【多选题】
A 4 GB Memory virtual machine is experiencing extended memory issues, as shown in the Exhibit. What potential issues could be attributed to this memory pressure?___
A. A limit is imposed on the virtual memory of this virtual machine.
B. The Balloon driver has been uninstalled.
C. A limit has been imposed on the Virtual CPU of the virtual machine.
D. Storage IO control has been enabled for the virtual machine causing the swapped memory.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【多选题】
You are creating a virtual machine in the Web Client using the New Virtual Machine wizard. Which two steps are required? (Choose two.)___
A. Select a valid name.
B. Select a cluster for the compute resource.
C. Select a network adapter.
D. Select the virtual machine compatibility.
【多选题】
An administrator has been given requirements to configure vMotion for a new virtual machine. The configuration should: <Provide Network Redundancy Use VLAN 550> <Be secured against anyone trying to spoof communication The vSwitch1 configuration is shown in the Exhibit.> Which three changes should be made to meet the stated requirements? (Choose three.)___
A. The VLAN ID must be set appropriately.
B. The default values for MAC Address Changes and Forged Transmits must be altered.
C. The teaming and failover adapters must be set appropriately.
D. The Traffic Shaping configuration must be altered.
E. The Load Balancing Policy must be set appropriately.
【多选题】
Which three traffic types are available services options when configuring a vmkernel port? (Choose three.)___
A. Provisioning Traffic
B. Virtual Volumes Traffic
C. vSphere Replication NFC Traffic
D. Virtual SAN Traffic
E. FCoE Traffic
【多选题】
An administrator logs into the vSphere Web Client, but is unable to see any hosts and clusters. Which two options could fix the problem? (Choose two.)___
A. Verify that the client web browser and vCenter Server are in the same broadcast domain.
B. Verify that the vCenter Server system is registered with the same Platform Services Controller as the vSphere Web Client.
C. Log in to the vCenter Server as a user within the Active
D. irectory domain.
【多选题】
Which three VLAN Tagging modes are available in vSphere 6.x? (Choose three.)___
A. External Switch Tagging
B. Private VLAN Tagging
C. Virtual Switch Tagging
D. VXLAN Tagging
E. Virtual Guest Tagging
【多选题】
Which two statements are true about VMFS5 datastores on ESXi 6.x? (Choose two.)___
A. Virtual Disk (VMDK) size can be larger than 2TB.
B. Datastore extent size can be larger than 2TB.
C. Only Physical Mode Raw
D. evice Map (Passthrough-RDM) can be larger than 2TB.
【多选题】
Which two statements are correct when turning off a Distributed Resource Scheduler (DRS) Cluster? (Choose two.)___
A. The resource pool hierarchy of the DRS cluster is maintained.
B. The resource pool hierarchy of the DRS cluster is removed.
C. The affinity settings of the
D. RS cluster are removed and not maintained when DRS is re-enabled.
【多选题】
An administrator is creating a new Virtual SAN cluster on a Layer 2 network. There is an existing Virtual SAN cluster on the same Layer 2 network. Which two actions would allow the new Virtual SAN cluster to coexist with the older cluster? (Choose two.)___
A. Change the default Multicast Address on the new Virtual SAN cluster.
B. Change the default Unicast Address on the new Virtual SAN Cluster.
C. Create a separate VLAN for each cluster.
D. Create an ARP Alias for the Virtual SAN VMkernel Network Adapter.
【多选题】
A vCenter Operations Manager 5.7 environment is upgraded to vRealize Operations. After the upgrade, the analytics services fail to start. Which three steps must be taken to resolve the problem? (Choose three.)___
A. Take the vRealize Operations cluster offline.
B. Delete the activity persistence files.
C. Bring the cluster back online.
D. Remove any unresponsive nodes.
E. Stop the CaSA service.
【多选题】
An organization has an ESXi 6.x host that contains two resource pools. The host is being relocated to a DRS cluster. What two actions can be taken to integrate the host into the cluster, and what would happen to the existing ESXi resource pool hierarchy as a result? (Choose two.)___
A. Place all of the host's virtual machines into the DRS cluster root resource pool. The resource pools present on the host will be deleted.
