【单选题】
An ESXi 6.x host consists of 24 logical cores. Hyperthreading is enabled on the host. What is the maximum number of vCPUs that can be assigned to a virtual machine on this host?___
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【单选题】
By default, each ESXi 6.x host is provisioned with a certificate from which root certificate authority?___
A. RedHat Certificate Authority
B. VMware Certificate Authority
C. DigiCert Certificate Authority
D. Verisign Certificate Authority
【单选题】
An administrator is adding an NFS datastore as shown in the Exhibit. What is the purpose of the Servers to be added list?___
A. It contains the IP addresses of the NFS Storage Server to provide multipathing capability.
B. It contains the IP addresses of the ESXi hosts that mount the datastore.
C. It contains the IP addresses used for
D. ynamic Discovery of targets.
【单选题】
An administrator reports that the System Event log data is only available for 24 hours when reviewing the Hardware Status tab. Which condition could be responsible for the loss of data?___
A. A Reset event log was executed.
B. The statistical collection level was set to a value of 1.
C. The boot disk of the host is corrupt.
D. Syslog has been configured at the vCenter Server level.
【单选题】
During an upgrade, the ESXi 6.x installer finds an existing version of ESXi and a VMFS3 volume. No virtual machines exist on the host or VMFS3 volume. The requirement is to upgrade to VMFS5. Which option should be chosen to meet this requirement?___
A. Upgrade ESXi and preserve the VMFS datastore
B. Install ESXi and preserve the VMFS datastore
C. Install ESXi and overwrite the VMFS datastore
D. Upgrade
E. SXi and overwrite the VMFS datastore
【单选题】
A vSphere 6.x Standard Switch is configured with 4 virtual machine portgroups, as shown in the exhibit. Which portgroup would be utilized by default when creating a new virtual machine?___
A. Access Network
B. DMZ Network
C. VM Network
D. Virtual Machine Network
【单选题】
Which vSphere 6.x feature will allow an organization to utilize native snapshots?___
A. Virtual Volumes
B. Virtual SAN
C. VMFS3
D. VMFS5
【单选题】
An administrator is creating a new vSphere Distributed Switch that will be utilized with a specific vSphere Cluster. The cluster itself contains a mix of ESXi 5.x and 6.x Hosts. Which Distributed Switch version should be created to support this configuration?___
A. Distributed Switch: 6.0.0
B. Distributed Switch: 5.0.0
C. Distributed Switch: 5.1.0
D. Distributed Switch: 5.5.0
【单选题】
Which load balancing policy, previously limited to vSphere Distributed Switches, is now available on vSphere Standard Switches with vSphere 6.x?___
A. Route based on physical NIC workload
B. Route based on IP Hash
C. Route based on the originating virtual port
D. Route based on Source MAC Hash
【单选题】
A storage administrator is not seeing full utilization of all bandwidth from an ESXi host. The vSphere administrator observes the adapter details, as shown in the Exhibit. What is the probable cause of this issue?___
A. Another path needs to be used to allow full utilization of the bandwidth.
B. The array is not setup to use the correct multipathing policy.
C. There are no virtual machines on the host.
D. No traffic is being sent across it because a path failed.
【单选题】
A storage administrator is not seeing full utilization of all bandwidth from an ESXi host. The vSphere administrator observes the adapter details, as shown in the Exhibit. What is the probable cause of this issue?___
A. Another path needs to be used to allow full utilization of the bandwidth.
B. The array is not setup to use the correct multipathing policy.
C. There are no virtual machines on the host.
D. No traffic is being sent across it because a path failed.
【单选题】
An administrator has just completed performing an interactive installation of ESXi 6.x and is booting the host. How is the network initially configured?___
A. The network is configured by Automatic Private IP Addressing (APIPA).
B. The network is configured based on the settings detected in DNS.
C. The network is configured with the address as specified in the installer.
D. The network is automatically configured by DHCP.
【单选题】
You have just installed an ESXi 6.x Host. As part of your company security regulations, a security banner must be presented on the console of the host. How can this action be accomplished?___
A. Configure the Advanced Settings > Annotations screen of the ESXi host.
B. This is configured from the Direct Console User Interface configuration menu.
C. It is not possible to configure a security banner for the ESXi host.
D. From vCenter Server, this setting is configured globally in the vCenter Server configuration.
【单选题】
An administrator is only able to see the Health Badge when using the vRealize Operations user interface. What is the likely cause of this behavior?___
