【多选题】
Which two NFS Protocol versions does vSphere 6 support? (Choose two.)___
A. Version 3
B. Version 3.1
C. Version 4
D. Version 4.1
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【多选题】
Which three operations occur during a cold migration of a virtual machine? (Choose three.)___
A. The virtual machine disks are moved if the datastore is being changed.
B. The virtual machine is registered with the destination server.
C. The source virtual machine is removed from the old hosts.
D. The virtual machine hardware is upgraded.
E. The virtual machine files are quiesced prior to the migration.
【多选题】
A 4 GB Memory virtual machine is experiencing extended memory issues, as shown in the Exhibit. What potential issues could be attributed to this memory pressure?___
A. A limit is imposed on the virtual memory of this virtual machine.
B. The Balloon driver has been uninstalled.
C. A limit has been imposed on the Virtual CPU of the virtual machine.
D. Storage IO control has been enabled for the virtual machine causing the swapped memory.
【多选题】
You are creating a virtual machine in the Web Client using the New Virtual Machine wizard. Which two steps are required? (Choose two.)___
A. Select a valid name.
B. Select a cluster for the compute resource.
C. Select a network adapter.
D. Select the virtual machine compatibility.
【多选题】
An administrator has been given requirements to configure vMotion for a new virtual machine. The configuration should: <Provide Network Redundancy Use VLAN 550> <Be secured against anyone trying to spoof communication The vSwitch1 configuration is shown in the Exhibit.> Which three changes should be made to meet the stated requirements? (Choose three.)___
A. The VLAN ID must be set appropriately.
B. The default values for MAC Address Changes and Forged Transmits must be altered.
C. The teaming and failover adapters must be set appropriately.
D. The Traffic Shaping configuration must be altered.
E. The Load Balancing Policy must be set appropriately.
【多选题】
Which three traffic types are available services options when configuring a vmkernel port? (Choose three.)___
A. Provisioning Traffic
B. Virtual Volumes Traffic
C. vSphere Replication NFC Traffic
D. Virtual SAN Traffic
E. FCoE Traffic
【多选题】
An administrator logs into the vSphere Web Client, but is unable to see any hosts and clusters. Which two options could fix the problem? (Choose two.)___
A. Verify that the client web browser and vCenter Server are in the same broadcast domain.
B. Verify that the vCenter Server system is registered with the same Platform Services Controller as the vSphere Web Client.
C. Log in to the vCenter Server as a user within the Active
D. irectory domain.
【多选题】
Which three VLAN Tagging modes are available in vSphere 6.x? (Choose three.)___
A. External Switch Tagging
B. Private VLAN Tagging
C. Virtual Switch Tagging
D. VXLAN Tagging
E. Virtual Guest Tagging
【多选题】
Which two statements are true about VMFS5 datastores on ESXi 6.x? (Choose two.)___
A. Virtual Disk (VMDK) size can be larger than 2TB.
B. Datastore extent size can be larger than 2TB.
C. Only Physical Mode Raw
D. evice Map (Passthrough-RDM) can be larger than 2TB.
【多选题】
Which two statements are correct when turning off a Distributed Resource Scheduler (DRS) Cluster? (Choose two.)___
A. The resource pool hierarchy of the DRS cluster is maintained.
B. The resource pool hierarchy of the DRS cluster is removed.
C. The affinity settings of the
D. RS cluster are removed and not maintained when DRS is re-enabled.
【多选题】
An administrator is creating a new Virtual SAN cluster on a Layer 2 network. There is an existing Virtual SAN cluster on the same Layer 2 network. Which two actions would allow the new Virtual SAN cluster to coexist with the older cluster? (Choose two.)___