B. Create a resource pool for the ESXi host's virtual machines and resource pools. The resource pools present on the host will be deleted.
C. Place all of the host's virtual machines into the DRS cluster root resource pool. The resource pools present on the host will be preserved.
D. Create a resource pool for the
E. SXi host's virtual machines and resource pools. The resource pools present on the host will be preserved.
【多选题】
Which two parameters are required when adding an iSCSI target to an iSCSI Software Adapter using Dynamic Discovery? (Choose two.)___
A. The iSCSI device's IP Address or Fully Qualified Domain Name
B. The Port Number
C. The iSCSI device's iSCSI Qualified Name (IQN)
D. The Default Gateway IP Address
【多选题】
Which two SMTP Notification Event Details are specific to alarms triggered by events? (Choose two.)___
A. User Name
B. Summary
C. Old Status
D. Target
【多选题】
Which two High Availability ___ Cluster admission control policies can help avoid resource fragmentation? (Choose two.)(AC)
A. Define failover capacity by static number of hosts
B. Define failover capacity by reserving a percentage of the cluster resources
C. Use dedicated failover hosts
D. Use Virtual Machine Monitoring
【多选题】
An attempt to enable vSphere Fault Tolerance for a powered-on virtual machine fails. Which two scenarios would result in this failure? (Choose two.)___
A. The virtual machine has three vCPUs configured.
B. The host on which the virtual machine is running has insufficient memory resources.
C. The virtual machine has insufficient resources to accommodate full reservation plus the overhead memory.
D. VMware High Availability is enabled on the cluster of which this host is a member.
【多选题】
A vApp template recently added to a Content Library is not displayed. Which two actions could correct this problem? (Choose two.)___
A. Manually synchronize the library
B. Select the Download all library content immediately option
C. Select the Sync subscribed library option
D. Manually download the vApp template
【多选题】
What are three valid disk configurations for the vSphere Data Protection 6.x Appliance? (Choose three.)___
A. 500GB
B. 1TB
C. 1.5TB
D. 2TB
E. 4TB
【多选题】
Which three connection types are available when configuring a vSwitch in the vSphere Web Client? (Choose three.)___
A. VMkernel Network Adapter
B. Physical Network Adapter
C. Virtual Machine Port Group for a Standard Switch
D. vMotion Network Adapter
E. vSAN Network Adapter
【多选题】
Which three features can be enabled for a new host cluster? (Choose three.)___
A. Storage Distributed Resource Scheduling
B. High Availability
C. Fault Tolerance
D. Distributed Resource Scheduling
E. Virtual SAN
【多选题】
An administrator receives a report that no real time statistics are available for a virtual machine in the vCenter Server inventory. Which two statements indicate likely causes of the problem? (Choose two.)___
A. The virtual machine is powered off.
B. The host containing the virtual machine is disconnected from vCenter Server.
C. There is insufficient real time data to display the information.
D. The vCenter Server service is not running.
【多选题】
Your manager has given you a bash script that retrieves data for ESXi 6.x host configurations. This data needs to be collected right after the installation of a host and must be run directly on the host. Which two actions can be used to run this script on an ESXi host? (Choose two.)___
A. Connect to the host with Ruby vSphere Console and run the script from there.
B. Enable SSH access from the Direct Console User Interface.
C. Enable the ESXi Shell from the
D. irect Console User Interface.
【多选题】
Which two are true about the Risk badge in vRealize Operations? (Choose two.)___
A. The Risk badge indicates potential future problems that may degrade the performance of the system.
B. Risks may require attention in the near future.
C. The Risk badge indicates problems that are degrading performance of the system.
D. Risks require attention now to correct system performance problems.
【多选题】
vSphere Update Manager allows which two virtual machine attributes to be upgraded? (Choose two.)___
