【单选题】
You have just installed an ESXi 6.x Host. As part of your company security regulations, a security banner must be presented on the console of the host. How can this action be accomplished?___
A. Configure the Advanced Settings > Annotations screen of the ESXi host.
B. This is configured from the Direct Console User Interface configuration menu.
C. It is not possible to configure a security banner for the ESXi host.
D. From vCenter Server, this setting is configured globally in the vCenter Server configuration.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【单选题】
An administrator is only able to see the Health Badge when using the vRealize Operations user interface. What is the likely cause of this behavior?___
A. The vRealize Operations Foundation License is in use.
B. The vmware-sps service failed to start.
C. The vRealize Operations Standard License is in use.
D. The vmware-rbd-watchdog service failed to start.
【单选题】
An administrator has configured an alarm to be notified when a virtual machine meets either of these conditions: <High virtual CPU> <High active memory consumption.> <The alarm is only triggering when both of the conditions are met.> What can be done to correct the alarm behavior?___
A. Edit the alarm and select Trigger if ANY of the following conditions are satisfied.
B. Edit the alarm and select Trigger if ALL of the following conditions are satisfied.
C. Create two separate alarms, one for CPU and one for memory and link them together with ESXCLI.
D. Delete the existing alarm and create a new event based alarm.
【单选题】
An administrator creates an ESXi cluster using vSphere Auto Deploy. The ESXi hosts are configured to get a management IP address from a DHCP server. The administrator needs to troubleshoot the management network on one of the hosts. Which DCUI option should the administrator use to renew the DHCP lease? ___
A. Restart Management Network
B. Restore Network Settings
C. Test Management Network
D. Configure Management Network
【单选题】
An administrator is attempting to restore a number of files in a directory within the Operating System of a virtual machine. How can the administrator restore the files from a previous backup? ___
A. Use the File Level Restore option from the selected backup of the virtual machine in the vSphere Web Client.
B. Connect to the File Level Restore tool from a web browser in the virtual machine.
C. Connect to the File Level Restore tool from the VMware
D. ata Protection appliance.
【单选题】
After selecting an object in vRealize Operations, how can a user compare the badge values of related child objects? ___
A. Use the Scoreboard tab
B. Use the Relationship tab
C. Use the Members tab
D. Use the Overview tab
【单选题】
You want to deploy a vApp and dynamically assign IP addresses without a DHCP server on the network. Which action would you take to accomplish this task? ___
A. Enable IP pools.
B. Configure a local DHCP server in the vApp.
C. Enable NAT on the vApp router.
D. Configure the guest OS for workgroup and WINS.
【单选题】
What is the optimal configuration when building a virtual machine for a single-threaded Windows application? ___
A. Deploy single-threaded applications on uniprocessor virtual machines.
B. Deploy single-threaded applications on symmetric multi-processor virtual machines.
C. Tune single-threaded applications to take advantage of symmetric multi-processor resources.
D. Tune Single-threaded applications at the hypervisor level.
【单选题】
An administrator has created the resource pool configuration shown in the Exhibit. Based on the exhibit, which virtual machine(s) can be successfully powered on? ___
A. VM-M1 only
B. VM-K1 only
C. VM-K1 and VM-K2 only
D. VM-K1, VM-K2, and VM-M1
【单选题】
Which vSphere 6 Enterprise Edition feature will allow an organization to ensure that critical multi-threaded applications have the maximum possible uptime? ___
A. Fault Tolerance
B. High Availability
C. Distributed Resource Scheduler
D. App HA
【单选题】
An administrator has a virtual machine that requires four times the compute resources than other virtual machines on the same ESXi 6.x host. How should the administrator configure the virtual machine settings, in order to be prepared for any resource contention? ___
A. Set the shares of the priority virtual machine to High and the rest to Low.
B. Set the shares of the priority virtual machine to High.
C. Set the shares of the priority virtual machine to High and the rest to Normal.
D. Set the shares of the priority virtual machine to Normal and the rest to Low.
【单选题】
Which type of Adapter does not require vmkernel networking? ___
A. Independent Hardware iSCSI Adapter
B. Dependent Hardware iSCSI Adapter
C. Software iSCSI Adapter
D. Software FCoE Adapter
【单选题】
During the installation of ESXi 6.0, the following error message is reported: Hardware Virtualization is not a feature of the CPU, or is not enabled in the BIOS. Which condition would generate this message? ___