A. The vRealize Operations Foundation License is in use.
B. The vmware-sps service failed to start.
C. The vRealize Operations Standard License is in use.
D. The vmware-rbd-watchdog service failed to start.
【单选题】
An administrator has configured an alarm to be notified when a virtual machine meets either of these conditions: <High virtual CPU> <High active memory consumption.> <The alarm is only triggering when both of the conditions are met.> What can be done to correct the alarm behavior?___
A. Edit the alarm and select Trigger if ANY of the following conditions are satisfied.
B. Edit the alarm and select Trigger if ALL of the following conditions are satisfied.
C. Create two separate alarms, one for CPU and one for memory and link them together with ESXCLI.
D. Delete the existing alarm and create a new event based alarm.
【单选题】
An administrator creates an ESXi cluster using vSphere Auto Deploy. The ESXi hosts are configured to get a management IP address from a DHCP server. The administrator needs to troubleshoot the management network on one of the hosts. Which DCUI option should the administrator use to renew the DHCP lease? ___
A. Restart Management Network
B. Restore Network Settings
C. Test Management Network
D. Configure Management Network
【单选题】
An administrator is attempting to restore a number of files in a directory within the Operating System of a virtual machine. How can the administrator restore the files from a previous backup? ___
A. Use the File Level Restore option from the selected backup of the virtual machine in the vSphere Web Client.
B. Connect to the File Level Restore tool from a web browser in the virtual machine.
C. Connect to the File Level Restore tool from the VMware
D. ata Protection appliance.
【单选题】
After selecting an object in vRealize Operations, how can a user compare the badge values of related child objects? ___
A. Use the Scoreboard tab
B. Use the Relationship tab
C. Use the Members tab
D. Use the Overview tab
【单选题】
You want to deploy a vApp and dynamically assign IP addresses without a DHCP server on the network. Which action would you take to accomplish this task? ___
A. Enable IP pools.
B. Configure a local DHCP server in the vApp.
C. Enable NAT on the vApp router.
D. Configure the guest OS for workgroup and WINS.
【单选题】
What is the optimal configuration when building a virtual machine for a single-threaded Windows application? ___
A. Deploy single-threaded applications on uniprocessor virtual machines.
B. Deploy single-threaded applications on symmetric multi-processor virtual machines.
C. Tune single-threaded applications to take advantage of symmetric multi-processor resources.
D. Tune Single-threaded applications at the hypervisor level.
【单选题】
An administrator has created the resource pool configuration shown in the Exhibit. Based on the exhibit, which virtual machine(s) can be successfully powered on? ___
A. VM-M1 only
B. VM-K1 only
C. VM-K1 and VM-K2 only
D. VM-K1, VM-K2, and VM-M1
【单选题】
Which vSphere 6 Enterprise Edition feature will allow an organization to ensure that critical multi-threaded applications have the maximum possible uptime? ___
A. Fault Tolerance
B. High Availability
C. Distributed Resource Scheduler
D. App HA
【单选题】
An administrator has a virtual machine that requires four times the compute resources than other virtual machines on the same ESXi 6.x host. How should the administrator configure the virtual machine settings, in order to be prepared for any resource contention? ___
A. Set the shares of the priority virtual machine to High and the rest to Low.
B. Set the shares of the priority virtual machine to High.
C. Set the shares of the priority virtual machine to High and the rest to Normal.
D. Set the shares of the priority virtual machine to Normal and the rest to Low.
【单选题】
Which type of Adapter does not require vmkernel networking? ___
A. Independent Hardware iSCSI Adapter
B. Dependent Hardware iSCSI Adapter
C. Software iSCSI Adapter
D. Software FCoE Adapter
【单选题】
During the installation of ESXi 6.0, the following error message is reported: Hardware Virtualization is not a feature of the CPU, or is not enabled in the BIOS. Which condition would generate this message? ___
