【多选题】
A Fault Tolerance (FT) virtual machine with four vCPUs is experiencing high latency when performing ICMP and Application tests. What are three potential causes that may be attributing to this latency? (Choose three.)___
A. The FT network has insufficient bandwidth and is running on a 1GB Link.
B. The FT network is on a particularly high latency link.
C. The FT network has been configured with Network I/O Control.
D. The FT virtual machine is running an e1000 network adapter.
E. The
F. T virtual machine is running on poor performing network-based storage.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【多选题】
A virtual machine is experiencing performance issues. The following performance metrics are observed: <CPU usage value for the virtual machine is above 90%> < CPU ready value for the virtual machine is above 20%> Which two activities will likely resolve the performance issues? (Choose two.)___
A. Set a CPU reservation for the virtual machine.
B. Increase the CPU limit on the virtual machine.
C. Decrease CPU shares equally for all virtual machines on the host.
D. Increase CPU shares equally for all virtual machines on the host.
【多选题】
An administrator is upgrading a vSphere Distributed Switch. The existing switch is version 6.0 and the administrator wants to upgrade to the latest version possible. The environment contains several ESXi 6.1 hosts. Which two options are available to ensure that the upgraded switch will be compatible with these hosts? (Choose two.)___
A. Upgrade the vSphere Distributed Switch to 6.0
B. Upgrade the ESXi 5.5 hosts to version 6.0, then upgrade the vSphere Distributed Switch to 5.5
C. Upgrade the vSphere Distributed Switch to 5.1
D. Upgrade the
E. SXi host switches to 5.5, then upgrade the vSphere Distributed Switch to 5.5
【多选题】
An administrator attempts to create a Thick Provisioned Virtual Disk (VMDK) on an NFS datastore; but it fails. Which two reasons would explain the failure? (Choose two.)___
A. Datastore is on an NFS 3 storage server that does not support Hardware Acceleration
B. Datastore is on an NFS 4.1 storage server
C. Only VMFS datastores support "Thick Provisioned" VMDK
D. The NFS datastore was not created on a "Thick Provisioned" device
【多选题】
Which two NFS Protocol versions does vSphere 6 support? (Choose two.)___
A. Version 3
B. Version 3.1
C. Version 4
D. Version 4.1
【多选题】
Which three operations occur during a cold migration of a virtual machine? (Choose three.)___
A. The virtual machine disks are moved if the datastore is being changed.
B. The virtual machine is registered with the destination server.
C. The source virtual machine is removed from the old hosts.
D. The virtual machine hardware is upgraded.
E. The virtual machine files are quiesced prior to the migration.
【多选题】
A 4 GB Memory virtual machine is experiencing extended memory issues, as shown in the Exhibit. What potential issues could be attributed to this memory pressure?___
A. A limit is imposed on the virtual memory of this virtual machine.
B. The Balloon driver has been uninstalled.
C. A limit has been imposed on the Virtual CPU of the virtual machine.
D. Storage IO control has been enabled for the virtual machine causing the swapped memory.
【多选题】
You are creating a virtual machine in the Web Client using the New Virtual Machine wizard. Which two steps are required? (Choose two.)___
A. Select a valid name.
B. Select a cluster for the compute resource.
C. Select a network adapter.
D. Select the virtual machine compatibility.
【多选题】
An administrator has been given requirements to configure vMotion for a new virtual machine. The configuration should: <Provide Network Redundancy Use VLAN 550> <Be secured against anyone trying to spoof communication The vSwitch1 configuration is shown in the Exhibit.> Which three changes should be made to meet the stated requirements? (Choose three.)___
A. The VLAN ID must be set appropriately.
B. The default values for MAC Address Changes and Forged Transmits must be altered.
C. The teaming and failover adapters must be set appropriately.
D. The Traffic Shaping configuration must be altered.
E. The Load Balancing Policy must be set appropriately.
【多选题】
Which three traffic types are available services options when configuring a vmkernel port? (Choose three.)___
A. Provisioning Traffic
B. Virtual Volumes Traffic
C. vSphere Replication NFC Traffic
D. Virtual SAN Traffic
E. FCoE Traffic
【多选题】
An administrator logs into the vSphere Web Client, but is unable to see any hosts and clusters. Which two options could fix the problem? (Choose two.)___
A. Verify that the client web browser and vCenter Server are in the same broadcast domain.
B. Verify that the vCenter Server system is registered with the same Platform Services Controller as the vSphere Web Client.
