【单选题】
Which vSphere 6 Enterprise Edition feature will allow an organization to ensure that critical multi-threaded applications have the maximum possible uptime? ___
A. Fault Tolerance
B. High Availability
C. Distributed Resource Scheduler
D. App HA
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
A
解析
暂无解析
相关试题
【单选题】
An administrator has a virtual machine that requires four times the compute resources than other virtual machines on the same ESXi 6.x host. How should the administrator configure the virtual machine settings, in order to be prepared for any resource contention? ___
A. Set the shares of the priority virtual machine to High and the rest to Low.
B. Set the shares of the priority virtual machine to High.
C. Set the shares of the priority virtual machine to High and the rest to Normal.
D. Set the shares of the priority virtual machine to Normal and the rest to Low.
【单选题】
Which type of Adapter does not require vmkernel networking? ___
A. Independent Hardware iSCSI Adapter
B. Dependent Hardware iSCSI Adapter
C. Software iSCSI Adapter
D. Software FCoE Adapter
【单选题】
During the installation of ESXi 6.0, the following error message is reported: Hardware Virtualization is not a feature of the CPU, or is not enabled in the BIOS. Which condition would generate this message? ___
A. LAHF/SAHF is not enabled in the BIOS.
B. NX/XD is not enabled in the BIOS.
C. SSE3 is not enabled in the BIOS.
D. Hyperthreading is not enabled in the BIOS.
【单选题】
An administrator is unable to login to vCenter Server when using the vSphere web client. The administrator successfully accessed vCenter Server using the client earlier the same day. What is the most appropriate first step the administrator should take to resolve this issue? ___
A. Verify the web browser being used has Adobe Flash plugin version 11.5 or later
B. Verify the vCenter Single Sign-On service is running on the vCenter Server
C. Verify the vSphere Web Server service is running on the vCenter Server
D. Verify the administrator has permissions configured in vCenter Server
【单选题】
An administrator has configured an alarm to be notified when a virtual machine meets two conditions: <high virtual CPU> <high active memory consumption> The alarm is malfunctioning and triggering when either condition is met instead of both. What can be done to correct the issue? ___
A. Edit the alarm and select Trigger if ALL of the following conditions are satisfied.
B. Edit the alarm and select Trigger if ANY of the following conditions are satisfied.
C. Create two separate alarms, one for CPU and one for memory.
D. Delete the existing alarm and create a new event based alarm.
【单选题】
What must be enabled to ensure that VM Component Protection (VMCP) works in a High Availability cluster? ___
A. VMware Tools Virtual Machine Communication Interface (VMCI)
B. Fault Tolerance
C. Atomic Test and Set (ATS)
D. All Paths Down (APD) Timeout
【单选题】
An administrator wants to add a web server to an existing multi-tier application consisting of three virtual machines: <A web server> <A database server An application server> The web server should be added to the application when the primary web server reaches: <70% vCPU utilization> <55% active memory> Which option will achieve this result? ___
A. Create a virtual machine alarm with an action to run a script that starts a new instance of the web server.
B. Create a host cpu and memory alarm with an action to run a script that starts a new instance of the webserver.
C. Configure HA application monitoring for the web server and set it to trigger deployment of a new instance of the web server.
D. Configure Fault Tolerance on the virtual machine and leave the secondary machine disabled until needed.
【单选题】
An administrator has an application that requires connection directly to PCI devices through a virtual machine. What is a limitation of this configuration? ___
A. Devices must be reserved for PCI passthrough on at least one host on which the virtual machine will run.
B. Snapshots are not supported with DirectPath I/O passthrough devices.
C. A maximum of 18 PCI vSphere
D. irectPath devices can be added to a virtual machine.
【单选题】
The vSphere administrator is configuring directory services for an ESXi host: What should the vSphere administrator do to configure the host to use CAM services? ___