A. LAHF/SAHF is not enabled in the BIOS.
B. NX/XD is not enabled in the BIOS.
C. SSE3 is not enabled in the BIOS.
D. Hyperthreading is not enabled in the BIOS.
【单选题】
An administrator is unable to login to vCenter Server when using the vSphere web client. The administrator successfully accessed vCenter Server using the client earlier the same day. What is the most appropriate first step the administrator should take to resolve this issue? ___
A. Verify the web browser being used has Adobe Flash plugin version 11.5 or later
B. Verify the vCenter Single Sign-On service is running on the vCenter Server
C. Verify the vSphere Web Server service is running on the vCenter Server
D. Verify the administrator has permissions configured in vCenter Server
【单选题】
An administrator has configured an alarm to be notified when a virtual machine meets two conditions: <high virtual CPU> <high active memory consumption> The alarm is malfunctioning and triggering when either condition is met instead of both. What can be done to correct the issue? ___
A. Edit the alarm and select Trigger if ALL of the following conditions are satisfied.
B. Edit the alarm and select Trigger if ANY of the following conditions are satisfied.
C. Create two separate alarms, one for CPU and one for memory.
D. Delete the existing alarm and create a new event based alarm.
【单选题】
What must be enabled to ensure that VM Component Protection (VMCP) works in a High Availability cluster? ___
A. VMware Tools Virtual Machine Communication Interface (VMCI)
B. Fault Tolerance
C. Atomic Test and Set (ATS)
D. All Paths Down (APD) Timeout
【单选题】
An administrator wants to add a web server to an existing multi-tier application consisting of three virtual machines: <A web server> <A database server An application server> The web server should be added to the application when the primary web server reaches: <70% vCPU utilization> <55% active memory> Which option will achieve this result? ___
A. Create a virtual machine alarm with an action to run a script that starts a new instance of the web server.
B. Create a host cpu and memory alarm with an action to run a script that starts a new instance of the webserver.
C. Configure HA application monitoring for the web server and set it to trigger deployment of a new instance of the web server.
D. Configure Fault Tolerance on the virtual machine and leave the secondary machine disabled until needed.
【单选题】
An administrator has an application that requires connection directly to PCI devices through a virtual machine. What is a limitation of this configuration? ___
A. Devices must be reserved for PCI passthrough on at least one host on which the virtual machine will run.
B. Snapshots are not supported with DirectPath I/O passthrough devices.
C. A maximum of 18 PCI vSphere
D. irectPath devices can be added to a virtual machine.
【单选题】
The vSphere administrator is configuring directory services for an ESXi host: What should the vSphere administrator do to configure the host to use CAM services? ___
A. Check the Use vSphere Authentication Proxy checkbox.
B. Set Select Directory Service Type to CAM services.
C. Specify CAM$ for the
D. omain.
【单选题】
Which statement is true regarding the licensing of vCenter Server? ___
A. The license for vCenter Server must be provided at the time of installation.
B. Changing the license assigned to vCenter Server requires a restart of the vCenter Server service.
C. Virtual machines can still be powered on if the vCenter Server license expires.
D. Licensing for a single vCenter Server installation is determined by the number of managed virtual machines.
【单选题】
When configuring vSphere Replication for a virtual machine, what is the lowest Recovery Point Objective (RPO) that can be selected? ___
A. 1 min
B. 5 min
C. 10 min
D. 15min
【单选题】
A developer needs to create a multi-tier development stack for a home lab. Which vSphere product will support the architecture required for the least software cost? ___
A. vSphere Hypervisor
B. vSphere Essentials
C. VMware Player
D. VMware Workstation
【单选题】
An administrator is installing Windows into a virtual machine. The DVD has been mounted on the Host and configured for the virtual machine as shown in the Exhibit. Based on the exhibit, when the virtual machine is booted, why would it attempt to search for a PXE server? ___
A. The CD/DVD device is not connected.
B. The ISO is in the incorrect storage location.
C. The OS minimum requirements have not been met.
D. The CD/DVD device is not set to Client Device.
【单选题】
What component must be installed prior to deploying a vCenter Server in vSphere 6.x? ___
A. vCenter Identity Services
B. Platform Services Controller
C. vCenter Single Sign-On
D. Client Integration Plug-In
【单选题】
What is a valid plug-in status for a plug-in that has been added to a vSphere client? ___
A. Disabled
B. Unknown
C. Stopped
D. Installed
【单选题】
Users of an application are reporting performance issues. The following performance values are observed in the vSphere Web Client: <Host CPU utilization is 90%> <Virtual Machine memory utilization is consistently greater than 90% CPU Ready values are higher than 20%> What could be the cause of the application performance issue? ___
