刷题
导入试题
【单选题】
An administrator enables vSphere High Availability (HA) on an existing cluster with a large number of hosts and virtual machines. The administrator notices that the setup of vSphere HA on some of the hosts is failing. What step, if taken, might resolve this issue?___
A. Increase the value of the config.vpxd.das.electionWaitTimeSec setting.
B. Set the value of vpxd.das.aamMemoryLimit to 256.
C. Set the value of the das.useDefaultIsolationAddress setting to False.
D. Increase the value of the das.iostatsinterval setting.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
A
解析
暂无解析
相关试题
【单选题】
An ESXi 6.x host consists of 24 logical cores. Hyperthreading is enabled on the host. What is the maximum number of vCPUs that can be assigned to a virtual machine on this host?___
A. 24
B. 48
C. 64
D. 128
【单选题】
By default, each ESXi 6.x host is provisioned with a certificate from which root certificate authority?___
A. RedHat Certificate Authority
B. VMware Certificate Authority
C. DigiCert Certificate Authority
D. Verisign Certificate Authority
【单选题】
An administrator is adding an NFS datastore as shown in the Exhibit. What is the purpose of the Servers to be added list?___
A. It contains the IP addresses of the NFS Storage Server to provide multipathing capability.
B. It contains the IP addresses of the ESXi hosts that mount the datastore.
C. It contains the IP addresses used for
D. ynamic Discovery of targets.
【单选题】
An administrator reports that the System Event log data is only available for 24 hours when reviewing the Hardware Status tab. Which condition could be responsible for the loss of data?___
A. A Reset event log was executed.
B. The statistical collection level was set to a value of 1.
C. The boot disk of the host is corrupt.
D. Syslog has been configured at the vCenter Server level.
【单选题】
During an upgrade, the ESXi 6.x installer finds an existing version of ESXi and a VMFS3 volume. No virtual machines exist on the host or VMFS3 volume. The requirement is to upgrade to VMFS5. Which option should be chosen to meet this requirement?___
A. Upgrade ESXi and preserve the VMFS datastore
B. Install ESXi and preserve the VMFS datastore
C. Install ESXi and overwrite the VMFS datastore
D. Upgrade
E. SXi and overwrite the VMFS datastore
【单选题】
A vSphere 6.x Standard Switch is configured with 4 virtual machine portgroups, as shown in the exhibit. Which portgroup would be utilized by default when creating a new virtual machine?___
A. Access Network
B. DMZ Network
C. VM Network
D. Virtual Machine Network
【单选题】
Which vSphere 6.x feature will allow an organization to utilize native snapshots?___
A. Virtual Volumes
B. Virtual SAN
C. VMFS3
D. VMFS5
【单选题】
An administrator is creating a new vSphere Distributed Switch that will be utilized with a specific vSphere Cluster. The cluster itself contains a mix of ESXi 5.x and 6.x Hosts. Which Distributed Switch version should be created to support this configuration?___
A. Distributed Switch: 6.0.0
B. Distributed Switch: 5.0.0
C. Distributed Switch: 5.1.0
D. Distributed Switch: 5.5.0
【单选题】
Which load balancing policy, previously limited to vSphere Distributed Switches, is now available on vSphere Standard Switches with vSphere 6.x?___
A. Route based on physical NIC workload
B. Route based on IP Hash
C. Route based on the originating virtual port
D. Route based on Source MAC Hash
【单选题】
A storage administrator is not seeing full utilization of all bandwidth from an ESXi host. The vSphere administrator observes the adapter details, as shown in the Exhibit. What is the probable cause of this issue?___
A. Another path needs to be used to allow full utilization of the bandwidth.
B. The array is not setup to use the correct multipathing policy.
C. There are no virtual machines on the host.
D. No traffic is being sent across it because a path failed.
【单选题】
A storage administrator is not seeing full utilization of all bandwidth from an ESXi host. The vSphere administrator observes the adapter details, as shown in the Exhibit. What is the probable cause of this issue?___
A. Another path needs to be used to allow full utilization of the bandwidth.
B. The array is not setup to use the correct multipathing policy.
C. There are no virtual machines on the host.
D. No traffic is being sent across it because a path failed.
【单选题】
An administrator has just completed performing an interactive installation of ESXi 6.x and is booting the host. How is the network initially configured?___
