Which three traffic types are available services options when configuring a vmkernel port? (Choose three.)___
A. Provisioning Traffic
B. Virtual Volumes Traffic
C. vSphere Replication NFC Traffic
D. Virtual SAN Traffic
E. FCoE Traffic
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
ACD
解析
暂无解析
相关试题
【多选题】
An administrator logs into the vSphere Web Client, but is unable to see any hosts and clusters. Which two options could fix the problem? (Choose two.)___
A. Verify that the client web browser and vCenter Server are in the same broadcast domain.
B. Verify that the vCenter Server system is registered with the same Platform Services Controller as the vSphere Web Client.
C. Log in to the vCenter Server as a user within the Active
D. irectory domain.
【多选题】
Which three VLAN Tagging modes are available in vSphere 6.x? (Choose three.)___
A. External Switch Tagging
B. Private VLAN Tagging
C. Virtual Switch Tagging
D. VXLAN Tagging
E. Virtual Guest Tagging
【多选题】
Which two statements are true about VMFS5 datastores on ESXi 6.x? (Choose two.)___
A. Virtual Disk (VMDK) size can be larger than 2TB.
B. Datastore extent size can be larger than 2TB.
C. Only Physical Mode Raw
D. evice Map (Passthrough-RDM) can be larger than 2TB.
【多选题】
Which two statements are correct when turning off a Distributed Resource Scheduler (DRS) Cluster? (Choose two.)___
A. The resource pool hierarchy of the DRS cluster is maintained.
B. The resource pool hierarchy of the DRS cluster is removed.
C. The affinity settings of the
D. RS cluster are removed and not maintained when DRS is re-enabled.
【多选题】
An administrator is creating a new Virtual SAN cluster on a Layer 2 network. There is an existing Virtual SAN cluster on the same Layer 2 network. Which two actions would allow the new Virtual SAN cluster to coexist with the older cluster? (Choose two.)___
A. Change the default Multicast Address on the new Virtual SAN cluster.
B. Change the default Unicast Address on the new Virtual SAN Cluster.
C. Create a separate VLAN for each cluster.
D. Create an ARP Alias for the Virtual SAN VMkernel Network Adapter.
【多选题】
A vCenter Operations Manager 5.7 environment is upgraded to vRealize Operations. After the upgrade, the analytics services fail to start. Which three steps must be taken to resolve the problem? (Choose three.)___
A. Take the vRealize Operations cluster offline.
B. Delete the activity persistence files.
C. Bring the cluster back online.
D. Remove any unresponsive nodes.
E. Stop the CaSA service.
【多选题】
An organization has an ESXi 6.x host that contains two resource pools. The host is being relocated to a DRS cluster. What two actions can be taken to integrate the host into the cluster, and what would happen to the existing ESXi resource pool hierarchy as a result? (Choose two.)___
A. Place all of the host's virtual machines into the DRS cluster root resource pool. The resource pools present on the host will be deleted.
B. Create a resource pool for the ESXi host's virtual machines and resource pools. The resource pools present on the host will be deleted.
C. Place all of the host's virtual machines into the DRS cluster root resource pool. The resource pools present on the host will be preserved.
D. Create a resource pool for the
E. SXi host's virtual machines and resource pools. The resource pools present on the host will be preserved.
【多选题】
Which two parameters are required when adding an iSCSI target to an iSCSI Software Adapter using Dynamic Discovery? (Choose two.)___
A. The iSCSI device's IP Address or Fully Qualified Domain Name
B. The Port Number
C. The iSCSI device's iSCSI Qualified Name (IQN)
D. The Default Gateway IP Address
【多选题】
Which two SMTP Notification Event Details are specific to alarms triggered by events? (Choose two.)___
A. User Name
B. Summary
C. Old Status
D. Target
【多选题】
Which two High Availability ___ Cluster admission control policies can help avoid resource fragmentation? (Choose two.)(AC)
A. Define failover capacity by static number of hosts
B. Define failover capacity by reserving a percentage of the cluster resources
C. Use dedicated failover hosts
D. Use Virtual Machine Monitoring
【多选题】
An attempt to enable vSphere Fault Tolerance for a powered-on virtual machine fails. Which two scenarios would result in this failure? (Choose two.)___
