【多选题】
A 4 GB Memory virtual machine is experiencing extended memory issues, as shown in the Exhibit. What potential issues could be attributed to this memory pressure?___
A. A limit is imposed on the virtual memory of this virtual machine.
B. The Balloon driver has been uninstalled.
C. A limit has been imposed on the Virtual CPU of the virtual machine.
D. Storage IO control has been enabled for the virtual machine causing the swapped memory.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【多选题】
You are creating a virtual machine in the Web Client using the New Virtual Machine wizard. Which two steps are required? (Choose two.)___
A. Select a valid name.
B. Select a cluster for the compute resource.
C. Select a network adapter.
D. Select the virtual machine compatibility.
【多选题】
An administrator has been given requirements to configure vMotion for a new virtual machine. The configuration should: <Provide Network Redundancy Use VLAN 550> <Be secured against anyone trying to spoof communication The vSwitch1 configuration is shown in the Exhibit.> Which three changes should be made to meet the stated requirements? (Choose three.)___
A. The VLAN ID must be set appropriately.
B. The default values for MAC Address Changes and Forged Transmits must be altered.
C. The teaming and failover adapters must be set appropriately.
D. The Traffic Shaping configuration must be altered.
E. The Load Balancing Policy must be set appropriately.
【多选题】
Which three traffic types are available services options when configuring a vmkernel port? (Choose three.)___
A. Provisioning Traffic
B. Virtual Volumes Traffic
C. vSphere Replication NFC Traffic
D. Virtual SAN Traffic
E. FCoE Traffic
【多选题】
An administrator logs into the vSphere Web Client, but is unable to see any hosts and clusters. Which two options could fix the problem? (Choose two.)___
A. Verify that the client web browser and vCenter Server are in the same broadcast domain.
B. Verify that the vCenter Server system is registered with the same Platform Services Controller as the vSphere Web Client.
C. Log in to the vCenter Server as a user within the Active
D. irectory domain.
【多选题】
Which three VLAN Tagging modes are available in vSphere 6.x? (Choose three.)___
A. External Switch Tagging
B. Private VLAN Tagging
C. Virtual Switch Tagging
D. VXLAN Tagging
E. Virtual Guest Tagging
【多选题】
Which two statements are true about VMFS5 datastores on ESXi 6.x? (Choose two.)___
A. Virtual Disk (VMDK) size can be larger than 2TB.
B. Datastore extent size can be larger than 2TB.
C. Only Physical Mode Raw
D. evice Map (Passthrough-RDM) can be larger than 2TB.
【多选题】
Which two statements are correct when turning off a Distributed Resource Scheduler (DRS) Cluster? (Choose two.)___
A. The resource pool hierarchy of the DRS cluster is maintained.
B. The resource pool hierarchy of the DRS cluster is removed.
C. The affinity settings of the
D. RS cluster are removed and not maintained when DRS is re-enabled.
【多选题】
An administrator is creating a new Virtual SAN cluster on a Layer 2 network. There is an existing Virtual SAN cluster on the same Layer 2 network. Which two actions would allow the new Virtual SAN cluster to coexist with the older cluster? (Choose two.)___
A. Change the default Multicast Address on the new Virtual SAN cluster.
B. Change the default Unicast Address on the new Virtual SAN Cluster.
C. Create a separate VLAN for each cluster.
D. Create an ARP Alias for the Virtual SAN VMkernel Network Adapter.
【多选题】
A vCenter Operations Manager 5.7 environment is upgraded to vRealize Operations. After the upgrade, the analytics services fail to start. Which three steps must be taken to resolve the problem? (Choose three.)___
A. Take the vRealize Operations cluster offline.
B. Delete the activity persistence files.
C. Bring the cluster back online.
D. Remove any unresponsive nodes.
E. Stop the CaSA service.
【多选题】
An organization has an ESXi 6.x host that contains two resource pools. The host is being relocated to a DRS cluster. What two actions can be taken to integrate the host into the cluster, and what would happen to the existing ESXi resource pool hierarchy as a result? (Choose two.)___
A. Place all of the host's virtual machines into the DRS cluster root resource pool. The resource pools present on the host will be deleted.
B. Create a resource pool for the ESXi host's virtual machines and resource pools. The resource pools present on the host will be deleted.
C. Place all of the host's virtual machines into the DRS cluster root resource pool. The resource pools present on the host will be preserved.
