Which vSphere 6 Standard Edition feature will allow an organization to ensure that critical multi-threaded applications have the maximum possible uptime? ___
A. Fault Tolerance
B. High Availability
C. Distributed Resource Scheduler
D. App HA
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
B
解析
暂无解析
相关试题
【多选题】
An application running in a virtual machine is experiencing performance issues. When utilizing performance monitoring utilities, it is noted that the CPU Utilization of the application is at 100%. Which two scenarios are probable causes of the CPU contention for the application? (Choose two.)___
A. There is a network I/O constraint.
B. There is a storage I/O constraint.
C. There is insufficient disk space assigned to the virtual machine.
D. The application is not virtualization aware.
【多选题】
A Fault Tolerance (FT) virtual machine with four vCPUs is experiencing high latency when performing ICMP and Application tests. What are three potential causes that may be attributing to this latency? (Choose three.)___
A. The FT network has insufficient bandwidth and is running on a 1GB Link.
B. The FT network is on a particularly high latency link.
C. The FT network has been configured with Network I/O Control.
D. The FT virtual machine is running an e1000 network adapter.
E. The
F. T virtual machine is running on poor performing network-based storage.
【多选题】
A virtual machine is experiencing performance issues. The following performance metrics are observed: <CPU usage value for the virtual machine is above 90%> < CPU ready value for the virtual machine is above 20%> Which two activities will likely resolve the performance issues? (Choose two.)___
A. Set a CPU reservation for the virtual machine.
B. Increase the CPU limit on the virtual machine.
C. Decrease CPU shares equally for all virtual machines on the host.
D. Increase CPU shares equally for all virtual machines on the host.
【多选题】
An administrator is upgrading a vSphere Distributed Switch. The existing switch is version 6.0 and the administrator wants to upgrade to the latest version possible. The environment contains several ESXi 6.1 hosts. Which two options are available to ensure that the upgraded switch will be compatible with these hosts? (Choose two.)___
A. Upgrade the vSphere Distributed Switch to 6.0
B. Upgrade the ESXi 5.5 hosts to version 6.0, then upgrade the vSphere Distributed Switch to 5.5
C. Upgrade the vSphere Distributed Switch to 5.1
D. Upgrade the
E. SXi host switches to 5.5, then upgrade the vSphere Distributed Switch to 5.5
【多选题】
An administrator attempts to create a Thick Provisioned Virtual Disk (VMDK) on an NFS datastore; but it fails. Which two reasons would explain the failure? (Choose two.)___
A. Datastore is on an NFS 3 storage server that does not support Hardware Acceleration
B. Datastore is on an NFS 4.1 storage server
C. Only VMFS datastores support "Thick Provisioned" VMDK
D. The NFS datastore was not created on a "Thick Provisioned" device
【多选题】
Which two NFS Protocol versions does vSphere 6 support? (Choose two.)___
A. Version 3
B. Version 3.1
C. Version 4
D. Version 4.1
【多选题】
Which three operations occur during a cold migration of a virtual machine? (Choose three.)___
A. The virtual machine disks are moved if the datastore is being changed.
B. The virtual machine is registered with the destination server.
C. The source virtual machine is removed from the old hosts.
D. The virtual machine hardware is upgraded.
E. The virtual machine files are quiesced prior to the migration.
【多选题】
A 4 GB Memory virtual machine is experiencing extended memory issues, as shown in the Exhibit. What potential issues could be attributed to this memory pressure?___
A. A limit is imposed on the virtual memory of this virtual machine.
B. The Balloon driver has been uninstalled.
C. A limit has been imposed on the Virtual CPU of the virtual machine.
D. Storage IO control has been enabled for the virtual machine causing the swapped memory.
【多选题】
You are creating a virtual machine in the Web Client using the New Virtual Machine wizard. Which two steps are required? (Choose two.)___
A. Select a valid name.
B. Select a cluster for the compute resource.
C. Select a network adapter.
D. Select the virtual machine compatibility.
【多选题】
An administrator has been given requirements to configure vMotion for a new virtual machine. The configuration should: <Provide Network Redundancy Use VLAN 550> <Be secured against anyone trying to spoof communication The vSwitch1 configuration is shown in the Exhibit.> Which three changes should be made to meet the stated requirements? (Choose three.)___