A. The virtual machine has three vCPUs configured.
B. The host on which the virtual machine is running has insufficient memory resources.
C. The virtual machine has insufficient resources to accommodate full reservation plus the overhead memory.
D. VMware High Availability is enabled on the cluster of which this host is a member.
【多选题】
A vApp template recently added to a Content Library is not displayed. Which two actions could correct this problem? (Choose two.)___
A. Manually synchronize the library
B. Select the Download all library content immediately option
C. Select the Sync subscribed library option
D. Manually download the vApp template
【多选题】
What are three valid disk configurations for the vSphere Data Protection 6.x Appliance? (Choose three.)___
A. 500GB
B. 1TB
C. 1.5TB
D. 2TB
E. 4TB
【多选题】
Which three connection types are available when configuring a vSwitch in the vSphere Web Client? (Choose three.)___
A. VMkernel Network Adapter
B. Physical Network Adapter
C. Virtual Machine Port Group for a Standard Switch
D. vMotion Network Adapter
E. vSAN Network Adapter
【多选题】
Which three features can be enabled for a new host cluster? (Choose three.)___
A. Storage Distributed Resource Scheduling
B. High Availability
C. Fault Tolerance
D. Distributed Resource Scheduling
E. Virtual SAN
【多选题】
An administrator receives a report that no real time statistics are available for a virtual machine in the vCenter Server inventory. Which two statements indicate likely causes of the problem? (Choose two.)___
A. The virtual machine is powered off.
B. The host containing the virtual machine is disconnected from vCenter Server.
C. There is insufficient real time data to display the information.
D. The vCenter Server service is not running.
【多选题】
Your manager has given you a bash script that retrieves data for ESXi 6.x host configurations. This data needs to be collected right after the installation of a host and must be run directly on the host. Which two actions can be used to run this script on an ESXi host? (Choose two.)___
A. Connect to the host with Ruby vSphere Console and run the script from there.
B. Enable SSH access from the Direct Console User Interface.
C. Enable the ESXi Shell from the
D. irect Console User Interface.
【多选题】
Which two are true about the Risk badge in vRealize Operations? (Choose two.)___
A. The Risk badge indicates potential future problems that may degrade the performance of the system.
B. Risks may require attention in the near future.
C. The Risk badge indicates problems that are degrading performance of the system.
D. Risks require attention now to correct system performance problems.
【多选题】
vSphere Update Manager allows which two virtual machine attributes to be upgraded? (Choose two.)___
A. Virtual machine firewall policies for NSX.
B. Software Packages in the virtual machine.
C. Virtual machine Hardware Version.
D. VMware Tools Upgrade.
【多选题】
What are two benefits of using NFS 4.1 with vSphere 6.x as compared to NFS 3? (Choose two.)___
A. NFS 4.1 supports Kerberos Authentication
B. NFS 4.1 supports multipathing
C. NFS 4.1 supports IPv6
D. NFS 4.1 supports hardware acceleration
【多选题】
Which three statements are true regarding Fault Tolerance? (Choose three.)___
A. Applications need to be continuously available to users.
B. Applications without native clustering capabilities can be protected.
C. Custom clustering solutions are complicated to configure and maintain.
D. Applications that have 16 vCPUs are supported.
E. Prevents application crashes by analyzing the workload and correcting problems.
【多选题】
Which two statements are true regarding VMware vSphere Flash Read Cache (vFRC)? (Choose two.)___
A. Cache fills and cache evictions happen in the granularity of a cache block size.
B. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying storage.
C. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying cache data.
D. Cache fills and cache evictions happen in the granularity of the disk block size.
【多选题】
What are two possible causes of Storage Distributed Resource Scheduler (SDRS) being disabled on one or more virtual machine disks in a datastore cluster? (Choose two.)___
A. The virtual machine has vSphere Fault Tolerance disabled.
B. The virtual machine is a template.
C. The virtual machine swap file is on a shared datastore.
D. The disk is a CD-ROM/ISO file.
【多选题】
An administrator attempts to install vCenter Single Sign-On Server. The installer returns an error message indicating that the installation failed. Prior to the installation, all setup prerequisites were met. The administrator has generated a vCenter Server Single Sign-On support bundle. Which two files should the administrator analyze to determine the cause of the failure? (Choose two.)___
A. Server\utils\logs\imsTrace.log
B. Server\utils\logs\install.txt
C. %TEMP%\utils\logs\vminst.log
D. %TEMP%\vminst.log
【多选题】
An administrator is unable to remove an ESXi 6.x host from a vSphere Distributed Switch. What are two likely reasons for this issue? (Choose two.)___