A. The network is configured by Automatic Private IP Addressing (APIPA).
B. The network is configured based on the settings detected in DNS.
C. The network is configured with the address as specified in the installer.
D. The network is automatically configured by DHCP.
【单选题】
You have just installed an ESXi 6.x Host. As part of your company security regulations, a security banner must be presented on the console of the host. How can this action be accomplished?___
A. Configure the Advanced Settings > Annotations screen of the ESXi host.
B. This is configured from the Direct Console User Interface configuration menu.
C. It is not possible to configure a security banner for the ESXi host.
D. From vCenter Server, this setting is configured globally in the vCenter Server configuration.
【单选题】
An administrator is only able to see the Health Badge when using the vRealize Operations user interface. What is the likely cause of this behavior?___
A. The vRealize Operations Foundation License is in use.
B. The vmware-sps service failed to start.
C. The vRealize Operations Standard License is in use.
D. The vmware-rbd-watchdog service failed to start.
【单选题】
An administrator has configured an alarm to be notified when a virtual machine meets either of these conditions: <High virtual CPU> <High active memory consumption.> <The alarm is only triggering when both of the conditions are met.> What can be done to correct the alarm behavior?___
A. Edit the alarm and select Trigger if ANY of the following conditions are satisfied.
B. Edit the alarm and select Trigger if ALL of the following conditions are satisfied.
C. Create two separate alarms, one for CPU and one for memory and link them together with ESXCLI.
D. Delete the existing alarm and create a new event based alarm.
【单选题】
An administrator creates an ESXi cluster using vSphere Auto Deploy. The ESXi hosts are configured to get a management IP address from a DHCP server. The administrator needs to troubleshoot the management network on one of the hosts. Which DCUI option should the administrator use to renew the DHCP lease? ___
A. Restart Management Network
B. Restore Network Settings
C. Test Management Network
D. Configure Management Network
【单选题】
An administrator is attempting to restore a number of files in a directory within the Operating System of a virtual machine. How can the administrator restore the files from a previous backup? ___
A. Use the File Level Restore option from the selected backup of the virtual machine in the vSphere Web Client.
B. Connect to the File Level Restore tool from a web browser in the virtual machine.
C. Connect to the File Level Restore tool from the VMware
D. ata Protection appliance.
【单选题】
After selecting an object in vRealize Operations, how can a user compare the badge values of related child objects? ___
A. Use the Scoreboard tab
B. Use the Relationship tab
C. Use the Members tab
D. Use the Overview tab
【单选题】
You want to deploy a vApp and dynamically assign IP addresses without a DHCP server on the network. Which action would you take to accomplish this task? ___
A. Enable IP pools.
B. Configure a local DHCP server in the vApp.
C. Enable NAT on the vApp router.
D. Configure the guest OS for workgroup and WINS.
【单选题】
What is the optimal configuration when building a virtual machine for a single-threaded Windows application? ___
A. Deploy single-threaded applications on uniprocessor virtual machines.
B. Deploy single-threaded applications on symmetric multi-processor virtual machines.
C. Tune single-threaded applications to take advantage of symmetric multi-processor resources.
D. Tune Single-threaded applications at the hypervisor level.
【单选题】
An administrator has created the resource pool configuration shown in the Exhibit. Based on the exhibit, which virtual machine(s) can be successfully powered on? ___
A. VM-M1 only
B. VM-K1 only
C. VM-K1 and VM-K2 only
D. VM-K1, VM-K2, and VM-M1
【单选题】
Which vSphere 6 Enterprise Edition feature will allow an organization to ensure that critical multi-threaded applications have the maximum possible uptime? ___
A. Fault Tolerance
B. High Availability
C. Distributed Resource Scheduler
D. App HA
【单选题】
An administrator has a virtual machine that requires four times the compute resources than other virtual machines on the same ESXi 6.x host. How should the administrator configure the virtual machine settings, in order to be prepared for any resource contention? ___
A. Set the shares of the priority virtual machine to High and the rest to Low.
B. Set the shares of the priority virtual machine to High.
C. Set the shares of the priority virtual machine to High and the rest to Normal.
D. Set the shares of the priority virtual machine to Normal and the rest to Low.
【单选题】
Which type of Adapter does not require vmkernel networking? ___
A. Independent Hardware iSCSI Adapter
B. Dependent Hardware iSCSI Adapter
C. Software iSCSI Adapter
D. Software FCoE Adapter
【单选题】
During the installation of ESXi 6.0, the following error message is reported: Hardware Virtualization is not a feature of the CPU, or is not enabled in the BIOS. Which condition would generate this message? ___
