB plus memory overhead.
C. The CPU reservation should be set to 2 GHz, and the memory reservation should be set to 0MB plus the virtual machine memory overhead.
D. The CPU reservation should be set to 2 GHz, and the memory reservation should be set to 32MB, plus the virtual machine memory overhead.
【单选题】
An administrator is planning a vSphere infrastructure with the following specific networking requirements: <The ability to shape inbound (RX) traffic> <Support for Private VLANs (PVLANs)> <Support for LLDP (Link Layer Discovery Protocol)>. What is the minimum vSphere Edition that will support these requirements? ___
A. vSphere Essentials Plus
B. vSphere Standard
C. vSphere Enterprise
D. vSphere
E. nterprise Plus
【单选题】
When you add an ESXi 6.x host to a new Cluster, which vSphere object owns the CPU and Memory resources of the hosts? ___
A. vCenter Server
B. Datacenter
C. Cluster
D. Host
【单选题】
A user is trying to retrieve objects from a SharePoint server and finds the request is taking an excessive amount of time. An administrator tries to isolate the issue and notes the following: Application performance is poor when compared to virtual machines on other hosts. Performance improves when the virtual machine is moved to another host. The virtual machine encounters higher than expected CPU %Ready times. What conclusion can be reached regarding the performance issues for this virtual machine? ___
A. Host Power Management is directly impacting virtual machine performance.
B. The virtual machine has a large number of snapshots.
C. The Path Selection Policy for the storage device is set differently on the affected host.
D. Network I/O control is configured for the portgroup.
【单选题】
A virtual machine template is accidently removed from the vCenter Server Inventory. Which method would be used to recover the template back into the environment?___
A. Use the datastore browser to locate the template, then right click and add the .vmtx file to inventory.
B. Use the datastore browser to locate the template, then right click and add the .vmx file to inventory.
C. Using the Managed Object Browser and adding the template from the ManagedObjectReference:GuestFileManager object.
D. Using the Managed Object Browser and adding the template from the ManagedObjectReference:VirtualDiskManager object.
【单选题】
A vSphere administrator needs to backup a virtual machine that has a Microsoft SQL Server Database installed. Which solution allows for an application quiesce to occur during backup?___
A. VMware vCenter Converter
B. VMware vCenter Site Recovery Manager
C. VMware vSphere Replication
D. VMware vSphere Data Protection Advanced
【单选题】
An administrator is migrating a virtual machine from a Test cluster to a Production cluster. The two environments do not have any shared storage. What is the easiest way to accomplish this task? ___
A. Perform a Storage vMotion.
B. Perform a regular vMotion.
C. Perform a Virtual to Virtual migration.
D. Perform a backup and restore using VMware Data Protection.
【单选题】
An administrator must determine an appropriate backup solution, given these conditions: 50 of the virtual machines are in a resource pool named Finance. 50 of the virtual machines are in a resource pool named QA. Which solution allows an administrator the ability to backup 100 virtual machines? ___
A. Use Snapshot Manager on the vCenter Server to backup the virtual machines.
B. Use the VMware Consolidated Backup (vcb) tool on the ESXi Host to backup the virtual machines.
C. Use the VMware Data Recovery (VDR) Appliance on the vCenter Server to backup the virtual machines.
D. Use the VMware Data Protection (VDP) Appliance on one of the
E. SXi Hosts to backup the virtual machines.
【单选题】
What is a benefit of using Enhanced vMotion Compatibility for an environment? ___
A. EVC masks CPU features to allow compatibility between hosts that are dissimilar.
B. EVC allows for cross platform vMotion to occur.
C. EVC enables Long
D. istance vMotion.
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
An administrator needs to verify that vMotion operations can be performed in a vSphere data center.What round trip time (RTT) latency is the maximum value that will allow vMotion operations to succeed? ___
A. 50ms RTT
B. 100ms RTT
C. 150ms RTT
D. 200ms RTT
【单选题】
A storage administrator has reported that full utilization of all bandwidth from an ESXi 6.x host is not being seen. In troubleshooting the issue, the Adapter details are shown in the Exhibit. Based on the exhibit, what is cause of the issue? ___
