刷题
导入试题
【单选题】
An administrator has recently installed a new ESXi 6.x Host, and during the configuration notices sporadic network problems. To check whether the issue occurred sometime during the configuration, the administrator would like to reset the system.How can this be accomplished in the shortest amount of time?___
A. Run the ESXi installer again and reinstall the host.
B. Select the Reset System Configuration option from the vSphere Client when connected directly to the host.
C. From the
D. irect Console User Interface, select Reset System Configuration.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
C
解析
暂无解析
相关试题
【单选题】
A vApp is running out of compute resources when overall activity is high within the resource pool. At other times, everything is fine.What should be done to resolve this issue?___
A. Increase the size of the resource pool Shares.
B. Set the vApp's CPU and Memory Reservation Type to Expandable.
C. Set the vApp's CPU and Memory Limit to Unlimited.
D. Create a new resource pool with the existing hardware configuration.
【单选题】
A virtual machine has been renamed and an administrator is unable to find files with the new virtual machine name in the datastore.What is the reason for this?___
A. The names of the files on the datastore do not change.
B. The names of the files on the datastore have been corrupted.
C. The virtual machine needs to be re-added to the inventory.
D. The Distributed Resource Scheduler moved the virtual machine to another host.
【单选题】
An administrator has configured network connectivity for a new virtual machine, as shown in the Exhibit.What will occur with the network traffic of this virtual machine when communicating externally from vSwitch1?___
A. The virtual machine will communicate on both uplinks
B. The virtual machine will only communicate on vmnic1
C. The virtual machine will only communicate on vmnic2
D. The virtual machine will fail to communicate externally
【单选题】
An administrator is unable to create the first group in a new vRealize Operations environment. What is the likely cause of the problem?___
A. There are no group types defined.
B. The group is not defined in SSO.
C. There are more than 32 group types defined.
D. The description for the group is not provided.
【单选题】
A new vApp was built and tested in the corporate headquarters datacenter running vSphere 6.x. What condition would explain why the virtual machine is failing to boot in an offsite datacenter running on vSphere 5.5?___
A. The virtual machine was built with the default hardware version.
B. The VMFS 5 datastore is not compatible with virtual machines configured with vSphere 6.x.
C. a
D. RS 5.5 cluster cannot run virtual machines configured with vSphere 6.x.
【单选题】
An administrator is evaluating whether to deploy vCenter Server on a Windows server or on a vCenter Server appliance. The administrator has the following requirements: <A web browser will be utilized to manage the vSphere environment.> <16 ESXi hosts will be deployed.> <Licenses must be shared with a vCenter Server at another site.> <An external Oracle 10g database server will be used to host the vCenter Server database.> Why will the administrator need to deploy vCenter Server on a Windows server?___
A. Linked Mode is a requirement for the solution.
B. Oracle 10g is a requirement for the solution.
C. The vSphere web client is a requirement for the solution.
D. Management of more than 5 hosts is a requirement for the solution.
【单选题】
What is a benefit of using VMware Data Protection ?___
A. Provides support for guest-level backups and restores of Microsoft SQL Servers, Exchange Servers, and Share Point Servers.
B. Provides support for advanced storage services including replication, encryption, deduplication, and compression.
C. Provides direct access to VDP configuration integrated into the vSphere Client.
D. Reduces disk space consumed by virtual machine data using deduplication.
【单选题】
An administrator enables vSphere High Availability (HA) on an existing cluster with a large number of hosts and virtual machines. The administrator notices that the setup of vSphere HA on some of the hosts is failing. What step, if taken, might resolve this issue?___