A. LAHF/SAHF is not enabled in the BIOS.
B. NX/XD is not enabled in the BIOS.
C. SSE3 is not enabled in the BIOS.
D. Hyperthreading is not enabled in the BIOS.
【单选题】
An administrator is unable to login to vCenter Server when using the vSphere web client. The administrator successfully accessed vCenter Server using the client earlier the same day. What is the most appropriate first step the administrator should take to resolve this issue? ___
A. Verify the web browser being used has Adobe Flash plugin version 11.5 or later
B. Verify the vCenter Single Sign-On service is running on the vCenter Server
C. Verify the vSphere Web Server service is running on the vCenter Server
D. Verify the administrator has permissions configured in vCenter Server
【单选题】
An administrator has configured an alarm to be notified when a virtual machine meets two conditions: <high virtual CPU> <high active memory consumption> The alarm is malfunctioning and triggering when either condition is met instead of both. What can be done to correct the issue? ___
A. Edit the alarm and select Trigger if ALL of the following conditions are satisfied.
B. Edit the alarm and select Trigger if ANY of the following conditions are satisfied.
C. Create two separate alarms, one for CPU and one for memory.
D. Delete the existing alarm and create a new event based alarm.
【单选题】
What must be enabled to ensure that VM Component Protection (VMCP) works in a High Availability cluster? ___
A. VMware Tools Virtual Machine Communication Interface (VMCI)
B. Fault Tolerance
C. Atomic Test and Set (ATS)
D. All Paths Down (APD) Timeout
【单选题】
An administrator wants to add a web server to an existing multi-tier application consisting of three virtual machines: <A web server> <A database server An application server> The web server should be added to the application when the primary web server reaches: <70% vCPU utilization> <55% active memory> Which option will achieve this result? ___
A. Create a virtual machine alarm with an action to run a script that starts a new instance of the web server.
B. Create a host cpu and memory alarm with an action to run a script that starts a new instance of the webserver.
C. Configure HA application monitoring for the web server and set it to trigger deployment of a new instance of the web server.
D. Configure Fault Tolerance on the virtual machine and leave the secondary machine disabled until needed.
【单选题】
An administrator has an application that requires connection directly to PCI devices through a virtual machine. What is a limitation of this configuration? ___
A. Devices must be reserved for PCI passthrough on at least one host on which the virtual machine will run.
B. Snapshots are not supported with DirectPath I/O passthrough devices.
C. A maximum of 18 PCI vSphere
D. irectPath devices can be added to a virtual machine.
【单选题】
The vSphere administrator is configuring directory services for an ESXi host: What should the vSphere administrator do to configure the host to use CAM services? ___
A. Check the Use vSphere Authentication Proxy checkbox.
B. Set Select Directory Service Type to CAM services.
C. Specify CAM$ for the
D. omain.
【单选题】
Which statement is true regarding the licensing of vCenter Server? ___
A. The license for vCenter Server must be provided at the time of installation.
B. Changing the license assigned to vCenter Server requires a restart of the vCenter Server service.
C. Virtual machines can still be powered on if the vCenter Server license expires.
D. Licensing for a single vCenter Server installation is determined by the number of managed virtual machines.
【单选题】
When configuring vSphere Replication for a virtual machine, what is the lowest Recovery Point Objective (RPO) that can be selected? ___
A. 1 min
B. 5 min
C. 10 min
D. 15min
【单选题】
A developer needs to create a multi-tier development stack for a home lab. Which vSphere product will support the architecture required for the least software cost? ___
A. vSphere Hypervisor
B. vSphere Essentials
C. VMware Player
D. VMware Workstation
【单选题】
An administrator is installing Windows into a virtual machine. The DVD has been mounted on the Host and configured for the virtual machine as shown in the Exhibit. Based on the exhibit, when the virtual machine is booted, why would it attempt to search for a PXE server? ___