A. LAHF/SAHF is not enabled in the BIOS.
B. NX/XD is not enabled in the BIOS.
C. SSE3 is not enabled in the BIOS.
D. Hyperthreading is not enabled in the BIOS.
【单选题】
An administrator is unable to login to vCenter Server when using the vSphere web client. The administrator successfully accessed vCenter Server using the client earlier the same day. What is the most appropriate first step the administrator should take to resolve this issue? ___
A. Verify the web browser being used has Adobe Flash plugin version 11.5 or later
B. Verify the vCenter Single Sign-On service is running on the vCenter Server
C. Verify the vSphere Web Server service is running on the vCenter Server
D. Verify the administrator has permissions configured in vCenter Server
【单选题】
An administrator has configured an alarm to be notified when a virtual machine meets two conditions: <high virtual CPU> <high active memory consumption> The alarm is malfunctioning and triggering when either condition is met instead of both. What can be done to correct the issue? ___
A. Edit the alarm and select Trigger if ALL of the following conditions are satisfied.
B. Edit the alarm and select Trigger if ANY of the following conditions are satisfied.
C. Create two separate alarms, one for CPU and one for memory.
D. Delete the existing alarm and create a new event based alarm.
【单选题】
What must be enabled to ensure that VM Component Protection (VMCP) works in a High Availability cluster? ___
A. VMware Tools Virtual Machine Communication Interface (VMCI)
B. Fault Tolerance
C. Atomic Test and Set (ATS)
D. All Paths Down (APD) Timeout
【单选题】
An administrator wants to add a web server to an existing multi-tier application consisting of three virtual machines: <A web server> <A database server An application server> The web server should be added to the application when the primary web server reaches: <70% vCPU utilization> <55% active memory> Which option will achieve this result? ___
A. Create a virtual machine alarm with an action to run a script that starts a new instance of the web server.
B. Create a host cpu and memory alarm with an action to run a script that starts a new instance of the webserver.
C. Configure HA application monitoring for the web server and set it to trigger deployment of a new instance of the web server.
D. Configure Fault Tolerance on the virtual machine and leave the secondary machine disabled until needed.
【单选题】
An administrator has an application that requires connection directly to PCI devices through a virtual machine. What is a limitation of this configuration? ___
A. Devices must be reserved for PCI passthrough on at least one host on which the virtual machine will run.
B. Snapshots are not supported with DirectPath I/O passthrough devices.
C. A maximum of 18 PCI vSphere
D. irectPath devices can be added to a virtual machine.
【单选题】
The vSphere administrator is configuring directory services for an ESXi host: What should the vSphere administrator do to configure the host to use CAM services? ___
A. Check the Use vSphere Authentication Proxy checkbox.
B. Set Select Directory Service Type to CAM services.
C. Specify CAM$ for the
D. omain.
【单选题】
Which statement is true regarding the licensing of vCenter Server? ___
A. The license for vCenter Server must be provided at the time of installation.
B. Changing the license assigned to vCenter Server requires a restart of the vCenter Server service.
C. Virtual machines can still be powered on if the vCenter Server license expires.
D. Licensing for a single vCenter Server installation is determined by the number of managed virtual machines.
【单选题】
When configuring vSphere Replication for a virtual machine, what is the lowest Recovery Point Objective (RPO) that can be selected? ___
A. 1 min
B. 5 min
C. 10 min
D. 15min
【单选题】
A developer needs to create a multi-tier development stack for a home lab. Which vSphere product will support the architecture required for the least software cost? ___
A. vSphere Hypervisor
B. vSphere Essentials
C. VMware Player
D. VMware Workstation
【单选题】
An administrator is installing Windows into a virtual machine. The DVD has been mounted on the Host and configured for the virtual machine as shown in the Exhibit. Based on the exhibit, when the virtual machine is booted, why would it attempt to search for a PXE server? ___
