What must be enabled to ensure that VM Component Protection (VMCP) works in a High Availability cluster? ___
A. VMware Tools Virtual Machine Communication Interface (VMCI)
B. Fault Tolerance
C. Atomic Test and Set (ATS)
D. All Paths Down (APD) Timeout
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
D
解析
暂无解析
相关试题
【单选题】
An administrator wants to add a web server to an existing multi-tier application consisting of three virtual machines: <A web server> <A database server An application server> The web server should be added to the application when the primary web server reaches: <70% vCPU utilization> <55% active memory> Which option will achieve this result? ___
A. Create a virtual machine alarm with an action to run a script that starts a new instance of the web server.
B. Create a host cpu and memory alarm with an action to run a script that starts a new instance of the webserver.
C. Configure HA application monitoring for the web server and set it to trigger deployment of a new instance of the web server.
D. Configure Fault Tolerance on the virtual machine and leave the secondary machine disabled until needed.
【单选题】
An administrator has an application that requires connection directly to PCI devices through a virtual machine. What is a limitation of this configuration? ___
A. Devices must be reserved for PCI passthrough on at least one host on which the virtual machine will run.
B. Snapshots are not supported with DirectPath I/O passthrough devices.
C. A maximum of 18 PCI vSphere
D. irectPath devices can be added to a virtual machine.
【单选题】
The vSphere administrator is configuring directory services for an ESXi host: What should the vSphere administrator do to configure the host to use CAM services? ___
A. Check the Use vSphere Authentication Proxy checkbox.
B. Set Select Directory Service Type to CAM services.
C. Specify CAM$ for the
D. omain.
【单选题】
Which statement is true regarding the licensing of vCenter Server? ___
A. The license for vCenter Server must be provided at the time of installation.
B. Changing the license assigned to vCenter Server requires a restart of the vCenter Server service.
C. Virtual machines can still be powered on if the vCenter Server license expires.
D. Licensing for a single vCenter Server installation is determined by the number of managed virtual machines.
【单选题】
When configuring vSphere Replication for a virtual machine, what is the lowest Recovery Point Objective (RPO) that can be selected? ___
A. 1 min
B. 5 min
C. 10 min
D. 15min
【单选题】
A developer needs to create a multi-tier development stack for a home lab. Which vSphere product will support the architecture required for the least software cost? ___
A. vSphere Hypervisor
B. vSphere Essentials
C. VMware Player
D. VMware Workstation
【单选题】
An administrator is installing Windows into a virtual machine. The DVD has been mounted on the Host and configured for the virtual machine as shown in the Exhibit. Based on the exhibit, when the virtual machine is booted, why would it attempt to search for a PXE server? ___
A. The CD/DVD device is not connected.
B. The ISO is in the incorrect storage location.
C. The OS minimum requirements have not been met.
D. The CD/DVD device is not set to Client Device.
【单选题】
What component must be installed prior to deploying a vCenter Server in vSphere 6.x? ___
A. vCenter Identity Services
B. Platform Services Controller
C. vCenter Single Sign-On
D. Client Integration Plug-In
【单选题】
What is a valid plug-in status for a plug-in that has been added to a vSphere client? ___
A. Disabled
B. Unknown
C. Stopped
D. Installed
【单选题】
Users of an application are reporting performance issues. The following performance values are observed in the vSphere Web Client: <Host CPU utilization is 90%> <Virtual Machine memory utilization is consistently greater than 90% CPU Ready values are higher than 20%> What could be the cause of the application performance issue? ___
A. The host is lacking the CPU resources required to meet the demand.
B. The host is lacking the memory resources required to meet the demand.
C. The virtual machine is lacking the CPU resources required to meet the demand.
D. The virtual machine is lacking the memory resources required to meet the demand.
【单选题】
An administrator creates an ESXi cluster using vSphere Auto Deploy. The ESXi hosts are configured to get a management IP address from a DHCP server. The administrator needs to troubleshoot the management network on one of the hosts. Which DCUI option should the administrator use to renew the DHCP lease? ___
A. Restart Management Network
B. Restore Network Settings
C. Test Management Network
D. Configure Management Network
【单选题】
An administrator is re-provisioning an ESXi host and moving it to another datacenter. Which DCUI option should the administrator use to revert the system configuration to the default settings? ___
A. Reset System Configuration
B. Rebuild Default System Configuration
C. Revert System Configuration
D. Renew Default System Configuration
【单选题】
An administrator has just completed installing an ESXi 6.x host, but doesn't know what address has been configured. Where is the ESXi host IP address configured? ___
A. RVC console
B. Direct Console User Interface
C. vSphere Web Client
D. vSphere Client
【单选题】
When is it possible to place a VMFS5 datastore in maintenance mode? ___
A. When it is a member of a Storage DRS cluster
B. When it is a member of Virtual SAN cluster
C. When it is a member of a multi-extent datastore
D. When it is a member of a Virtual Volume
【单选题】
Immediately after installing ESXi, an administrator observes that the Configure Lockdown Mode option is grayed out in the Direct Console User Interface (DCUI). What is the most likely explanation? ___
