【单选题】
The vSphere administrator is configuring directory services for an ESXi host: What should the vSphere administrator do to configure the host to use CAM services? ___
A. Check the Use vSphere Authentication Proxy checkbox.
B. Set Select Directory Service Type to CAM services.
C. Specify CAM$ for the
D. omain.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
A
解析
暂无解析
相关试题
【单选题】
Which statement is true regarding the licensing of vCenter Server? ___
A. The license for vCenter Server must be provided at the time of installation.
B. Changing the license assigned to vCenter Server requires a restart of the vCenter Server service.
C. Virtual machines can still be powered on if the vCenter Server license expires.
D. Licensing for a single vCenter Server installation is determined by the number of managed virtual machines.
【单选题】
When configuring vSphere Replication for a virtual machine, what is the lowest Recovery Point Objective (RPO) that can be selected? ___
A. 1 min
B. 5 min
C. 10 min
D. 15min
【单选题】
A developer needs to create a multi-tier development stack for a home lab. Which vSphere product will support the architecture required for the least software cost? ___
A. vSphere Hypervisor
B. vSphere Essentials
C. VMware Player
D. VMware Workstation
【单选题】
An administrator is installing Windows into a virtual machine. The DVD has been mounted on the Host and configured for the virtual machine as shown in the Exhibit. Based on the exhibit, when the virtual machine is booted, why would it attempt to search for a PXE server? ___
A. The CD/DVD device is not connected.
B. The ISO is in the incorrect storage location.
C. The OS minimum requirements have not been met.
D. The CD/DVD device is not set to Client Device.
【单选题】
What component must be installed prior to deploying a vCenter Server in vSphere 6.x? ___
A. vCenter Identity Services
B. Platform Services Controller
C. vCenter Single Sign-On
D. Client Integration Plug-In
【单选题】
What is a valid plug-in status for a plug-in that has been added to a vSphere client? ___
A. Disabled
B. Unknown
C. Stopped
D. Installed
【单选题】
Users of an application are reporting performance issues. The following performance values are observed in the vSphere Web Client: <Host CPU utilization is 90%> <Virtual Machine memory utilization is consistently greater than 90% CPU Ready values are higher than 20%> What could be the cause of the application performance issue? ___
A. The host is lacking the CPU resources required to meet the demand.
B. The host is lacking the memory resources required to meet the demand.
C. The virtual machine is lacking the CPU resources required to meet the demand.
D. The virtual machine is lacking the memory resources required to meet the demand.
【单选题】
An administrator creates an ESXi cluster using vSphere Auto Deploy. The ESXi hosts are configured to get a management IP address from a DHCP server. The administrator needs to troubleshoot the management network on one of the hosts. Which DCUI option should the administrator use to renew the DHCP lease? ___
A. Restart Management Network
B. Restore Network Settings
C. Test Management Network
D. Configure Management Network
【单选题】
An administrator is re-provisioning an ESXi host and moving it to another datacenter. Which DCUI option should the administrator use to revert the system configuration to the default settings? ___
A. Reset System Configuration
B. Rebuild Default System Configuration
C. Revert System Configuration
D. Renew Default System Configuration
【单选题】
An administrator has just completed installing an ESXi 6.x host, but doesn't know what address has been configured. Where is the ESXi host IP address configured? ___
A. RVC console
B. Direct Console User Interface
C. vSphere Web Client
D. vSphere Client
【单选题】
When is it possible to place a VMFS5 datastore in maintenance mode? ___
A. When it is a member of a Storage DRS cluster
B. When it is a member of Virtual SAN cluster
C. When it is a member of a multi-extent datastore
D. When it is a member of a Virtual Volume
【单选题】
Immediately after installing ESXi, an administrator observes that the Configure Lockdown Mode option is grayed out in the Direct Console User Interface (DCUI). What is the most likely explanation? ___
A. The host has not yet been added to a vCenter Server.
B. The BIOS on the host does not have NX/XD enabled.
C. The ESXi host is running in evaluation mode.
D. The host requires a reboot before this feature is available.
【单选题】
Immediately after installing ESXi, an administrator observes that the Configure Lockdown Mode option is grayed out in the Direct Console User Interface (DCUI). What is the most likely explanation? ___