A. The VLAN ID must be set appropriately.
B. The default values for MAC Address Changes and Forged Transmits must be altered.
C. The teaming and failover adapters must be set appropriately.
D. The Traffic Shaping configuration must be altered.
E. The Load Balancing Policy must be set appropriately.
【多选题】
Which three traffic types are available services options when configuring a vmkernel port? (Choose three.)___
A. Provisioning Traffic
B. Virtual Volumes Traffic
C. vSphere Replication NFC Traffic
D. Virtual SAN Traffic
E. FCoE Traffic
【多选题】
An administrator logs into the vSphere Web Client, but is unable to see any hosts and clusters. Which two options could fix the problem? (Choose two.)___
A. Verify that the client web browser and vCenter Server are in the same broadcast domain.
B. Verify that the vCenter Server system is registered with the same Platform Services Controller as the vSphere Web Client.
C. Log in to the vCenter Server as a user within the Active
D. irectory domain.
【多选题】
Which three VLAN Tagging modes are available in vSphere 6.x? (Choose three.)___
A. External Switch Tagging
B. Private VLAN Tagging
C. Virtual Switch Tagging
D. VXLAN Tagging
E. Virtual Guest Tagging
【多选题】
Which two statements are true about VMFS5 datastores on ESXi 6.x? (Choose two.)___
A. Virtual Disk (VMDK) size can be larger than 2TB.
B. Datastore extent size can be larger than 2TB.
C. Only Physical Mode Raw
D. evice Map (Passthrough-RDM) can be larger than 2TB.
【多选题】
Which two statements are correct when turning off a Distributed Resource Scheduler (DRS) Cluster? (Choose two.)___
A. The resource pool hierarchy of the DRS cluster is maintained.
B. The resource pool hierarchy of the DRS cluster is removed.
C. The affinity settings of the
D. RS cluster are removed and not maintained when DRS is re-enabled.
【多选题】
An administrator is creating a new Virtual SAN cluster on a Layer 2 network. There is an existing Virtual SAN cluster on the same Layer 2 network. Which two actions would allow the new Virtual SAN cluster to coexist with the older cluster? (Choose two.)___
A. Change the default Multicast Address on the new Virtual SAN cluster.
B. Change the default Unicast Address on the new Virtual SAN Cluster.
C. Create a separate VLAN for each cluster.
D. Create an ARP Alias for the Virtual SAN VMkernel Network Adapter.
【多选题】
A vCenter Operations Manager 5.7 environment is upgraded to vRealize Operations. After the upgrade, the analytics services fail to start. Which three steps must be taken to resolve the problem? (Choose three.)___
A. Take the vRealize Operations cluster offline.
B. Delete the activity persistence files.
C. Bring the cluster back online.
D. Remove any unresponsive nodes.
E. Stop the CaSA service.
【多选题】
An organization has an ESXi 6.x host that contains two resource pools. The host is being relocated to a DRS cluster. What two actions can be taken to integrate the host into the cluster, and what would happen to the existing ESXi resource pool hierarchy as a result? (Choose two.)___
A. Place all of the host's virtual machines into the DRS cluster root resource pool. The resource pools present on the host will be deleted.
B. Create a resource pool for the ESXi host's virtual machines and resource pools. The resource pools present on the host will be deleted.
C. Place all of the host's virtual machines into the DRS cluster root resource pool. The resource pools present on the host will be preserved.
D. Create a resource pool for the
E. SXi host's virtual machines and resource pools. The resource pools present on the host will be preserved.
【多选题】
Which two parameters are required when adding an iSCSI target to an iSCSI Software Adapter using Dynamic Discovery? (Choose two.)___
A. The iSCSI device's IP Address or Fully Qualified Domain Name
B. The Port Number
C. The iSCSI device's iSCSI Qualified Name (IQN)
D. The Default Gateway IP Address
【多选题】
Which two SMTP Notification Event Details are specific to alarms triggered by events? (Choose two.)___
A. User Name
B. Summary
C. Old Status
D. Target
【多选题】
Which two High Availability ___ Cluster admission control policies can help avoid resource fragmentation? (Choose two.)(AC)
A. Define failover capacity by static number of hosts
B. Define failover capacity by reserving a percentage of the cluster resources
C. Use dedicated failover hosts
D. Use Virtual Machine Monitoring
【多选题】
An attempt to enable vSphere Fault Tolerance for a powered-on virtual machine fails. Which two scenarios would result in this failure? (Choose two.)___