A. The CD/DVD device is not connected.
B. The ISO is in the incorrect storage location.
C. The OS minimum requirements have not been met.
D. The CD/DVD device is not set to Client Device.
【单选题】
What component must be installed prior to deploying a vCenter Server in vSphere 6.x? ___
A. vCenter Identity Services
B. Platform Services Controller
C. vCenter Single Sign-On
D. Client Integration Plug-In
【单选题】
What is a valid plug-in status for a plug-in that has been added to a vSphere client? ___
A. Disabled
B. Unknown
C. Stopped
D. Installed
【单选题】
Users of an application are reporting performance issues. The following performance values are observed in the vSphere Web Client: <Host CPU utilization is 90%> <Virtual Machine memory utilization is consistently greater than 90% CPU Ready values are higher than 20%> What could be the cause of the application performance issue? ___
A. The host is lacking the CPU resources required to meet the demand.
B. The host is lacking the memory resources required to meet the demand.
C. The virtual machine is lacking the CPU resources required to meet the demand.
D. The virtual machine is lacking the memory resources required to meet the demand.
【单选题】
An administrator creates an ESXi cluster using vSphere Auto Deploy. The ESXi hosts are configured to get a management IP address from a DHCP server. The administrator needs to troubleshoot the management network on one of the hosts. Which DCUI option should the administrator use to renew the DHCP lease? ___
A. Restart Management Network
B. Restore Network Settings
C. Test Management Network
D. Configure Management Network
【单选题】
An administrator is re-provisioning an ESXi host and moving it to another datacenter. Which DCUI option should the administrator use to revert the system configuration to the default settings? ___
A. Reset System Configuration
B. Rebuild Default System Configuration
C. Revert System Configuration
D. Renew Default System Configuration
【单选题】
An administrator has just completed installing an ESXi 6.x host, but doesn't know what address has been configured. Where is the ESXi host IP address configured? ___
A. RVC console
B. Direct Console User Interface
C. vSphere Web Client
D. vSphere Client
【单选题】
When is it possible to place a VMFS5 datastore in maintenance mode? ___
A. When it is a member of a Storage DRS cluster
B. When it is a member of Virtual SAN cluster
C. When it is a member of a multi-extent datastore
D. When it is a member of a Virtual Volume
【单选题】
Immediately after installing ESXi, an administrator observes that the Configure Lockdown Mode option is grayed out in the Direct Console User Interface (DCUI). What is the most likely explanation? ___
A. The host has not yet been added to a vCenter Server.
B. The BIOS on the host does not have NX/XD enabled.
C. The ESXi host is running in evaluation mode.
D. The host requires a reboot before this feature is available.
【单选题】
Immediately after installing ESXi, an administrator observes that the Configure Lockdown Mode option is grayed out in the Direct Console User Interface (DCUI). What is the most likely explanation? ___
A. The host has not yet been added to a vCenter Server.
B. The BIOS on the host does not have NX/XD enabled.
C. The ESXi host is running in evaluation mode.
D. The host requires a reboot before this feature is available.
【单选题】
Which Single Sign-On deployment mode should an administrator use for two 6.x vCenter Servers configured with linked mode? ___
A. Basic Single Sign-On with vCenter Server Heartbeat
B. Multisite Single Sign-On
C. Basic Single Sign-On
D. Single Sign-On with Linked Mode
【单选题】
What is required when changing a virtual machine name using the vSphere Web Client? ___
A. Verify connectivity to the ESXi host where the virtual machine is running and its inventory list is accessible.
B. Verify in which datastore the virtual machine resides and that you have access and its inventory list is accessible.
C. Verify that virtual machine files are stored in the same datastore and can be accessed in the datastore browser list.
D. Verify the virtual machine is not running in Fault Tolerant mode and that it is not in a Distributed Resource Scheduler cluster.