A. The host has not yet been added to a vCenter Server.
B. The BIOS on the host does not have NX/XD enabled.
C. The ESXi host is running in evaluation mode.
D. The host requires a reboot before this feature is available.
【单选题】
Which Single Sign-On deployment mode should an administrator use for two 6.x vCenter Servers configured with linked mode? ___
A. Basic Single Sign-On with vCenter Server Heartbeat
B. Multisite Single Sign-On
C. Basic Single Sign-On
D. Single Sign-On with Linked Mode
【单选题】
What is required when changing a virtual machine name using the vSphere Web Client? ___
A. Verify connectivity to the ESXi host where the virtual machine is running and its inventory list is accessible.
B. Verify in which datastore the virtual machine resides and that you have access and its inventory list is accessible.
C. Verify that virtual machine files are stored in the same datastore and can be accessed in the datastore browser list.
D. Verify the virtual machine is not running in Fault Tolerant mode and that it is not in a Distributed Resource Scheduler cluster.
【单选题】
An administrator deploys vRealize Operations into a vSphere 6.x environment. After the deployment, the administrator notices that badges are not appearing. What is a likely cause of this behavior? ___
A. Badges do not appear until you register vRealize Operations with vCenter Server.
B. Badges do not appear until you register a vCenter Server in vRealize Operations.
C. The vRealize Operations appliance needs to be redeployed.
D. The vCenter Server appliance needs to be redeployed.
【单选题】
How are ports scaled on vSphere Standard Switches (vSS)? ___
A. Ports on a vSS can be dynamically scaled up and down.
B. Ports on a vSS can only be statically scaled up or down.
C. Ports on a vSS can only be dynamically scaled down.
D. Ports on a vSS can only be dynamically scaled up.
【单选题】
A High Availability (HA) cluster is configured to respond to a given number of host failures. The cluster contains virtual machines configured with these settings: VM1 has a 1GHz CPU reservation and no Memory reservation VM2 has a 2GHz CPU reservation and no Memory reservation VM3 has no CPU reservation and no Memory reservation . Given this information, what is the correct slot size for the cluster? ___
A. The CPU Reservation should be set to 32MHz and the memory reservation should be set to 32MB plus memory overhead.
B. The CPU reservation should be set to 1 GHz and the memory reservation should be set to 0MB plus memory overhead.
C. The CPU reservation should be set to 2 GHz, and the memory reservation should be set to 0MB plus the virtual machine memory overhead.
D. The CPU reservation should be set to 2 GHz, and the memory reservation should be set to 32MB, plus the virtual machine memory overhead.
【单选题】
An administrator is planning a vSphere infrastructure with the following specific networking requirements: <The ability to shape inbound (RX) traffic> <Support for Private VLANs (PVLANs)> <Support for LLDP (Link Layer Discovery Protocol)>. What is the minimum vSphere Edition that will support these requirements? ___
A. vSphere Essentials Plus
B. vSphere Standard
C. vSphere Enterprise
D. vSphere
E. nterprise Plus
【单选题】
When you add an ESXi 6.x host to a new Cluster, which vSphere object owns the CPU and Memory resources of the hosts? ___
A. vCenter Server
B. Datacenter
C. Cluster
D. Host
【单选题】
A user is trying to retrieve objects from a SharePoint server and finds the request is taking an excessive amount of time. An administrator tries to isolate the issue and notes the following: Application performance is poor when compared to virtual machines on other hosts. Performance improves when the virtual machine is moved to another host. The virtual machine encounters higher than expected CPU %Ready times. What conclusion can be reached regarding the performance issues for this virtual machine? ___
A. Host Power Management is directly impacting virtual machine performance.
B. The virtual machine has a large number of snapshots.
C. The Path Selection Policy for the storage device is set differently on the affected host.
D. Network I/O control is configured for the portgroup.
【单选题】
A virtual machine template is accidently removed from the vCenter Server Inventory. Which method would be used to recover the template back into the environment?___
A. Use the datastore browser to locate the template, then right click and add the .vmtx file to inventory.
B. Use the datastore browser to locate the template, then right click and add the .vmx file to inventory.
C. Using the Managed Object Browser and adding the template from the ManagedObjectReference:GuestFileManager object.
D. Using the Managed Object Browser and adding the template from the ManagedObjectReference:VirtualDiskManager object.
【单选题】
A vSphere administrator needs to backup a virtual machine that has a Microsoft SQL Server Database installed. Which solution allows for an application quiesce to occur during backup?___
A. VMware vCenter Converter
B. VMware vCenter Site Recovery Manager
C. VMware vSphere Replication
D. VMware vSphere Data Protection Advanced
【单选题】
An administrator is migrating a virtual machine from a Test cluster to a Production cluster. The two environments do not have any shared storage. What is the easiest way to accomplish this task? ___