A. Change the default Multicast Address on the new Virtual SAN cluster.
B. Change the default Unicast Address on the new Virtual SAN Cluster.
C. Create a separate VLAN for each cluster.
D. Create an ARP Alias for the Virtual SAN VMkernel Network Adapter.
【多选题】
A vCenter Operations Manager 5.7 environment is upgraded to vRealize Operations. After the upgrade, the analytics services fail to start. Which three steps must be taken to resolve the problem? (Choose three.)___
A. Take the vRealize Operations cluster offline.
B. Delete the activity persistence files.
C. Bring the cluster back online.
D. Remove any unresponsive nodes.
E. Stop the CaSA service.
【多选题】
An organization has an ESXi 6.x host that contains two resource pools. The host is being relocated to a DRS cluster. What two actions can be taken to integrate the host into the cluster, and what would happen to the existing ESXi resource pool hierarchy as a result? (Choose two.)___
A. Place all of the host's virtual machines into the DRS cluster root resource pool. The resource pools present on the host will be deleted.
B. Create a resource pool for the ESXi host's virtual machines and resource pools. The resource pools present on the host will be deleted.
C. Place all of the host's virtual machines into the DRS cluster root resource pool. The resource pools present on the host will be preserved.
D. Create a resource pool for the
E. SXi host's virtual machines and resource pools. The resource pools present on the host will be preserved.
【多选题】
Which two parameters are required when adding an iSCSI target to an iSCSI Software Adapter using Dynamic Discovery? (Choose two.)___
A. The iSCSI device's IP Address or Fully Qualified Domain Name
B. The Port Number
C. The iSCSI device's iSCSI Qualified Name (IQN)
D. The Default Gateway IP Address
【多选题】
Which two SMTP Notification Event Details are specific to alarms triggered by events? (Choose two.)___
A. User Name
B. Summary
C. Old Status
D. Target
【多选题】
Which two High Availability ___ Cluster admission control policies can help avoid resource fragmentation? (Choose two.)(AC)
A. Define failover capacity by static number of hosts
B. Define failover capacity by reserving a percentage of the cluster resources
C. Use dedicated failover hosts
D. Use Virtual Machine Monitoring
【多选题】
An attempt to enable vSphere Fault Tolerance for a powered-on virtual machine fails. Which two scenarios would result in this failure? (Choose two.)___
A. The virtual machine has three vCPUs configured.
B. The host on which the virtual machine is running has insufficient memory resources.
C. The virtual machine has insufficient resources to accommodate full reservation plus the overhead memory.
D. VMware High Availability is enabled on the cluster of which this host is a member.
【多选题】
A vApp template recently added to a Content Library is not displayed. Which two actions could correct this problem? (Choose two.)___
A. Manually synchronize the library
B. Select the Download all library content immediately option
C. Select the Sync subscribed library option
D. Manually download the vApp template
【多选题】
What are three valid disk configurations for the vSphere Data Protection 6.x Appliance? (Choose three.)___
A. 500GB
B. 1TB
C. 1.5TB
D. 2TB
E. 4TB
【多选题】
Which three connection types are available when configuring a vSwitch in the vSphere Web Client? (Choose three.)___
A. VMkernel Network Adapter
B. Physical Network Adapter
C. Virtual Machine Port Group for a Standard Switch
D. vMotion Network Adapter
E. vSAN Network Adapter
【多选题】
Which three features can be enabled for a new host cluster? (Choose three.)___
A. Storage Distributed Resource Scheduling
B. High Availability
C. Fault Tolerance
D. Distributed Resource Scheduling
E. Virtual SAN
【多选题】
An administrator receives a report that no real time statistics are available for a virtual machine in the vCenter Server inventory. Which two statements indicate likely causes of the problem? (Choose two.)___
A. The virtual machine is powered off.
B. The host containing the virtual machine is disconnected from vCenter Server.
C. There is insufficient real time data to display the information.
D. The vCenter Server service is not running.
【多选题】
Your manager has given you a bash script that retrieves data for ESXi 6.x host configurations. This data needs to be collected right after the installation of a host and must be run directly on the host. Which two actions can be used to run this script on an ESXi host? (Choose two.)___