C. Log in to the vCenter Server as a user within the Active
D. irectory domain.
【多选题】
Which three VLAN Tagging modes are available in vSphere 6.x? (Choose three.)___
A. External Switch Tagging
B. Private VLAN Tagging
C. Virtual Switch Tagging
D. VXLAN Tagging
E. Virtual Guest Tagging
【多选题】
Which two statements are true about VMFS5 datastores on ESXi 6.x? (Choose two.)___
A. Virtual Disk (VMDK) size can be larger than 2TB.
B. Datastore extent size can be larger than 2TB.
C. Only Physical Mode Raw
D. evice Map (Passthrough-RDM) can be larger than 2TB.
【多选题】
Which two statements are correct when turning off a Distributed Resource Scheduler (DRS) Cluster? (Choose two.)___
A. The resource pool hierarchy of the DRS cluster is maintained.
B. The resource pool hierarchy of the DRS cluster is removed.
C. The affinity settings of the
D. RS cluster are removed and not maintained when DRS is re-enabled.
【多选题】
An administrator is creating a new Virtual SAN cluster on a Layer 2 network. There is an existing Virtual SAN cluster on the same Layer 2 network. Which two actions would allow the new Virtual SAN cluster to coexist with the older cluster? (Choose two.)___
A. Change the default Multicast Address on the new Virtual SAN cluster.
B. Change the default Unicast Address on the new Virtual SAN Cluster.
C. Create a separate VLAN for each cluster.
D. Create an ARP Alias for the Virtual SAN VMkernel Network Adapter.
【多选题】
A vCenter Operations Manager 5.7 environment is upgraded to vRealize Operations. After the upgrade, the analytics services fail to start. Which three steps must be taken to resolve the problem? (Choose three.)___
A. Take the vRealize Operations cluster offline.
B. Delete the activity persistence files.
C. Bring the cluster back online.
D. Remove any unresponsive nodes.
E. Stop the CaSA service.
【多选题】
An organization has an ESXi 6.x host that contains two resource pools. The host is being relocated to a DRS cluster. What two actions can be taken to integrate the host into the cluster, and what would happen to the existing ESXi resource pool hierarchy as a result? (Choose two.)___
A. Place all of the host's virtual machines into the DRS cluster root resource pool. The resource pools present on the host will be deleted.
B. Create a resource pool for the ESXi host's virtual machines and resource pools. The resource pools present on the host will be deleted.
C. Place all of the host's virtual machines into the DRS cluster root resource pool. The resource pools present on the host will be preserved.
D. Create a resource pool for the
E. SXi host's virtual machines and resource pools. The resource pools present on the host will be preserved.
【多选题】
Which two parameters are required when adding an iSCSI target to an iSCSI Software Adapter using Dynamic Discovery? (Choose two.)___
A. The iSCSI device's IP Address or Fully Qualified Domain Name
B. The Port Number
C. The iSCSI device's iSCSI Qualified Name (IQN)
D. The Default Gateway IP Address
【多选题】
Which two SMTP Notification Event Details are specific to alarms triggered by events? (Choose two.)___
A. User Name
B. Summary
C. Old Status
D. Target
【多选题】
Which two High Availability ___ Cluster admission control policies can help avoid resource fragmentation? (Choose two.)(AC)
A. Define failover capacity by static number of hosts
B. Define failover capacity by reserving a percentage of the cluster resources
C. Use dedicated failover hosts
D. Use Virtual Machine Monitoring
【多选题】
An attempt to enable vSphere Fault Tolerance for a powered-on virtual machine fails. Which two scenarios would result in this failure? (Choose two.)___