A. Perform a Storage vMotion.
B. Perform a regular vMotion.
C. Perform a Virtual to Virtual migration.
D. Perform a backup and restore using VMware Data Protection.
【单选题】
An administrator must determine an appropriate backup solution, given these conditions: 50 of the virtual machines are in a resource pool named Finance. 50 of the virtual machines are in a resource pool named QA. Which solution allows an administrator the ability to backup 100 virtual machines? ___
A. Use Snapshot Manager on the vCenter Server to backup the virtual machines.
B. Use the VMware Consolidated Backup (vcb) tool on the ESXi Host to backup the virtual machines.
C. Use the VMware Data Recovery (VDR) Appliance on the vCenter Server to backup the virtual machines.
D. Use the VMware Data Protection (VDP) Appliance on one of the
E. SXi Hosts to backup the virtual machines.
【单选题】
What is a benefit of using Enhanced vMotion Compatibility for an environment? ___
A. EVC masks CPU features to allow compatibility between hosts that are dissimilar.
B. EVC allows for cross platform vMotion to occur.
C. EVC enables Long
D. istance vMotion.
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
An administrator needs to verify that vMotion operations can be performed in a vSphere data center.What round trip time (RTT) latency is the maximum value that will allow vMotion operations to succeed? ___
A. 50ms RTT
B. 100ms RTT
C. 150ms RTT
D. 200ms RTT
【单选题】
A storage administrator has reported that full utilization of all bandwidth from an ESXi 6.x host is not being seen. In troubleshooting the issue, the Adapter details are shown in the Exhibit. Based on the exhibit, what is cause of the issue? ___
A. The array is not setup to use the correct multipathing policy.
B. There are no virtual machines on the ESXi host.
C. Not all links are used because a path is disabled.
D. Another path needs to be configured.
【单选题】
An administrator is migrating a powered-on virtual machine, as shown in the exhibit. Which option should be selected to perform a Storage vMotion of the VM? ___
A. Change storage only
B. Change VM compute resource only
C. Change both compute resource and storage, changing the compute resource first.
D. Change both compute resource and storage, changing the storage resource first.
【单选题】
An administrator is attempting to enable Storage I/O Control on a datastore, but it is failing. What is the likely reason for this failure? ___
A. The host is connected to a datastore is running on ESX 4.0.
B. The host is connected to a Fibre Channel storage array.
C. The datastore has multiple extents.
D. The datastore is managed by a single vCenter Server.
【单选题】
A mission-critical virtual machine built on vSphere 4.1 needs to be moved to an ESXi 6.x host.Which virtual hardware version is needed to move the virtual machine without upgrading? ___
A. 6
B. 7
C. 10
D. 11
【单选题】
An administrator is analyzing a virtual machine as shown in the Exhibit. What is the current long term risk for this virtual machine? ___
A. The virtual machine may run out of memory before April 27.
B. The virtual machine may continue to function after April 27.
C. The virtual machine has adequate memory configured for operation for the next 120 days.
D. The virtual machine has adequate memory reservation configured for operation for the next 120 days.
【单选题】
An administrator is monitoring a High Availability (HA) and Distributed Resource Scheduler (DRS) enabled cluster and has noticed that virtual machines in the cluster are being migrated without user intervention. Why is this happening? ___
A. The DRS Automation level is set to Fully Automated.
B. The Automation level is set to Automatic.
C. The
D. PM Threshold is set to Aggressive.
【单选题】
An administrator attempts to migrate a suspended virtual machine to a newly deployed vSphere 6.x cluster. The compatibility check fails. What condition could cause this behavior?___
A. The new vSphere 6.x cluster is running Intel CPUs instead of AMD CPUs.
B. A suspended virtual machine cannot be migrated.
C. The hardware virtualization feature of the CPU is not enabled on the new hosts.
D. A vSphere Distributed Switch is required to migrate a suspended virtual machine.
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
【单选题】
An administrator has just configured the IP address on an ESXi host from the Direct Console User Interface. How can the configuration be validated as correct without any additional tools?___