【单选题】
An administrator deploys vRealize Operations into a vSphere 6.x environment. After the deployment, the administrator notices that badges are not appearing. What is a likely cause of this behavior? ___
A. Badges do not appear until you register vRealize Operations with vCenter Server.
B. Badges do not appear until you register a vCenter Server in vRealize Operations.
C. The vRealize Operations appliance needs to be redeployed.
D. The vCenter Server appliance needs to be redeployed.
【单选题】
How are ports scaled on vSphere Standard Switches (vSS)? ___
A. Ports on a vSS can be dynamically scaled up and down.
B. Ports on a vSS can only be statically scaled up or down.
C. Ports on a vSS can only be dynamically scaled down.
D. Ports on a vSS can only be dynamically scaled up.
【单选题】
A High Availability (HA) cluster is configured to respond to a given number of host failures. The cluster contains virtual machines configured with these settings: VM1 has a 1GHz CPU reservation and no Memory reservation VM2 has a 2GHz CPU reservation and no Memory reservation VM3 has no CPU reservation and no Memory reservation . Given this information, what is the correct slot size for the cluster? ___
A. The CPU Reservation should be set to 32MHz and the memory reservation should be set to 32MB plus memory overhead.
B. The CPU reservation should be set to 1 GHz and the memory reservation should be set to 0MB plus memory overhead.
C. The CPU reservation should be set to 2 GHz, and the memory reservation should be set to 0MB plus the virtual machine memory overhead.
D. The CPU reservation should be set to 2 GHz, and the memory reservation should be set to 32MB, plus the virtual machine memory overhead.
【单选题】
An administrator is planning a vSphere infrastructure with the following specific networking requirements: <The ability to shape inbound (RX) traffic> <Support for Private VLANs (PVLANs)> <Support for LLDP (Link Layer Discovery Protocol)>. What is the minimum vSphere Edition that will support these requirements? ___
A. vSphere Essentials Plus
B. vSphere Standard
C. vSphere Enterprise
D. vSphere
E. nterprise Plus
【单选题】