A. Increase the value of the config.vpxd.das.electionWaitTimeSec setting.
B. Set the value of vpxd.das.aamMemoryLimit to 256.
C. Set the value of the das.useDefaultIsolationAddress setting to False.
D. Increase the value of the das.iostatsinterval setting.
【单选题】
An ESXi 6.x host consists of 24 logical cores. Hyperthreading is enabled on the host. What is the maximum number of vCPUs that can be assigned to a virtual machine on this host?___
A. 24
B. 48
C. 64
D. 128
【单选题】
By default, each ESXi 6.x host is provisioned with a certificate from which root certificate authority?___
A. RedHat Certificate Authority
B. VMware Certificate Authority
C. DigiCert Certificate Authority
D. Verisign Certificate Authority
【单选题】
An administrator is adding an NFS datastore as shown in the Exhibit. What is the purpose of the Servers to be added list?___
A. It contains the IP addresses of the NFS Storage Server to provide multipathing capability.
B. It contains the IP addresses of the ESXi hosts that mount the datastore.
C. It contains the IP addresses used for
D. ynamic Discovery of targets.
【单选题】
An administrator reports that the System Event log data is only available for 24 hours when reviewing the Hardware Status tab. Which condition could be responsible for the loss of data?___
A. A Reset event log was executed.
B. The statistical collection level was set to a value of 1.
C. The boot disk of the host is corrupt.
D. Syslog has been configured at the vCenter Server level.
【单选题】
During an upgrade, the ESXi 6.x installer finds an existing version of ESXi and a VMFS3 volume. No virtual machines exist on the host or VMFS3 volume. The requirement is to upgrade to VMFS5. Which option should be chosen to meet this requirement?___
A. Upgrade ESXi and preserve the VMFS datastore
B. Install ESXi and preserve the VMFS datastore
C. Install ESXi and overwrite the VMFS datastore
D. Upgrade
E. SXi and overwrite the VMFS datastore
【单选题】
A vSphere 6.x Standard Switch is configured with 4 virtual machine portgroups, as shown in the exhibit. Which portgroup would be utilized by default when creating a new virtual machine?___
A. Access Network
B. DMZ Network
C. VM Network
D. Virtual Machine Network
【单选题】
Which vSphere 6.x feature will allow an organization to utilize native snapshots?___
A. Virtual Volumes
B. Virtual SAN
C. VMFS3
D. VMFS5
【单选题】
An administrator is creating a new vSphere Distributed Switch that will be utilized with a specific vSphere Cluster. The cluster itself contains a mix of ESXi 5.x and 6.x Hosts. Which Distributed Switch version should be created to support this configuration?___
A. Distributed Switch: 6.0.0
B. Distributed Switch: 5.0.0
C. Distributed Switch: 5.1.0
D. Distributed Switch: 5.5.0
【单选题】
Which load balancing policy, previously limited to vSphere Distributed Switches, is now available on vSphere Standard Switches with vSphere 6.x?___
A. Route based on physical NIC workload
B. Route based on IP Hash
C. Route based on the originating virtual port
D. Route based on Source MAC Hash
【单选题】
A storage administrator is not seeing full utilization of all bandwidth from an ESXi host. The vSphere administrator observes the adapter details, as shown in the Exhibit. What is the probable cause of this issue?___
A. Another path needs to be used to allow full utilization of the bandwidth.
B. The array is not setup to use the correct multipathing policy.
C. There are no virtual machines on the host.
D. No traffic is being sent across it because a path failed.
【单选题】
A storage administrator is not seeing full utilization of all bandwidth from an ESXi host. The vSphere administrator observes the adapter details, as shown in the Exhibit. What is the probable cause of this issue?___
A. Another path needs to be used to allow full utilization of the bandwidth.
B. The array is not setup to use the correct multipathing policy.
C. There are no virtual machines on the host.
D. No traffic is being sent across it because a path failed.
【单选题】
An administrator has just completed performing an interactive installation of ESXi 6.x and is booting the host. How is the network initially configured?___
A. The network is configured by Automatic Private IP Addressing (APIPA).
B. The network is configured based on the settings detected in DNS.
C. The network is configured with the address as specified in the installer.
D. The network is automatically configured by DHCP.
【单选题】
You have just installed an ESXi 6.x Host. As part of your company security regulations, a security banner must be presented on the console of the host. How can this action be accomplished?___