A. Check the Use vSphere Authentication Proxy checkbox.
B. Set Select Directory Service Type to CAM services.
C. Specify CAM$ for the
D. omain.
【单选题】
Which statement is true regarding the licensing of vCenter Server? ___
A. The license for vCenter Server must be provided at the time of installation.
B. Changing the license assigned to vCenter Server requires a restart of the vCenter Server service.
C. Virtual machines can still be powered on if the vCenter Server license expires.
D. Licensing for a single vCenter Server installation is determined by the number of managed virtual machines.
【单选题】
When configuring vSphere Replication for a virtual machine, what is the lowest Recovery Point Objective (RPO) that can be selected? ___
A. 1 min
B. 5 min
C. 10 min
D. 15min
【单选题】
A developer needs to create a multi-tier development stack for a home lab. Which vSphere product will support the architecture required for the least software cost? ___
A. vSphere Hypervisor
B. vSphere Essentials
C. VMware Player
D. VMware Workstation
【单选题】
An administrator is installing Windows into a virtual machine. The DVD has been mounted on the Host and configured for the virtual machine as shown in the Exhibit. Based on the exhibit, when the virtual machine is booted, why would it attempt to search for a PXE server? ___
A. The CD/DVD device is not connected.
B. The ISO is in the incorrect storage location.
C. The OS minimum requirements have not been met.
D. The CD/DVD device is not set to Client Device.
【单选题】
What component must be installed prior to deploying a vCenter Server in vSphere 6.x? ___
A. vCenter Identity Services
B. Platform Services Controller
C. vCenter Single Sign-On
D. Client Integration Plug-In
【单选题】
What is a valid plug-in status for a plug-in that has been added to a vSphere client? ___
A. Disabled
B. Unknown
C. Stopped
D. Installed
【单选题】
Users of an application are reporting performance issues. The following performance values are observed in the vSphere Web Client: <Host CPU utilization is 90%> <Virtual Machine memory utilization is consistently greater than 90% CPU Ready values are higher than 20%> What could be the cause of the application performance issue? ___
A. The host is lacking the CPU resources required to meet the demand.
B. The host is lacking the memory resources required to meet the demand.
C. The virtual machine is lacking the CPU resources required to meet the demand.
D. The virtual machine is lacking the memory resources required to meet the demand.
【单选题】
An administrator creates an ESXi cluster using vSphere Auto Deploy. The ESXi hosts are configured to get a management IP address from a DHCP server. The administrator needs to troubleshoot the management network on one of the hosts. Which DCUI option should the administrator use to renew the DHCP lease? ___
A. Restart Management Network
B. Restore Network Settings
C. Test Management Network
D. Configure Management Network
【单选题】
An administrator is re-provisioning an ESXi host and moving it to another datacenter. Which DCUI option should the administrator use to revert the system configuration to the default settings? ___
A. Reset System Configuration
B. Rebuild Default System Configuration
C. Revert System Configuration
D. Renew Default System Configuration
【单选题】
An administrator has just completed installing an ESXi 6.x host, but doesn't know what address has been configured. Where is the ESXi host IP address configured? ___
A. RVC console
B. Direct Console User Interface
C. vSphere Web Client
D. vSphere Client
【单选题】
When is it possible to place a VMFS5 datastore in maintenance mode? ___
A. When it is a member of a Storage DRS cluster
B. When it is a member of Virtual SAN cluster
C. When it is a member of a multi-extent datastore
D. When it is a member of a Virtual Volume
【单选题】
Immediately after installing ESXi, an administrator observes that the Configure Lockdown Mode option is grayed out in the Direct Console User Interface (DCUI). What is the most likely explanation? ___
A. The host has not yet been added to a vCenter Server.
B. The BIOS on the host does not have NX/XD enabled.
C. The ESXi host is running in evaluation mode.
D. The host requires a reboot before this feature is available.
【单选题】
Immediately after installing ESXi, an administrator observes that the Configure Lockdown Mode option is grayed out in the Direct Console User Interface (DCUI). What is the most likely explanation? ___
