【单选题】
An administrator creates an ESXi cluster using vSphere Auto Deploy. The ESXi hosts are configured to get a management IP address from a DHCP server. The administrator needs to troubleshoot the management network on one of the hosts. Which DCUI option should the administrator use to renew the DHCP lease? ___
A. Restart Management Network
B. Restore Network Settings
C. Test Management Network
D. Configure Management Network
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【单选题】
An administrator is re-provisioning an ESXi host and moving it to another datacenter. Which DCUI option should the administrator use to revert the system configuration to the default settings? ___
A. Reset System Configuration
B. Rebuild Default System Configuration
C. Revert System Configuration
D. Renew Default System Configuration
【单选题】
An administrator has just completed installing an ESXi 6.x host, but doesn't know what address has been configured. Where is the ESXi host IP address configured? ___
A. RVC console
B. Direct Console User Interface
C. vSphere Web Client
D. vSphere Client
【单选题】
When is it possible to place a VMFS5 datastore in maintenance mode? ___
A. When it is a member of a Storage DRS cluster
B. When it is a member of Virtual SAN cluster
C. When it is a member of a multi-extent datastore
D. When it is a member of a Virtual Volume
【单选题】
Immediately after installing ESXi, an administrator observes that the Configure Lockdown Mode option is grayed out in the Direct Console User Interface (DCUI). What is the most likely explanation? ___
A. The host has not yet been added to a vCenter Server.
B. The BIOS on the host does not have NX/XD enabled.
C. The ESXi host is running in evaluation mode.
D. The host requires a reboot before this feature is available.
【单选题】
Immediately after installing ESXi, an administrator observes that the Configure Lockdown Mode option is grayed out in the Direct Console User Interface (DCUI). What is the most likely explanation? ___
A. The host has not yet been added to a vCenter Server.
B. The BIOS on the host does not have NX/XD enabled.
C. The ESXi host is running in evaluation mode.
D. The host requires a reboot before this feature is available.
【单选题】
Which Single Sign-On deployment mode should an administrator use for two 6.x vCenter Servers configured with linked mode? ___
A. Basic Single Sign-On with vCenter Server Heartbeat
B. Multisite Single Sign-On
C. Basic Single Sign-On
D. Single Sign-On with Linked Mode
【单选题】
What is required when changing a virtual machine name using the vSphere Web Client? ___
A. Verify connectivity to the ESXi host where the virtual machine is running and its inventory list is accessible.
B. Verify in which datastore the virtual machine resides and that you have access and its inventory list is accessible.
C. Verify that virtual machine files are stored in the same datastore and can be accessed in the datastore browser list.
D. Verify the virtual machine is not running in Fault Tolerant mode and that it is not in a Distributed Resource Scheduler cluster.
【单选题】
An administrator deploys vRealize Operations into a vSphere 6.x environment. After the deployment, the administrator notices that badges are not appearing. What is a likely cause of this behavior? ___
A. Badges do not appear until you register vRealize Operations with vCenter Server.
B. Badges do not appear until you register a vCenter Server in vRealize Operations.
C. The vRealize Operations appliance needs to be redeployed.
D. The vCenter Server appliance needs to be redeployed.
【单选题】
How are ports scaled on vSphere Standard Switches (vSS)? ___
A. Ports on a vSS can be dynamically scaled up and down.
B. Ports on a vSS can only be statically scaled up or down.
C. Ports on a vSS can only be dynamically scaled down.
D. Ports on a vSS can only be dynamically scaled up.
【单选题】
A High Availability (HA) cluster is configured to respond to a given number of host failures. The cluster contains virtual machines configured with these settings: VM1 has a 1GHz CPU reservation and no Memory reservation VM2 has a 2GHz CPU reservation and no Memory reservation VM3 has no CPU reservation and no Memory reservation . Given this information, what is the correct slot size for the cluster? ___
A. The CPU Reservation should be set to 32MHz and the memory reservation should be set to 32MB plus memory overhead.
B. The CPU reservation should be set to 1 GHz and the memory reservation should be set to 0MB plus memory overhead.
C. The CPU reservation should be set to 2 GHz, and the memory reservation should be set to 0MB plus the virtual machine memory overhead.
D. The CPU reservation should be set to 2 GHz, and the memory reservation should be set to 32MB, plus the virtual machine memory overhead.