A. Virtual machine firewall policies for NSX.
B. Software Packages in the virtual machine.
C. Virtual machine Hardware Version.
D. VMware Tools Upgrade.
【多选题】
What are two benefits of using NFS 4.1 with vSphere 6.x as compared to NFS 3? (Choose two.)___
A. NFS 4.1 supports Kerberos Authentication
B. NFS 4.1 supports multipathing
C. NFS 4.1 supports IPv6
D. NFS 4.1 supports hardware acceleration
【多选题】
Which three statements are true regarding Fault Tolerance? (Choose three.)___
A. Applications need to be continuously available to users.
B. Applications without native clustering capabilities can be protected.
C. Custom clustering solutions are complicated to configure and maintain.
D. Applications that have 16 vCPUs are supported.
E. Prevents application crashes by analyzing the workload and correcting problems.
【多选题】
Which two statements are true regarding VMware vSphere Flash Read Cache (vFRC)? (Choose two.)___
A. Cache fills and cache evictions happen in the granularity of a cache block size.
B. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying storage.
C. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying cache data.
D. Cache fills and cache evictions happen in the granularity of the disk block size.
【多选题】
What are two possible causes of Storage Distributed Resource Scheduler (SDRS) being disabled on one or more virtual machine disks in a datastore cluster? (Choose two.)___
A. The virtual machine has vSphere Fault Tolerance disabled.
B. The virtual machine is a template.
C. The virtual machine swap file is on a shared datastore.
D. The disk is a CD-ROM/ISO file.
【多选题】
An administrator attempts to install vCenter Single Sign-On Server. The installer returns an error message indicating that the installation failed. Prior to the installation, all setup prerequisites were met. The administrator has generated a vCenter Server Single Sign-On support bundle. Which two files should the administrator analyze to determine the cause of the failure? (Choose two.)___
A. Server\utils\logs\imsTrace.log
B. Server\utils\logs\install.txt
C. %TEMP%\utils\logs\vminst.log
D. %TEMP%\vminst.log
【多选题】
An administrator is unable to remove an ESXi 6.x host from a vSphere Distributed Switch. What are two likely reasons for this issue? (Choose two.)___
A. Vmkernel interfaces on the switch are still in use.
B. VM Network port group adapters are connected to different switch.
C. Physical NICs are migrated to different switch.
D. VM Network adapters are connected to this switch.
【多选题】
Which two Identity Sources are available to add for vCenter Single Sign-On authentication? (Choose two.)___
A. LocalOS
B. OpenLDAP
C. NIS as an LDAP Server
D. VCMSDS
【多选题】
What are three goals of resource management within a cluster? (Choose three.)___
A. To prevent virtual machines from monopolizing resources and to guarantee predictable service rates.
B. To exploit undercommitted resources and overcommit with graceful degradation.
C. To provide solutions to potential problems that you might encounter when using vCenter Server.
D. To control the relative importance of virtual machines and provide flexible dynamic partitioning.
E. To provide additional network administration capabilities.
【多选题】
Which three actions can be taken as a result of executing the vSphere Update Manager 6.x scan and remediation wizards? (Choose three.)___
A. Install and upgrade software in virtual machines.
B. Upgrade the firmware on ESXi host devices.
C. Upgrade and Patch ESXi hosts.
D. Install and update third-party software on hosts.
E. Upgrade virtual machine hardware.
【多选题】
Which two statements are true about deploying and using vSphere Replication? (Choose two.)___
A. ESXi hosts managed by a single vCenter Server instance require a connection between the two vSphere Replication appliances.
B. Sites managed by different vCenter Server instances require a connection between the two vSphere Replication appliances.
C. Sites managed by different vCenter Server instances require the use of Site Recovery Manager and a connection between the two vSphere Replication appliances.