A. The host has not yet been added to a vCenter Server.
B. The BIOS on the host does not have NX/XD enabled.
C. The ESXi host is running in evaluation mode.
D. The host requires a reboot before this feature is available.
【单选题】
Which Single Sign-On deployment mode should an administrator use for two 6.x vCenter Servers configured with linked mode? ___
A. Basic Single Sign-On with vCenter Server Heartbeat
B. Multisite Single Sign-On
C. Basic Single Sign-On
D. Single Sign-On with Linked Mode
【单选题】
What is required when changing a virtual machine name using the vSphere Web Client? ___
A. Verify connectivity to the ESXi host where the virtual machine is running and its inventory list is accessible.
B. Verify in which datastore the virtual machine resides and that you have access and its inventory list is accessible.
C. Verify that virtual machine files are stored in the same datastore and can be accessed in the datastore browser list.
D. Verify the virtual machine is not running in Fault Tolerant mode and that it is not in a Distributed Resource Scheduler cluster.
【单选题】
An administrator deploys vRealize Operations into a vSphere 6.x environment. After the deployment, the administrator notices that badges are not appearing. What is a likely cause of this behavior? ___
A. Badges do not appear until you register vRealize Operations with vCenter Server.
B. Badges do not appear until you register a vCenter Server in vRealize Operations.
C. The vRealize Operations appliance needs to be redeployed.
D. The vCenter Server appliance needs to be redeployed.
【单选题】
How are ports scaled on vSphere Standard Switches (vSS)? ___
A. Ports on a vSS can be dynamically scaled up and down.
B. Ports on a vSS can only be statically scaled up or down.
C. Ports on a vSS can only be dynamically scaled down.
D. Ports on a vSS can only be dynamically scaled up.
【单选题】
A High Availability (HA) cluster is configured to respond to a given number of host failures. The cluster contains virtual machines configured with these settings: VM1 has a 1GHz CPU reservation and no Memory reservation VM2 has a 2GHz CPU reservation and no Memory reservation VM3 has no CPU reservation and no Memory reservation . Given this information, what is the correct slot size for the cluster? ___
A. The CPU Reservation should be set to 32MHz and the memory reservation should be set to 32MB plus memory overhead.
B. The CPU reservation should be set to 1 GHz and the memory reservation should be set to 0MB plus memory overhead.
C. The CPU reservation should be set to 2 GHz, and the memory reservation should be set to 0MB plus the virtual machine memory overhead.
D. The CPU reservation should be set to 2 GHz, and the memory reservation should be set to 32MB, plus the virtual machine memory overhead.
【单选题】
An administrator is planning a vSphere infrastructure with the following specific networking requirements: <The ability to shape inbound (RX) traffic> <Support for Private VLANs (PVLANs)> <Support for LLDP (Link Layer Discovery Protocol)>. What is the minimum vSphere Edition that will support these requirements? ___
A. vSphere Essentials Plus
B. vSphere Standard
C. vSphere Enterprise
D. vSphere
E. nterprise Plus
【单选题】
When you add an ESXi 6.x host to a new Cluster, which vSphere object owns the CPU and Memory resources of the hosts? ___
A. vCenter Server
B. Datacenter
C. Cluster
D. Host
【单选题】
A user is trying to retrieve objects from a SharePoint server and finds the request is taking an excessive amount of time. An administrator tries to isolate the issue and notes the following: Application performance is poor when compared to virtual machines on other hosts. Performance improves when the virtual machine is moved to another host. The virtual machine encounters higher than expected CPU %Ready times. What conclusion can be reached regarding the performance issues for this virtual machine? ___
A. Host Power Management is directly impacting virtual machine performance.
B. The virtual machine has a large number of snapshots.
C. The Path Selection Policy for the storage device is set differently on the affected host.
D. Network I/O control is configured for the portgroup.
【单选题】
A virtual machine template is accidently removed from the vCenter Server Inventory. Which method would be used to recover the template back into the environment?___