A. The CD/DVD device is not connected.
B. The ISO is in the incorrect storage location.
C. The OS minimum requirements have not been met.
D. The CD/DVD device is not set to Client Device.
【单选题】
What component must be installed prior to deploying a vCenter Server in vSphere 6.x? ___
A. vCenter Identity Services
B. Platform Services Controller
C. vCenter Single Sign-On
D. Client Integration Plug-In
【单选题】
What is a valid plug-in status for a plug-in that has been added to a vSphere client? ___
A. Disabled
B. Unknown
C. Stopped
D. Installed
【单选题】
Users of an application are reporting performance issues. The following performance values are observed in the vSphere Web Client: <Host CPU utilization is 90%> <Virtual Machine memory utilization is consistently greater than 90% CPU Ready values are higher than 20%> What could be the cause of the application performance issue? ___
A. The host is lacking the CPU resources required to meet the demand.
B. The host is lacking the memory resources required to meet the demand.
C. The virtual machine is lacking the CPU resources required to meet the demand.
D. The virtual machine is lacking the memory resources required to meet the demand.
【单选题】
An administrator creates an ESXi cluster using vSphere Auto Deploy. The ESXi hosts are configured to get a management IP address from a DHCP server. The administrator needs to troubleshoot the management network on one of the hosts. Which DCUI option should the administrator use to renew the DHCP lease? ___
A. Restart Management Network
B. Restore Network Settings
C. Test Management Network
D. Configure Management Network
【单选题】
An administrator is re-provisioning an ESXi host and moving it to another datacenter. Which DCUI option should the administrator use to revert the system configuration to the default settings? ___
A. Reset System Configuration
B. Rebuild Default System Configuration
C. Revert System Configuration
D. Renew Default System Configuration
推荐试题
【单选题】
项目前期策划的开展时间不少于___天,必须实地徒步进行现场调查讨论研究初步确定策划方案。
A. 3
B. 5
C. 7
D. 10
【单选题】
对规模大、风险高,经济效益对公司影响大的项目应由子、分公司___组织开展前期策划工作。
A. 董事长
B. 总经理
C. 主管领导
D. 分管领导
【单选题】
集团公司项管会办公室设在集团公司___。
A. 企业发展部
B. 安全质量部
C. 工程管理部
D. 技术中心
【单选题】
各层级项管会会议___召开一次,如遇重要或紧急情况,项管会主任委员可决定召开临时会议。
A. 每周
B. 每月
C. 每季
D. 每年
【单选题】
由___牵头组织相关部门根据合同工期,优化资源管理,明确施工进度目标、重要节点目标,编制总体进度计划。
A. 项目经理
B. 项目总工
C. 生产副经理
D. 项目书记
【单选题】
后评价的具体组织实施工作由___负责。
A. 集团公司
B. 子分公司
C. 直(代)管项目部
D. 项目部
【单选题】
项目经理部___应建立设计文件发文及审核台帐。
A. 项目总工
B. 工程部长
C. 技术主管
D. 工程部资料员
【单选题】
由___组织对全体技术人员及相关的管理人员进行书面交底后,设计文件才能交付施工。