A. Add the host to vCenter Server and if it works, then all networking settings are ok.
B. Select the Test Management Network option from the DCUI.
C. Connect to the host with the vSphere Client and click the Test Network option.
D. Use PowerCLI to connect to the host and initiate a network test.
【单选题】
An administrator is installing vCenter Server for an environment that has 40 ESXi 6.x Hosts and 150 virtual machines. Which database would meet the minimal requirements needed for this task? ___
A. vFabric Postgres
B. Microsoft SQL Express 2008
C. Microsoft SQL Server 2014
D. Oracle 11g
推荐试题
【多选题】
超越本单位资质等级承揽工程的,责令( );情节严重的,吊销资质证书;有违法所得的,予以没收。
A. 停止违法行为
B. 处以罚款
C. 可以责令停业整顿
D. 降低资质等级
E. 吊销资质证书
【多选题】
《中华人民共和国建筑法》规定,对在工程承包中行贿的承包单位,除依照前款规定处罚外,可以( )。
A. 罚款
B. 责令停业整顿
C. 降低资质等级
D. 吊销资质证书
E. 追究刑事责任
【多选题】
《中华人民共和国建筑法》规定,建设单位违反本法规定,要求建筑设计单位或者建筑施工企业违反建筑工程质量、安全标准,降低工程质量的,( );构成犯罪的,依法追究刑事责任。
A. 责令停工整顿
B. 责令改正
C. 可以处以罚款
D. 降低资质等级
E. 追究刑事责任
【多选题】
《中华人民共和国建筑法》规定,违反本法规定,对不具备相应资质等级条件的单位颁发该等级资质证书的,由其上级机关责令收回所发的资质证书,对( )给予行政处分;构成犯罪的,依法追究刑事责任。
A. 主要负责人
B. 分管负责人
C. 直接负责的主管人员
D. 其他直接责任人员
E. 有关所有人员
【多选题】
《中华人民共和国建筑法》规定,( )人民政府确定的小型房屋建筑工程的建筑活动,参照本法执行。
A. 省
B. 自治区
C. 直辖市
D. 县
E. 乡镇
【多选题】
深入贯彻党的十九大精神,全面落实党中央、国务院关于安全生产的决策部署,牢固树立安全发展理念,坚守发展决不能以牺牲安全为代价这条不可逾越的红线,以防范和遏制电力建设施工重特大事故为重点,坚持( )的方针,按照“管行业必须管安全、管业务必须管安全、管生产经营必须管安全”的要求,着力强化企业安全生产主体责任,切实增强安全防范治理能力,为经济社会发展提供强有力的电力建设安全保障。
A. 安全第一
B. 预防为主
C. 综合治理
D. 质量第一
【多选题】
专项治理范围包括( )、核电(除核岛外)等发电建设工程和输电、配电等电网建设工程,特别要重点治理复杂地质条件下各类电力隧道工程项目。
A. 火电
B. 水电
C. 风电
D. 太阳能发电
【多选题】
专项治理重点内容重点治理施工现场包括以下方面的违法违规行为和事故隐患( )。
A. 安全教育培训。教育培训制度建立、作业人员三级安全教育培训和考核、施工管理人员年度安全教育培训等情况
B. 专项施工方案。施工组织设计中的安全技术措施、危险性较大分部分项工程专项施工方案编制、方案审核论证审批等情况
C. 安全技术交底。施工负责人对相关管理人员及施工作业人员书面安全技术交底、交底内容针对性及操作性等情况
D. 现场安全管理。对分包单位带班管理、设备设施安全管理、洞口及临边防护、人员持证上岗等情况
E. 应急管理。应急预案制定、应急救援组织及人员、应急救援器材和设备、定期应急演练等情况
【多选题】
各单位要结合岗位职责和工作实际,制定电力建设工程安全专项治理行动实施方案,进一步明确,细化专项治理( ),做好前期准备和动员部署。
A. 范围
B. 重点
C. 步骤
D. 措施
E. 要求
【多选题】