A. The host has not yet been added to a vCenter Server.
B. The BIOS on the host does not have NX/XD enabled.
C. The ESXi host is running in evaluation mode.
D. The host requires a reboot before this feature is available.
【单选题】
Immediately after installing ESXi, an administrator observes that the Configure Lockdown Mode option is grayed out in the Direct Console User Interface (DCUI). What is the most likely explanation? ___
A. The host has not yet been added to a vCenter Server.
B. The BIOS on the host does not have NX/XD enabled.
C. The ESXi host is running in evaluation mode.
D. The host requires a reboot before this feature is available.
【单选题】
Which Single Sign-On deployment mode should an administrator use for two 6.x vCenter Servers configured with linked mode? ___
A. Basic Single Sign-On with vCenter Server Heartbeat
B. Multisite Single Sign-On
C. Basic Single Sign-On
D. Single Sign-On with Linked Mode
【单选题】
What is required when changing a virtual machine name using the vSphere Web Client? ___
A. Verify connectivity to the ESXi host where the virtual machine is running and its inventory list is accessible.
B. Verify in which datastore the virtual machine resides and that you have access and its inventory list is accessible.
C. Verify that virtual machine files are stored in the same datastore and can be accessed in the datastore browser list.
D. Verify the virtual machine is not running in Fault Tolerant mode and that it is not in a Distributed Resource Scheduler cluster.
【单选题】
An administrator deploys vRealize Operations into a vSphere 6.x environment. After the deployment, the administrator notices that badges are not appearing. What is a likely cause of this behavior? ___
A. Badges do not appear until you register vRealize Operations with vCenter Server.
B. Badges do not appear until you register a vCenter Server in vRealize Operations.
C. The vRealize Operations appliance needs to be redeployed.
D. The vCenter Server appliance needs to be redeployed.
【单选题】
How are ports scaled on vSphere Standard Switches (vSS)? ___
A. Ports on a vSS can be dynamically scaled up and down.
B. Ports on a vSS can only be statically scaled up or down.
C. Ports on a vSS can only be dynamically scaled down.
D. Ports on a vSS can only be dynamically scaled up.
【单选题】
A High Availability (HA) cluster is configured to respond to a given number of host failures. The cluster contains virtual machines configured with these settings: VM1 has a 1GHz CPU reservation and no Memory reservation VM2 has a 2GHz CPU reservation and no Memory reservation VM3 has no CPU reservation and no Memory reservation . Given this information, what is the correct slot size for the cluster? ___
A. The CPU Reservation should be set to 32MHz and the memory reservation should be set to 32MB plus memory overhead.
B. The CPU reservation should be set to 1 GHz and the memory reservation should be set to 0MB plus memory overhead.
C. The CPU reservation should be set to 2 GHz, and the memory reservation should be set to 0MB plus the virtual machine memory overhead.
D. The CPU reservation should be set to 2 GHz, and the memory reservation should be set to 32MB, plus the virtual machine memory overhead.
【单选题】
An administrator is planning a vSphere infrastructure with the following specific networking requirements: <The ability to shape inbound (RX) traffic> <Support for Private VLANs (PVLANs)> <Support for LLDP (Link Layer Discovery Protocol)>. What is the minimum vSphere Edition that will support these requirements? ___
A. vSphere Essentials Plus
B. vSphere Standard
C. vSphere Enterprise
D. vSphere
E. nterprise Plus
【单选题】
When you add an ESXi 6.x host to a new Cluster, which vSphere object owns the CPU and Memory resources of the hosts? ___
A. vCenter Server
B. Datacenter
C. Cluster
D. Host
【单选题】
A user is trying to retrieve objects from a SharePoint server and finds the request is taking an excessive amount of time. An administrator tries to isolate the issue and notes the following: Application performance is poor when compared to virtual machines on other hosts. Performance improves when the virtual machine is moved to another host. The virtual machine encounters higher than expected CPU %Ready times. What conclusion can be reached regarding the performance issues for this virtual machine? ___