A. Connect to the host with Ruby vSphere Console and run the script from there.
B. Enable SSH access from the Direct Console User Interface.
C. Enable the ESXi Shell from the
D. irect Console User Interface.
【多选题】
Which two are true about the Risk badge in vRealize Operations? (Choose two.)___
A. The Risk badge indicates potential future problems that may degrade the performance of the system.
B. Risks may require attention in the near future.
C. The Risk badge indicates problems that are degrading performance of the system.
D. Risks require attention now to correct system performance problems.
【多选题】
vSphere Update Manager allows which two virtual machine attributes to be upgraded? (Choose two.)___
A. Virtual machine firewall policies for NSX.
B. Software Packages in the virtual machine.
C. Virtual machine Hardware Version.
D. VMware Tools Upgrade.
【多选题】
What are two benefits of using NFS 4.1 with vSphere 6.x as compared to NFS 3? (Choose two.)___
A. NFS 4.1 supports Kerberos Authentication
B. NFS 4.1 supports multipathing
C. NFS 4.1 supports IPv6
D. NFS 4.1 supports hardware acceleration
【多选题】
Which three statements are true regarding Fault Tolerance? (Choose three.)___
A. Applications need to be continuously available to users.
B. Applications without native clustering capabilities can be protected.
C. Custom clustering solutions are complicated to configure and maintain.
D. Applications that have 16 vCPUs are supported.
E. Prevents application crashes by analyzing the workload and correcting problems.
【多选题】
Which two statements are true regarding VMware vSphere Flash Read Cache (vFRC)? (Choose two.)___
A. Cache fills and cache evictions happen in the granularity of a cache block size.
B. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying storage.
C. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying cache data.
D. Cache fills and cache evictions happen in the granularity of the disk block size.
【多选题】
What are two possible causes of Storage Distributed Resource Scheduler (SDRS) being disabled on one or more virtual machine disks in a datastore cluster? (Choose two.)___
A. The virtual machine has vSphere Fault Tolerance disabled.
B. The virtual machine is a template.
C. The virtual machine swap file is on a shared datastore.
D. The disk is a CD-ROM/ISO file.
【多选题】
An administrator attempts to install vCenter Single Sign-On Server. The installer returns an error message indicating that the installation failed. Prior to the installation, all setup prerequisites were met. The administrator has generated a vCenter Server Single Sign-On support bundle. Which two files should the administrator analyze to determine the cause of the failure? (Choose two.)___
A. Server\utils\logs\imsTrace.log
B. Server\utils\logs\install.txt
C. %TEMP%\utils\logs\vminst.log
D. %TEMP%\vminst.log
【多选题】
An administrator is unable to remove an ESXi 6.x host from a vSphere Distributed Switch. What are two likely reasons for this issue? (Choose two.)___
A. Vmkernel interfaces on the switch are still in use.
B. VM Network port group adapters are connected to different switch.
C. Physical NICs are migrated to different switch.
D. VM Network adapters are connected to this switch.
【多选题】
Which two Identity Sources are available to add for vCenter Single Sign-On authentication? (Choose two.)___
A. LocalOS
B. OpenLDAP
C. NIS as an LDAP Server
D. VCMSDS
【多选题】
What are three goals of resource management within a cluster? (Choose three.)___
A. To prevent virtual machines from monopolizing resources and to guarantee predictable service rates.
B. To exploit undercommitted resources and overcommit with graceful degradation.
C. To provide solutions to potential problems that you might encounter when using vCenter Server.
D. To control the relative importance of virtual machines and provide flexible dynamic partitioning.
E. To provide additional network administration capabilities.
【多选题】
Which three actions can be taken as a result of executing the vSphere Update Manager 6.x scan and remediation wizards? (Choose three.)___
A. Install and upgrade software in virtual machines.
B. Upgrade the firmware on ESXi host devices.
C. Upgrade and Patch ESXi hosts.
D. Install and update third-party software on hosts.
E. Upgrade virtual machine hardware.
【多选题】
Which two statements are true about deploying and using vSphere Replication? (Choose two.)___
A. ESXi hosts managed by a single vCenter Server instance require a connection between the two vSphere Replication appliances.