【单选题】
An administrator is planning a vSphere infrastructure with the following specific networking requirements: <The ability to shape inbound (RX) traffic> <Support for Private VLANs (PVLANs)> <Support for LLDP (Link Layer Discovery Protocol)>. What is the minimum vSphere Edition that will support these requirements? ___
A. vSphere Essentials Plus
B. vSphere Standard
C. vSphere Enterprise
D. vSphere
E. nterprise Plus
【单选题】
When you add an ESXi 6.x host to a new Cluster, which vSphere object owns the CPU and Memory resources of the hosts? ___
A. vCenter Server
B. Datacenter
C. Cluster
D. Host
【单选题】
A user is trying to retrieve objects from a SharePoint server and finds the request is taking an excessive amount of time. An administrator tries to isolate the issue and notes the following: Application performance is poor when compared to virtual machines on other hosts. Performance improves when the virtual machine is moved to another host. The virtual machine encounters higher than expected CPU %Ready times. What conclusion can be reached regarding the performance issues for this virtual machine? ___
A. Host Power Management is directly impacting virtual machine performance.
B. The virtual machine has a large number of snapshots.
C. The Path Selection Policy for the storage device is set differently on the affected host.
D. Network I/O control is configured for the portgroup.
【单选题】
A virtual machine template is accidently removed from the vCenter Server Inventory. Which method would be used to recover the template back into the environment?___
A. Use the datastore browser to locate the template, then right click and add the .vmtx file to inventory.
B. Use the datastore browser to locate the template, then right click and add the .vmx file to inventory.
C. Using the Managed Object Browser and adding the template from the ManagedObjectReference:GuestFileManager object.
D. Using the Managed Object Browser and adding the template from the ManagedObjectReference:VirtualDiskManager object.
【单选题】
A vSphere administrator needs to backup a virtual machine that has a Microsoft SQL Server Database installed. Which solution allows for an application quiesce to occur during backup?___
A. VMware vCenter Converter
B. VMware vCenter Site Recovery Manager
C. VMware vSphere Replication
D. VMware vSphere Data Protection Advanced
【单选题】
An administrator is migrating a virtual machine from a Test cluster to a Production cluster. The two environments do not have any shared storage. What is the easiest way to accomplish this task? ___
A. Perform a Storage vMotion.
B. Perform a regular vMotion.
C. Perform a Virtual to Virtual migration.
D. Perform a backup and restore using VMware Data Protection.
【单选题】
An administrator must determine an appropriate backup solution, given these conditions: 50 of the virtual machines are in a resource pool named Finance. 50 of the virtual machines are in a resource pool named QA. Which solution allows an administrator the ability to backup 100 virtual machines? ___
A. Use Snapshot Manager on the vCenter Server to backup the virtual machines.
B. Use the VMware Consolidated Backup (vcb) tool on the ESXi Host to backup the virtual machines.
C. Use the VMware Data Recovery (VDR) Appliance on the vCenter Server to backup the virtual machines.
D. Use the VMware Data Protection (VDP) Appliance on one of the
E. SXi Hosts to backup the virtual machines.
【单选题】
What is a benefit of using Enhanced vMotion Compatibility for an environment? ___
A. EVC masks CPU features to allow compatibility between hosts that are dissimilar.
B. EVC allows for cross platform vMotion to occur.
C. EVC enables Long
D. istance vMotion.
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
An administrator needs to verify that vMotion operations can be performed in a vSphere data center.What round trip time (RTT) latency is the maximum value that will allow vMotion operations to succeed? ___
A. 50ms RTT
B. 100ms RTT
C. 150ms RTT
D. 200ms RTT
【单选题】
A storage administrator has reported that full utilization of all bandwidth from an ESXi 6.x host is not being seen. In troubleshooting the issue, the Adapter details are shown in the Exhibit. Based on the exhibit, what is cause of the issue? ___
A. The array is not setup to use the correct multipathing policy.
B. There are no virtual machines on the ESXi host.
C. Not all links are used because a path is disabled.
D. Another path needs to be configured.
【单选题】
An administrator is migrating a powered-on virtual machine, as shown in the exhibit. Which option should be selected to perform a Storage vMotion of the VM? ___
A. Change storage only
B. Change VM compute resource only
C. Change both compute resource and storage, changing the compute resource first.
D. Change both compute resource and storage, changing the storage resource first.
【单选题】
An administrator is attempting to enable Storage I/O Control on a datastore, but it is failing. What is the likely reason for this failure? ___
A. The host is connected to a datastore is running on ESX 4.0.
B. The host is connected to a Fibre Channel storage array.
C. The datastore has multiple extents.
D. The datastore is managed by a single vCenter Server.
【单选题】
A mission-critical virtual machine built on vSphere 4.1 needs to be moved to an ESXi 6.x host.Which virtual hardware version is needed to move the virtual machine without upgrading? ___
【单选题】
An administrator is analyzing a virtual machine as shown in the Exhibit. What is the current long term risk for this virtual machine? ___