D. Create a resource pool for the
E. SXi host's virtual machines and resource pools. The resource pools present on the host will be preserved.
【多选题】
Which two parameters are required when adding an iSCSI target to an iSCSI Software Adapter using Dynamic Discovery? (Choose two.)___
A. The iSCSI device's IP Address or Fully Qualified Domain Name
B. The Port Number
C. The iSCSI device's iSCSI Qualified Name (IQN)
D. The Default Gateway IP Address
【多选题】
Which two SMTP Notification Event Details are specific to alarms triggered by events? (Choose two.)___
A. User Name
B. Summary
C. Old Status
D. Target
【多选题】
Which two High Availability ___ Cluster admission control policies can help avoid resource fragmentation? (Choose two.)(AC)
A. Define failover capacity by static number of hosts
B. Define failover capacity by reserving a percentage of the cluster resources
C. Use dedicated failover hosts
D. Use Virtual Machine Monitoring
【多选题】
An attempt to enable vSphere Fault Tolerance for a powered-on virtual machine fails. Which two scenarios would result in this failure? (Choose two.)___
A. The virtual machine has three vCPUs configured.
B. The host on which the virtual machine is running has insufficient memory resources.
C. The virtual machine has insufficient resources to accommodate full reservation plus the overhead memory.
D. VMware High Availability is enabled on the cluster of which this host is a member.
【多选题】
A vApp template recently added to a Content Library is not displayed. Which two actions could correct this problem? (Choose two.)___
A. Manually synchronize the library
B. Select the Download all library content immediately option
C. Select the Sync subscribed library option
D. Manually download the vApp template
【多选题】
What are three valid disk configurations for the vSphere Data Protection 6.x Appliance? (Choose three.)___
A. 500GB
B. 1TB
C. 1.5TB
D. 2TB
E. 4TB
【多选题】
Which three connection types are available when configuring a vSwitch in the vSphere Web Client? (Choose three.)___
A. VMkernel Network Adapter
B. Physical Network Adapter
C. Virtual Machine Port Group for a Standard Switch
D. vMotion Network Adapter
E. vSAN Network Adapter
【多选题】
Which three features can be enabled for a new host cluster? (Choose three.)___
A. Storage Distributed Resource Scheduling
B. High Availability
C. Fault Tolerance
D. Distributed Resource Scheduling
E. Virtual SAN
【多选题】
An administrator receives a report that no real time statistics are available for a virtual machine in the vCenter Server inventory. Which two statements indicate likely causes of the problem? (Choose two.)___
A. The virtual machine is powered off.
B. The host containing the virtual machine is disconnected from vCenter Server.
C. There is insufficient real time data to display the information.
D. The vCenter Server service is not running.
【多选题】
Your manager has given you a bash script that retrieves data for ESXi 6.x host configurations. This data needs to be collected right after the installation of a host and must be run directly on the host. Which two actions can be used to run this script on an ESXi host? (Choose two.)___
A. Connect to the host with Ruby vSphere Console and run the script from there.
B. Enable SSH access from the Direct Console User Interface.
C. Enable the ESXi Shell from the
D. irect Console User Interface.
【多选题】
Which two are true about the Risk badge in vRealize Operations? (Choose two.)___
A. The Risk badge indicates potential future problems that may degrade the performance of the system.
B. Risks may require attention in the near future.
C. The Risk badge indicates problems that are degrading performance of the system.
D. Risks require attention now to correct system performance problems.
【多选题】
vSphere Update Manager allows which two virtual machine attributes to be upgraded? (Choose two.)___
A. Virtual machine firewall policies for NSX.
B. Software Packages in the virtual machine.
C. Virtual machine Hardware Version.
D. VMware Tools Upgrade.
【多选题】
What are two benefits of using NFS 4.1 with vSphere 6.x as compared to NFS 3? (Choose two.)___
A. NFS 4.1 supports Kerberos Authentication
B. NFS 4.1 supports multipathing
C. NFS 4.1 supports IPv6
D. NFS 4.1 supports hardware acceleration
【多选题】
Which three statements are true regarding Fault Tolerance? (Choose three.)___
A. Applications need to be continuously available to users.
B. Applications without native clustering capabilities can be protected.
C. Custom clustering solutions are complicated to configure and maintain.
D. Applications that have 16 vCPUs are supported.
E. Prevents application crashes by analyzing the workload and correcting problems.
【多选题】
Which two statements are true regarding VMware vSphere Flash Read Cache (vFRC)? (Choose two.)___
A. Cache fills and cache evictions happen in the granularity of a cache block size.
B. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying storage.
C. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying cache data.