A. The array is not setup to use the correct multipathing policy.
B. There are no virtual machines on the ESXi host.
C. Not all links are used because a path is disabled.
D. Another path needs to be configured.
【单选题】
An administrator is migrating a powered-on virtual machine, as shown in the exhibit. Which option should be selected to perform a Storage vMotion of the VM? ___
A. Change storage only
B. Change VM compute resource only
C. Change both compute resource and storage, changing the compute resource first.
D. Change both compute resource and storage, changing the storage resource first.
【单选题】
An administrator is attempting to enable Storage I/O Control on a datastore, but it is failing. What is the likely reason for this failure? ___
A. The host is connected to a datastore is running on ESX 4.0.
B. The host is connected to a Fibre Channel storage array.
C. The datastore has multiple extents.
D. The datastore is managed by a single vCenter Server.
【单选题】
A mission-critical virtual machine built on vSphere 4.1 needs to be moved to an ESXi 6.x host.Which virtual hardware version is needed to move the virtual machine without upgrading? ___
推荐试题
【判断题】
触电者神志不清,判断意识无,有心跳,但呼吸停止或极微弱时,应立即用仰头抬颏法,使气道开放,并对触电者施行心脏按压
【判断题】
伤员脱离电源后,对伤者有无脉搏的判断应同时触摸两侧颈动脉
【判断题】
创伤急救过程中,平地搬运时伤员头部在前,上楼、下楼、下坡时头部在下,搬运中应严密观察伤员,防止伤情突变
【判断题】
创伤急救止血时,可用电线、铁丝、细绳等作止血带使用
【判断题】
骨折急救时,开放性骨折,伴有大出血者,先固定、再止血,并用干净布片覆盖伤口,然后速送医院救治
【单选题】
申请暂停用电,每次应不少于___。
A. 十五天
B. 七天
C. 一个月
D. 两个月
【单选题】
用户申请暂停业务,需提前___个工作日办理。
【单选题】
营业厅实行一证受理,用户需要签署___,并向用户提供业务办理告知书。告知客户需提交的资料清单、业务办理流程、收费项目及标准、监督电话等信息。
A. 业务申请单
B. 业务确认单
C. 承诺书
D. 一次性告知书
【单选题】
低价居民新装(增容)业务受理后,现场作业实行___作业。
A. 现场勘查
B. 装表接电
C. 现场启封
D. 一岗制
【单选题】
推行居民客户“免填单”服务,业务办理人员了解客户申请信息并录入营销业务应用系统,生成___,打印后交由客户签字确认。
A. 用电登记表
B. 用电申请单
C. 居民供用电合同
D. 用电确认书
【单选题】
同城异地营业厅应在___个工作日内将收集的客户报装资料传递至属地营业厅。
【单选题】
对于无配套电网工程的低压居民客户,在正式受理用电申请后,需要___个工作日内完成装表接电。
【单选题】
受理时业务受理人员应向用户提供业务办理告知书,告知用户需提交的资料清单、业务办理流程等信息,对于申请资料不齐全的用户,业务受理人员应通过___形式告知用户需提供的缺件内容。
A. 承诺书
B. 业务申请单
C. 缺件通知书
D. 业务办理告知书
【单选题】
减容( )内恢复的,按减容恢复办理;超过___的按新装或增容手续办理。
A. 半年;半年
B. 一年;一年
C. 两年;两年
D. 三年;三年
【单选题】
现场工作人员应根据现场勘查结果,拟定供电方案,形成供电方案答复单。营销部门统一答复用户供电方案。浙江省电力公司供电方案答复时限:业务正式受理后,单电源用户___个工作日完成,多电 源用户( )个工作日完成。
A. 3;5
B. 5;7