A. Host Power Management is directly impacting virtual machine performance.
B. The virtual machine has a large number of snapshots.
C. The Path Selection Policy for the storage device is set differently on the affected host.
D. Network I/O control is configured for the portgroup.
【单选题】
A virtual machine template is accidently removed from the vCenter Server Inventory. Which method would be used to recover the template back into the environment?___
A. Use the datastore browser to locate the template, then right click and add the .vmtx file to inventory.
B. Use the datastore browser to locate the template, then right click and add the .vmx file to inventory.
C. Using the Managed Object Browser and adding the template from the ManagedObjectReference:GuestFileManager object.
D. Using the Managed Object Browser and adding the template from the ManagedObjectReference:VirtualDiskManager object.
【单选题】
A vSphere administrator needs to backup a virtual machine that has a Microsoft SQL Server Database installed. Which solution allows for an application quiesce to occur during backup?___
A. VMware vCenter Converter
B. VMware vCenter Site Recovery Manager
C. VMware vSphere Replication
D. VMware vSphere Data Protection Advanced
【单选题】
An administrator is migrating a virtual machine from a Test cluster to a Production cluster. The two environments do not have any shared storage. What is the easiest way to accomplish this task? ___
A. Perform a Storage vMotion.
B. Perform a regular vMotion.
C. Perform a Virtual to Virtual migration.
D. Perform a backup and restore using VMware Data Protection.
【单选题】
An administrator must determine an appropriate backup solution, given these conditions: 50 of the virtual machines are in a resource pool named Finance. 50 of the virtual machines are in a resource pool named QA. Which solution allows an administrator the ability to backup 100 virtual machines? ___
A. Use Snapshot Manager on the vCenter Server to backup the virtual machines.
B. Use the VMware Consolidated Backup (vcb) tool on the ESXi Host to backup the virtual machines.
C. Use the VMware Data Recovery (VDR) Appliance on the vCenter Server to backup the virtual machines.
D. Use the VMware Data Protection (VDP) Appliance on one of the
E. SXi Hosts to backup the virtual machines.
【单选题】
What is a benefit of using Enhanced vMotion Compatibility for an environment? ___
A. EVC masks CPU features to allow compatibility between hosts that are dissimilar.
B. EVC allows for cross platform vMotion to occur.
C. EVC enables Long
D. istance vMotion.
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
An administrator needs to verify that vMotion operations can be performed in a vSphere data center.What round trip time (RTT) latency is the maximum value that will allow vMotion operations to succeed? ___
A. 50ms RTT
B. 100ms RTT
C. 150ms RTT
D. 200ms RTT
【单选题】
A storage administrator has reported that full utilization of all bandwidth from an ESXi 6.x host is not being seen. In troubleshooting the issue, the Adapter details are shown in the Exhibit. Based on the exhibit, what is cause of the issue? ___
A. The array is not setup to use the correct multipathing policy.
B. There are no virtual machines on the ESXi host.
C. Not all links are used because a path is disabled.
D. Another path needs to be configured.
【单选题】
An administrator is migrating a powered-on virtual machine, as shown in the exhibit. Which option should be selected to perform a Storage vMotion of the VM? ___
A. Change storage only
B. Change VM compute resource only
C. Change both compute resource and storage, changing the compute resource first.
D. Change both compute resource and storage, changing the storage resource first.
【单选题】
An administrator is attempting to enable Storage I/O Control on a datastore, but it is failing. What is the likely reason for this failure? ___
A. The host is connected to a datastore is running on ESX 4.0.
B. The host is connected to a Fibre Channel storage array.
C. The datastore has multiple extents.
D. The datastore is managed by a single vCenter Server.
【单选题】
A mission-critical virtual machine built on vSphere 4.1 needs to be moved to an ESXi 6.x host.Which virtual hardware version is needed to move the virtual machine without upgrading? ___
A. 6
B. 7
C. 10
D. 11
【单选题】
An administrator is analyzing a virtual machine as shown in the Exhibit. What is the current long term risk for this virtual machine? ___
A. The virtual machine may run out of memory before April 27.
B. The virtual machine may continue to function after April 27.
C. The virtual machine has adequate memory configured for operation for the next 120 days.
D. The virtual machine has adequate memory reservation configured for operation for the next 120 days.
【单选题】
An administrator is monitoring a High Availability (HA) and Distributed Resource Scheduler (DRS) enabled cluster and has noticed that virtual machines in the cluster are being migrated without user intervention. Why is this happening? ___