A. Vmkernel interfaces on the switch are still in use.
B. VM Network port group adapters are connected to different switch.
C. Physical NICs are migrated to different switch.
D. VM Network adapters are connected to this switch.
【多选题】
Which two Identity Sources are available to add for vCenter Single Sign-On authentication? (Choose two.)___
A. LocalOS
B. OpenLDAP
C. NIS as an LDAP Server
D. VCMSDS
【多选题】
What are three goals of resource management within a cluster? (Choose three.)___
A. To prevent virtual machines from monopolizing resources and to guarantee predictable service rates.
B. To exploit undercommitted resources and overcommit with graceful degradation.
C. To provide solutions to potential problems that you might encounter when using vCenter Server.
D. To control the relative importance of virtual machines and provide flexible dynamic partitioning.
E. To provide additional network administration capabilities.
【多选题】
Which three actions can be taken as a result of executing the vSphere Update Manager 6.x scan and remediation wizards? (Choose three.)___
A. Install and upgrade software in virtual machines.
B. Upgrade the firmware on ESXi host devices.
C. Upgrade and Patch ESXi hosts.
D. Install and update third-party software on hosts.
E. Upgrade virtual machine hardware.
【多选题】
Which two statements are true about deploying and using vSphere Replication? (Choose two.)___
A. ESXi hosts managed by a single vCenter Server instance require a connection between the two vSphere Replication appliances.
B. Sites managed by different vCenter Server instances require a connection between the two vSphere Replication appliances.
C. Sites managed by different vCenter Server instances require the use of Site Recovery Manager and a connection between the two vSphere Replication appliances.
D. ESXi hosts managed by a single vCenter Server instance require a single vSphere Replication appliance.
【多选题】
An administrator is attempting to power on a virtual machine, but the task is hanging at 95%. What three scenarios best explain why this problem is happening? (Choose three.)___
A. A virtual machine question is currently being posed to the administrator.
B. Another task for the virtual machine or other component is already in progress.
C. The VMware High Availability cluster has insufficient resources to guarantee failover.
D. The host has lost access to the storage device containing the virtual machine files.
E. The host is under resource contention and unable to power on the virtual machine.
【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
【多选题】
Which two storage controller configurations can be used with Virtual SAN? (Choose two.)___
A. SAS controllers in Passthrough mode
B. SAS controllers in RAID0 mode
C. SAS controllers in RAID1 mode
D. SAS controllers in RAID10 mode
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
【多选题】
An administrator is deploying multiple Windows 2003 Virtual Machines from the same template. What two steps should be taken to avoid network conflicts? (Choose two.)___
A. Customize the guest operating system.
B. Install VMware Tools into the new virtual machines.
C. Copy the Microsoft Sysprep tools onto the vCenter Server system.
D. Ensure the e1000 vmnic is selected for each new virtual machine.
【多选题】
Which three conditions would prevent Storage I/O Control from being enabled on a group of datastores? (Choose three.)___
A. The datastores planned for the solution are used by different vSphere clusters.
B. A datastore planned for the solution is configured as a Raw Device Mapping file.
C. A datastore planned for the solution has three extents.
D. A datastore planned for the solution is configured as NFS.
E. The organization has an Enterprise license.
【多选题】
Which two actions are prerequisites to adding ESXi 6.x hosts to a vSphere Distributed Switch? (Choose two.)___
A. Verify that there is at least one Distributed Port Group on the Distributed Switch.
B. Verify that the Distributed Port Group have active uplinks configured in its teaming and failover policy.
C. Verify that the
D. istributed Switch has been configured with a Network Profile.
【多选题】
An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. Which two options represent the type and name of the alarm that would accomplish this? (Choose two.)___
A. DrsEnteringStandbyModeEvent
B. DrsEnteredStandbyModeEvent
C. Event-based
D. Condition-based
推荐试题
【单选题】
项目经理识别到项目相关方具有明显不同的需求和期望。为确保项目成功,项目经理应该怎么做?
A. 应用推进技术
B. 创建权力/影响方格
C. 执行风险分析
D. 定义角色和职责
【单选题】
在项目执行期间,某些任务所花的时间比预期长,团队成员之间存在一些分歧,并且发起人要求迅速采取行动来解决这个问题。项目经理应该怎么做?
A. 制定团队章程。
B. 与团队一起审查团队章程。
C. 与人力资源部门和团队一起开会讨论这个问题。
D. 实施冲突管理过程。
【单选题】
一位团队成员急于将客户正在考虑的新功能添加到项目可交付成果中。在开始为这些新功能工作之前,需要谁的批准?