A. The virtual machine has three vCPUs configured.
B. The host on which the virtual machine is running has insufficient memory resources.
C. The virtual machine has insufficient resources to accommodate full reservation plus the overhead memory.
D. VMware High Availability is enabled on the cluster of which this host is a member.
【多选题】
A vApp template recently added to a Content Library is not displayed. Which two actions could correct this problem? (Choose two.)___
A. Manually synchronize the library
B. Select the Download all library content immediately option
C. Select the Sync subscribed library option
D. Manually download the vApp template
【多选题】
What are three valid disk configurations for the vSphere Data Protection 6.x Appliance? (Choose three.)___
A. 500GB
B. 1TB
C. 1.5TB
D. 2TB
E. 4TB
【多选题】
Which three connection types are available when configuring a vSwitch in the vSphere Web Client? (Choose three.)___
A. VMkernel Network Adapter
B. Physical Network Adapter
C. Virtual Machine Port Group for a Standard Switch
D. vMotion Network Adapter
E. vSAN Network Adapter
【多选题】
Which three features can be enabled for a new host cluster? (Choose three.)___
A. Storage Distributed Resource Scheduling
B. High Availability
C. Fault Tolerance
D. Distributed Resource Scheduling
E. Virtual SAN
【多选题】
An administrator receives a report that no real time statistics are available for a virtual machine in the vCenter Server inventory. Which two statements indicate likely causes of the problem? (Choose two.)___
A. The virtual machine is powered off.
B. The host containing the virtual machine is disconnected from vCenter Server.
C. There is insufficient real time data to display the information.
D. The vCenter Server service is not running.
【多选题】
Your manager has given you a bash script that retrieves data for ESXi 6.x host configurations. This data needs to be collected right after the installation of a host and must be run directly on the host. Which two actions can be used to run this script on an ESXi host? (Choose two.)___
A. Connect to the host with Ruby vSphere Console and run the script from there.
B. Enable SSH access from the Direct Console User Interface.
C. Enable the ESXi Shell from the
D. irect Console User Interface.
【多选题】
Which two are true about the Risk badge in vRealize Operations? (Choose two.)___
A. The Risk badge indicates potential future problems that may degrade the performance of the system.
B. Risks may require attention in the near future.
C. The Risk badge indicates problems that are degrading performance of the system.
D. Risks require attention now to correct system performance problems.
【多选题】
vSphere Update Manager allows which two virtual machine attributes to be upgraded? (Choose two.)___
A. Virtual machine firewall policies for NSX.
B. Software Packages in the virtual machine.
C. Virtual machine Hardware Version.
D. VMware Tools Upgrade.
【多选题】
What are two benefits of using NFS 4.1 with vSphere 6.x as compared to NFS 3? (Choose two.)___
A. NFS 4.1 supports Kerberos Authentication
B. NFS 4.1 supports multipathing
C. NFS 4.1 supports IPv6
D. NFS 4.1 supports hardware acceleration
【多选题】
Which three statements are true regarding Fault Tolerance? (Choose three.)___
A. Applications need to be continuously available to users.
B. Applications without native clustering capabilities can be protected.
C. Custom clustering solutions are complicated to configure and maintain.
D. Applications that have 16 vCPUs are supported.
E. Prevents application crashes by analyzing the workload and correcting problems.
【多选题】
Which two statements are true regarding VMware vSphere Flash Read Cache (vFRC)? (Choose two.)___
A. Cache fills and cache evictions happen in the granularity of a cache block size.
B. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying storage.
C. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying cache data.