D. Cache fills and cache evictions happen in the granularity of the disk block size.
【多选题】
What are two possible causes of Storage Distributed Resource Scheduler (SDRS) being disabled on one or more virtual machine disks in a datastore cluster? (Choose two.)___
A. The virtual machine has vSphere Fault Tolerance disabled.
B. The virtual machine is a template.
C. The virtual machine swap file is on a shared datastore.
D. The disk is a CD-ROM/ISO file.
【多选题】
An administrator attempts to install vCenter Single Sign-On Server. The installer returns an error message indicating that the installation failed. Prior to the installation, all setup prerequisites were met. The administrator has generated a vCenter Server Single Sign-On support bundle. Which two files should the administrator analyze to determine the cause of the failure? (Choose two.)___
A. Server\utils\logs\imsTrace.log
B. Server\utils\logs\install.txt
C. %TEMP%\utils\logs\vminst.log
D. %TEMP%\vminst.log
【多选题】
An administrator is unable to remove an ESXi 6.x host from a vSphere Distributed Switch. What are two likely reasons for this issue? (Choose two.)___
A. Vmkernel interfaces on the switch are still in use.
B. VM Network port group adapters are connected to different switch.
C. Physical NICs are migrated to different switch.
D. VM Network adapters are connected to this switch.
【多选题】
Which two Identity Sources are available to add for vCenter Single Sign-On authentication? (Choose two.)___
A. LocalOS
B. OpenLDAP
C. NIS as an LDAP Server
D. VCMSDS
【多选题】
What are three goals of resource management within a cluster? (Choose three.)___
A. To prevent virtual machines from monopolizing resources and to guarantee predictable service rates.
B. To exploit undercommitted resources and overcommit with graceful degradation.
C. To provide solutions to potential problems that you might encounter when using vCenter Server.
D. To control the relative importance of virtual machines and provide flexible dynamic partitioning.
E. To provide additional network administration capabilities.
【多选题】
Which three actions can be taken as a result of executing the vSphere Update Manager 6.x scan and remediation wizards? (Choose three.)___
A. Install and upgrade software in virtual machines.
B. Upgrade the firmware on ESXi host devices.
C. Upgrade and Patch ESXi hosts.
D. Install and update third-party software on hosts.
E. Upgrade virtual machine hardware.
【多选题】
Which two statements are true about deploying and using vSphere Replication? (Choose two.)___
A. ESXi hosts managed by a single vCenter Server instance require a connection between the two vSphere Replication appliances.
B. Sites managed by different vCenter Server instances require a connection between the two vSphere Replication appliances.
C. Sites managed by different vCenter Server instances require the use of Site Recovery Manager and a connection between the two vSphere Replication appliances.
D. ESXi hosts managed by a single vCenter Server instance require a single vSphere Replication appliance.
【多选题】
An administrator is attempting to power on a virtual machine, but the task is hanging at 95%. What three scenarios best explain why this problem is happening? (Choose three.)___
A. A virtual machine question is currently being posed to the administrator.
B. Another task for the virtual machine or other component is already in progress.
C. The VMware High Availability cluster has insufficient resources to guarantee failover.