A. 项目经理
B. 变更控制委员会( CCB)
C. 项目发起人
D. 主题专家( SME)
【单选题】
在一个价值 100 万美元的项目中途,项目经理进行挣值分析( EVA),分析显示计划价值( PV)为 623, 000 美元,挣值( EV)为 523, 000 美元,实际成本( AC)为643, 000 美元。根据这些数字,项目的成本偏差( CV)和进度偏差( SV)分别是多少?
A. CV=+120.000 美元, SV=+100, 000 美元
B. CV=+100.000 美元, SV=+120, 000 美元
C. CV=-100.000 美元, SV=-120, 000 美元
D. CV=-120.000 美元, SV=-100, 000 美元
【单选题】
在一个项目的执行阶段,一些资源不能按照计划可用,项目经理应该怎么做?
A. 将该问题上报给项目发起人。
B. 提交变更请求。
C. 实施风险应对计划。
D. 与其他项目经理进行谈判。
【单选题】
项目经理发现由于一名资源过度承诺而导致一些任务未完成。项目经理意识到如果使用其他资源,将不影响到关键路径。项目经理应该使用什么来满足进度计划?
A. 假设情景分析
B. 资源平衡
C. 快速跟进
D. 资源平滑
【单选题】
项目发起人通知项目经理,最关键的项目标准是按时交付产品,客户对资源可用性没有时间限制,哪个行动会减少时间表,但会增加风险?
A. 添加团队成员
B. 并行执行活动
C. 外包项目执行
D. 聘请高薪专家
【单选题】
项目经理已经准备好结束一个项目,项目经理下一步应该怎么做?
A. 管理质量来确认可交付成果是否符合标准。
B. 根据项目章程衡量项目可交付成果,并请求客户验收。
C. 解决所有项目风险,以确保可交付成果将被验收。
D. 审查项目管理计划,以确保完成范围并请求客户验收。
【单选题】
项目经理成功完成一个项目,需要收集在地理位置上分散的大量相关方的反馈意见。项目经理应该用什么沟通方法来收集反馈意见?
A. 拉式沟通
B. 推式沟通
C. 有效沟通
D. 互动沟通
【单选题】
在新项目的相关方会议中,项目经理发现一名干系人对项目有抵触。项目经理记录这个问题,并对该相关方的参与程度评级。项目经理使用了哪项工具或技术来为相关方的参与程度评级?
A. 相关方参与评估矩阵
B. 风险概率和影响评估
C. 人际关系技巧
D. 专家判断
【单选题】
由于质量过程的问题,一个项目明显落后于进度计划。项目相关方坚持要求项目经理采取任何必要的行动来满足初始时间表。项目经理下一步应该怎么做?
A. 与相关方谈判质量标准并更新质量管理计划。
B. 重新确定客户的需求清单优先级并调整项目范围。
C. 在风险登记册中记录所有问题并接受质量过程。
D. 审查质量核对单以确定根本原因并实施所需的变更。
【单选题】
在项目状态审查会议期间,显而易见的是,整体项目效绩低于预期的项目目标,并且一些关键的可交付成果未能满足客户的需求。项目经理应该怎么做?
A. 更新范围管理计划并执行备选方案分析。
B. 使用德尔菲技术并执行备选方案分析。
C. 执行趋势分析并更新质量管理计划。
D. 执行根本原因和备选方案分析。
【单选题】
项目经理了解到项目进度的绩效指数( SPI)为 0.77。项目经理应该怎么做?
A. 更新成本基准
B. 更新进度基准
C. 分析关键路径上的绩效
D. 分析项目管理计划
【单选题】
在发起人批准项目后,项目经理邀请发起人、选定的团队成员和其他相关方出席一次会议。会议的主要目的是制定一份文件,该文件将指导团队确定主要项目可交付成果。这次会议的最终输出是什么?
A. 里程碑清单
B. 工作分解结构(WBS)字典
C. 范围管理计划
D. 需求管理计划
【单选题】
一个项目已经启动,该项目拟标准化四个国家的人力资源模块开发。每个国家都有不同的人力资源管理流程。其中两个国家与相关方,没有提供任何意见,迫使项目经理在没有他们的意见下制定项目计划,并将其发送给四个国家的所有相关方进行批准。到目前为止已经收到三份批准。项目经理下一步应该怎么做?
A. 开始项目执行,因为项目计划不需要所有相关方的意见。
B. 开始项目,因为大多数相关方已经批准了这项计划。
C. 等到所有项目相关方都参与并批准项目计划,然后开始项目执行。
D. 等待所有相关方的意见,然后由于大多数相关方已经批准,先开始项目执行。
【单选题】
在一个为期两年的新高速公路建设项目的前八个月中,由于缺乏一种机械,项目落后于进度计划。这属于哪一种事业环境因素?