A. The virtual machine has three vCPUs configured.
B. The host on which the virtual machine is running has insufficient memory resources.
C. The virtual machine has insufficient resources to accommodate full reservation plus the overhead memory.
D. VMware High Availability is enabled on the cluster of which this host is a member.
【多选题】
A vApp template recently added to a Content Library is not displayed. Which two actions could correct this problem? (Choose two.)___
A. Manually synchronize the library
B. Select the Download all library content immediately option
C. Select the Sync subscribed library option
D. Manually download the vApp template
【多选题】
What are three valid disk configurations for the vSphere Data Protection 6.x Appliance? (Choose three.)___
A. 500GB
B. 1TB
C. 1.5TB
D. 2TB
E. 4TB
【多选题】
Which three connection types are available when configuring a vSwitch in the vSphere Web Client? (Choose three.)___
A. VMkernel Network Adapter
B. Physical Network Adapter
C. Virtual Machine Port Group for a Standard Switch
D. vMotion Network Adapter
E. vSAN Network Adapter
【多选题】
Which three features can be enabled for a new host cluster? (Choose three.)___
A. Storage Distributed Resource Scheduling
B. High Availability
C. Fault Tolerance
D. Distributed Resource Scheduling
E. Virtual SAN
【多选题】
An administrator receives a report that no real time statistics are available for a virtual machine in the vCenter Server inventory. Which two statements indicate likely causes of the problem? (Choose two.)___
A. The virtual machine is powered off.
B. The host containing the virtual machine is disconnected from vCenter Server.
C. There is insufficient real time data to display the information.
D. The vCenter Server service is not running.
【多选题】
Your manager has given you a bash script that retrieves data for ESXi 6.x host configurations. This data needs to be collected right after the installation of a host and must be run directly on the host. Which two actions can be used to run this script on an ESXi host? (Choose two.)___
A. Connect to the host with Ruby vSphere Console and run the script from there.
B. Enable SSH access from the Direct Console User Interface.
C. Enable the ESXi Shell from the
D. irect Console User Interface.
【多选题】
Which two are true about the Risk badge in vRealize Operations? (Choose two.)___
A. The Risk badge indicates potential future problems that may degrade the performance of the system.
B. Risks may require attention in the near future.
C. The Risk badge indicates problems that are degrading performance of the system.
D. Risks require attention now to correct system performance problems.
【多选题】
vSphere Update Manager allows which two virtual machine attributes to be upgraded? (Choose two.)___
A. Virtual machine firewall policies for NSX.
B. Software Packages in the virtual machine.
C. Virtual machine Hardware Version.
D. VMware Tools Upgrade.
【多选题】
What are two benefits of using NFS 4.1 with vSphere 6.x as compared to NFS 3? (Choose two.)___
A. NFS 4.1 supports Kerberos Authentication
B. NFS 4.1 supports multipathing
C. NFS 4.1 supports IPv6
D. NFS 4.1 supports hardware acceleration
【多选题】
Which three statements are true regarding Fault Tolerance? (Choose three.)___
A. Applications need to be continuously available to users.
B. Applications without native clustering capabilities can be protected.
C. Custom clustering solutions are complicated to configure and maintain.
D. Applications that have 16 vCPUs are supported.
E. Prevents application crashes by analyzing the workload and correcting problems.
【多选题】
Which two statements are true regarding VMware vSphere Flash Read Cache (vFRC)? (Choose two.)___
A. Cache fills and cache evictions happen in the granularity of a cache block size.
B. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying storage.