B. Sites managed by different vCenter Server instances require a connection between the two vSphere Replication appliances.
C. Sites managed by different vCenter Server instances require the use of Site Recovery Manager and a connection between the two vSphere Replication appliances.
D. ESXi hosts managed by a single vCenter Server instance require a single vSphere Replication appliance.
【多选题】
An administrator is attempting to power on a virtual machine, but the task is hanging at 95%. What three scenarios best explain why this problem is happening? (Choose three.)___
A. A virtual machine question is currently being posed to the administrator.
B. Another task for the virtual machine or other component is already in progress.
C. The VMware High Availability cluster has insufficient resources to guarantee failover.
D. The host has lost access to the storage device containing the virtual machine files.
E. The host is under resource contention and unable to power on the virtual machine.
【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
【多选题】
Which two storage controller configurations can be used with Virtual SAN? (Choose two.)___
A. SAS controllers in Passthrough mode
B. SAS controllers in RAID0 mode
C. SAS controllers in RAID1 mode
D. SAS controllers in RAID10 mode
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
推荐试题
【单选题】
[单选题]按造价形成划分,建筑安装工程费由___组成
A. 人工费+材料费+施工机具使用费+措施项目费+规费+税金
B. 人工费+材料费+施工机具使用费+其他项目费+规费+税金
C. 分部分项工程费+措施项目费+其他项目费+规费+税金
D. 分部分项工程费+施工机具使用费+其他项目费+规费+税金
【单选题】
[单选题]根据《建筑安装工程费用项目组成》(建标[2013]44号),工程施工中所使用的仪器仪表的维修费用应计入___
A. 工具用具使用费
B. 固定资产使用费
C. 企业管理费
D. 施工机具使用费
【单选题】
[单选题]某建筑工程项目的分部分项工程费为180万元,其中人工费为45万元,可计量的措施项目费为65万元,安全文明施工费以定额基价为计算基础,费率为2.25%,则该项目的安全文明施工费为___万元。
A. 1.46
B. 2.48
C. 4.05
D. 5.51
【单选题】
[单选题]根据现行《建筑安装工程费用项目组成》健建标2013]44号),教育费附加应计入建筑安装工程的___。
A. 税金
B. 措施费
C. 规费
D. 企业管理费
【单选题】
[单选题]施工企业对新结构、新材料的试验费属于___。