A. The virtual machine may run out of memory before April 27.
B. The virtual machine may continue to function after April 27.
C. The virtual machine has adequate memory configured for operation for the next 120 days.
D. The virtual machine has adequate memory reservation configured for operation for the next 120 days.
【单选题】
An administrator is monitoring a High Availability (HA) and Distributed Resource Scheduler (DRS) enabled cluster and has noticed that virtual machines in the cluster are being migrated without user intervention. Why is this happening? ___
A. The DRS Automation level is set to Fully Automated.
B. The Automation level is set to Automatic.
C. The
D. PM Threshold is set to Aggressive.
【单选题】
An administrator attempts to migrate a suspended virtual machine to a newly deployed vSphere 6.x cluster. The compatibility check fails. What condition could cause this behavior?___
A. The new vSphere 6.x cluster is running Intel CPUs instead of AMD CPUs.
B. A suspended virtual machine cannot be migrated.
C. The hardware virtualization feature of the CPU is not enabled on the new hosts.
D. A vSphere Distributed Switch is required to migrate a suspended virtual machine.
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
【单选题】
An administrator has just configured the IP address on an ESXi host from the Direct Console User Interface. How can the configuration be validated as correct without any additional tools?___
A. Add the host to vCenter Server and if it works, then all networking settings are ok.
B. Select the Test Management Network option from the DCUI.
C. Connect to the host with the vSphere Client and click the Test Network option.
D. Use PowerCLI to connect to the host and initiate a network test.
【单选题】
An administrator is installing vCenter Server for an environment that has 40 ESXi 6.x Hosts and 150 virtual machines. Which database would meet the minimal requirements needed for this task? ___
A. vFabric Postgres
B. Microsoft SQL Express 2008
C. Microsoft SQL Server 2014
D. Oracle 11g
【单选题】
What is a requirement when enabling a Virtual SAN cluster in an existing High Availability (HA) and Distributed Resource Scheduler (DRS) Cluster? ___
A. Disable DRS and HA before enabling Virtual SAN
B. Enable DRS before enabling Virtual SAN
C. Disable HA before enabling Virtual SAN
D. Enable Storage DRS before enabling Virtual SAN
【单选题】
The vSphere administrator attempts to connect to an ESXi host via an SSH client and receives the following security alert: The vSphere administrator needs to determine whether the RSA key fingerprint shown in the security alert is the fingerprint of the intended ESXi host. Which tool should the vSphere administrator use? ___
A. Direct Console User Interface
B. vSphere Client
C. vSphere Web Client
D. vSphere Management Assistant
【单选题】
An administrator needs to monitor traffic on vSwitches in a vSphere 6.x environment. Which option, if configured, would accomplish this task? ___
A. Forged Transmits
B. MAC Address Changes
C. Promiscuous Mode
D. Notify Switches
【单选题】
What is true regarding datastores on ESXi 6.x? ___
A. NFS 4.1 datastore does not support Fault Tolerance (FT)
B. VMFS3 and VMFS5 datastores can be newly created
C. NFS datastore can be concurrently mounted using NFS 4.1 on one host and NFS on another
D. NFS 3.0 datastore does not support Fault Tolerance (FT)
【单选题】
An administrator is cloning and configuring five new web server virtual machines. What would be the benefit of configuring resource shares for the new VMs? ___
A. To prioritize access to a resource during contention.
B. To guarantee access to a resource during contention.
C. To prioritize access to a resource before contention occurs.
D. To guarantee access to a resource before contention occurs.
【单选题】
An administrator logs into the vSphere Web Client and sees the warning shown in the Exhibit. During a change control window, the warning was addressed. What should be done to verify that the host is no longer showing the warning? ___
A. Run a Remediate host operation.
B. Recheck the compliance of the host.
C. Restart the host to get rid of the warning.
D. Install VMware tools to clear the warning.
【单选题】
A vApp named Sales has a Memory Limit of 32 GB and a CPU Limit of 12,000 MHz. There are three virtual machines within the vApp: <Sales-DB -- Has a memory reservation of 20 GB. > <Sales-DC -- Has a memory reservation of 8 GB. > <Sales-Web -- Has a memory reservation of 8 GB.> Which statement is correct? ___
A. All three virtual machines can power on, but will have memory contention.
B. All three virtual machines can power on without memory contention.
C. Only two of the three virtual machines can power on.
D. Only one of the virtual machines can power on.
【单选题】
You are editing the management network configuration of an ESXi 6.x Host from the vSphere Web Client. You mistakenly put the incorrect VLAN in place for the management network. What action do you need to take to correct this? ___