C. vFRC caches data from both read and write I/Os, but write I/Os are always serviced by the underlying cache data.
D. Cache fills and cache evictions happen in the granularity of the disk block size.
【多选题】
What are two possible causes of Storage Distributed Resource Scheduler (SDRS) being disabled on one or more virtual machine disks in a datastore cluster? (Choose two.)___
A. The virtual machine has vSphere Fault Tolerance disabled.
B. The virtual machine is a template.
C. The virtual machine swap file is on a shared datastore.
D. The disk is a CD-ROM/ISO file.
【多选题】
An administrator attempts to install vCenter Single Sign-On Server. The installer returns an error message indicating that the installation failed. Prior to the installation, all setup prerequisites were met. The administrator has generated a vCenter Server Single Sign-On support bundle. Which two files should the administrator analyze to determine the cause of the failure? (Choose two.)___
A. Server\utils\logs\imsTrace.log
B. Server\utils\logs\install.txt
C. %TEMP%\utils\logs\vminst.log
D. %TEMP%\vminst.log
【多选题】
An administrator is unable to remove an ESXi 6.x host from a vSphere Distributed Switch. What are two likely reasons for this issue? (Choose two.)___
A. Vmkernel interfaces on the switch are still in use.
B. VM Network port group adapters are connected to different switch.
C. Physical NICs are migrated to different switch.
D. VM Network adapters are connected to this switch.
【多选题】
Which two Identity Sources are available to add for vCenter Single Sign-On authentication? (Choose two.)___
A. LocalOS
B. OpenLDAP
C. NIS as an LDAP Server
D. VCMSDS
【多选题】
What are three goals of resource management within a cluster? (Choose three.)___
A. To prevent virtual machines from monopolizing resources and to guarantee predictable service rates.
B. To exploit undercommitted resources and overcommit with graceful degradation.
C. To provide solutions to potential problems that you might encounter when using vCenter Server.
D. To control the relative importance of virtual machines and provide flexible dynamic partitioning.
E. To provide additional network administration capabilities.
【多选题】
Which three actions can be taken as a result of executing the vSphere Update Manager 6.x scan and remediation wizards? (Choose three.)___
A. Install and upgrade software in virtual machines.
B. Upgrade the firmware on ESXi host devices.
C. Upgrade and Patch ESXi hosts.
D. Install and update third-party software on hosts.
E. Upgrade virtual machine hardware.
【多选题】
Which two statements are true about deploying and using vSphere Replication? (Choose two.)___
A. ESXi hosts managed by a single vCenter Server instance require a connection between the two vSphere Replication appliances.