企业是安全生产的责任主体,对本单位安全生产工作负全面责任,要严格履行安全生产法定责任,实行全员安全生产责任制度,健全自我约束、持续改进的常态化机制。要健全法定代表人和实际控制人同为安全生产第一责任人的责任体系,建立并完善电力安全生产保证体系和监督体系,建立全过程安全生产管理制度,做到( )、( )、( )、( )和应急救援“五到位”。
A. 安全保障
B. 安全责任
C. 管理
D. 投入
E. 培训
【多选题】
地方各级政府电力管理等有关部门按照“( )、( )、( )”的原则,履行地方电力安全管理责任,加强电力安全生产管理。
A. 管行业必须管安全
B. 管业务必须管安全
C. 管生产经营必须管安全
D. 管施工必须管安全
【多选题】
牢固树立安全发展、科学发展理念,加强电力安全监管体系建设,逐步理顺电力行业跨区域监管体制,明确( )、( )与( )职责,鼓励有条件的地区先行先试。
A. 政府监管
B. 行业监管
C. 区域监管
D. 地方监管
【多选题】
国家能源局依法依规履行电力行业安全监管职责,( )、( )和( )全国电力安全生产监管工作。
A. 组织
B. 指导
C. 指挥
D. 协调
【多选题】
规范电力事故事件及相关信息的报送工作,畅通报送渠道,确保及时、准确、完整。对于( )、( )、( )、( )事故的单位和个人,依法依规予以处理。
A. 瞒报
B. 谎报
C. 漏报
D. 迟报
【多选题】
充分应用现代信息化技术,适应大数据时代流程再造,实施“互联网+安全监管”战略,实现监管手段创新,完善( )、( )、( )“三位一体”管理网络,实现流程和模式创新。
A. 监督检查
B. 责任落实
C. 数据分析
D. 人员行为
【多选题】
健全安全风险辨识评估机制,构建( )、( )、( )、( )和管控的闭环管理体系,建立健全风险清册或台账,确定管控重点,实行风险分类分级管理,加强新材料、新工艺、新业态安全风险评估和管控,有效实施风险控制。
A. 风险辨识
B. 评估
C. 预警
D. 预防
E. 防范
【多选题】
各企业要研究制定重特大事故风险管控措施,根据作业场所、( )、( )、( )及人员能力等,认真辨识风险及危害程度,合理确定作业定员、时间等组织方案,实行分级管控,落实分级管控责任。
A. 作业内容
B. 任务
C. 环境
D. 强度
【多选题】
加强安全危险因素分析,制定落实电力安全措施和反事故措施计划,形成安全隐患( )、( )、( )的闭环管理长效机制。
A. 排查
B. 整改
C. 治理
D. 消除
【多选题】
针对电力安全生产过程中存在的突出问题和薄弱环节,进一步规范电力安全生产监督管理,从( )、作业流程控制、( )、( )等方面,明确必须坚决禁止的行为,避免和减少事故的发生。
A. 人员资格
B. 安全措施管控
C. 安全生产条件
D. 安全生产管理
【多选题】
加强设备( )、( )和( ),完善设备安全监视与保护装置。
A. 状态监测
B. 设备维护
C. 设备养护
D. 巡视检查
【多选题】
加强参建单位资质和人员资格审查,严厉查处( )、( )、( )等各类违法违规行为。
A. 租借资质
B. 违规挂靠
C. 弄虚作假
D. 代签字
【多选题】
坚持统筹谋划,做好顶层设计,推进网络安全技术布防建设。按照“安全分区、( )、( )、( )”要求,做好电力监控系统的安全防护。
A. 网络专用
B. 专网专用
C. 横向隔离
D. 纵向认证
【多选题】
推动应急演练常态化,创新演练模式,逐步实现桌面推演与( )、专项演练与( )、常态化演练与( )相结合。
A. 现场演练
B. 实战演练
C. 综合演练
D. 示范性演练
【多选题】
强化企业班组建设,实现安全管理、( )、( )和( )的标准化,提升企业本质安全水平。
A. 操作行为
B. 设备设施
C. 安全防护
D. 作业环境
【多选题】
要将外包单位( )、( )、( )等纳入本单位从业人员统一管理,对其进行岗位安全操作规程和安全操作技能教育培训。
A. 从业人员
B. 作业人员
C. 劳务派遣人员
D. 实习人员
【多选题】
根据《国家电网有限公司基建安全管理规定》,下列关于国网基建部管理职责说法正确的是( )。
A. 制订公司基建安全管理制度、技术标准
B. 确定公司基建安全管理目标
C. 参与基建安全事件的调查处理工作
D. 监督、检查工程项目安全文明施工费的使用
【多选题】
根据《国家电网有限公司基建安全管理规定》,下列关于省公司建设部管理职责说法正确的是( )。
A. 负责本单位及所属企业的基建安全管理工作