A. You need to manually edit the configuration on the host with command line utilities.
B. No action is required. By default ESXi rolls back configuration changes that disconnect the host.
C. The ESXi host system configuration will need to be restored to the factory configuration to fix the issue.
D. The change can be reverted in the vSphere Web Client by simply editing the switch again.
推荐试题
【填空题】
在成本管理信息<V5.0>系统中,由于某单价合同签订时工程量小,单价确定的较高,但是实际施工时由于变更引起量增加较多,需进行对原合同细目单价进行调减,在发起劳务合同变更流程后,可通过 ___ 来实现。
【填空题】
在成本管理信息<V5.0>系统中,项目在发起机械结算时的前置流程为___,在单机油料核算中无扣款,复选框是指当该合同没有油料扣款时才勾选。
【填空题】
在成本管理信息<V5.0>系统中,现场经费全周期预算表中的预算现场经费总额取自经审批的___。
【填空题】
在成本管理信息<V5.0>系统中,各公司___可以通过文档管理模板模块,上传本公司的合同文本,供项目使用。
【填空题】
在成本管理信息<V5.0>系统中,三项指标计算分析表中的实际产值的数据来源取自 ___。
【填空题】
中铁四成本〔2018〕717 号文规定,变更索赔评审的内容应重点从___进行评估,经评审通过后方可实施,严禁未经评审先行实施变更。
【填空题】
根据《铁路建设项目变更设计管理办法》<铁建设[2012]253号文>规定,铁路项目巳签合同中非责任事故、问题的 II 类变更设计,增减工程费用在300 万元以内的,纳入风险包干费;增减工程费用在 300 万元及以上的,由建设单位在___找那个列支并相应调整施工合同额。
【填空题】
根据《铁路建设项目变更设计管理办法》<铁建设[2012]253号文>规定,变更索赔是工程项目增盈减亏的重要手段,是企业实现效益的重要途径,应在确保质量、安全、工期和环保的前提下,围绕效益最大化的目标进行,应始终贯穿于___的全过程。
【填空题】
中铁股份成本〔2018〕61 号文,铁路Ⅱ类变更程序分四个步骤:提出变更设计建议→___→确定变更设计方案→审核下发变更施工图等。
【填空题】
中铁股份成本〔2018〕61 号文,施工图招标铁路项目投资控制程序为:可研批复投资估算<项目总投资控制法定限额>→初步设计概算→鉴修概算→___→分标预算<招标预算>→投标合同清单→概算清理→审价→办理末次计价。
【填空题】
根据中铁股份成本〔2018〕61 号文,商品混凝土调差,在城市施工时,若因地方政府要求,不允许施工单位自行建站拌制混凝土,需采购商品砼时,采购的商品砼也可以争取按___进行调差。
【填空题】
根据中铁股份成本〔2018〕61 号文,轨料运杂费界定,首先要划分好界面,一般情况下,在铺轨基地之前发生的运杂费都在___中,铺轨基地之后发生的运杂费,则在清单单价中考虑。
【填空题】
根据铁建设〔2013〕99 号文《中国铁路总公司关于铁路工程推广应用高强钢筋有关工作的通知》,自通知颁布之日<2013年8月7日>起,在建暂未施工的项目,原设计的HRB35 钢筋,应用 HRB400 钢筋代替,增加的相关费用按___办理。
【填空题】
根据中铁股份成本〔2018〕61 号文, 二次经营各章节要点提示提出,围岩变更,可结合不同围岩单价分析情况,办理正变更或负变更。变更过程中须注意:一是办理正变更时,要努力办理成___,围岩连续问题要合理策划,分步实施推进。
【填空题】
根据中铁股份成本〔2018〕61 号文,价差是指应调材料整期与编制期的差价,对应的应调材料数量为___消耗数量。
【填空题】
《中国中铁工程项目变更索赔指导意见》<中铁股份成本[2018]213号>,项目经理部的工经部是项目变更索赔工作的___部门。
【填空题】
《中国中铁工程项目变更索赔指导意见》<中铁股份成本[2018]213号>,各层级要贯彻落实变更索赔“___”工作思路和“六要”工作方法,建立有计划、切实可行的目标管理制度。
【填空题】
《中国中铁工程项目变更索赔指导意见》<中铁股份成本[2018]213号>,要把___指标纳入生产经营考核指标体系,增强二次经营工作的严肃性,促进各级切实提高抓好这项工作的自觉性。