A. Use the datastore browser to locate the template, then right click and add the .vmtx file to inventory.
B. Use the datastore browser to locate the template, then right click and add the .vmx file to inventory.
C. Using the Managed Object Browser and adding the template from the ManagedObjectReference:GuestFileManager object.
D. Using the Managed Object Browser and adding the template from the ManagedObjectReference:VirtualDiskManager object.
【单选题】
A vSphere administrator needs to backup a virtual machine that has a Microsoft SQL Server Database installed. Which solution allows for an application quiesce to occur during backup?___
A. VMware vCenter Converter
B. VMware vCenter Site Recovery Manager
C. VMware vSphere Replication
D. VMware vSphere Data Protection Advanced
【单选题】
An administrator is migrating a virtual machine from a Test cluster to a Production cluster. The two environments do not have any shared storage. What is the easiest way to accomplish this task? ___
A. Perform a Storage vMotion.
B. Perform a regular vMotion.
C. Perform a Virtual to Virtual migration.
D. Perform a backup and restore using VMware Data Protection.
【单选题】
An administrator must determine an appropriate backup solution, given these conditions: 50 of the virtual machines are in a resource pool named Finance. 50 of the virtual machines are in a resource pool named QA. Which solution allows an administrator the ability to backup 100 virtual machines? ___
A. Use Snapshot Manager on the vCenter Server to backup the virtual machines.
B. Use the VMware Consolidated Backup (vcb) tool on the ESXi Host to backup the virtual machines.
C. Use the VMware Data Recovery (VDR) Appliance on the vCenter Server to backup the virtual machines.
D. Use the VMware Data Protection (VDP) Appliance on one of the
E. SXi Hosts to backup the virtual machines.
【单选题】
What is a benefit of using Enhanced vMotion Compatibility for an environment? ___
A. EVC masks CPU features to allow compatibility between hosts that are dissimilar.
B. EVC allows for cross platform vMotion to occur.
C. EVC enables Long
D. istance vMotion.
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