D. Cache fills and cache evictions happen in the granularity of the disk block size.
【多选题】
What are two possible causes of Storage Distributed Resource Scheduler (SDRS) being disabled on one or more virtual machine disks in a datastore cluster? (Choose two.)___
A. The virtual machine has vSphere Fault Tolerance disabled.
B. The virtual machine is a template.
C. The virtual machine swap file is on a shared datastore.
D. The disk is a CD-ROM/ISO file.
【多选题】
An administrator attempts to install vCenter Single Sign-On Server. The installer returns an error message indicating that the installation failed. Prior to the installation, all setup prerequisites were met. The administrator has generated a vCenter Server Single Sign-On support bundle. Which two files should the administrator analyze to determine the cause of the failure? (Choose two.)___
A. Server\utils\logs\imsTrace.log
B. Server\utils\logs\install.txt
C. %TEMP%\utils\logs\vminst.log
D. %TEMP%\vminst.log
【多选题】
An administrator is unable to remove an ESXi 6.x host from a vSphere Distributed Switch. What are two likely reasons for this issue? (Choose two.)___
A. Vmkernel interfaces on the switch are still in use.
B. VM Network port group adapters are connected to different switch.
C. Physical NICs are migrated to different switch.
D. VM Network adapters are connected to this switch.
【多选题】
Which two Identity Sources are available to add for vCenter Single Sign-On authentication? (Choose two.)___
A. LocalOS
B. OpenLDAP
C. NIS as an LDAP Server
D. VCMSDS
【多选题】
What are three goals of resource management within a cluster? (Choose three.)___
A. To prevent virtual machines from monopolizing resources and to guarantee predictable service rates.
B. To exploit undercommitted resources and overcommit with graceful degradation.
C. To provide solutions to potential problems that you might encounter when using vCenter Server.
D. To control the relative importance of virtual machines and provide flexible dynamic partitioning.
E. To provide additional network administration capabilities.
【多选题】
Which three actions can be taken as a result of executing the vSphere Update Manager 6.x scan and remediation wizards? (Choose three.)___
A. Install and upgrade software in virtual machines.
B. Upgrade the firmware on ESXi host devices.
C. Upgrade and Patch ESXi hosts.
D. Install and update third-party software on hosts.
E. Upgrade virtual machine hardware.
【多选题】
Which two statements are true about deploying and using vSphere Replication? (Choose two.)___
A. ESXi hosts managed by a single vCenter Server instance require a connection between the two vSphere Replication appliances.
B. Sites managed by different vCenter Server instances require a connection between the two vSphere Replication appliances.
C. Sites managed by different vCenter Server instances require the use of Site Recovery Manager and a connection between the two vSphere Replication appliances.
D. ESXi hosts managed by a single vCenter Server instance require a single vSphere Replication appliance.
【多选题】
An administrator is attempting to power on a virtual machine, but the task is hanging at 95%. What three scenarios best explain why this problem is happening? (Choose three.)___