When you add an ESXi 6.x host to a new Cluster, which vSphere object owns the CPU and Memory resources of the hosts? ___
A. vCenter Server
B. Datacenter
C. Cluster
D. Host
【单选题】
A user is trying to retrieve objects from a SharePoint server and finds the request is taking an excessive amount of time. An administrator tries to isolate the issue and notes the following: Application performance is poor when compared to virtual machines on other hosts. Performance improves when the virtual machine is moved to another host. The virtual machine encounters higher than expected CPU %Ready times. What conclusion can be reached regarding the performance issues for this virtual machine? ___
A. Host Power Management is directly impacting virtual machine performance.
B. The virtual machine has a large number of snapshots.
C. The Path Selection Policy for the storage device is set differently on the affected host.
D. Network I/O control is configured for the portgroup.
【单选题】
A virtual machine template is accidently removed from the vCenter Server Inventory. Which method would be used to recover the template back into the environment?___
A. Use the datastore browser to locate the template, then right click and add the .vmtx file to inventory.
B. Use the datastore browser to locate the template, then right click and add the .vmx file to inventory.
C. Using the Managed Object Browser and adding the template from the ManagedObjectReference:GuestFileManager object.
D. Using the Managed Object Browser and adding the template from the ManagedObjectReference:VirtualDiskManager object.
推荐试题
【单选题】
CCE36、批准项目章程之后,人力资源总监要求增加项目范围,一名项目团队成员在没有获得批准的情况下增加了这些范围。项目经理应该怎么做?___
A. 与该团队成员讨论该问题
B. 执行实施整体变更控制过程
C. 寻求项目发起人的指导
D. 与项目管理办公室(PMO)一起审查范围变更
【单选题】
CCE37、在项目执行过程中,指定供应商的仓库发生火灾,导致无法按计划为项目提供所需产品。为了不影响项目顺利执行,项目经理决定从原定备用供应商那里采购所需产品。项目经理的做法属于?___
A. 执行权变措施
B. 执行弹回计划
C. 执行应急计划
D. 执行风险转移
【单选题】
CCE38、某项目主要依靠外部组织的力量来完成,其中一个合同的期限预计为3年,价格可能高达500万美元。买方想要采用总价合同,但又担心潜在卖方在报价中计入过高的通货膨胀应急储备。买方应该选择什么合同?___
A. 固定总价合同
B. 总价加激励费用合同
C. 总价加奖励费用合同
D. 总价加经济价格调整合同
【单选题】
CCE39、项目经理在项目中途发现,一个环境机构的新主任担心该项目可能会对环境造成严重影响,并且该主任正在影响项目发起人。项目经理下一步应该怎么做?___
A. 将该主任添加到相关方登记册中
B. 要求项目发起人预告与该主任之间的互动
C. 继续执行项目
D. 停止工作,直到主任担心的问题解决
【单选题】