B. Sites managed by different vCenter Server instances require a connection between the two vSphere Replication appliances.
C. Sites managed by different vCenter Server instances require the use of Site Recovery Manager and a connection between the two vSphere Replication appliances.
D. ESXi hosts managed by a single vCenter Server instance require a single vSphere Replication appliance.
推荐试题
【判断题】
在坡道上起道,从上坡往下坡看时,每点都不能低,从下坡往上坡看时每点都不能高
A. 对
B. 错
【判断题】
正线路轨距变化率不大于1/1000,其他线路不大于2/1000
A. 对
B. 错
【判断题】
据轨作业时,锯后钢轨长度误差不超过±2mm
A. 对
B. 错
【判断题】
钻孔作业时,螺孔允许误差:孔径±1mm,位置±lmm
A. 对
B. 错
【判断题】
钻孔作业时,钢轨孔两边应到棱,边缘不得有毛刺;倒棱倒角45°~60°,顺长0.5~1.0mm
A. 对
B. 错
【判断题】
安装接头鱼尾板时,曲线线路接头的紧固顺序为:先紧1、6位,再2、5位,最后紧3、4位
A. 对
B. 错
【判断题】
安装接头鱼尾板时,直线线路的接头螺栓紧固顺序为:先紧1、6位,再紧3、4位,最后拧紧2、5位
A. 对
B. 错
【判断题】
安装接头鱼尾板时,初步紧固后,要用扭矩扳手按顺序扭紧螺帽,调校至所需的扭矩
A. 对
B. 错
【判断题】
接头鱼尾板安装完成后的1至2个星期内,工班长应安排人员对该接头螺栓进行复紧
A. 对
B. 错
【判断题】
更换铁垫板时,铁垫板应安放在木枕中间,位置正确平整,垫板外肩要与轨底密靠,空隙不超过2mm,滑床板与基本轨落槽,滑床板与基本轨及尖轨底部密贴
A. 对
B. 错
【判断题】
更换铁垫板时,将更换下来的旧铁垫板整理收齐,放置在指定位置
A. 对
B. 错
【判断题】
更换铁垫板时,施工前认真检查锤把及锤头飞边,严禁在钢轨面上直钉,防止飞钉伤人
A. 对
B. 错
【判断题】
更换铁垫板时,拿取、安放、整正铁垫板时,严禁将手伸入轨底
A. 对
B. 错
【判断题】
在尖轨与基本轨间松卸、安装螺栓时,其中放—木块,防止夹伤手指
A. 对
B. 错
【判断题】
在接触网高架区段露天作业,严格遵守雨天作业的安全规定。防止触电伤害情况发生
A. 对
B. 错
【判断题】
将轨距尺的固定端紧贴一条钢轨的工作边,另一端放置在另一股钢轨工作边上,并左右移动,直至到最小间距,此时刻度就是准确轨距值
A. 对
B. 错
【判断题】
轨距尺垂直线路中心线架设在钢轨顶面,读取水平尺的气泡靠近末端相对应的值则为准确水平值
A. 对
B. 错
【判断题】
线路工班人员应规定定期用钢轨磨耗测量仪检测轨道上的钢轨侧面、垂直磨耗情况
A. 对
B. 错
【判断题】
钢轨磨耗检测方法:将磨耗测量仪紧贴钢轨行车工作边的轨腰、轨头,调校测量仪使其密贴钢轨,然后记下钢轨侧面及垂直磨耗读数
A. 对
B. 错
【判断题】
测量道岔转辙部分的轨道不平顺时,为防止尖轨闭合,出现夹伤意外,应将转辙机转到手动位置,并放置止动块在基本轨与尖轨之间,同时应与车站保持联络畅通
A. 对
B. 错
【判断题】
"
A. 对
B. 错
【判断题】
两名线路巡检员检查一指定轨段须要执行巡道的地方包括正线、车辆段、停车场
A. 对
B. 错
【判断题】
线路巡检员上班前应按照规定穿戴好防护服装及劳保用品
A. 对
B. 错
【判断题】
线路的终点站或区段折返站设置折返线或折返渡线
A. 对
B. 错
【判断题】
杭州地铁设计最高运行速度为100km/h的系统
A. 对
B. 错
【判断题】
设在两线交叉处的警冲标,应满足相邻两线设备限界的要求
A. 对
B. 错
【判断题】
道岔应设在曲线地段
A. 对
B. 错
【判断题】
正线及配线钢轨宜采用50kg/m钢轨,车场线宜采用60kg/m钢轨
A. 对
B. 错
【判断题】
正线道岔钢轨类型应与相邻区间钢轨类型一致,并不得低于相邻区间钢轨的强度等级及材质要求
A. 对
B. 错
【判断题】
无缝线路设计应根据当地气象及地下线温度资料确定设计锁定轨温,并应对轨道结构强度、稳定性等进行计算
A. 对
B. 错
【判断题】
防脱护轨应设置在钢轨内侧
A. 对
B. 错
【判断题】
排水设施应布置合理,当与桥梁、隧道、车站等排水设施衔接时,应保证排水畅通
A. 对
B. 错
【判断题】
排水沟的横断面应按流量及用地情况确定,路基排水设施均应采取防止冲刷或渗漏的加固措施,并应确保边坡稳定
A. 对
B. 错
【判断题】
维修是指根据轨道变化规律和特点或者为消除施工影响,通过目视及时发现问题并生成记录报告
A. 对
B. 错
【判断题】
在维修计划中,应根据设备条件和实际状态,结合季节特点,合理地安排维修计划和重点工作
A. 对
B. 错
【判断题】
线路设备状态评定时以km为单位,满分为100分,扣除缺点分后,85~100分为优良,60~85分为合格,60分以下为不合格
A. 对
B. 错
【判断题】
线路轨道、道岔保养质量评定,是考核线路轨道、道岔养护工作质量的基本指标,也是安排维修计划的主要依据
A. 对
B. 错
【判断题】
中心依据《轨道委外管理办法》及委外合同,代表运营分公司全面负责工务委外的日常安全生产管理
A. 对
B. 错
【判断题】
中心应按要求组织委外单位建立维保设备台帐
A. 对
B. 错
【判断题】
中心安全、技术人员进行监督检查时发现委外单位人员违反安全管理规定,影响行车、设备、人身、消防等安全的应给予制止,必要时停止作业,其产生的后果由委外单位承担
A. 对
B. 错
欢迎使用我爱刷题
×
微信搜索我爱刷题小程序
温馨提示
×
请在电脑上登陆“www.woaishuati.com”使用