A. Configure the Advanced Settings > Annotations screen of the ESXi host.
B. This is configured from the Direct Console User Interface configuration menu.
C. It is not possible to configure a security banner for the ESXi host.
D. From vCenter Server, this setting is configured globally in the vCenter Server configuration.
【单选题】
An administrator is only able to see the Health Badge when using the vRealize Operations user interface. What is the likely cause of this behavior?___
A. The vRealize Operations Foundation License is in use.
B. The vmware-sps service failed to start.
C. The vRealize Operations Standard License is in use.
D. The vmware-rbd-watchdog service failed to start.
【单选题】
An administrator has configured an alarm to be notified when a virtual machine meets either of these conditions: <High virtual CPU> <High active memory consumption.> <The alarm is only triggering when both of the conditions are met.> What can be done to correct the alarm behavior?___
A. Edit the alarm and select Trigger if ANY of the following conditions are satisfied.
B. Edit the alarm and select Trigger if ALL of the following conditions are satisfied.
C. Create two separate alarms, one for CPU and one for memory and link them together with ESXCLI.
D. Delete the existing alarm and create a new event based alarm.
【单选题】
An administrator creates an ESXi cluster using vSphere Auto Deploy. The ESXi hosts are configured to get a management IP address from a DHCP server. The administrator needs to troubleshoot the management network on one of the hosts. Which DCUI option should the administrator use to renew the DHCP lease? ___
A. Restart Management Network
B. Restore Network Settings
C. Test Management Network
D. Configure Management Network
【单选题】
An administrator is attempting to restore a number of files in a directory within the Operating System of a virtual machine. How can the administrator restore the files from a previous backup? ___
A. Use the File Level Restore option from the selected backup of the virtual machine in the vSphere Web Client.
B. Connect to the File Level Restore tool from a web browser in the virtual machine.
C. Connect to the File Level Restore tool from the VMware
D. ata Protection appliance.
【单选题】
After selecting an object in vRealize Operations, how can a user compare the badge values of related child objects? ___
A. Use the Scoreboard tab
B. Use the Relationship tab
C. Use the Members tab
D. Use the Overview tab
【单选题】
You want to deploy a vApp and dynamically assign IP addresses without a DHCP server on the network. Which action would you take to accomplish this task? ___
A. Enable IP pools.
B. Configure a local DHCP server in the vApp.
C. Enable NAT on the vApp router.
D. Configure the guest OS for workgroup and WINS.
【单选题】
What is the optimal configuration when building a virtual machine for a single-threaded Windows application? ___
A. Deploy single-threaded applications on uniprocessor virtual machines.
B. Deploy single-threaded applications on symmetric multi-processor virtual machines.
C. Tune single-threaded applications to take advantage of symmetric multi-processor resources.
D. Tune Single-threaded applications at the hypervisor level.
【单选题】
An administrator has created the resource pool configuration shown in the Exhibit. Based on the exhibit, which virtual machine(s) can be successfully powered on? ___
A. VM-M1 only
B. VM-K1 only
C. VM-K1 and VM-K2 only
D. VM-K1, VM-K2, and VM-M1
【单选题】
Which vSphere 6 Enterprise Edition feature will allow an organization to ensure that critical multi-threaded applications have the maximum possible uptime? ___
A. Fault Tolerance
B. High Availability
C. Distributed Resource Scheduler
D. App HA
【单选题】
An administrator has a virtual machine that requires four times the compute resources than other virtual machines on the same ESXi 6.x host. How should the administrator configure the virtual machine settings, in order to be prepared for any resource contention? ___
A. Set the shares of the priority virtual machine to High and the rest to Low.
B. Set the shares of the priority virtual machine to High.
C. Set the shares of the priority virtual machine to High and the rest to Normal.
D. Set the shares of the priority virtual machine to Normal and the rest to Low.
【单选题】
Which type of Adapter does not require vmkernel networking? ___
A. Independent Hardware iSCSI Adapter
B. Dependent Hardware iSCSI Adapter
C. Software iSCSI Adapter
D. Software FCoE Adapter
【单选题】
During the installation of ESXi 6.0, the following error message is reported: Hardware Virtualization is not a feature of the CPU, or is not enabled in the BIOS. Which condition would generate this message? ___