CCE40、一个项目已经分包给宣布破产的供应商,项目经理遵循标准的行动,但是一名项目相关方质疑该行动是否恰当。项目经理应该跟该相关方分享什么文件?___
A. 风险登记册
B. 风险紧急评估
C. 影响分析
D. 定量分析
【单选题】
CCE41、在项目执行过程中,项目团队需要按项目沟通计划的要求召开项目状态评审会议。为了使会议有效进行,沟通计划要求相关成员在预定的状态评审会议之前2天提交项目进展情况报告。尽管他们过去都严格按计划执行,但这次却直到状态评审会议之前4小时才提交了报告。你粗略地看了一下报告,发现其中有几处严重的错误。此时项目经理应该怎么做?___
A. 照常召开状态评审会议,并计划在会议上纠正这几处错误
B. 要求团队纠正错误,并推迟状态评审会议
C. 查明是谁引起的错误,并加以处罚
D. 照常召开状态评审会议,并看看其他人能否发现这几处错误
【单选题】
CCE42、在某个软件开发项目中,卖方已经按照合同要求圆满地完成了项目工作,这时,买方又要求在合同中添加一项新工作。鉴于上述情况,卖方应该如何做?___
A. 开始合同收尾,并要求就新工作签订新合同
B. 同意添加新工作,但要求用成本补偿的方式来做
C. 拒绝做新工作,因为合同已经完成
D. 立即开展新工作,以便维护与买方的良好关系
【单选题】
CCE43、项目经理把发起人的指示函件通过电子邮件转发给了异地的团队成员,该团队成员收到该邮件后及时发送了邮件回执,并开始采取行动。然而项目经理到项目上去检查时,对项目团队成员的工作非常不满意,坚持说他曲解了邮件的内容。这可能是沟通中哪个环节出了问题?___
A. 项目经理编码错误
B. 不应该采取电子邮件来传递信息
C. 缺乏信息反馈
D. 没有及时告知收到信息
【单选题】
CCE44、公司总经理刚刚委任你为项目经理,并请你起草项目章程。你从总经理那里得到了项目工作说明书,了解到项目的时间很紧。你也知道公司等级森严、权力距离很大。针对这种情况,制定项目章程的最佳办法是?___
A. 召开头脑风暴会议,与潜在的项目团队成员一起制定项目章程
B. 自己起草项目章程,然后提交给潜在团队成员和其他项目相关方征求意见
C. 与项目发起人一起编制项目章程,然后分发给项目相关方
D. 与职能经理一起编制项目章程,并提交给项目发起人签字确认
【单选题】
CCE45、项目经理准备收尾一个项目的第四阶段,但是一位相关方拒绝向前推进项目,除非增加一个范围之外的功能,项目经理下一步应该怎么做?___
A. 开始变更请求过程
B. 增加该功能
C. 审查相关方登记册
D. 与项目相关方会面
【单选题】
CCE46、你所在的公司正在考虑启动一个新产品研发项目。公司的总工程师要求采用“最先进的设计方法”,公司的营销总监要求未来的新产品要“绝对好卖”,而公司分管生产的副总经理则要求“制造成本低”。公司准备聘请你担任该项目的项目经理。你最应该做下列哪项?___
A. 优先满足总工程师的要求,因为他是你的顶头上司
B. 优先满足营销总监的要求,以便给公司带来尽可能多的利润
C. 优先满足生产副总经理的要求,以便最大限度地降低生产成本
D. 确保所有要求都是可以测量的
【单选题】
CCE47、你所在的公司采用职能型组织结构,各部门各自为政、分工负责,不能为完成跨部门的工作而有效合作。受管理层的委派,你刚刚接任某个大型项目的项目经理。你发现该项目的启动和计划文件都比较齐全,拥有项目工作说明书、项目章程、项目管理计划和项目文件等。按照项目沟通计划的规定,你正在主持召开项目状态评审会议。尽管项目执行完全符合计划,但是参加会议的项目团队成员不经意间流露出了对项目的很大的不满。存在这种情况,最可能的原因是什么?___
A. 项目团队成员对项目有不合理的要求
B. 高级管理层对项目的支持力度不够
C. 不同的相关方对于项目有不同的要求
D. 职能型组织结构不适用于这类大型项目
【单选题】
CCE48、某项目正处于规划阶段。前任项目经理已经完成了项目范围说明书的编制。你刚刚受管理层的委派出任项目经理。管理层要求你立即开始工作,并尽快完成项目计划的编制工作。你应该首先怎么做?___
A. 根据项目范围说明书,编制工作分解结构
B. 确认各项目相关方的要求都已包括在项目范围说明书中。
C. 重新编制项目范围说明书,以确保其有效性
D. 根据项目范围说明书,编制项目进度计划
【单选题】
CCE49、项目经理收到一封正式函件,通知由于组织结构内部调整,某一重要相关方不再作为主抓该项目的负责人,而是作为咨询顾问继续参与项目工作。得到这一信息后,项目经理应该如何处理?___
A. 修改项目文件和项目管理计划
B. 通知团队成员,以后不需要再给该相关方发送报告
C. 私下沟通,核实该消息的可靠性
D. 要求项目执行组织解释做出这种调整的理由
【单选题】
CCE50、在项目即将进入收尾阶段时,项目经理发现了一项原来没有考虑到的新风险。该风险一旦发生,可能给最终的可交付成果带来重要影响,甚至可能使其不能被客户接受。项目经理应该怎么做?___
A. 把该风险的影响通知管理层和客户
B. 进行定性风险分析
C. 制定风险缓解措施
D. 增加应急储备
【单选题】