A. The DRS Automation level is set to Fully Automated.
B. The Automation level is set to Automatic.
C. The
D. PM Threshold is set to Aggressive.
【单选题】
An administrator attempts to migrate a suspended virtual machine to a newly deployed vSphere 6.x cluster. The compatibility check fails. What condition could cause this behavior?___
A. The new vSphere 6.x cluster is running Intel CPUs instead of AMD CPUs.
B. A suspended virtual machine cannot be migrated.
C. The hardware virtualization feature of the CPU is not enabled on the new hosts.
D. A vSphere Distributed Switch is required to migrate a suspended virtual machine.
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
推荐试题
【单选题】
槽钢底座、悬吊槽钢、绝缘横撑、悬垂吊柱、T型头螺栓等构件无变形、镀锌层完整;T型头螺栓应留有不少于___mm的调节余量(净空限制地段除外),所有外露螺栓长度应满足电气绝缘距离,静态值不小于150mm。
A. 10
B. 15、
C. 20
D. 30
【单选题】
T型头螺栓的头部长边应基本垂直于安装槽道,T型头螺杆距邻近绝缘子裙边不小于___mm。
A. 50
B. 60、
C. 100
D. 150
【单选题】
汇流排定位绝缘子安装端正,表面光滑、清洁,无裂纹、破损、缺釉、斑点等缺陷,瓷釉剥落总面积不大于___mm2。
A. 150
B. 250、
C. 300
D. 500
【单选题】
汇流排终端到相邻悬挂点的距离为___mm,允许误差:+200mm,-100mm。
A. 1500
B. 1600、
C. 1800
D. 2500
【单选题】
接触线在锚段末端汇流排外余长为100~150mm,沿汇流排终端方向顺延,水平夹角一般不小于为___°;接触线端头对接地体的距离不小于150mm;困难情况不小于115mm。
A. 25
B. 30、
C. 45
D. 60
【单选题】
中心锚结处于汇流排中心线的正上方,基座中心偏离汇流排中心不大于___mm。
A. 25
B. 30、
C. 45
D. 60
【单选题】
中心锚结绝缘子表面应无损伤,接地端至带电体、汇流排距离一般情况下应不小于150mm;困难情况不应小于___mm。中心锚结线夹处接触线的工作面应平顺无负弛度。
A. 60
B. 100、
C. 115
D. 120
【单选题】
中心锚结绝缘子及拉杆受力均衡,与汇流排的夹角一般不大于___°;中心锚结线夹与汇流排固定牢靠,调整螺栓处于可调状态。
A. 25
B. 30、
C. 45
D. 60
【单选题】
悬挂点处接触线拉出值范围为±___mm,误差不应大于±10mm。关键悬挂点的拉出值与设计值一致,其它一般悬挂点的拉出值仅作调整参考,但必须保证汇流排平滑过渡,且拉出值的绝对值不得大于300mm。
A. 200
B. 250、
C. 300
D. 350
【单选题】
汇流排横截面中轴线应垂直于所在处的轨道平面,偏斜不应大于___°。
A. 1
B. 2、
C. 3
D. 5
【单选题】
锚段关节两支接触线在关节中间悬挂点处应等高,其高差不大于___mm;转换悬挂点非工作支比工作支高出3~6mm,受电弓在双向通过时应平滑过渡,无撞击和拉弧现象。
A. 1
B. 2、
C. 3
D. 5
【单选题】
分段绝缘器中心偏离线路中心线不应大于___mm。
A. 10
B. 20、
C. 30
D. 50
【单选题】
分段绝缘器紧固件连接牢固可靠,滑板连接螺栓紧固力矩为___N•m。
A. 25
B. 30、
C. 44
D. 50
【单选题】
分段绝缘器中心距相邻悬挂定位点的距离为___mm,允许误差±500mm。
A. 500
B. 800
C. 1000
D. 1500
【单选题】
测量机构箱内电磁离合器电阻,其阻值为___Ω,误差为±5Ω。
A. 25
B. 30、
C. 35
D. 36
【单选题】
隔离开关触头带电部分至顶部建筑物距离,不应小于___mm;至隧道壁不应小于150mm。
A. 250