An administrator needs to verify that vMotion operations can be performed in a vSphere data center.What round trip time (RTT) latency is the maximum value that will allow vMotion operations to succeed? ___
A. 50ms RTT
B. 100ms RTT
C. 150ms RTT
D. 200ms RTT
【单选题】
A storage administrator has reported that full utilization of all bandwidth from an ESXi 6.x host is not being seen. In troubleshooting the issue, the Adapter details are shown in the Exhibit. Based on the exhibit, what is cause of the issue? ___
A. The array is not setup to use the correct multipathing policy.
B. There are no virtual machines on the ESXi host.
C. Not all links are used because a path is disabled.
D. Another path needs to be configured.
【单选题】
An administrator is migrating a powered-on virtual machine, as shown in the exhibit. Which option should be selected to perform a Storage vMotion of the VM? ___
A. Change storage only
B. Change VM compute resource only
C. Change both compute resource and storage, changing the compute resource first.
D. Change both compute resource and storage, changing the storage resource first.
推荐试题
【单选题】
AMA152项目受到一个未预料的风险的影响,迫使项目经理执行一个权变措施,但是权变措施作用有限,这种情况将影响到需求的达成,项目经理应该怎么做?___
A. 将影响归档为质量偏差
B. 将该案例转给专家判断
C. 提出变更请求
D. 进行敏感性分析
【单选题】
AMA153某个项目上的团队成员A和团队成员B发成冲突,项目经理将两个团队成员叫到一起,针对问题研究了不同的解决方案,项目经理使用的是下列哪一项技巧来解决冲突的?___
A. 面对
B. 妥协
C. 控制
D. 强迫
【单选题】
AMA154项目经理接管一个处于执行阶段的项目,客户无法按照要求的详细程度来定义项目目标,项目团队成员已经开始抱怨,因为需求的不断变化导致无法进行工作估算和进度编制,项目经理应该怎么做?___
A. 将团队成员的抱怨告诉客户,并要求更多的详细要求
B. 告诉项目团队成员客户无法按照要求的节奏提供需求
C. 当有更详细信息时,更新高层次WBS
D. 让项目团队关注当前任务
【单选题】
AMA155在自制或外购分析之后,组织决定内部开发产品,但是功能测试将外包给战略供应商,这个决策导致记录了一项新风险,因为供应商可能结束业务,而这则没有风险减轻计划。这属于下列哪一项的实例?___
A. 由于人员配备不足将风险转移给供应商
B. 回避进度偏移风险
C. 接受供应商结束业务风险
D. 与新供应商谈判一项计划
【单选题】
AMA156项目经理向发起人分发每周状态报告。报告中应包含下列哪一项?___
A. 项目组织图
B. 详细的风险分析
C. 团队培训计划
D. 已完成工作百分比
【单选题】
AMA157你在准备一个综合项目计划和一个项目时间表。你将它们提交给筹划指导委员会,并得到了批准。有关各方也接受了计划。现在是分发这些计划的时候了。项目计划和时间表应该分发给:___
A. 组织中执行项目的所有有关各方
B. 项目所有的相关方
C. 项目小组成员和项目发起人
D. 在沟通管理计划中指明的人
【单选题】
AMA158因为项目进度不满足时间制约的因素,项目经理将最困难的任务外包给一知道其有能力但昂贵的供应商。该供应商的合同是成本加固定费用合同。项目经理应该更新下列哪一文件?___
A. 进度和成本管理计划
B. 成本、风险、进度和沟通管理计划
C. 风险、采购、和进度管理计划
D. 进度、成本、风险、沟通和采购管理计划
【单选题】
AMA159项目经理希望确定计划采购的服务提供商,项目经理应该参考下列哪一项?___
A. 广告
B. 投标人会议
C. 合格卖方清单
D. 之前项目的经验教训文件
【单选题】