CCE51、午餐时,你遇到一位管理大型营业额化工厂项目的同事。你的同事很担心,因为客户是不理性的,要求进行对范围计划和成本产生严重影响的变更,客户也没有准备好接受对时间表和成本的额外影响。同事寻求你的建议,此时应该怎么做?___
A. 拒绝让步,不做任何改变
B. 要求其执行管理层对客户提起法律诉讼
C. 最终客户永远是对的,所以继续进行改变吸收对成本,进度和范围的影响
D. 与客户建立会议,以更好地了解变更的必要性要求
【单选题】
CCE52、一个项目的规模已经大到由指导委员会取代单一的项目发起人,项目经理应该怎么做来适应这个新发展?___
A. 认识到相关方结构发生了变化,并量身定制与这个团队的沟通
B. 按照最初的计划继续工作,同时认识到该项目现在包括其他相关方
C. 为团队组织一次新的指导委员会一起召开的会议,继续进行项目工作
D. 与新的委员会分享当前的状态报告
【单选题】
CCE53、项目经理无意听到两个相关方的会话,他们在讨论对项目对他们所在部门的影响有多么不高兴。相关方A问是否项目符合进度,相关方B答复SPI是1.05;相关方A问是否项目经理知道项目相关方B关心的,相关方B说不确定。下列哪个是项目经理最该做的?___
A. 确保相关方知道项目经理听到了他们的谈话,要求他们直接书面方式和项目经理交流
B. 向所有相关方做个项目状态的汇报
C. 发送两个相关方问题日志,要求增加评论
D. 安排和相关方的会议,允许他们说出他们关心的事情
【单选题】
CCE54、项目在计划阶段,你已经支付了这两周工作的费用。项目发起人告知你:公司内部对项目进行了重新评估,你的项目将不再获得另外的资金。在这种情况下,你应该___
A. 立刻停止工作并遣散所有资源
B. 为项目执行合适的收尾
C. 减少队伍
D. 去掉非关键任务来压缩成本
【单选题】
CCE55、项目经理尝试解决两个团队成员的冲突。一个说系统测试之前应该整合,另一个说系统必须整合之前测试。这个项目包括30个人和12个系统需要整合。发起人要求整合只做一次。下列哪个语句是项目经理及解决冲突的最好选择?___
A. 按我的方式来做
B. 让我们平静下来,完成工作
C. 等我们平静下来之后下周再解决这个工作
D. 让我们做有限的测试在实施之前,在实施后做最终的测试
【单选题】
CCE56、分配到你的项目上的团队成员只有50%可用,昨天,他们向你报告了项目执行中出现的重大偏差。你发现团队成员花了不到50%的时间在你的项目上。你的项目进度很沉重,最终期限很危险。你应该做什么?___
A. 告诉你的发起人,尝试获得更多的资源
B. 告诉职能经理,谈判清楚并写下来预期可以利用的资源水平
C. 忽略这些困难,调整你的进度,根据当前缓慢的进展确定新的最终期限
D. 集中在内部控制上,确保你的项目不会出现比实际工作很多的问题
【单选题】
CCE57、公司有一个生物项目,你是项目经理,现在研究部门已经分离了一种高级微生物。当与海藻结合的时候,这种微生物能够形成一种可生物降解的合成材料。销售部门相信该材料应该用来制造能够只穿一次就可以抛弃并变成花园肥料的袜子。管理层问你是否应该启动一个项目来制造这种产品。为此,你应准备:___
A. 可行性研究
B. 投资回报报告
C. 生产和购买分析
D. 项目章程
【单选题】
CCE58、项目信息已按沟通计划发布,一些项目可交付成果已经按变更控制计划做了变更。当项目经理通知到对某一项目可交付成果以前已公布过变更时,一项目相关方表示惊讶,而所有其他相关方都收到了含有该项变更通知的信息。问项目经理该如何处理此事?___
A. 弄清该相关方为什么未收到信息并告诉他该信息是何时发布的
B. 审查沟通计划以确定为什么该相关方不理解他的职责
C. 审查沟通计划,必要时做修改
D. 在下一次筹划指导委员会上谈及该情况,以便其他人不错过公布的变更
【单选题】
CCE59、在项目前半部分,5个团队成员去了其他项目,2个成员通知你想去休假,其他成员表示不确定他们的工作是否完成。在这种情形下,你最好为项目后半部分创建一个___
A. 工作分解结构
B. 资源直方图
C. 资源管理计划
D. 责任分配矩阵
【单选题】
CCE60、你是一名项目经理,正负责一种新产品的研发。由于市场准入降低,新的竞争对手不断加入,竞争激烈。为长期保持产品优势,你被要求增加产品的功能时,你应该首先___
A. 向团队成员说明情况,征求意见
B. 要求组织分派更多资源
C. 对此产生的影响进行评估
D. 与职能经理协商
【单选题】
CCE61、你正在管理一个项目,开发一种适合新生婴儿的代人乳饮料。项目进行了一半,并且已经有一家大型超市同意在你们研发并生产成功后立即销售。该超市作为项目的重要客户之一,要求监督产品的研发过程。为此,你给他们报送了项目状态报告。他们抱怨这个报告如同天书,无法看懂。这种情况本来可以通过以下哪种方法避免?___
A. 事先通知客户报告将要采取的形式,以便客户做好准备
B. 做好沟通管理计划
C. 雇佣写作水平较高的人编写该报告
D. 更好地管理相关方期望
【单选题】
CCE62、B公司是一家拥有5000名员工的大公司,现由于公司发展需要更换考勤系统。为保证项目成功执行,必须记录详细的需求。如果你是负责这个项目的项目经理,将如何处理这项需求?___