A. 项目经理
B. 项目总工
C. 工程部长
D. 技术主管
【单选题】
工程实施过程中___随意改变设计文件,如需要变更原设计,必须按建设单位的规定履行程序。
A. 不得
B. 可以
C. 项目经理有权
D. 经监理同意可以
【单选题】
集团公司___一次行文公布工程建设标准目录,子分公司、直(代)管项目经理部要依据标准目录对现行标准规范及时进行更新。
A. 每月
B. 每季度
C. 每半年
D. 每年
【单选题】
个人自购或网上下载的标准规范,必须经项目经理部___确认有效,加盖有效标识后,才允许在项目施工现场使用。
A. 项目经理
B. 项目总工
C. 工程部长
D. 技术主管
【单选题】
测量工作采取___负责制。
A. 项目经理
B. 总工程师
C. 工程部长
D. 测量主管
【单选题】
每个隧道洞口平面控制点布设不少于___个,并满足两两通视。
A. 1
B. 2
C. 3
D. 4
【单选题】
没有编制实施性施工组织设计或施工组织设计未经批准的工程项目,___开工。
A. 一律不得
B. 可以
C. 领导同意可以
D. 条件具备可以
【单选题】
施工方案实行___审批制度。
A. 独立
B. 特批
C. 据实
D. 分级
【单选题】
___应组织相关部门对需要编入工程竣工文件的技术资料进行界定。
A. 项目总工
B. 工程部长
C. 技术主管
D. 工程部资料员
【单选题】
项目经理部的绿色施工专项实施方案应按照___方案进行管理。
A. A级
B. B级
C. C级
D. D级
【单选题】
项目经理部每月由___带队组织一次施工管理大检查。
A. 项目经理
B. 项目副经理
C. 项目总工
D. 项目安全总监
【单选题】
项目经理部应结合工程特点和具体施工内容,界定本项目施工的关键工序和___工序。
A. 一般
B. 重要
C. 危险
D. 特殊
【单选题】
项目经理部应建立工程日志台帐,按___填写工程日志。
A. 单项工程
B. 单位工程
C. 分部工程
D. 分项工程
【单选题】
___包括设计图纸数量、设计图纸复核量差、现场变更数量、临时工程数量。
A. 清单数量
B. 设计数量
C. 实际数量
D. 结算数量
【单选题】
___作为结算依据,是控制结算量是否流失的关键。
A. 清单数量
B. 设计数量
C. 实际数量
D. 结算数量
【单选题】
项目经理部归档资料包括工程技术资料及___两部分。
A. 管理资料
B. 办公资料
C. 监理资料
D. 计量资料
【单选题】
单位工程总结应在单位工程施工完成后___内编制完成。
A. 半个月
B. 1个月
C. 3个月
D. 6个月
【单选题】
对于重大施工方案,集团公司、子分公司技术管理部门不定期组织___平推检查,验证方案执行情况和效果。
A. 综合
B. 季度
C. 年度
D. 专项
【单选题】
技术交底必须以___形式进行交底,坚持复核制度。
A. 口头
B. 书面
C. 电子
D. 转告
【单选题】
工地试验室实行___,对试验室运行管理和试验检测行为全面负责。
A. 授权负责人责任制
B. 项目总工程师责任制
C. 项目经理责任制
【单选题】
原材料或构配件进场后由___委托,物资和试验检测人员共同取样后检验。
A. 混凝土搅拌站
B. 物资部门
C. 工程部
D. 安质部
【单选题】
工地试验室应及时将检验结果反馈至委托部门,对于检验不合格的应反馈至___。
A. 业主
B. 监理
C. 项目领导层
【单选题】
混凝土及砂浆施工质量检验由___根据混凝土搅拌站生产情况按频次取样、试验。
A. 混凝土搅拌站
B. 工地试验室
C. 施工队
【单选题】
路基路面施工质量检验和道路热拌沥青混合料施工质量检验由___书面通知工地试验室进行检测。
A. 物资部门
B. 安质部
C. 相应施工班组
【单选题】
搅拌前各种衡器和自动加水计量装置应由混凝土搅拌站进行计量自校,至少___自校一次。
A. 每年
B. 每月
C. 每周
D. 每日
【单选题】
混凝土搅拌站的混凝土拌和、计量过程必须由___跟班旁站管理,确保计量准确,控制混凝土配合比和拌和物质量。
A. 试验检测人员
B. 安质人员
C. 物资人员
【单选题】
商品混凝土到达现场时,工地试验室应按设计要求、对商品混凝土___进行检验。
A. 数量
B. 质量
C. 数量和质量
【单选题】
商品混凝土到达现场时,工地试验室应按___,对商品混凝土进行验收。
A. 设计要求
B. 验收标准
C. 合同约定
D. 口头约定
【单选题】
物资计划分为需求计划、申购计划、采购计划三类,___是编制计划的责任主体,子分公司物资管理部门负责检查指导项目部计划的编制、管理与执行。
A. 工地材料厂
B. 劳务队
C. 集团公司
D. 项目部
【单选题】
项目物资部门根据___等实际情况将采购计划分劈成批次进料计划,每一批次进料计划按规定或合同约定方式、程序及格式发送至供应机构或供应商,
A. 劳务队计划
B. 供应商计划
C. 用料进度
D. 施工计划 。
【单选题】
项目部___负责组织与本项目有业务往来供应商的日物资部门审批后方可签订采购合同
A. 1
B. 3
C. 5
D. 10
【单选题】
因自然灾害、现场突发事件或不可预见情况,或因项目部资金支付不及时、料源因突发事件断货等导致供应商临时停供等情况,项目部可启用应急采购。由___或应急抢险负责人下达采购指令,物资部门组织实施。
A. 项目经理
B. 施工队长
C. 劳务队带班人
D. 总工程师
【单选题】
合同签订前项目部应要求对方提交企业法人营业执照、法定代表人身份证明书、法定代表人授权委托书等作为合同附件。资料为复印件的,应当加盖___公章。
A. 生产厂家
B. 上级单位
C. 项目部
D. 对方单位
欢迎使用我爱刷题
×
微信搜索我爱刷题小程序
温馨提示
×
请在电脑上登陆“www.woaishuati.com”使用