A. A virtual machine question is currently being posed to the administrator.
B. Another task for the virtual machine or other component is already in progress.
C. The VMware High Availability cluster has insufficient resources to guarantee failover.
D. The host has lost access to the storage device containing the virtual machine files.
E. The host is under resource contention and unable to power on the virtual machine.
【多选题】
Which three features are not supported when using Fault Tolerance in vSphere 6.x? (Choose three.)___
A. Virtual Volumes (VVOLS)
B. Storage vMotion
C. Virtual Machine Component Protection
D. vMotion
E. vSphere Distributed Switches
推荐试题
【填空题】
在成本管理信息<V5.0>系统中,由于某单价合同签订时工程量小,单价确定的较高,但是实际施工时由于变更引起量增加较多,需进行对原合同细目单价进行调减,在发起劳务合同变更流程后,可通过 ___ 来实现。
【填空题】
在成本管理信息<V5.0>系统中,项目在发起机械结算时的前置流程为___,在单机油料核算中无扣款,复选框是指当该合同没有油料扣款时才勾选。
【填空题】
在成本管理信息<V5.0>系统中,现场经费全周期预算表中的预算现场经费总额取自经审批的___。
【填空题】
在成本管理信息<V5.0>系统中,各公司___可以通过文档管理模板模块,上传本公司的合同文本,供项目使用。
【填空题】
在成本管理信息<V5.0>系统中,三项指标计算分析表中的实际产值的数据来源取自 ___。
【填空题】
中铁四成本〔2018〕717 号文规定,变更索赔评审的内容应重点从___进行评估,经评审通过后方可实施,严禁未经评审先行实施变更。
【填空题】
根据《铁路建设项目变更设计管理办法》<铁建设[2012]253号文>规定,铁路项目巳签合同中非责任事故、问题的 II 类变更设计,增减工程费用在300 万元以内的,纳入风险包干费;增减工程费用在 300 万元及以上的,由建设单位在___找那个列支并相应调整施工合同额。
【填空题】
根据《铁路建设项目变更设计管理办法》<铁建设[2012]253号文>规定,变更索赔是工程项目增盈减亏的重要手段,是企业实现效益的重要途径,应在确保质量、安全、工期和环保的前提下,围绕效益最大化的目标进行,应始终贯穿于___的全过程。
【填空题】
中铁股份成本〔2018〕61 号文,铁路Ⅱ类变更程序分四个步骤:提出变更设计建议→___→确定变更设计方案→审核下发变更施工图等。
【填空题】
中铁股份成本〔2018〕61 号文,施工图招标铁路项目投资控制程序为:可研批复投资估算<项目总投资控制法定限额>→初步设计概算→鉴修概算→___→分标预算<招标预算>→投标合同清单→概算清理→审价→办理末次计价。
【填空题】
根据中铁股份成本〔2018〕61 号文,商品混凝土调差,在城市施工时,若因地方政府要求,不允许施工单位自行建站拌制混凝土,需采购商品砼时,采购的商品砼也可以争取按___进行调差。
【填空题】
根据中铁股份成本〔2018〕61 号文,轨料运杂费界定,首先要划分好界面,一般情况下,在铺轨基地之前发生的运杂费都在___中,铺轨基地之后发生的运杂费,则在清单单价中考虑。
【填空题】
根据铁建设〔2013〕99 号文《中国铁路总公司关于铁路工程推广应用高强钢筋有关工作的通知》,自通知颁布之日<2013年8月7日>起,在建暂未施工的项目,原设计的HRB35 钢筋,应用 HRB400 钢筋代替,增加的相关费用按___办理。
【填空题】
根据中铁股份成本〔2018〕61 号文, 二次经营各章节要点提示提出,围岩变更,可结合不同围岩单价分析情况,办理正变更或负变更。变更过程中须注意:一是办理正变更时,要努力办理成___,围岩连续问题要合理策划,分步实施推进。
【填空题】
根据中铁股份成本〔2018〕61 号文,价差是指应调材料整期与编制期的差价,对应的应调材料数量为___消耗数量。
【填空题】
《中国中铁工程项目变更索赔指导意见》<中铁股份成本[2018]213号>,项目经理部的工经部是项目变更索赔工作的___部门。
【填空题】