A. 组织结构
B. 基础设施
C. 相关方风险界值
D. 可持续性
【单选题】
两家公司之间的并购项目正处于启动阶段,显然这个项目对这两个组织产生影响。若要确保项目成功,发起人应关注下列哪一项?
A. 明确定义项目目标,优先事项和战略
B. 预算
C. 沟通管理计划
D. 变更管理计划
【单选题】
项目经理正在管理价值 300 万美元、涉及两个供应商的项目。项目经理为每名供应商创建了一份工作说明书(SOW)。下列哪一项需要 SOW 的信息?
A. 风险管理计划
B. 合同
C. 采购管理计划
D. 供应商范围说明书
【单选题】
项目经理负责管理一个项目,该项目旨在推出一项新服务,项目经理得知,技术部门对于使用已提供的培训来操作这项服务感到不自信。项目经理首先应该怎么做?
A. 完成一项变更控制要求并将该问题纳入经验教训中
B. 建议团队与指定的相关方一起审查验收标准
C. 将可交付成果转移给对操作这项服务更有信心的另一团队
D. 停止项目以确认操作员对接受的培训感到满意
【单选题】
一个全球多学科项目的项目经理如何才能确保在所有学科中使用变更控制过程?
A. 执行影响分析以考虑所有项目学科
B. 确保变更控制委员会( CCB)有来自所有学科的代表
C. 邀请所有学科参加变更控制系统委员会会议,但仅从所参加的学科收集意见
D. 代表其他学科控制所有变更请求
【单选题】
在一个项目中,一位关键项目团队成员因私事请假两个月,项目经理首先应该怎么做?
A. 询问这位关键团队成员是否可以推迟请假
B. 与职能经理协商替换一名团队成员
C. 评估对项目的影响
D. 审查志愿管理计划
【单选题】
在项目启动期间,项目经理进行了成本效益分析,结果为 0.6,项目经理下一步应该怎么做?
A. 咨询专家,寻找选择方案,并重新执行分析
B. 与项目发起人一起审查结果,以确认项目的可行性
C. 审查报告以确定是应该开始项目还是拒绝项目
D. 咨询相关方关于项目的批准情况
【单选题】
项目经理正在管理一项创建新项目管理办公室( PMO)的计划,必须创建一种方法来管理项目组合、项目群和项目。项目经理应该使用哪一项来管理期望?
A. 相关方分析
B. 专家判断
C. 沟通技能
D. 团队会议
【单选题】
一家跨国公司的组织单位有大量的产品增强功能待办事项,这些产品增强功能是暂时保留的用户故事。待批准的预算申请在上周获得批准。 作为启动程序的一部分,新分配的项目经理应该做什么?
A. 记录项目生命周期和方法讨论需求
B. 为所有用户故事制定一份进度计划
C. 对所有用户故事执行风险评估
D. 根据以前相同产品的项目分配资源
【单选题】
项目经理需要身处不同国家的两位副总裁提供意见。应该使用哪种沟通方法?
A. 推式沟通
B. 拉式沟通
C. 选择式沟通
D. 交互式沟通
【单选题】
在项目结束时要求进行一项重要变更,虽然需要进行这项变更来解决可能影响业务连续性的紧急问题,但会延长进度计划并增加成本。项目经理下一步应该怎么做?
A. 拒绝该变更
B. 提交变更请求
C. 实施该变更
D. 沟通对预算和进度的影响
【单选题】
一个大型项目包含将由分包商执行的许多阶段。团队成员各自负责一个阶段。项目经理应该使用什么来执行质量管理计划?
A. 质量测量指标
B. 质量审计
C. 根本原因分析
D. 因果分析
【单选题】
项目经理识别到本地和虚拟团队成员之间的进度优先级存在冲突,项目经理安排了一次电话会议来管理这个冲突。项目经理使用的是哪种冲突解决技巧?
A. 缓和/包容
B. 合作/解决问题
C. 强迫/命令
D. 妥协/调解
【单选题】
项目发起人对项目进行审查并对一些项目风险提出质疑,项目发起人要求项目经理分析这些风险对项目总体目标的影响。项目经理应该执行下列哪一项?