A. 制定计划
B. 确定项目目标
C. 监视过程变化
D. 尽早让员工参与其中
【单选题】
CCE63、A公司刚刚执行了一个采购项目,项目涉及三家大型供应商。因为A公司内部合作不利,项目经理在采购过程的每个阶段都遇到了很多困难。为了确保未来项目不遇到同样的问题,最适合的做法是___
A. 安排相关部门领导开会讨论
B. 进行采购审计
C. 将所有问题都记录在备忘录
D. 通过合同变更控制,解决这些问题
【单选题】
CCE64、在项目执行过程中,你被任命为项目经理。项目各项指标都在基线的允许范围内,如果客户对项目绩效不满意,你首先应该做什么?___
A. 与项目团队一起讨论
B. 重新计算基线
C. 重新商谈合同
D. 与客户见面
【单选题】
CCE65、你是一个系统集成项目的经理,该项目将使人们能在各地医院的急诊室购买到彩票。你的公司开发适用的软件,但需要向其他公司购买硬件设备。你的外包管理员告知你要准备一份详细描述拟采购产品的文件,该文件被称为___
A. 采购文件
B. 采购管理计划
C. 采购工作说明书
D. 需求文件
【单选题】
CCE66、你的公司打算将一种特殊的染色材料加入最新生产的布匹中。由于没有关于这种染色材料的成分数据并且你们不知道如何获得这些材料。为了解决这些问题,你可能会建议使用下列工具,除了___
A. 自制或外购分析
B. 专家判断
C. 会议
D. 独立估算
【单选题】
CCE67、项目成本绩效指数是0.6;进度绩效指数是0.71。项目有625个工作包,预计在4年完成。项目团队成员非常缺乏经验,规划时项目得到很少的支持,下列哪个是最应该做的?___
A. 更新风险识别和分析
B. 花更多时间改进成本估算
C. 尽可能移除工作包
D. 改组责任分配矩阵
【单选题】
CCE68、假设你是A项目的项目经理,职责范围限于信息系统的设计及开发。某位客户组成员向项目部门主管要求在信息系统安装阶段完成一项小工作。项目部门主管请客户向你询问。对这一请求做出最佳答复需要审查以下哪个过程中开发的信息?___
A. 制定进度计划
B. 核实范围
C. 排列活动顺序
D. 定义范围
【单选题】
CCE69、你一直在管理一个要应用许多分包商的项目,为世界上最大的热气球开发和设计一个新的航空电子设备,项目正接近尾声。在过去的4年中,你得到了10个各种各样的合同。有的分包商表现很好且容易共事,有的因为绩效欠佳你不得不终止合同。另一个在付款前还需要完成一些技术记录。还有一个,因为没有遵守适当的合同条款和条件而导致一些异常的支出。在你结束合同时,你应该___
A. 书面通知每个分包商告诉他们的项目结束了
B. 为以后的参考准备一个完整的记录索引和合同文件
C. 进行变量分析
D. 进行采购审计
【单选题】
CCE70、在某建设工程项目的地基开挖过程中,对于因气候原因造成的进度拖后风险,项目经理采取了风险接受的策略。由于在施工期间下特大雨,工程不得不停工3天。项目经理应该___
A. 使用应急储备
B. 把项目工期延长3天
C. 要求保险公司赔偿
D. 与团队成员开会讨论处理方案
【单选题】
CCE71、你正在管理一个为期7个月的项目,并且建立和严格执行了项目计划。在工作了5个半月后,这个项目既符合进度又在预算内,但是项目发起人对可交付成果不满意,这一情况会导致项目完工延误。防止这种情况的最重要的过程是___
A. 控制风险
B. 监控项目工作
C. 收集需求和定义范围
D. 实施整体变更控制
【单选题】
CCE72、你所在的公司正在考虑启动一个新产品研发项目。公司的总工程师要求采用最先进的设计方法,公司的营销总监要求未来的新产品要绝对好卖,公司分管生产的副总经理则要求制造成本低。公司准备聘请你担任该项目的项目经理。你最应该做下列哪项?___
A. 优先满足总工程师的要求,因为他是你的顶头上司
B. 优先满足营销总监的要求,以便给公司带来尽可能多的利润
C. 优先满足生产副总经理的要求,以便最大限度地降低生产成本
D. 确保所有要求都是可以测量的
【单选题】
CCE73、你负责组织中的一个项目,该项目具有多个内部客户。由于组织中的很多人对此项目有兴趣,你决定制定一个相关方管理策略。在制定该策略之前,你应当___
A. 进行相关方分析,以评估信息需求
B. 确定信息生成的进度,用以在每个相关方需要得到每类信息时展示给他们
C. 确定每个相关方可能产生的潜在影响
D. 设立每个相关方利益和影响的优先次序
【单选题】
CCE74、你正开始一个新项目,项目配以虚拟团队,成员位于五个国家。为避免你的团队与其职能经理之间的工作优先级发生冲突,你要求项目发起人编制一份___
A. 给团队成员的备忘录,告知他们,他们现在为你工作
B. 项目章程
C. 给职能经理的备忘录,告知他们,你有权指挥他们的雇员
D. 资源管理计划
【单选题】
CCE75、项目经理刚刚被分配到新项目并得到了项目章程,接下来项目经理首先做什么?___
A. 创建项目范围说明书
B. 确认所有相关方提供到范围的输入
C. 分析项目风险
D. 开始项目管理计划上的工作