A. LAHF/SAHF is not enabled in the BIOS.
B. NX/XD is not enabled in the BIOS.
C. SSE3 is not enabled in the BIOS.
D. Hyperthreading is not enabled in the BIOS.
【单选题】
An administrator is unable to login to vCenter Server when using the vSphere web client. The administrator successfully accessed vCenter Server using the client earlier the same day. What is the most appropriate first step the administrator should take to resolve this issue? ___
A. Verify the web browser being used has Adobe Flash plugin version 11.5 or later
B. Verify the vCenter Single Sign-On service is running on the vCenter Server
C. Verify the vSphere Web Server service is running on the vCenter Server
D. Verify the administrator has permissions configured in vCenter Server
【单选题】
An administrator has configured an alarm to be notified when a virtual machine meets two conditions: <high virtual CPU> <high active memory consumption> The alarm is malfunctioning and triggering when either condition is met instead of both. What can be done to correct the issue? ___
A. Edit the alarm and select Trigger if ALL of the following conditions are satisfied.
B. Edit the alarm and select Trigger if ANY of the following conditions are satisfied.
C. Create two separate alarms, one for CPU and one for memory.
D. Delete the existing alarm and create a new event based alarm.
【单选题】
What must be enabled to ensure that VM Component Protection (VMCP) works in a High Availability cluster? ___
A. VMware Tools Virtual Machine Communication Interface (VMCI)
B. Fault Tolerance
C. Atomic Test and Set (ATS)
D. All Paths Down (APD) Timeout
【单选题】
An administrator wants to add a web server to an existing multi-tier application consisting of three virtual machines: <A web server> <A database server An application server> The web server should be added to the application when the primary web server reaches: <70% vCPU utilization> <55% active memory> Which option will achieve this result? ___
A. Create a virtual machine alarm with an action to run a script that starts a new instance of the web server.
B. Create a host cpu and memory alarm with an action to run a script that starts a new instance of the webserver.
C. Configure HA application monitoring for the web server and set it to trigger deployment of a new instance of the web server.
D. Configure Fault Tolerance on the virtual machine and leave the secondary machine disabled until needed.
【单选题】
An administrator has an application that requires connection directly to PCI devices through a virtual machine. What is a limitation of this configuration? ___
A. Devices must be reserved for PCI passthrough on at least one host on which the virtual machine will run.
B. Snapshots are not supported with DirectPath I/O passthrough devices.
C. A maximum of 18 PCI vSphere
D. irectPath devices can be added to a virtual machine.
【单选题】
The vSphere administrator is configuring directory services for an ESXi host: What should the vSphere administrator do to configure the host to use CAM services? ___
A. Check the Use vSphere Authentication Proxy checkbox.
B. Set Select Directory Service Type to CAM services.
C. Specify CAM$ for the
D. omain.
【单选题】
Which statement is true regarding the licensing of vCenter Server? ___
A. The license for vCenter Server must be provided at the time of installation.
B. Changing the license assigned to vCenter Server requires a restart of the vCenter Server service.
C. Virtual machines can still be powered on if the vCenter Server license expires.
D. Licensing for a single vCenter Server installation is determined by the number of managed virtual machines.
推荐试题
【单选题】
项目团队满足项目工期,但却超出预算。关键相关方正式验收可交付成果,且项目团队完成了事后审查,项目团队应该创建哪一份报告?
A. 项目管理报告
B. 项目收尾报告
C. 成本和利润报告
D. 最终状态报告
【单选题】
在月度项目状态会议上,项目经理得知当地政府宣布的资金问题可能影响项目,项目经理下一步应该怎么做?
A. 暂停项目,因为资金可能会削减或增强项目可交付成果
B. 将这条信息更新到风险登记中,并将其添加到下次风险会议的讨论议程中
C. 向项目发起人通知这个新机会,并提出一项变更请求
D. 指定一名团队成员请求获得关于该资金的详细信息,以及需要采取哪些步骤才能获得资格
【单选题】
在下列哪一个过程组中,项目可交付成果将会被分成较小较容易管理的部分?
A. 启动
B. 计划
C. 执行
D. 监控
【单选题】
一名团队成员主管询问项目经理获得项目资源的职权,项目经理可以通过向主管提供下列哪一项来验证他们拥有适当的职权?