AMA160你的项目团队成员总是抱怨没有项目团队的整体感,因为他们分别在不同地方工作。为了改善这种情况,你设计了一个项目口号并将其印在T恤衫上来提高大家的集体感,但这一做法没有起到多大作用。你下一步要怎么做?___
A. 印发时事通信
B. 创造一种关于这个项目的神秘感
C. 建立一个“作战室
D. 发布一个关于团队成员应如何同主要相关方相互合作的指导方针
【单选题】
AMA161在项目执行阶段,供应商选择团队收集评估资料,做出选择客户关系管理体系的决策。对于这项工作,项目经理会采取下面那个方法呢?___
A. 建议评估表
B. 自制或外购表
C. 采购工作描述
D. 挣值分析
【单选题】
AMA162一家公司以1公斤每包的价格销售咖啡。在质量管理计划阶段,项目经理发现装包机器的历史标准偏差为1克。控制图应该使用哪一个控制限制?___
A. 1,000-1,006克
B. 994-1,0001克
C. 996-1,006克
D. 997-1,003克
【单选题】
AMA163职能经理雇佣了一名新团队成员,项目经理认定其为一名优秀的项目人员,但是项目经理在后来认识到这名新成员缺乏一些让项目成功所必须的技术专业知识。项目经理下一步该怎么做?___
A. 释放该人员,并将该人员分配到另一个项目上
B. 确保新团队成员获得必要的技术培训
C. 要求职能经理确保团队成员获得必要培训
D. 更新项目管理计划,修订项目范围,以适应技术技能缺乏的情况
【单选题】
AMA164项目团队主管通知项目经理一个阶段已经完成,项目经理下一步应该怎么做?___
A. 更新项目计划,并继续下一个阶段
B. 向客户提供阶段可交付成果
C. 接受可交付成果
D. 验证可交付成果
【单选题】
AMA165委员会将要从提交的一份清单中选择项目,应该使用下列哪一项选择标准?___
A. 战略一致性需求,成本效率和可行性。
B. 根据首席执行官的决定排列项目的优先顺序。
C. 启动具有最佳文件计划的项目。
D. 解决主要相关方的需求。
【单选题】
AMA166项目经理向PMO团队呈交项目团队报告。PMO团队的一名高级成员认为当地政府机构未参与到该项目中。因此,公司可能必须支付罚款。项目经理疏漏于下面的哪项工作?___
A. 项目相关方识别
B. 沟通计划
C. 项目相关方管理战略
D. 需求计划
【单选题】
AMA167审查项目章程之后,项目经理下一步应该做什么?___
A. 制定项目进度表
B. 收集需求
C. 定义产品范围
D. 制定项目范围说明书
【单选题】
AMA168一个新项目需要一名关键项目人员的支持,该人员是有多个项目共用的,项目经理联系人力主管,希望获得该人员的参与,但却收到了负面答复。项目经理下一步该怎么做?___
A. 与其他项目经理协商,提前让出该项目人员。
B. 聘用一名拥有类似技能集的外部承包商来支持实施。
C. 利用管理层的影响来获得这名项目人员的时间。
D. 在项目风险登记册中记录该风险,并制定一份风险减轻计划。
【单选题】
AMA169当新进公司的发起人B替代A时,项目已接近完工,项目经理首先应该怎么做?___
A. 与发起人B会面,确定是否需要任何项目变更
B. 根据发起人A的目标完成项目
C. 开始变更控制
D. 更新相关方登记册
【单选题】
AMA170在项目执行阶段之前,一名新项目经理被任命管理项目,前任项目经理在完成交接工作之前就已辞职,新项目经理需要了解项目开展的目的和理由。下列哪一份文件将为新项目经理提供该信息?___
A. 商业文件
B. 项目管理计划
C. 项目进度基准
D. 项目章程
【单选题】
AMA171什么时候应该寻求项目可接受成果的正式验收?___
A. 在交付成果安装在客户系统之前
B. 在可交付成果安装在客户系统之后,
C. 在项目经理证明所有客户需求均已满足之后。
D. 在项目经理汇报所有客户需求均已满足之后。
【单选题】
AMA172项目经理接管一个执行阶段的项目,在对项目进度进行初步审查期间,项目经理注意到与特定关键路径活动有关的信息不完整,有些活动还存在风险。项目经理如何才能确定每项活动的责任?___
A. 工作分解结构
B. 责任分配矩阵
C. 组织分解结构
D. 风险登记册
【单选题】
AMA173下面哪一个选项最好的描述了属性样本以及变量样本?___
A. 属性样本与预防有关,而变量样本与监督有关
B. 属性样本与一致性有关,而变量样本与一致性的程度有关
C. 属性样本与具体原因有关,而变量样本与任何原因有关
D. 两者是同一概念
【单选题】
AMA174为了创建项目进度计划,项目经理估算资源活动制约因素。全球项目团队成员在不同的时区并遵循不同的节假日。另外,团队成员被分配到多个不同项目。若要更好的理解资源制约因素以及对项目的影响,项目经理应该怎么做?___
A. 创建资源分解结构。
B. 执行蒙特卡洛分析。
C. 执行资源储备分析。
D. 创建资源日历。
【单选题】
AMA175一家公司的组织形式是每个职能经理负责各自的项目部分。在这种类型的组织中,项目经理的典型角色是什么?___
A. 协调员和联络员
B. 分包商
C. 主管
D. 项目组合经理
【单选题】