D. ESXi hosts managed by a single vCenter Server instance require a single vSphere Replication appliance.
【多选题】
An administrator is attempting to power on a virtual machine, but the task is hanging at 95%. What three scenarios best explain why this problem is happening? (Choose three.)___
A. A virtual machine question is currently being posed to the administrator.
B. Another task for the virtual machine or other component is already in progress.
C. The VMware High Availability cluster has insufficient resources to guarantee failover.
D. The host has lost access to the storage device containing the virtual machine files.
E. The host is under resource contention and unable to power on the virtual machine.
【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
【多选题】
Which two storage controller configurations can be used with Virtual SAN? (Choose two.)___
A. SAS controllers in Passthrough mode
B. SAS controllers in RAID0 mode
C. SAS controllers in RAID1 mode
D. SAS controllers in RAID10 mode
【多选题】
Which three are requirements when using vMotion to move a virtual machine across vCenter Server systems? (Choose three.)___
A. Both vCenter Servers must be using Enhanced Linked Mode.
B. Both vCenter Servers must be in the same Single Sign-On Domain.
C. Time must be synchronized.
D. Duplicate VM MAC addresses must be configured.
E. Both vCenter Servers must have High Availability enabled on source and destination clusters.
【多选题】
Which two components can be used when configuring Enhanced Linked Mode? (Choose two.)___
A. vCenter Server Appliance
B. vRealize Operations Manager
C. vSphere Management Appliance
D. vCenter Server for Windows
【多选题】
An organization has a number of virtual machines that would benefit from Fault Tolerance. These include: <A single vCPU Apache Server> < A dual vCPU vCenter Server> < A quad vCPU SQL Server> <An eight vCPU Hadoop Server>. Which two virtual machines can be configured to use VMware Fault Tolerance? (Choose two.)___
A. Apache Server
B. vCenter Server
C. SQL Server
D. Hadoop Server