A. 定量和定性风险分析
B. 假设条件和制约因素分析
C. 优势、劣势、机会与威胁( SWOT)分析
D. 核对单分析
【单选题】
管理层将一个国际项目分配给一位新项目经理。这是该项目经理第一次与团队合作,团队成员位于两个国家,数量平均分布,一个团队由最合适作为个人工作的成员组成,另一个团队由最适合作为团队工作的成员组成。项目经理该怎么做?
A. 更新风险登记册
B. 要求团队在项目期间以相同的风格工作
C. 修订沟通管理计划
D. 为团队设置一个虚拟协作工作,以便每天签到
【单选题】
一个项目团队成员已经延迟两次交付一个工作包,其职能经理已经通知项目经理,该团队成员资历较新,需要时间学习。项目经理应该怎么做?
A. 要求职能经理替换该团队成员
B. 与该团队成员私下讨论该问题
C. 向该团队成员提供培训
D. 在团队会议上讨论该问题
【单选题】
一位新团队成员在一个月前加入团队,并接受了资源管理计划中规定的必要培训,这位新团队成员无法按时完成分配的任务,从而影响到团队绩效。项目经理下一项应该怎么做?
A. 识别所需的额外培训并更新资源管理计划
B. 将问题升级上报给管理层,要求将该团队成员调到另一个项目,并找到一位经验更丰富的资源作为替代
C. 与该团队成员讨论这个问题, 并一致达成一项具有可测量纠正措施的行动计划
D. 在下一次计划的绩效评估中解决该团队成员的培训需求。
【单选题】
一家银行正在执行一个项目,在整个组织中部署新软件。在完成项目的第一阶段后,项目经理召集所有部门的职能经理召开会议,以审查项目问题并收集经验教训。项目经理应该在会议期间使用什么来检查项目问题并分析经验教训?
A. 头脑风暴
B. 因果分析
C. 专家判断
D. 散点图
【单选题】
某位项目相关方要求对已批准的产品设计进行变更,程序员仅需少量工作就可进行这项变更。但是存在一个风险,即另一位相关方将不同意这项变更。项目经理应该怎么做?
A. 由于不存在重大的财务影响,因此实施这项变更
B. 根据变更管理计划创建一份变更请求
C. 请求项目发起人的批准
D. 与相关方谈判接受这项变更
【单选题】
项目发起人任命一位高级工程师到指导委员会,来帮助监督项目管理计划。该工程师经常不同意由项目团队制定的计划,并在提交批准之前对项目管理计划表达严重关切。项目经理应该怎么做?
A. 通知项目发起人,该工程师延迟了规划过程
B. 与指导委员会一起审查项目计划,并解决该工程师提出的任何问题
C. 与工程师进行私下会议,了解并解决他关切的问题
D. 提交项目管理计划,并在以后通过遵循变更管理程序解决该工程师的关切问题
【单选题】
项目可行性研究确定了应该创建什么产品。现在,开发与原始需求冲突的另一种产品的一项变更请求,已经获得批准,在变更请求获得批准前已进行数据分析。项目经理应该怎么做?
A. 实施该变更请求
B. 拒绝该变更请求
C. 请求详细的数据分析报告
D. 请求新产品的可行性研究
【单选题】
一家组织执行了电子邮件迁移项目,虽然电子邮件迁移成功,但用户地址簿信息的迁移却不正确,这会影响到该组织的内部沟通。项目经理应该怎么做?
A. 向所有相关方解释这种情况,然后就后续步骤达成一致
B. 确定迁移错误的根本原因
C. 要求项目团队提出纠正措施
D. 请求发起人批准延长项目时间
【单选题】
由于一个施工项目的相关方数量异常之多, 因此在初始规划阶段起草若干职能要求,项目经理应该关注什么方法?
A. 需求管理计划
B. 变更管理计划
C. 组织过程资产
D. 资源管理计划
【单选题】
一位团队成员通知项目经理,供应商延迟交付一个重要部件,由于潜在的影响,该团队成员希望项目经理允许直接通知发起人并生成与这种情况相关的警报。项目经理应该查阅哪一份计划?
A. 采购管理计划
B. 沟通管理计划
C. 相关方参与计划
D. 风险管理计划
【单选题】
项目经理加入一个新的价值数百万美元的项目,要求成功实施来自各部门的可交付成果。若要成功实施该项目。项目经理首先应该怎么做?
A. 拜访客户以确保已为关键客户相关方识别到所有沟通渠道
B. 执行相关方分析并进行详细的需求会议
C. 立即识别在该项目上工作的最佳资源
D. 与已经成功向客户交付的外部供应商签订合同