【填空题】
《中国中铁工程项目变更索赔指导意见》<中铁股份成本[2018]213号>,明确项目经理部___至少要召开一次变更索赔<工程经济>管理分析会。
【填空题】
《中国中铁工程项目变更索赔指导意见》<中铁股份成本[2018]213号>,明确在单项变更索赔批复计价后、项目整体完工后,应对各项变更索赔进行___,总结经验、查找得失、指导后续变更索赔工作。
【填空题】
《中国中铁工程项目变更索赔指导意见》<中铁股份成本[2018]213号>,文明确变更索赔工作应强化法制意识和风险防范意思,确保经得起审计、___和各类执法检查;应强化风险控制,杜绝隐患,并做好反索赔相关工作。
【填空题】
《中国中铁工程项目变更索赔指导意见》<中铁股份成本[2018]213号>,明确在项目开工___,项目经理部应成立变更索赔工作小组,明确分工,责任到人;项目经理为变更索赔管理的第一负责人,全面负责变更索赔工作。
【填空题】
《中国中铁工程项目变更索赔指导意见》<中铁股份成本[2018]213号>,根据工程项目变更设计管理流程,提出并编制变更设计建议书由___负责提出。
【填空题】
《中国中铁工程项目变更索赔指导意见》<中铁股份成本[2018]213号>,变更索赔是工程项目增盈减亏的重要手段,是企业实现效益的重要途径,应在确保___、___、___和___的前提下,围绕利益最大化的目标进行,应始终贯穿于企业生产经营管理的全过程。
【填空题】
《中国中铁工程项目变更索赔指导意见》<中铁股份成本[2018]213号>,___与___是股份公司变更索赔工作的主责部门,主要负责全系统变更索赔工作的日常管理。
【填空题】
《中国中铁工程项目变更索赔指导意见》<中铁股份成本[2018]213号>,___主要负责前期经营策划,在一次经营的基础上,为中标后的变更索赔埋下伏笔;负责就股份公司直属工程项目向成本与___进行营销交底。
【填空题】
《中国中铁工程项目变更索赔指导意见》<中铁股份成本[2018]213号>,铁路工程项目变更索赔额指___优化、___<不含保险费>及___收入之和,其中负变更金额按绝对值计列。
【填空题】
《中国中铁工程项目变更索赔指导意见》<中铁股份成本[2018]213号>,股份公司每年、二级公司___、三级公司___、项目经理部每月至少要召开一次变更索赔管理分析会。
【填空题】
中铁四成本<2018>717 号文明确,特殊变更事项是指负变更设计实现项目减亏、___、PPP项目设计方案优化节约等内容。
【填空题】
中铁四成本<2018>717 号文明确,项目收尾结算阶段,___是第一责任人。
【填空题】
中铁四成本<2018>717 号文明确,项目准备阶段。项目合同开工日期后___个月内,局指组织参建单位,分析合同、结合实际、研究策略,制订变更索赔策划方案,录入成本管理信息系统审批。
【填空题】
中铁四成本<2018>717 号文明确,变更索赔奖励以实现___为考核指标,按实现的变更索赔利润额为奖励计取基数。
【填空题】
中铁四成本<2018>717 号文明确,项目竣工结算完成后,依据局审计部认定的实际利润,遵照___等项目成本管理六大理念,由局指配合局成本管理部区分“三项指标”对项目利润贡献大小,并配合局相关部门综合评价,评价结果与项目考核兑现挂钩。
【填空题】
中铁四成本<2018>717 号文规定,变更索赔收入按___的原则进行分劈。
【填空题】
《公路工程标准施工招标文件》2018版,如果工程的变更指示是因___引起的任何额外费用应由承包人承担。
【填空题】
《公路工程标准施工招标文件》2018版,合同一方向另一方提出索赔时,应有正当的___和___,并应符合合同的相关约定。
【填空题】
《公路工程标准施工招标文件》2018版,承包人应在发出索赔意向通知书后___天内,向监理人正式提交索赔通知书,索赔通知书应详细说明索赔理由和要求,并应附必要的记录和证明材料。
【填空题】
根据《铁路建设项目变更设计管理办法》<铁建设[2012]253号文>规定,建设单位应对I类变更设计文件进行初审,涉及环水保的重大问题的变更设计,应先向___主管部门报告,经同意后,再形成初审意见连同I类变更设计文件一并报送总公司
【填空题】
根据《铁路建设项目变更设计管理办法》<铁建设[2012]253号文>规定,包干外II类变更设计由建设单位组织审定,费用在___中列支。
【填空题】
根据《铁路建设项目变更设计管理办法》<铁建设[2012]253号文>规定,铁路项目涉及___的II类变更设计,建设单位应在现场组织确定变更设计方案,按确定的方案先进行施工准备和应急处理。