【多选题】
Which two badges are major badges in vRealize Operations? (Choose two.)___
A. Risk
B. Efficency
C. Workload
D. Faults
【多选题】
An administrator is deploying multiple Windows 2003 Virtual Machines from the same template. What two steps should be taken to avoid network conflicts? (Choose two.)___
A. Customize the guest operating system.
B. Install VMware Tools into the new virtual machines.
C. Copy the Microsoft Sysprep tools onto the vCenter Server system.
D. Ensure the e1000 vmnic is selected for each new virtual machine.
推荐试题
【多选题】
倒落式人字抱杆整体组立杆塔时,___四点应在同一垂直面上,不得偏移。
A. 总牵引地锚出土点
B. 制动系统中心
C. 抱杆根部
D. 抱杆顶点
E. 杆塔中心
【多选题】
杆塔顶部吊离地面约___时,应暂停牵引,进行冲击试验,全面检查各___,确认无问题后方可继续起立。
A. 500mm
B. 600mm
C. 吊点
D. 受力部位
【多选题】
倒落式人字抱杆整体组立杆塔时,杆塔起立角约___时应减慢牵引速度。约___时应停止牵引,利用临时拉线将杆塔调正、调直。
A. 50°
B. 60°
C. 70°
D. 80°
E. 90°
【多选题】
整体组立铁塔时,应安装铰链,以下说法正确的是___。
A. 铁塔根部应安装塔脚铰链
B. 铰链应转动灵活
C. 铰链强度应符合施工设计要求
D. 铰链与抱杆之间应连接固定
【多选题】
邻近带电体整体组立杆塔的___安全距离应___倒杆距离,并采取防感应电的措施。
【多选题】
电杆的临时拉线数量:单杆不得少于___根,双杆不得少于___根。
A. 2
B. 4
C. 6
D. 8
E. 10
【多选题】
抱杆及电杆的临时拉线绑扎及锚固应牢固可靠,起吊前应经___检查。
A. 指挥人
B. 管理人员
C. 专责监护人
D. 监理人
【多选题】
内悬浮内(外)拉线抱杆分解组塔时,应视构件结构情况在其上、___部位绑扎控制绳,下控制绳(也称攀根绳)宜使用___。
A. 上
B. 中
C. 下
D. 钢丝绳
E. 绝缘绳
【多选题】
构件起吊过程中,下控制绳应随吊件的___,保持吊件与塔架间距不小于___。
A. 上升随之松出
B. 上升随之收紧
C. 200mm
D. 100mm
【多选题】
提升(顶升)抱杆时,不得少于___腰环,腰环固定钢丝绳应呈___,同时应设专人指挥。
A. 两道
B. 水平并收紧
C. 三道
D. 平行
【多选题】
座地摇(平)臂抱杆分解组塔时,___时,应将起吊滑车组收紧在地面固定。
A. 大风
B. 停工
C. 阴天
D. 雨雪天
E. 过夜
【多选题】
抱杆就位后,四侧拉线应___,组塔过程中应有专人值守。
【多选题】
吊件离开地面约___时应暂停起吊并进行检查,确认正常且吊件上无搁置物及人员后方可继续起吊,起吊速度应___。
A. 100mm
B. 200mm
C. 均匀
D. 缓慢
【多选题】
在66kV~110kV电力线附近组塔时,起重机应接地良好。起重机及吊件、牵引绳索和拉绳与带电体的最小安全距离,沿垂直方向___m,沿水平方向___m。
【多选题】
杆塔拆除,以下不符合规定的是___。
A. 吊车整体拆除杆塔
B. 随意整体拉倒杆塔
C. 在塔上有导、地线的情况下整体拆除
D. 先拆导地线,后拆杆塔
【多选题】
下列关于跨越架搭设与拆除的说法正确的是___。
A. 跨越架的搭设应有搭设方案或施工作业指导书,并经审批后办理相关手续
B. 跨越架架体的强度,应能在发生断线或跑线时承受冲击荷载
C. 搭设或拆除跨越架应设专责监护人
D. 跨越架搭设前应进行安全技术交底
【多选题】
下列关于跨越架的说法正确的是___。
A. 跨越架横担中心应设置在新架线路每相(极)导线的中心水平投影上
B. 跨越架横担中心应设置在新架线路每相(极)导线的中心垂直投影上
C. 各类型金属格构式跨越架架顶应设置挂胶滚筒或挂胶滚动横梁
D. 跨越架上应悬挂醒目的警告标志及夜间警示装置
【多选题】
下列关于跨越架的说法正确的是___。
A. 强风、暴雨过后应对跨越架进行检查,确认合格后方可使用