《中国中铁工程项目变更索赔指导意见》<中铁股份成本[2018]213号>,各层级要贯彻落实变更索赔“___”工作思路和“六要”工作方法,建立有计划、切实可行的目标管理制度。
【填空题】
《中国中铁工程项目变更索赔指导意见》<中铁股份成本[2018]213号>,要把___指标纳入生产经营考核指标体系,增强二次经营工作的严肃性,促进各级切实提高抓好这项工作的自觉性。
【填空题】
《中国中铁工程项目变更索赔指导意见》<中铁股份成本[2018]213号>,明确项目经理部___至少要召开一次变更索赔<工程经济>管理分析会。
【填空题】
《中国中铁工程项目变更索赔指导意见》<中铁股份成本[2018]213号>,明确在单项变更索赔批复计价后、项目整体完工后,应对各项变更索赔进行___,总结经验、查找得失、指导后续变更索赔工作。
【填空题】
《中国中铁工程项目变更索赔指导意见》<中铁股份成本[2018]213号>,文明确变更索赔工作应强化法制意识和风险防范意思,确保经得起审计、___和各类执法检查;应强化风险控制,杜绝隐患,并做好反索赔相关工作。
【填空题】
《中国中铁工程项目变更索赔指导意见》<中铁股份成本[2018]213号>,明确在项目开工___,项目经理部应成立变更索赔工作小组,明确分工,责任到人;项目经理为变更索赔管理的第一负责人,全面负责变更索赔工作。
【填空题】
《中国中铁工程项目变更索赔指导意见》<中铁股份成本[2018]213号>,根据工程项目变更设计管理流程,提出并编制变更设计建议书由___负责提出。
【填空题】
《中国中铁工程项目变更索赔指导意见》<中铁股份成本[2018]213号>,变更索赔是工程项目增盈减亏的重要手段,是企业实现效益的重要途径,应在确保___、___、___和___的前提下,围绕利益最大化的目标进行,应始终贯穿于企业生产经营管理的全过程。
【填空题】
《中国中铁工程项目变更索赔指导意见》<中铁股份成本[2018]213号>,___与___是股份公司变更索赔工作的主责部门,主要负责全系统变更索赔工作的日常管理。
【填空题】
《中国中铁工程项目变更索赔指导意见》<中铁股份成本[2018]213号>,___主要负责前期经营策划,在一次经营的基础上,为中标后的变更索赔埋下伏笔;负责就股份公司直属工程项目向成本与___进行营销交底。
【填空题】
《中国中铁工程项目变更索赔指导意见》<中铁股份成本[2018]213号>,铁路工程项目变更索赔额指___优化、___<不含保险费>及___收入之和,其中负变更金额按绝对值计列。
【填空题】
《中国中铁工程项目变更索赔指导意见》<中铁股份成本[2018]213号>,股份公司每年、二级公司___、三级公司___、项目经理部每月至少要召开一次变更索赔管理分析会。
【填空题】
中铁四成本<2018>717 号文明确,特殊变更事项是指负变更设计实现项目减亏、___、PPP项目设计方案优化节约等内容。
【填空题】
中铁四成本<2018>717 号文明确,项目收尾结算阶段,___是第一责任人。
【填空题】
中铁四成本<2018>717 号文明确,项目准备阶段。项目合同开工日期后___个月内,局指组织参建单位,分析合同、结合实际、研究策略,制订变更索赔策划方案,录入成本管理信息系统审批。
【填空题】
中铁四成本<2018>717 号文明确,变更索赔奖励以实现___为考核指标,按实现的变更索赔利润额为奖励计取基数。
【填空题】
中铁四成本<2018>717 号文明确,项目竣工结算完成后,依据局审计部认定的实际利润,遵照___等项目成本管理六大理念,由局指配合局成本管理部区分“三项指标”对项目利润贡献大小,并配合局相关部门综合评价,评价结果与项目考核兑现挂钩。
【填空题】
中铁四成本<2018>717 号文规定,变更索赔收入按___的原则进行分劈。
【填空题】
《公路工程标准施工招标文件》2018版,如果工程的变更指示是因___引起的任何额外费用应由承包人承担。
【填空题】
《公路工程标准施工招标文件》2018版,合同一方向另一方提出索赔时,应有正当的___和___,并应符合合同的相关约定。
【填空题】
《公路工程标准施工招标文件》2018版,承包人应在发出索赔意向通知书后___天内,向监理人正式提交索赔通知书,索赔通知书应详细说明索赔理由和要求,并应附必要的记录和证明材料。
【填空题】
根据《铁路建设项目变更设计管理办法》<铁建设[2012]253号文>规定,建设单位应对I类变更设计文件进行初审,涉及环水保的重大问题的变更设计,应先向___主管部门报告,经同意后,再形成初审意见连同I类变更设计文件一并报送总公司
【填空题】
根据《铁路建设项目变更设计管理办法》<铁建设[2012]253号文>规定,包干外II类变更设计由建设单位组织审定,费用在___中列支。
【填空题】
根据《铁路建设项目变更设计管理办法》<铁建设[2012]253号文>规定,铁路项目涉及___的II类变更设计,建设单位应在现场组织确定变更设计方案,按确定的方案先进行施工准备和应急处理。