A. 人力资源计划
B. 项目章程
C. 工作分解结构
D. 沟通计划
【单选题】
项目收尾时,项目经理审查上一个阶段收尾信息,以验证所有项目工作是否完成,项目经理应该做什么?
A. 集合团队,认可他们对项目付出的努力
B. 通知项目发起人项目已收尾
C. 在组织过程资产中更新经验教训
D. 执行偏差分析
【单选题】
一位新项目经理在制定工作分解结构时征求你的意见。当你解释完流程后,他又问该借助何种软件完成 WBS制作,WBS 制作完成后如何运用等问题。你回答说,最有价值的 WBS 制作结果不仅仅是一张图片,而是:
A. 甘特图
B. 团队组建
C. 活动
D. 风险清单
【单选题】
资源经理询问项目经理的角色和职责以及项目目的,项目经理应向资源经理提供下列哪一份文件?
A. 人力资源计划
B. 工作说明书
C. 商业论证
D. 项目章程
【单选题】
项目经理加入一个设计阶段接近完成的项目,虽然客户已经批准所有设计图,但项目经理发现最终设计中包含了多项客户变更,这些变更尚未经过审核和批准。项目经理下一步应该怎么做?
A. 向客户提交变更请求以记录这些变更
B. 实施整体变更控制流程
C. 与客户一起回顾变更管理计划
D. 停止所有工作以减轻变更对成本.时间和质量的影响
【单选题】
项目团队正在识别项目和产品方案,项目经理让专家组填写问卷并仅向协调员做出直接反馈,项目经理采用了哪种方法?
A. 德尔菲法
B. 头脑风暴法
C. 名义小组法
D. 概念思维导图法
【单选题】
在计划某个系统实施时,项目经理遇到一个不满意的职能经理。职能经理质疑项目经理继续执行项目的权利。项目经理应向职能经理提供下列哪一份文件?
A. 项目章程
B. 项目管理计划
C. 项目范围说明书
D. 组织结构图
【单选题】
一位经验丰富的主题专家(SME)非常擅长工作,但缺乏与团队其他成员分享交流技能,这造成了沟通落差,延误任务,项目经理应该怎么做?
A. 确保项目会议提供重要的信息,包括正面和负面的信息,可用于讨论
B. 与该主题专家会面,以获得重要信息,然后传达给团队的其他成员
C. 安排该主题专家参加沟通课程来提高技能,有助于积极地支持团队
D. 寻找能够更好地将其想法传达给团队的另一位经验丰富的资源
【单选题】
为了在需求收集过程中产生创新意见,项目经理通过一系列问卷调查来征求专家的意见,问卷调查是匿名形式的,答案将会直接返回给项目经理,这种技术称作下列哪一项?
A. 多义小组技术
B. 德尔菲技术
C. 头脑风暴
D. 思维导图
【单选题】
公司任命一名项目经理管理一个新项目。项目经理可使用下列哪能一项作为制定项目管理计划的依据?
A. 项目管理计划(更新)
B. 需求管理计划
C. 项目章程
D. 工作分解结构
【单选题】
在项目进行阶段,批准了一项监管法律,责令立即遵守,该项法律将影响项目的范围.进度和成本。项目经理首先应该做什么?
A. 减轻风险
B. 更新项目管理计划
C. 上报高级管理层
D. 启动变更请求过程
【单选题】
你正在管理一个历时六个月的项目,而且每两周要和项目相关方召开状态会议。工作完成五个半月后,项目的进度和预算均在计划内,但相关方对可交付成果并不满意。这样会导致项目延期一个月完工。阻止此类问题发生的最有效的过程是哪个?
A. 监督风险
B. 控制进度
C. 定义范围
D. 控制范围
【单选题】
项目经理拥有一份在项目开始时由不同相关方提供的成功标准清单. 项目经理对于如何排列这些成功标准的优先顺序感到不确定,并且明天必须在会上陈述项目章程. 项目经理接下来应该怎么做?