B. 300
C. 500
D. 1000
【单选题】
隔离开关底座和操作机构底座应呈水平状态,安装牢固;靠近线路侧至线路中心线不得小于___mm。操作机构底座安装高度距地面1000~1200mm为宜。操作机构箱应密封良好,门锁和钥匙完好齐全。
A. 1500
B. 1800
C. 1900
D. 2000
【单选题】
电连接线的安装位置允许偏差为±200mm,距相邻绝缘子最小距离不小于___mm,在任何情况下均应满足带电距离要求。
A. 50
B. 60
C. 100
D. 150
【单选题】
150mm2电缆绝缘层剥开长度为___mm;400mm2电缆绝缘层剥开长度为90mm;电缆导体不得损伤。
A. 50
B. 60、
C. 70
D. 100
【单选题】
150mm2电缆卡子间距不大于___mm;400mm2电缆卡子间距不大于1000mm。
A. 50 0
B. 600、
C. 700
D. 800
【单选题】
电连接电缆弯曲半径150mm2不小于___mm, 400mm2不小于800mm。
A. 250 0
B. 300、
C. 500
D. 800
【单选题】
电连接线的安装位置允许偏差为±___mm,距相邻绝缘子最小距离不小于60mm,在任何情况下均应满足带电距离要求。
A. 100 0
B. 200、
C. 250
D. 300
【单选题】
架空地线的弛度应符合安装曲线,其允许偏差为+5%至-___%。
A. 1
B. 2、
C. 2.5
D. 3
【单选题】
架空地线不得有___股以上的断股,同一锚段内,断股补强数和接头数均不超过4个。
A. 1
B. 2、
C. 3
D. 4
【单选题】
架空地线下锚处调整螺栓长度处于可调节范围内,并有不少于___mm的调节余量。
A. 15
B. 20、
C. 30
D. 50
【单选题】
接地线及其固定螺栓、电缆卡子等对接触网带电体的距离不小于150mm,对受电弓的瞬时距离不小于___mm,且不得侵入行车限界。
A. 50
B. 100、
C. 150
D. 250
【单选题】
运行中的避雷器___预防性试验。
A. 每年一次
B. 每年在雷雨季节前需做一次、
C. 每两年一次
D. 视情况做
【单选题】
放电间隙___mm,放电铜棒应无严重烧伤变形。
A. 2-3
B. 2.5-3、
C. 2.5-3.5
D. 3-6
【单选题】
简单悬挂的吊索回头不小于___mm,吊索压板紧固良好。
A. 20
B. 30
C. 50
D. 100
【单选题】
柔性接触网定位器及定位管坡度为___。
A. 1/10-1/6
B. 1/10-1/5
C. 1/6-1/5
D. 1/10-1/7
【单选题】
2号线共有___处接触网刚柔过渡装置。
A. 1
B. 2
C. 3
D. 4
【单选题】
2号线共有___座牵引变电所(含车辆段停车场)。
A. 11
B. 12
C. 13
D. 14
【单选题】
蛇口西车辆段运用库线路为___mm;洗车线为5400mm;定修线为5700mm;蛇口西车辆段其它线路一般为4800mm。
A. 5000
B. 5200
C. 5400
D. 5500
【单选题】
后海停车场接触网导高:一般为___mm。
A. 5000
B. 5200
C. 5400
D. 5500
【单选题】
接触网额定电压DC1500V,允许波动范围1000~1800V;接触网额定电流___A。
A. 2000
B. 2500
C. 3000
D. 5000
【单选题】
在某一变电所故障退出运行时采用___的供电的方式
A. 单边供电
B. 正常双边供电
C. 跨越故障变电所单边供电
D. 大双边供电
【单选题】
每次开工前,施工负责人要向全体作业组成员宣读工作票内容,布置作业任务(《工作分工及卡控单》(详见附件6))及安全措施。作业结束后,施工负责人要及时收回工作票(附相应的命令票),交由接触网工班统一保管不少于___个月。
A. 1
B. 2、
C. 3
D. 6
【单选题】
工作票中规定的作业组成员,一般不应更换;若必须更换时,须经发票人同意,发票人不在可经施工负责人同意,但更换施工负责人时,仍须经___同意,并在工作票上签字确认。
A. 工班长
B. 安全员、
C. 发票人
D. 审票人
【单选题】
工作票中规定的作业任务完成后,作业人员需将工器具、材料撤至安全地带,拆除接地线。___确认具备送电、行车条件后,宣布作业结束,向电力调度员消除停电作业命令。
A. 工班长
B. 安全员、
C. 施工负责人
D. 作业组中最高领导人
【单选题】
同一项作业,几个作业组同时作业时,由___统一向电力调度消除停电作业命令。
A. 工班长
B. 安全员、
C. 施工负责人
D. 作业组中最高领导人
欢迎使用我爱刷题
×
微信搜索我爱刷题小程序
温馨提示
×
请在电脑上登陆“www.woaishuati.com”使用