A. 材料费
B. 检验试验费
C. 工程建设其他费用
D. 措施项目费
【单选题】
[单选题]下列费用中不属于施工机具使用费的是___。
A. 施工机械在规定年限内的折日费
B. 施工机械必要的大修理费
C. 施工机械的各级保养和临时故障排除所需的费用
D. 大型施工机械在现场进行安装与拆卸的费用
【单选题】
[单选题]某施工企业按规定为职工购买防暑降温饮料的支出属于___
A. 人工费里的补贴
B. 职工福利费
C. 劳动保护费
D. 企业管理费中的其他费用
【单选题】
[单选题]某施工企业按规定为职工购买防暑降温饮料的支出属于___
A. 人工费里的补贴
B. 职工福利费
C. 劳动保护费
D. 企业管理费中的其他费用
【单选题】
[单选题]某施工企业按规定标准为职工缴纳的住房公积金属于___
A. 企业管理费
B. 社会保险费
C. 规费
D. 税金
【单选题】
[单选题]建筑安装工程费用中的安全文明施工费中不包括___。
A. 环境保护费
B. 安全施工费
C. 工程排污费
D. 临时设施费
【单选题】
[单选题]某项目编制施工成本计划时,先将成本按分部分项工程进行了划分,又将各分部分项工程成本按人工费、材料费和施工机械使用费等分开编制,这种编制方法属于___
A. 按施工成本组成编制施工成本计划
B. 按项目组成编制施工成本计划
C. 按工程进度编制施工成本计划
D. 上述A、B两种方法的综合运用
【单选题】
[单选题]根据《建筑安装工程费用项目组成》建标[2018]44号),下列费用中,应计入措施项目费的是___。
A. 工程定位复测费
B. 检验试验费
C. 总承包服务费
D. 施工机具使用费
【单选题】
[单选题]施工过程中施工测量放线和复测工作发生的费用应计入___
A. 分部分项工程费
B. 其他项目费
C. 企业管理费
D. 措施项目费
【单选题】
[单选题]根据《建设工程工程量清单计价规范》GB50500-2013.下列费用可用暂列金额支付的是___
A. 业主提出设计变更增加的费用
B. 业主提供了暂估价的材料采购费用
C. 因承包人原因导致隐蔽工程质量不合格的返工费用
D. 固定总价合同中材料价格上涨费用
【单选题】
[单选题]根据现行《建筑安装工程费用项目组成》(建标[2013]144号),暂列金额应计入建筑安装工程的___
A. 规费
B. 指施费
C. 人工费
D. 其他项目费
【单选题】
[单选题]下列关于预算定额的表述中,正确的是___
A. 预算定额是合理确定建设工程项目投资的基础
B. 预算定额是社会性质的定额,可用于施工项目的施工管理
C. 预算定额是企业性质的定额,可以用来确定工程造价
D. 预算定额是以建筑物或构筑物各个分部分项工程为对象编制的
【单选题】
[单选题]在下列建设工程定额中,分项最细、定额子目最多的是___
A. 施工定额
B. 预算定额
C. 概算定额
D. 概算指标
【单选题】
[单选题]按照定额项目综合程度从大到小排序,下列顺序中正确的是___。
A. 施工定额、预算定额、概算定额
B. 预算定额、概算定额、施工定额
C. 概算定额、预算定额、施工定额
D. 施工定额、概算定额、预算定额
【单选题】
[单选题]下列工作中,应以预算定额作为编制依据的是___。
A. 编制施工作业计划
B. 编制单位估价表
C. 建设单位编制年度投资计划
D. 结算计件工资
【单选题】
[单选题]在制定材料消耗定额时,可以用来确定材料损耗率的方法是___。
A. 理论计算法
B. 观察法
C. 经验法
D. 计算法
【单选题】
[单选题]施工定额是企业性质的定额,可以用来___
A. 确定工程造价
B. 控制建设工程投资
C. 编制施工作业计划
D. 进行建设项目管理
【单选题】
[单选题]施工定额的研究对象是同性质的施工过程,这里的施工过程是指___
A. 工序
B. 分部工程
C. 分项工程
D. 整个建筑物
【单选题】
[单选题]下列关于投资估算指标的表述中错误的是___
A. 投资估算指标是概算指标的综合与扩大
B. 投资估算指标是在项目建议书阶段编制投资估算时使用的
C. 投资估算指标是以独立的单项工程或完整的工程项目为对象编制的
D. 投资估算指标是根据已建或现有工程的价格数据和资料编制的
【单选题】
[单选题]在招投标过程中,若出现招标文件中分部分项工程量淸单特征描述与设计图纸不符,投标人应以___为准确定投标报价的综合单价。