B. 建立基建安全管理体系
C. 组织在建项目推进基建安全管理标准化工作
D. 制订工程项目实现安全管理目标的保证措施
E. 参与本单位基建安全事件的调查处理工作
【多选题】
根据《国家电网有限公司基建安全管理规定》,下列关于业主项目部管理职责说法正确的是( )。
A. 组织监理、施工项目部落实相应的安全职责
B. 参加工程项目安委会,组织相关参建单位落实安委会会议决定
C. 备案施工分包资料,监督施工项目部对分包安全的全过程管理
D. 审批安全文明施工设施进场验收单,并监督现场使用情况
E. 组织安全检查活动,监督安全隐患闭环整改
【多选题】
根据《国家电网有限公司基建安全管理规定》,下列关于监理项目部管理职责说法正确的是( )。
A. 编制监理规划,明确安全监理工作要求和安全旁站监理工作计划
B. 督促施工项目部开展安全教育培训工作
C. 审查特种作业人员资格,监督其持证上岗
D. 对重要设施和重大转序进行安全检查签证
E. 审批安全文明施工设施进场验收单,并监督现场使用情况
【多选题】
根据《国家电网有限公司基建安全管理规定》,下列关于施工项目部管理职责说法正确的是( )。
A. 按照国家和公司有关规定提取安全文明施工费
B. 按规定配备专职安全管理人员
C. 组织开展安全教育培训
D. 完善安全技术交底和施工队班前站班会机制
E. 开展应急教育培训和应急演练
【多选题】
根据《国家电网有限公司基建安全管理规定》,下列关于国网公司基建安全管理目标说法正确的是( )。
A. 不发生三级及以上人身事件
B. 不发生基建原因引起的二级及以上电网及设备事件
C. 不发生有人员责任的重大火灾事故
D. 不发生负主要责任的重大交通事故
【多选题】
根据《国家电网有限公司基建安全管理规定》,下列关于省级单位基建安全管理目标说法正确的是( )。
A. 不发生四级及以上人身事件
B. 不发生基建原因引起的二级及以上电网及设备事件
C. 不发生有人员责任的较大火灾事故
D. 不发生较大环境污染事件
【多选题】
根据《国家电网有限公司基建安全管理规定》,下列关于建设管理单位基建安全管理目标说法正确的是( )。
A. 不发生三级及以上人身事件
B. 不发生基建原因引起的五级及以上电网及设备事件
C. 不发生有人员责任的一般火灾事故
D. 不发生一般环境污染事件
【多选题】
根据《国家电网有限公司基建安全管理规定》,下列关于监理企业基建安全管理目标说法正确的是( )。
A. 不发生因监理责任造成的五级及以上事件
B. 不发生有人员责任的较大火灾事故
C. 不发生本企业有责任的重大交通事故
D. 不发生六级及以上基建信息安全事件
【多选题】
根据《国家电网有限公司基建安全管理规定》,下列关于施工企业基建安全管理目标说法正确的是( )。
A. 不发生五级及以上人身事件
B. 不发生因施工原因造成的五级及以上电网及设备事件
C. 不发生有人员责任的一般火灾事故
D. 不发生本企业有责任的一般交通事故
【多选题】
根据《国家电网有限公司基建安全管理规定》,下列关于工程项目安全管理目标说法正确的是( )。
A. 不发生六级及以上人身事件
B. 不发生因工程建设引起的六级及以上电网及设备事件
C. 不发生火灾事故
D. 不发生负主要责任的较大交通事故
【多选题】
根据《国家电网有限公司基建安全管理规定》,下列关于安全标准化管理说法正确的是( )。
A. 业主项目部分阶段拨付安全文明施工费给施工项目部使用
B. 监理项目部履行监督职责,参与安全文明施工设施进场验收
C. 施工项目部按规定使用安全文明施工费,确保专款专用
D. 省级公司组织安全文明施工检查
【多选题】
根据《国家电网有限公司基建安全管理规定》,下列关于施工分包安全管理说法正确的是( )。
A. 业主项目部考核评价工程项目各参建单位分包管理工作
B. 监理项目部动态核查进场分包队伍的人员配备
C. 施工企业应与分包商签订规范的分包合同及安全协议
D. 施工项目部对分包队伍施工活动组织安全检查
【多选题】
根据《国家电网有限公司基建安全管理规定》,基建安全检查可分为( )等方式。
A. 例行检查
B. 专项检查
C. 随机检查
D. 安全巡查
【多选题】
根据《国家电网有限公司基建安全管理规定》,下列关于安全检查说法正确的是( )。
A. 省级公司每年组织不少于两次基建安全责任量化考核
B. 省级公司每季度开展安全责任量化考核
C. 工程项目安委会每月度至少组织开展一次安全检查
D. 业主项目部每月至少进行一次安全检查