A. The host is lacking the CPU resources required to meet the demand.
B. The host is lacking the memory resources required to meet the demand.
C. The virtual machine is lacking the CPU resources required to meet the demand.
D. The virtual machine is lacking the memory resources required to meet the demand.
【单选题】
An administrator creates an ESXi cluster using vSphere Auto Deploy. The ESXi hosts are configured to get a management IP address from a DHCP server. The administrator needs to troubleshoot the management network on one of the hosts. Which DCUI option should the administrator use to renew the DHCP lease? ___
A. Restart Management Network
B. Restore Network Settings
C. Test Management Network
D. Configure Management Network
【单选题】
An administrator is re-provisioning an ESXi host and moving it to another datacenter. Which DCUI option should the administrator use to revert the system configuration to the default settings? ___
A. Reset System Configuration
B. Rebuild Default System Configuration
C. Revert System Configuration
D. Renew Default System Configuration
【单选题】
An administrator has just completed installing an ESXi 6.x host, but doesn't know what address has been configured. Where is the ESXi host IP address configured? ___
A. RVC console
B. Direct Console User Interface
C. vSphere Web Client
D. vSphere Client
推荐试题
【单选题】
以下关于虚拟专用网()的叙述中,不正确的是:___。
A. VPN是指建立在私有网上的、由某一组织或某一群用户专用的通信网络
B. VPN的虚拟性表现在任意一对VPN用户之间没有专用的物理连接,而是通过ISP提供的公用网络来实现通信
C. VPN的专用性表现在VPN之外的用户无法访问VPN内部资源
D. 隧道技术是实现VPN的关键技术之一
【单选题】
—结构化分析与设计是信息系统开发时常用的方法。按其生命周期特征,它应属于___。
A. V模型
B. 原型化模型
C. 螺旋模型
D. 瀑布模型
【单选题】
评估开发所需的成本和资源属于可行性研究中___研究的主要内容。
A. 社会可行性
B. 经济可行性
C. 技术可行性
D. 实施可行性
【单选题】
立项管理是项目管理中的一项重要内容。从项目管理的角度看,立项管理主要是解决项目的___问题。
A. 技术可行性
B. 组织战略符合性
C. 高层偏好
D. 需求收集和确认
【单选题】
项目论证通过对实施方案的工艺技术、产品、原料、未来的市场需求与供应情况以及项目的投资与收益情况的分析,从而得出各种方案的优劣以及在实施技术上是否可行,经济土是否合算等信息供决策参考。项目论证的作用不包括:___。
A. 确定项目是否实施的依据
B. 编制计划设计、采购、施工及机构设置、资源配置的依据
C. 有效避免风险的发生,保证项目的效率
D. 筹措资金、向银行贷款的依据
【单选题】
承建方的立项管理与建设方的立项管理相比,更加关注___,以保证在招投标过程中获得与竞争对手的比较优势。
A. 客户关系
B. 项目采购管理过程
C. 项目的市场需求
D. 组织资源与项目的匹配程度
【单选题】
公司的小张正在准备一份关于甲项目的标书。标书中一般不包括___。
A. 投标书、投标报价一览表、分项一览表
B. 公司的营业执照副本复印件加盖公章及其他相关证件
C. 公司相关的技术资料
D. 甲项目需求合理性分析
【单选题】
变更管理有两个重要的用途,一是___;二是变更度量分析,帮助组织提升自身的项目管理能力。
A. 分析变更的原因,并管理这些原因
B. 规避风险,确保项目顺利
C. 限制变更,维持项目的计划
D. 控制变更,保证项目可控
【单选题】
以下关于项目范围和产品范围的叙述中,不正确的是:___。