A. 设计图纸
B. 消耗量定额
C. 工程量清单的项目特征描述
D. 企业定额
【单选题】
[单选]根据《建设工程工程量清单计价规范》GB50500--013,招标文件中要求投标人承担的风险费用,投标人应___。
A. 在投标总价的基础上加上一定比例
B. 在综合单价中给予考虑
C. 在总承包服务中给予考虑
D. 在其他项目费中给予考虑
【单选题】
[单选题]招标文件中的工程量清单标明的工程量是___。
A. 按施工图图示尺寸和清单工程量计算规则计算得到的工程净量
B. 承包人在履行合同义务中应予完成的实际工程量
C. 设计文件结合不同施工方案确定的工程量均值
D. 工程实体量和损耗量的合计
【单选题】
[单选题]某工程施工期间,因承包人原因导致工期延误,且在延误期内国家相关政策发生变化,由此引起的合同价款调整,应该___。
A. 调增的和调减的均予以调整
B. 调增的和调减的均不予调整
C. 调增的不予调整,调减的予以调整
D. 调增的予以调整,调减的不予调整
【单选题】
[单选题]合同工程实施期间,如果出现设计图纸(含设计变更)与招标工程量淸单任一项目的特征描述不符,且由此导致工程造价增减变化的,应按___的规定重新确定相应工程量清单项目的综合单价,调整合同价款。
A. 实际施工的项目特征
B. 设计图纸的项目特征
C. 招标工程量清单
D. 暂估价
【单选题】
[单选题]合同工程实施期间,如果出现招标工程量淸单中措施项目缺项,承包人应将新增措施项目实施方案提交发包人批准后,按照___的规定调整合同价款
A. 变更价款
B. 计价规范
C. 合同约定
D. 措施项目清单
【单选题】
[单选题]根据现行合同价款的调整要求,承包人采购材料和工程设备的,应在合同中约定主要材料或工程设备价格变化的范围和幅度,如没有约定,则单价变化超过___时,纷应做相应的调整。
A. 5%
B. 10%
C. 15%
D. 20%
【单选题】
[单选题]施工期间,需要进行价格调整的材料,承包人在采购前应将材料单价和采购数量报发包人核对,发包人应在___天内予以答复,否则视为已经认可。
【单选题】
[单选题]工程施工过程中,下列因不可抗力事件导致的人员伤亡、财产损失及其费用增加,由承包人承担的是___
A. 合同工程本身损害
B. 施工机械的停工损失
C. 待安装设备的损害
D. 工程修复费用
【单选题】
[单选题]工程变更引起施工方案改变,并使措施项目发生变化的,承包人提出调整措施项目费的,需按照实际发生变化的措施项目调整,其中不考虑承包人报价浮动因素的是___
A. 安全文明施工费
B. 二次搬运费
C. 冬雨期施工费
D. 夜间施工增加费
【单选题】
[单选题]某新校区抗震模拟实验室工程,主体部分采用钢架结构,施工合同约定钢材由业主供料,其余材料均委托承包商采购。但承包商在以自有机械设备进行主体钢结构制f吊装过程中,由于业主供应钢材不及时导致承包商停工7天,则承包商计算施工机械窝工费时,应按___向业主提出索赔
A. 机械台班费
B. 机械租赁费
C. 机械使用费
D. 机械台班折旧费
【单选题】
[单选题]由于业主原因,造成工期延长。在工期延长期间的管理人员的工资、办公、通讯和交通费等应归为索赔费用中的___
A. 人工费
B. 利润
C. 管理费
D. 间接费
【单选题】
[单选题]根据《标准施工招标文件》中通用条款的内容,由于发包人提供的材料和工程设备不符合合同要求,承包人可以向发包人索赔___
A. 工期+利润
B. 工期+费用
C. 费用+利润
D. 工期+费用+利润
【单选题】
[单选题]在索赔费用的计算方法中,___是最常用的种方法。
A. 实际费用法
B. 总费用法
C. 修正总费用法
D. 实物费用法
【单选题】
[单选题]某合同工程由于设计变更,发生现场签证事项,承包人为了赶工,在末经发包人现场确认和书面同意的情况下便擅自施工,由此产生的费用由___承担
A. 发包人
B. 承包人
C. 承发包双方共同
D. 设计单位
【单选题】
[单选题]根据现场签证程序,承包人应在现场签证工作完成后的7天内,向发包人提交现场签证报告,发包人应在收到现场签证报告后的___小时内对报告内容进行核实,予以确认或提出修改意见
【单选题】
[单选题]某包工包料工程发包后,发包人在预付款期满后的7天内仍未支付的,承包人可在付款期满后的第___天起暂停施工,发包人承担由此增加的费用和延误的工期。