B. 跨越架应经现场监理及使用单位验收合格后方可使用
C. 跨越架应经现场设计及使用单位验收合格后方可使用
D. 跨越公路的跨越架,应在公路前方距跨越架适当距离设置提示标志
【多选题】
木质跨越架所使用的杉木杆,出现___等情况的不得使用。
A. 木质腐朽
B. 枯黄
C. 损伤严重
D. 弯曲过大
【多选题】
钢管跨越架宜用外径 48mm~51mm 的钢管,___应错开搭接,搭接长度不得小于0.5m。
A. 小横杆
B. 大横杆
C. 立杆
D. 扫地杆
【多选题】
钢管跨越架所使用的钢管,如有___等情况的不得使用。
A. 弯曲严重
B. 磕瘪变形
C. 表面有严重腐蚀
D. 裂纹
E. 脱焊
【多选题】
附件安装完毕后,方可拆除跨越架。___跨越架应自上而下逐根拆除,并应有人传递,不得抛扔。不得上下同时拆架或将跨越架整体推倒。
A. 悬索
B. 钢管
C. 木质
D. 毛竹
E. 新型金属格构式
【多选题】
下列关于人力及机械牵引放线的说法正确的是___。
A. 放线时的通信应畅通、清晰、指令统一,不得在无通信联络的情况下放线
B. 放线时作业人员站在线圈内操作
C. 被跨越的低压线路或弱电线路需要开断时,应事先征得有关单位的同意
D. 穿越滑车的引绳应根据导、地线的规格选用
【多选题】
下列关于人力及机械牵引放线说法正确的是___。
A. 放线滑车使用前应进行外观检查
B. 带有开门装置的放线滑车,应有关门保险
C. 线盘架应稳固,转动灵活,制动可靠。必要时打上临时拉线固定
D. 被跨越的低压线路或弱电线路开断时应有防止电杆倾倒的措施
【多选题】
人力及机械牵引架线时,除应在杆塔处设监护人外,对被跨越的___和人畜较多处均应派专人监护。
A. 房屋
B. 路口
C. 河塘
D. 裸露岩石
E. 跨越架
【多选题】
牵引绳与导线、地线(光缆)连接应使用___。
A. 专用连接网套
B. 专用牵引头
C. 挂胶滚动横梁
D. 防护栅栏
【多选题】
牵引过程中发生___跳槽、走板翻转或平衡锤搭在导线上等情况时,应停机处理。
A. 导引绳
B. 牵引绳
C. 导线
D. 拉线
【多选题】
钳压机压接应遵守下列哪些规定___。
A. 手动钳压器应有固定设施,操作时平稳放置
B. 两侧扶线人应对准位置
C. 手指不得伸入压模内
D. 切割导线时线头应扎牢,并防止线头回弹伤人
【多选题】
手动钳压器应有固定设施,操作时___。
A. 平稳放置
B. 两侧扶线人应对准位置
C. 手指不得伸入压模内
D. 防止线头回弹伤人
【多选题】
下列关于紧线准备工作的规定正确的是___。
A. 杆塔的部件应齐全
B. 螺栓应紧固
C. 紧线杆塔的临时拉线和补强措施应准备完毕
D. 导线、地线的临锚应准备完毕
【多选题】
下列关于紧线的说法正确的是___。
A. 紧线杆塔的临时拉线和补强措施以及导线、地线的临锚应准备完毕
B. 地锚布置与受力方向一致,并埋设可靠
C. 埋入地下或临时绑扎的导线、地线挖出或解开后直接升空
D. 障碍物以及导线、地线跳槽等应处理完毕
【多选题】
紧线过程中监护人员应遵守的规定是___。
A. 可以站在悬空导线、地线的垂直下方
B. 不得站在悬空导线、地线的垂直下方
C. 不得跨越将离地面的导线或地线
D. 监视行人不得靠近牵引中的导线或地线
E. 传递信号应及时、清晰,不得擅自离岗
【多选题】
在跨越___等的线段杆塔上安装附件时,应采取防止导线或地线坠落的措施。
A. 电力线
B. 铁路
C. 公路
D. 通航河流
【多选题】
下列情况应填用电力线路第二种工作票的是___。
A. 电力线路、电缆不需要停电的工作
B. 直流线路上不需要停电的工作
C. 直流接地极线路上不需要停电的工作
D. 在停电的线路或同杆(塔)架设多回线路中的部分停电线路上的工作
【多选题】
同杆塔架设有多层电力线时,验电应___。
A. 先验低压、后验高压
B. 先验高压、后验低压
C. 先验下层、后验上层
D. 先验上层、后验下层
E. 无顺序要求
【多选题】
停电作业时,现场作业负责人在接到已停电许可作业命令后,下列做法正确的是___。
A. 应首先安排人员进行验电
B. 验电应使用相应电压等级的合格的验电器
C. 验电时应戴绝缘手套
D. 验电时应逐相进行
E. 验电时各相同时进行
【多选题】
停电作业结束后,作业负责人应报告工作许可人,以下属于报告内容的是___。
A. 作业负责人姓名
B. 该线路上某处(说明起止杆塔号、分支线名称等)作业已经完工
C. 线路改动情况
D. 作业地点所挂的工作接地线已全部拆除
【判断题】
施工现场的排水设施应全面规划(含设计、施工要求)
【判断题】
禁止酒后进入施工现场。与施工无关的人员未经允许不得进入施工现场
【判断题】
施工现场敷设的力能管线不得随意切割或移动。如需切割或移动,应事先告知产权管理单位