A. 项目范围是为了获得具有规定特性和功能的产品、服务和结果,而必须完成的项目工作
B. 产品范围是表示产品、服务和结果的特性和功能
C. 项目范围是否完成以产品要求作为衡量标准
D. 项目的目标是项目范围管理计划编制的一个基本依据
【单选题】
项目的工作分解结构是管理项目范围的基础,描述了项目需要完成的工作,___是实施工作分解结构的依据。
A. 项目活动估算
B. 组织过程资产
C. 详细的项目范围说明书
D. 更新的项目管理计划
【单选题】
小张在得到项目的成本估算后,开始制定项目的成本预算。他首先应该做的事情是___。
A. 确定项目成本预算计划
B. 识别并分析成本的构成科目
C. 确定各项成本预算指出的时间计划及项目成本预算计划
D. 将项目总成本分配到项目工作分解结构的各个工作包
【单选题】
以下关于项目成本预算的工具与技术的叙述中,不正确的是___。
A. 管理储备金包含在项目预算范围内,是项目成本基准的一部分
B. 参数估算技术是运用数学模型根据项目特性预测项目成本
C. 资金限制平衡需要对工作安排进行调整
D. 工作包的成本估算汇总到WBS中的更高一级,最终形成项目预算
【单选题】
项目成本控制是指___。
A. 对成本费用的趋势及可能达到的水平所作的分析和推断
B. 预先规定计划期内项目施工的耗费和成本要达到的水平
C. 确定各个成本项与计划值相比的差额和变化率
D. 在项目施工过程中,对形成成本的要素进行监督、调节和控制
【单选题】
某信息系统集成公司为客户公司开发非核心业务系统,项目开发过程中客户常常提出一些新的要求,如界面上的按钮位置、业务流程上的更改等。针对此状况,项目经理的正确做法是___。
A. 对于要求更改操作界面的颜色、按钮位置这样小的变更要求,开发人员可以请示项目经理后直接更改,不用保存变更记录
B. 对于修改业务流程这样的要求,项目经理可以单独批准
C. 应考虑客户需求方面的变更对进度、成本等方面是否有较大的影响,如果有较大影响并决定变更,需要修订相应的项目管理计划及其子计划
D. 应尽量找到有说服力的理由来劝说客户不要进行变更
【单选题】
某公司正在准备竞标一系统集成项目,为了估算项目的收益,技术总监带领风险管理团队,对项目可选的两种集成实施方案进行了决策树分析,分析图如下所示。以下说法中,正确的是___。
A. 以上进行的是风险定性分析,根据分析,该公司应采用方案B
B. 以上进行的是风险定量分析,根据分析,该公司应采用方案B
C. 以上进行的是风险定性分析,根据分析,该公司应采用方案A
D. 以上进行的是风险定量分析,根据分析,该公司应采用方案A
【单选题】
划的编制,项目经理小王采用了这个类似项目的任务或职责定义、汇报关系、组织架构图和职位描述。小王在人力资源计划的编制过程中采用了___方法。
A. 组织结构图和职位描述
B. 人力资源模板
C. 非正式的人际网络
D. 活动资源估算
【单选题】
一个为期2年的项目已经实施了1年,在项目期间不同的项目成员进进出出,团队成员已经发生了较大的变化,而相应的团队职责分工也已经与原计划有了很多出入。最近团队成员在为一个工作包由谁来负责产生了分歧,项目经理查看了项目计划,他发现很多工作包都没有规定负责人,或者是原定的负责人已经发生了变更。针对这种情况,项目经理应该首先___以加强对项目的管控。
A. 为该工作包指定负责人
B. 重新制定责任分配矩阵
C. 重新分解项目工作包
D. 重新制定人力资源计划
【单选题】
对团队成员的激励永远是困扰项目经理的一个问题,对于高创新要求的项目团队来说,利用___方法相对会更加有效。
A. 赋予更大的责任和权力
B. 大幅增加薪酬
C. 给予必要的关心和照顾
D. 给予更高的社会地位
【单选题】
项目合同评审是项目管理中一项重要工作,其中不包括___。
A. 确认合同的需求
B. 进行初步的项目任务分解
C. 对合同条款进行分析
D. 对自身的资源和能力进行确认
【单选题】
加强合同管理对于提高合同执行水平、减少合同纠纷、进而加强和改善建设单位和承建单位的经营管理、提高经济效益,都具有十分重要的意义。该过程主要包括___内容。
A. 合同签订管理、合同履行管理、合同变更管理以及合同档案管理
B. 合同签订管理、合同索赔管理、合同变更管理以及合同绩效管理
C. 合同谈判管理、合同履行管理、合同纠纷管理以及合同档案管理
D. 合同谈判管理、合同风险管理、合同变更管理以及合同档案管理
【单选题】
项目经理小李对某活动工期进行估算时,发现人员的熟练程度和设备供应是否及时对工期至关重要。如果形成最有利组合时,预计9天可以完成;如果形成最不利组合时,预计23天可以完成;按照公司的正常情况,一般13天可以完成。该项目的工期可估算为___天。
【单选题】
___不属于编制进度计划所采用的工具和技术。
A. 进度网络分析
B. 确定依赖关系
C. 进度压缩
D. 资源平衡
【单选题】
某项目当前的PV=150、AC=120、EV=140,则项目的绩效情况是___。
A. 进度超前,成本节约
B. 进度滞后,成本超支
C. 进度超前,成本超支
D. 进度滞后,成本节约
【单选题】
沟通管理计划的编制是确定___的过程,即明确谁需要何种信息,何时需要以及如何向他们传递。
A. 干系人信息与沟通需求
B. 沟通方式与信息发布
C. 干系人提供的绩效信息
D. 干系人管理与经验教训总结
【单选题】
项目经理80%甚至更多的时间都用于进行项目沟通工作。在项目的沟通管理计划中可以不包括___。
A. 传达信息所需的技术或方法
B. 沟通频率
C. 干系人登记册