A. 与发起人核对项目成功标准,并将其添加到项目章程中
B. 在下一次项目会议上,与相关方讨论成功标准
C. 在项目章程中列出所有成功标准
D. 选择其中一个成功标准,并将其包含在项目章程中
【单选题】
一家连锁店的项目经理目前正考虑在地点 A 或地点 B 开一间新店。项目经理给出以下信息:项目地点 A:投资回报期为 18 个月,净现值为-250。项目地点 B:投资回报期为 24 个月,净现值为 300。项目经理将会向选择委员会推荐哪个项目?
A. 项目地点 A,因为投资回报期比项目地点 B 短
B. 项目地点 B,因为净现值为正数
C. 项目地点 A,因为净现值为负数
D. 项目地点 B,因为投资回报期比项目地点 A 长
【单选题】
项目经理记录一个客户的新系统开发项目高层次需求。讨论过程中,项目经理意识到客户中每个人对需求有不同的理解。项目经理接下来应该怎么做?
A. 等待客户决定他们想要的是什么。
B. 编写一份报告,按项目经理的理解解释客户的需求。
C. 安排一次与客户的会议,澄清需求。
D. 继续按理解执行项目。
【单选题】
一家公司的首席技术官宣布将开发一项创新的新产品,并要求项目经理提供一份产品开发的计划,项目经理下一步该怎么做?
A. 定义活动
B. 制定项目计划
C. 指定项目管理计划
D. 制定项目章程
【单选题】
项目需要一名熟练的工程师来执行某个特定任务,但由于工作量大,该工程师不能参与这个项目,项目经理下一步应该怎么做?
A. 修改进度计划,以适应该资源
B. 与职能经理谈判该资源的参与
C. 培训项目团队去执行需要的活动
D. 向发起人请求更多时间去寻找另一名资源执行该任务
【单选题】
下列哪一项属于定义范围过程的输出?
A. 项目文件更新
B. 项目章程
C. 工作分解结构
D. 产品分析
【单选题】
公司中标一份合同,项目经理收到执行该合同的通知。若要开始项目,必须首先要求哪一份文件确定?
A. 项目章程
B. 工作说明书
C. 招标技术规范
D. 工作分解结构
【单选题】
一个项目涉及位于全球各地的团队成员,产生了许多不同意见,新项目经理通过成功协助团队协作和问题解决提高生产力。项目经理使用的是什么工具或技术?
A. 冲突管理
B. 沟通模型
C. 整体决策技术
D. 虚拟团队
【单选题】
项目经理向高级管理层提供了一份状态报告。项目经理制作了一幅 CPM 图,其中显示有两项活动的总浮动时间是负的。从该项分析中,管理层可以得出下列哪一项结论?
A. 这两项活动是项目的关键活动
B. 项目经理计算错误,因为最多只有一项可能浮动时间为负
C. 两项活动的最晚结束时间都早于最晚开始时间
D. 因为有活动处于负浮动时间,所以项目进度比计划超前了
【单选题】
项目经理对一项新服务有个创意,能让其公司在一个新细分市场中开展业务。经过咨询.联网.市场分析和项目评估后,项目经理认为存在进一步定义该项新服务创意的基础。项目经理接下来应该怎么做?
A. 识别风险
B. 收集要求
C. 定义高层次范围
D. 创建工作分解结构
【单选题】
在项目执行过程中,一位相关方要求一名团队成员执行与项目无关的紧急任务,团队成员执行了该请求,导致其项目相关活动延后,项目经理在一次状态报告会上得知这一情况,项目经理应该怎么做?
A. 要求该团队成员加班去弥补损失的时间
B. 通知相关方预期交付期限无法满足
C. 强调遵循沟通管理计划的重要性
D. 建议重新规划项目活动
【单选题】
活动清单.横道图和网络图属于下列哪一项的输出?
A. 风险管理计划
B. WBS 词典
C. 项目章程
D. 项目进度计划
【单选题】
项目章程包括下列哪一项?
A. 项目预算的汇总
B. 详细的产品范围
C. 范围基准
D. 项目管理计划
【单选题】
一个项目的项目经理被替换,新的项目经理识别到项目超出预算并落后于进度计划,新项目经理首先应该做什么?