C. 7;15
D. 13;28
【单选题】
现场检查时,应查验施工企业、试验单位资质,重点检查涉及电网安全的隐蔽工程施工工艺、计量相关设备选型等内容,填写中间检查单或在移动作业终端上录入相关信息,并由用户签字(或电子签名方式)确认。中间检查时限:中间检查受理后___个工作日内;对有特殊要求的用户,按照与用户约定的时间完成。
【单选题】
电力用户实际最大需量超过合同确定值105%时,超出部分按___收取基本电费。
A. 50%
B. 100%
C. 150%
D. 200%
【单选题】
电力用户实际最大需量低于容量总和40%时,按合同确认值的___收取基本电费。
A. 40%
B. 50%
C. 60%
D. 100%
【单选题】
申请暂停用电,每一日历年内暂停时间累计不超过___。
A. 两个月
B. 三个月
C. 六个月
D. 九个月
【单选题】
专变竣工验收通过,签订合同并交纳相关费用后___个工作日内完成装表接电;对有特殊要求的用户,按照与用户约定的时间完成。
【单选题】
当年内暂停累计期满___个月后,如需继续停用的,可申请减容,减容期限不受限制。
【单选题】
用户办理基本电价计费方式变更业务,在安装信息录入完成后,将流程发送至“归档” 环节。时限要求: 正式受理后,不需要换表在___个工作日内归档;需要换表的,在( )个工作日内归档。
A. 1 3
B. 3 7
C. 5 7
D. 5 10
【单选题】
居民用户的主体证明文件不包括___。
A. 户口本
B. 军人证
C. 驾驶证
D. 护照
【单选题】
低压居民新装(增容)通过线下和线上受理的申请, 分别由营业厅受理人员和服务调度人员确认资料的___和( )。
A. 真实性;有效性
B. 真实性;完整性
C. 合理性;有效性
D. 有效性;完整性
【单选题】
用户办理暂拆手续后,供电企业应在___个工作日内执行暂拆;暂拆原因消除,用户办理复装手续后,供电企业应在( )个工作日内复装接电。
A. 3;3
B. 5;5
C. 7;7
D. 10;10
【单选题】
减容必须是___变压器的停止或更换小容量变压器用电,根据用户提出的减容日期,将对申请减容的设备进行拆除(或调换)。
A. 整台
B. 整组
C. 整台或整组
D. 随意
【单选题】
受理人员接收并审核用户申请资料时,已有用户资料或资质证件尚在有效期内,用户( )再次提供;对资料不齐全的,应通过___形式告知用户具体缺件内容。
A. 需要 缺件通知书
B. 需要 口头
C. 无需 缺件通知书
D. 无需 口头
【单选题】
改类-调需量值是指实施两部制电价的用户,根据下个月预计达到的用电___,申请调整需量核定值的业务。
A. 最大负荷
B. 平均负荷
C. 最小负荷
D. 可能负荷
【单选题】
下列各项中不在三不指定范围内的是___。
A. 施工单位
B. 设计单位
C. 材料供应商
D. 电工
【单选题】
线下受理过户业务时收取资料清单非必备资料___。
A. 变更用电申请单
B. 产权证明(复印件)或其它证明文书
C. 房屋产权所有人有效身份证明
D. 非居民原户主提供用电户主体证明
【单选题】
非永久性减容在减容期限内供电企业___用户减少容量的使用权。
【单选题】
当年内暂停累计期满___个月后,如需继续停用的,可申请减容,减容期限( )。
A. 六;两年
B. 六;不受限制
C. 三;两年
D. 三;不受限制
【单选题】
浙江省电力公司办理低压居民新装(增容),装表接电的时限为:对于无配套电网工程的低压居民客户,在正式受理用电申请后,___个工作日内完成;对于有配套电网工程的低压居民客户,在受理用电申请后( )个工作日内完成。
A. 2;10
B. 5;10
C. 2;5
D. 5;7
【单选题】
用户提出减少用电容量的期限最短不得少于___个月,但同一历日年内暂停满( )个月申请办理减容的用户减容期限不受时间限制。
A. 6;6
B. 6;12
C. 3;6
D. 3;12
【单选题】
现场工作人员应根据现场勘查结果,拟定供电方案,形成供电方案答复单。供电方案答复时限:正式受理后,___电源用户( )个工作日完成,( )电源用户( )个工作日完成。
A. 单,13;双,28
B. 单,13;多,28
C. 单,15;双,30
D. 单,15;多,30
【单选题】
减容期满后的用户以及新装、增容用户 ,___内申办暂停的,不再收取暂停部分容量百分之五十的基本电费;
A. 12个月
B. 24个月
C. 6个月
D. 18个月
【单选题】
在用电地址、用电容量、用电类别不变条件下,可办理___。
A. 更名、移表
B. 过户、移表
C. 更名、过户
D. 更名、过户、移表
【单选题】
对于低压居民用户,在过户走到合同签订这一流程时,可采取___方式签订供用电合同。
【单选题】
低压销户分为___几步。
A. 业务受理、现场勘查、拆表、电费结算、归档。
B. 业务受理、现场勘查、计量装置及采集终端拆除、电费结算、归档。
C. 业务受理、现场封停、拆表、电费结算、归档。
D. 业务受理、现场封停、计量装置及采集终端拆除、电费结算、归档。
【单选题】
基本电价计费方式变更周期为按___变更。