D. The host has lost access to the storage device containing the virtual machine files.
E. The host is under resource contention and unable to power on the virtual machine.
【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
【多选题】
Which two storage controller configurations can be used with Virtual SAN? (Choose two.)___
A. SAS controllers in Passthrough mode
B. SAS controllers in RAID0 mode
C. SAS controllers in RAID1 mode
D. SAS controllers in RAID10 mode
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
【多选题】
An administrator is deploying multiple Windows 2003 Virtual Machines from the same template. What two steps should be taken to avoid network conflicts? (Choose two.)___
A. Customize the guest operating system.
B. Install VMware Tools into the new virtual machines.
C. Copy the Microsoft Sysprep tools onto the vCenter Server system.
D. Ensure the e1000 vmnic is selected for each new virtual machine.
推荐试题
【判断题】
检修、维护等采购项目,估算金额在200万元以上,属于集团采购管理范围。
【判断题】
合同承办部门负责审查合同项下支付条件是否成熟。支付条件成熟时,及时按照本标准5.8 条及Q/TY 206001、Q/TY 207002规定提出支付申请,若走线下流程签订费用支付申请表。
【判断题】
合同应采用书面形式,公司有合同范本的,应优先选用公司范本。
【判断题】
合同用语应严谨、简练、准确、正式,合同中的术语、专用词汇、重要概念原则上应设专款解释,合同价款必须同时采用中文大写标明,并注明货币种类。除特殊情况外,合同文本应当正式打印或印刷制成。
【判断题】
质量标准,质量标准按国家有关标准或部颁标准和行业标准执行。合同中必须写明标准的代号、编号和名称。虽有上述标准但如公司有特殊要求的,则应与对方按商定的技术条件、样品或补充的技术要求签订技术协议,作为合同的附件;
【判断题】
对于生产施工类合同,还应附安全协议。安全协议或/和廉政协议未签署的,不得签署主合同。安全协议由安全监察部提供模版或指导完成,廉政协议由纪检审计室配合完成。
【判断题】
合同谈判必须有纪检审计室、计划发展部、合同承办部门等相关部门人员参加。
【判断题】
若为采购分管领导口头授权计划发展部组织的,需在合同谈判记录中签署意见。
【判断题】
谈判过程以及最终的谈判结果需向合同签署人汇报。
【判断题】
合同审核时,审核意见应明确、具体,不得使用“原则同意”、“基本可行”等模糊性语言,一旦使用,视为对合同草案的否定。
【判断题】
公司各部门均不得以部门名义对外签订合同。公司各部门人员非经授权不得以公司名义对外签订合同或其他对本公司具有约束力的法律文件。
【判断题】
合同订立阶段,所有经招标的项目,合同的起草及合同谈判必须以招标文件中的合同文本为基础,结合投标文件及有效的补充文件(信函和澄清等)与中标人进行谈判和澄清,不得违反原则性条款,重大变更需由采购委员会同意后方可调整。
【判断题】
所有合同范围内变更,变更申请同意后,合同承办部门需在ERP合同管理系统上在合同关闭前发起合同变更流程。
【判断题】
所有联系单都必须明确是否涉及费用、预计涉及费用的额度,对于涉及费用的联系单,必须随附费用预算单。
【判断题】
联系单原则上一事一单,以便于保管和发送,对工作的原因、内容、应达的标准、完成时间、涉及费用等应明确、清晰。对承包方的工作联系单必须由合同承办部门发出,没有联系单的不得结算
【填空题】
1.工作票管理办法适用于公司___、___工作、光缆维护检修工作及其它各项维护检修工作。
【填空题】
2.工作监护人:指工作作业时,负有监护职责的___、___人员、___人员和线路管理人员。
【填空题】
3.设备停运或退出运行:在___中的设备经调度许可由运行值班人员操作,停止运行或停止备用,以进行检修、试验或其它工作。
【填空题】
4.生产区域:指站场工艺区、___工艺区、输气管道、___、站控室。
【填空题】
5.涉及如动火、___、___、管线打开、___、脚手架等特种,需按照公司《动火工作票管理办法》和特种作业管理相关规定开具特种作业票。
【填空题】
6.各级审批人及工作票签发人负责审查工作的作业方案、___、___是否符合作业安全要求,对不完善部分,提出整改意见。
【填空题】
7.工作负责人负责检查工作票所列的安全措施是否正确完善,根据本工作票实际工作内容采取必须的___,并做好___。
【填空题】
8.工作许可人负责向工作负责人正确说明哪些设备___或具有的危险性性等,交待清楚___和注意事项。
【填空题】
9.___负责做好相关的操作工作,重点全面监护___的现场作业。
【填空题】
10.在落实安全措施后,工作内容仍可能造成管线停输、气源中断、___、其他用户非计划停输,中控、站控___影响生产运行监控的作业,以及对人身安全、设备安全、生产安全或用户造成严重危害或影响的作业,必须开具___级工作票。
【填空题】
11.一级工作票由工作负责人申请、___签发,技术质量部、安全监察部、调度运行中心负责人会审,___批准,经___审批许可后,由输气站现场许可。
【填空题】
12.一级工作票有效期一般为___个小时;特殊情况可申请延期,延期最多不得超过___小时。
【填空题】
13.二级工作票由工作负责人申请、作业部门___、主任工程师及以上负责人签发,经___审批许可后,由输气站现场许可。
【填空题】
14.二级工作票有效期一般为___个小时;特殊情况可申请延期,延期最多不得超过___小时。
【填空题】
15.涉及技改、大修等时间跨度较长的施工作业,工作票的有效期可开具___。
【填空题】
16.对非生产区域和生产区域部分辅助设备检维修,对生产运行无影响的作业,不涉及特种作业许可的,由作业部门填写___,填写清楚作业内容,做好风险分析,落实安全措施,经___或___安全检查,签字确认后方可作业。
【填空题】
17.当生产设备发生故障被迫紧急停止运行,需立即恢复、抢修、排除故障的工作,且___不在现场时,可以使用___。
【填空题】
18.《临时/应急作业单》可用于___、双休日、___期间需对生产设备进行应急抢修时使用。
【填空题】
19.一张工作票中,___、___和___三者不得相互兼任。一个工作负责人不得在同一现场作业期间内,担任两个及以上工作任务的负责人或工作组成员。
【填空题】
20.一、二级工作票签发后,由___通知调度中心,经值班调度签署意见后,打印纸质工作票递交___办理许可手续。
【填空题】
21.___及___人员,在公司所辖生产范围内进行安装、检修、试验等工作,工作票签发人仍由本公司具备相应资格的人员签发、审批。
【填空题】
22.工作负责人对照工作票检查安全措施已正确执行后,工作许可人填写___并签名,工作负责人签字确认。
【填空题】
23.工作负责人或工作许可人不允许在开工以后单方面变更___,如需变更,应先停止工作,双方重新进行安全检查确认后,方可实施作业。
【填空题】
24.一张工作票工作负责人只允许变更___次
【填空题】
25.原、现工作负责人应对工作任务和___进行交接