AMA176在执行一个实施法规变更的项目时,根据专业技术专家的建议,项目经理发现新流程不符合法规指导方针。一个项目变更要求额外的资源,否则项目会受到的负面影响。项目经理首先应该怎么做?___
A. 更新项目质量管理计划
B. 评估变更,并提交更新的资源计划以供批准。
C. 修改沟通管理计划
D. 进行成本效益分析
【单选题】
AMA177两个互不相关的低影响风险同时发生,使项目进度受到了危害。项目经理接下来应该怎么做?___
A. 赶工
B. 创建一份项目变更请求
C. 上报给项目发起人
D. 查阅风险管理计划
【单选题】
AMA178一项目经理正在解决两名团队成员间的纠纷。一个人说系统应在测试之前集成,另一个说每个系统应该在集成之前分别测试。该项目包含30个人,要集成12个系统。出资人要求集成要按时。项目经理应该怎么说能够最好的解决这个冲突?___
A. 按我说的方法做
B. 让我们冷静下来,把工作做完
C. 我们先都冷静一下,下周再来处理
D. 让我们集成之前先部分测试,集成之后再全部测试
【单选题】
AMA179完成定义范围过程后,项目经理应该使用哪项技术来生成可靠估算并管理成本和活动历时。___
A. 分解
B. 紧前关系绘图法
C. 挣值管理
D. 确立基准
【单选题】
AMA180项目A的交付取决于项目B,项目A的项目经理发现项目B提交了一项变更请求,这会使项目B推迟两个月。项目A的项目经理下一步该怎么做?___
A. 与项目B的项目经理协商拒绝项目B的变更请求。
B. 审查项目A的风险应对计划,获得风险减轻措施。
C. 创建一项变更请求,反映项目A后续的进度偏移。
D. 要求项目A的项目发起人干预
【单选题】
AMA181项目经理正在向管理层汇报,确定出一个负的进度偏差和正的成本偏差。下列哪一项结论是合理的?___
A. 项目落后于进度,但是可以通过增加资源赶上进度
B. 项目超前于进度,但是超出预算,需要进一步调查
C. 项目落后于进度,超出预算,并引发特别关注
D. 项目超前于进度,低于预算,进展无明显事件
【单选题】
AMA182询问团队成员各自工作活动的时间估算,以及为每项活动讨论日历日期协议包含在哪一项?___
A. 制定进度计划
B. 控制进度
C. 定义活动
D. 估算活动持续时间
【单选题】
AMA183你负责一两年期的项目,该项目已经进行了一半,要在全国的外地办事处部署新技术。升级马上要完成时,一飓风造成了停电。当电力恢复时,所有的项目报告和历史数据都丢失了,没有办法找回。应该怎么做以减轻该风险?___
A. 买保险
B. 计划储备基金
C. 监测气象,建立应急计划
D. 在飓风期外安排安装工作
【单选题】
AMA184分包商的公司不能根据合同条款执行服务。项目经理接下来应该怎能做?___
A. 查看采购协议中的提前终止条款。
B. 与团队成员头脑风暴。
C. 更新风险管理计划。
D. 请求与项目发起人开会获得建议。
【单选题】
AMA185在以下哪种合同中,更容易进行合同范围变更?___
A. 固定价
B. 固定价加激励费
C. 成本加酬金
D. 以上都不是
【单选题】
AMA186项目范围已经核实,而且可交付成果已完成,并获得相关方的验收。根据这些可交付成果,组织过程资产和项目计划,项目经理接下来该做什么?___
A. 结束项目或阶段
B. 将绩效报告给团队
C. 安排项目启动大会
D. 开展质量保证审查
【单选题】
AMA187执行项目时,项目经理认识到其中一项任务的期限估计不足,下列哪项工具可以用来尽量减少影响?___
A. 规划风险应对
B. 快速跟进
C. 预测
D. 失效模式和影响分析
【单选题】
AMA188项目经理向客户提交可交付成果以供批准,客户称可交付成果没有达到验收标准,并要求项目经理对可交付成果进行返工,客户还希望查看返工进度的相关信息,项目经理接下来应该执行哪一项活动? ___
A. 配置识别
B. 配置状态记录
C. 配置控制
D. 配置核实与审计
【单选题】
AMA189项目经理接管了一个项目,该项目曾在范围管理方面存在挑战,项目变更控制计划要求项目发起人决定是否将变更纳入项目,若要减少当前项目范围的问题,项目经理应该建议下列哪一项?___
A. 由变更控制委员会来对变更做出最终决定
B. 由项目经理和发起人对变更做出最终决定
C. 由整个项目团队对变更做出最终决定
D. 仍由发起人对变更做出最终决定
【单选题】
AMA190在一个多阶段项目的中途,由于对该项目不再有组织上的需求,发起人终止了项目工作。下列哪种情况可以避免这个现象?___
A. 在制定项目管理计划时多花些精力
B. 正确制定项目商业论证
C. 在项目开始时分析法律要求
D. 更为详细地描述项目工作说明书
【单选题】
AMA191你的项目曾经很难获得项目管理计划的正式批准,因为项目相关方太多了,他们的要求不能放在项目里。这些项目相关方拖延项目,他们一次次的讨论他们的要求。项目最终得到了批准,于6个月前启动。下列哪项不是好的预防措施?___
A. 记录哪些要求没有放在项目里
B. 确实项目相关方没有用变更控制过程作为手段把之前的要求加回项目里
C. 使用问题登记簿
D. 会见项目相关方,重申不能放在项目里的工作