D. 对要发布信息的描述
【单选题】
为使项目团队提高项目管理效率,项目经理张工非常注重在项目进行过程中召开经验总结会,对经验教训进行汇编、格式化以及正式归档等相关工作。这种经验总结会应由___参加。
A. 项目负责人和项目主要技术人员
B. 公司质量经理和项目主要负责人
C. 公司内部和外部的主要项目干系人
D. 项目甲方业务代表和公司质量经理
【单选题】
某承建单位准备把机房项目中的消防系统工程分包出去,并准备了详细的设计图纸和各项说明。该项目工程包括:火灾自动报警、广播、火灾早期报警灭火等。为使总体成本可控,该分包合同宜采用___方式。
A. 单价合同
B. 成本加酬金合同
C. 总价合同
D. 委托合同
【单选题】
以下关于工作说明书SOW的叙述中,不正确的是___。
A. SOW包括的主要内容有前言、服务范围、方法、假设条件、变更管理等
B. 采购过程中,不能修改SOW
C. 对内部项目而言,SOW有时可称为任务书
D. SOW与范围说明书不同,SOW是对项目所要提供的产品、成本或服务的描述
【单选题】
《计算机软件产品开发文件编制指南》明确了软件文档分为___三种类型。
A. 需求文档、设计文档、总结文档
B. 开发文档、实施文档,验收文档
C. 需求说明书、详细设计说明书、操作手册
D. 开发文档、产品文档、管理文档
【单选题】
以下关于基线和配置项的叙述中,不正确的是:___。
A. 所有配置项的操作权限应由变更管理委员会严格管理
B. 基线配置项向软件开发人员开放读取的权限
C. 非基线配置项可能包含项目的各类计划和报告等
D. 每个配置项的基线都要纳入配置控制,对这些基线的更新只能采用正式的变更管理过程
【单选题】
配置项的状态可分为“草稿”、“正式”和“修改”三种。以下关于配置项状态的叙述中,不正确的是:___。
A. 配置项处于“草稿”状态时,版本号格式为0.YZ
B. 配置项第一次成为“正式”文件时,版本号为1.0
C. 配置项处于“修改”状态时,版本号应改回0.YZ
D. 对于配置项的任何版本都应该保存,不能抛弃旧版本
【单选题】
以下关于质量管理的叙述中,不正确的是:___。
A. 产品等级高就是质量好
B. 质量管理注重预防胜于检查
C. 质量方针由最高管理者批准并发布
D. 质量目标是落实质量方针的具体要求,从属于质量方针
【单选题】
在制定项目质量计划过程中,可以采用___方法以识别哪些因素会对特定变量产生影响。
A. 散点图
B. 检查表
C. 质量功能展开
D. 实验设计
【单选题】
知识产权作为法律所确认的知识产品所有人依法享有的民事权利,其管理的要项中不包括___。
A. 权利客体是一种无形财产
B. 权利具有地域性
C. 权利具有优先性
D. 权利具有时间性
【单选题】
WLAN is increasingly popular because it enables cost-effective ___ among people and applications that were not possible in the past.
A. line
B. circuit
C. connection
D. Interface
【单选题】
___is not included in the main contents of the operation and maintenance of the information system.
A. Daily operation and maintenance
B. System change
C. Security management
D. Business change
【单选题】
In project time management, activity definition is the process of identifying and documenting the specific action to be performed to produce the project deliverables. ___are not output of activity definition.
A. Activity list
B. Work Breakdown Structures
C. Activity Attributes
D. Milestone Lists
【单选题】
The customer asks your project to be completed 6 months earlier than planned.You think this target can be reached by-overlapping project activities. This approach is known as ___.
A. balance engjneering
B. fast-tracking
C. leveling
D. crashing
【单选题】
The auditing function that provides feedback about the quality of output is referred to as ___.
A. quality control
B. quality planning
C. quality assurance
D. quality improvement
【单选题】
七类高风险项目毛利率水平要求在___以上。
A. 5%
B. 10%
C. 15%
D. 18%