A. 要求项目发起人增加预算并延长进度计划
B. 获得发起人授权重新组织团队
C. 减少范围去满足初始预算和进度
D. 识别改进区域加强监控
【单选题】
项目经理使用渐进明细技术来定义项目活动,其中对在近期需要完成的工作做详细计划,对未来工作则在更高一级 WBS 计划。项目经理使用下列哪一项技术定义活动?
A. 滚动规划
B. 专家判断
C. WBS
D. 分解
【单选题】
项目经理正与一名承认未使用章程的同事讨论项目章程。为了向同事说明项目章程的重要性,项目经理表明项目章程和重要,因为项目章程的批准即意味着下列哪一项?
A. 启动阶段正式开始
B. 执行阶段正式开始
C. 详细需求清单的正式批准
D. 项目的正式授权
【单选题】
一个项目延迟交付,且需要进行变更才能获得理想的可交付成果质量级别,项目经理提出一个正式的变更请求,并与所有相关方沟通变更,然后项目经理得知这种沟通方式未能满足相关方期望,项目经理应该怎么做?
A. 审查沟通管理计划和相关方管理计划
B. 签发变更要求,在项目管理计划中包含相关方的期望
C. 与项目发起人开会,以更好地了解相关方的期望
D. 遵循沟通管理计划,并签发一份状态报告
【单选题】
项目经理确定在工程开始 15 天后可以将一个软件提供给质量保证组,这在项目计划上是如何表示的?
A. 完成-到-完成-15
B. 完成-到-开始+15
C. 完成-到-开始-15
D. 开始-到-开始+15
【单选题】
下列哪一项属于结束采购过程的工具和技术?
A. 专家判断
B. 绩效报告
C. 合同变更控制系统
D. 协商解决
【单选题】
项目经理管理的一个项目不断面临挑战,发起人经常无法做出决定,团队成员不断从项目离职,得不到来自高级管理层实际的支持。项目经理应该怎么做?
A. 与团队开会识别造成这种现状的原因,并上报管理层
B. 与关键相关方开会决定是否要终止项目
C. 启用新资源替换离职人员以确保实现项目范围
D. 减少范围确保剩余人员可以完成项目范围
【单选题】
如果任务 B 有 12 天的自由时差,而且有 24 天的总时差。假设其最早开始日期被推迟 26 天,那么项目的完工日期将会受到什么影响?
A. 该任务将不再位于关键路径上
B. 紧后活动的开始日期将被延后 14 天
C. 项目的完工日期将会延后 2 天
D. B 和 C
【单选题】
一家公司检阅了四个战略性创收方案,并从中选择其一,若要正式开始项目,下一步应是什么?
A. 定义范围
B. 估算成本和进度
C. 制定项目管理计划
D. 创建项目章程
【单选题】
项目经理完成了一个重要的 IT 部署项目,项目经理和发布经理确认,所有系统都在正常运行且质量保证团队已经验证这些功能。通知客户之后,项目经理下一步应该怎么做?
A. 将经验教训更新到组织知识库中
B. 更新风险登记册.项目相关方和项目团队成员
C. 关闭采购计划
D. 确认并完成发布文档
【单选题】
一家公司正在建设一座商业建筑,计划工期两年。在第四个月,附件的居民发了一封书面抗议书。投诉由于施工活动导致的不便。为了解决投诉,签发了一份为期一个月的临时停工令。项目经理应该怎么做才可以恢复进度?
A. 让上级管理层参与,让他们解决进度延期问题
B. 执行进度压缩,保持原始的完成日期
C. 通知高级经理需要应急储备金
D. 获得业主的同意,该风险已经超出项目控制范围
【单选题】
一名团队成员最近被提升为项目经理, 被任命管理一个 200 万美元的项目。部门经理安排召开会议,在两个星期内评审项目章程。项目经理下一步应该怎么做?
A. 制定项目范围说明书。
B. 与项目发起人会面,确定商业需求。
C. 与团队成员安排一次项目启动大会。
D. 与项目相关方一起评审项目管理计划。