【单选题】
An administrator attempts to enable Enhanced vMotion Compatibility (EVC) on a cluster. The operation results in a compatibility error, as shown in the exhibit. What is the likely cause of this error? ___
A. The CPUs in the ESXi host are not AMD CPUs.
B. The CPUs in the ESXi host do not support hardware virtualization capabilities.
C. The XD/NX CPU features have not been enabled in the BIOS of the server.
D. There is no shared storage between the hosts in the cluster.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【单选题】
What condition would prevent an administrator from creating a new VMFS3 datastore on an ESXi 6.x host using the vSphere Web Client? ___
A. A VMFS3 datastore cannot be created on an ESXi 6.x host.
B. The VMFS3 kernel module is not loaded.
C. A VMFS3 datastore cannot be mounted on an ESXi 6.x host.
D. VMFS3 datastores are not compatible with virtual machines created on an
E. SXi 6.x host.
【单选题】
During a new vSphere Distributed Switch configuration, where does the Maximum Transmission Unit (MTU) value get modified? ___
A. Uplink Settings
B. Switch Settings
C. Portgroup Settings
D. NIC Teaming Settings
【单选题】
A small company wants to use VMware products for its production systems. The system administrator needs to recommend a solution that will deliver High Availability to the company's production applications. What is minimum vSphere offering that will support this requirement? ___
A. vSphere Essentials
B. vSphere Essentials Plus
C. vSphere Hypervisor
D. vSphere Standard
【单选题】
Which scenario shows a reason for VMware Tools failing to install? ___
A. Virtual machine has a CD-ROM configured.
B. Guest OS Antivirus is blocking the VMware Tools installation.
C. Guest OS has 64-bit ldd (list dynamic dependencies) utility installed.
D. Virtual machine is powered on.
【单选题】
An administrator is configuring an ESXi 6.x host to use multiple NICs to resolve a management network redundancy error. After configuring a second NIC, the server is not able to communicate when the primary connection is taken down. The administrator analyzes the Exhibit shown here. Based on the exhibit, what is the likely cause of the issue? ___
A. vmnic4 is not attached to a vSwitch.
B. vmnic2 is not connected to a physical switch.
C. E1000 is the incorrect NIC
D. river for this card.
【单选题】
What information is required as part of an interactive ESXi 6.x installation? ___
A. Keyboard layout
B. IP Address
C. Root password
D. DNS information
【单选题】
What is the default load balancing policy for a newly created VMkernel port on a vSphere Distributed Switch? ___
A. Route based on orginating virtual port ID
B. Route based on IP Hash
C. Route based on source mac address
D. Route based on physical NIC load
【单选题】
An administrator deploys vCenter Server using the embedded Platform Services Controller. After testing the deployment for a couple of months, it is determined that the environment would be better served with an external Platform Services Controller. What should the administrator do to meet this new requirement? ___
A. Deploy a fresh instance of vCenter Server with an external Platform Services Controller.
B. Perform a fresh install of an external Platform Services Controller.
C. Migrate the embedded Platform Services Controller to an external Platform Services Controller.
D. Upgrade the embedded Platform Services Controller to an external Platform Services Controller.
【单选题】
Why are some virtual machines orphaned after rebooting a High Availability (HA) enabled host? ___
A. The Orphaned virtual machines have HA restart disabled.
B. The Orphaned virtual machines moved recently and the change did not persist.
C. The host is attached to failed storage.
D. The host just came out of maintenance mode.
【单选题】
Which vSphere 6 Standard Edition feature will allow an organization to ensure that critical multi-threaded applications have the maximum possible uptime? ___
A. Fault Tolerance
B. High Availability
C. Distributed Resource Scheduler
D. App HA
【多选题】
An application running in a virtual machine is experiencing performance issues. When utilizing performance monitoring utilities, it is noted that the CPU Utilization of the application is at 100%. Which two scenarios are probable causes of the CPU contention for the application? (Choose two.)___
A. There is a network I/O constraint.
B. There is a storage I/O constraint.
C. There is insufficient disk space assigned to the virtual machine.
D. The application is not virtualization aware.
【多选题】
A Fault Tolerance (FT) virtual machine with four vCPUs is experiencing high latency when performing ICMP and Application tests. What are three potential causes that may be attributing to this latency? (Choose three.)___
A. The FT network has insufficient bandwidth and is running on a 1GB Link.
B. The FT network is on a particularly high latency link.
C. The FT network has been configured with Network I/O Control.
D. The FT virtual machine is running an e1000 network adapter.
E. The
F. T virtual machine is running on poor performing network-based storage.
【多选题】
A virtual machine is experiencing performance issues. The following performance metrics are observed: <CPU usage value for the virtual machine is above 90%> < CPU ready value for the virtual machine is above 20%> Which two activities will likely resolve the performance issues? (Choose two.)___
A. Set a CPU reservation for the virtual machine.
B. Increase the CPU limit on the virtual machine.
C. Decrease CPU shares equally for all virtual machines on the host.
D. Increase CPU shares equally for all virtual machines on the host.
【多选题】
An administrator is upgrading a vSphere Distributed Switch. The existing switch is version 6.0 and the administrator wants to upgrade to the latest version possible. The environment contains several ESXi 6.1 hosts. Which two options are available to ensure that the upgraded switch will be compatible with these hosts? (Choose two.)___
A. Upgrade the vSphere Distributed Switch to 6.0
B. Upgrade the ESXi 5.5 hosts to version 6.0, then upgrade the vSphere Distributed Switch to 5.5
C. Upgrade the vSphere Distributed Switch to 5.1
D. Upgrade the
E. SXi host switches to 5.5, then upgrade the vSphere Distributed Switch to 5.5
【多选题】
An administrator attempts to create a Thick Provisioned Virtual Disk (VMDK) on an NFS datastore; but it fails. Which two reasons would explain the failure? (Choose two.)___
A. Datastore is on an NFS 3 storage server that does not support Hardware Acceleration
B. Datastore is on an NFS 4.1 storage server
C. Only VMFS datastores support "Thick Provisioned" VMDK
D. The NFS datastore was not created on a "Thick Provisioned" device
【多选题】
Which two NFS Protocol versions does vSphere 6 support? (Choose two.)___
A. Version 3
B. Version 3.1
C. Version 4
D. Version 4.1
【多选题】
Which three operations occur during a cold migration of a virtual machine? (Choose three.)___
A. The virtual machine disks are moved if the datastore is being changed.
B. The virtual machine is registered with the destination server.
C. The source virtual machine is removed from the old hosts.
D. The virtual machine hardware is upgraded.
E. The virtual machine files are quiesced prior to the migration.
【多选题】
A 4 GB Memory virtual machine is experiencing extended memory issues, as shown in the Exhibit. What potential issues could be attributed to this memory pressure?___
A. A limit is imposed on the virtual memory of this virtual machine.
B. The Balloon driver has been uninstalled.
C. A limit has been imposed on the Virtual CPU of the virtual machine.
D. Storage IO control has been enabled for the virtual machine causing the swapped memory.
【多选题】
You are creating a virtual machine in the Web Client using the New Virtual Machine wizard. Which two steps are required? (Choose two.)___
A. Select a valid name.
B. Select a cluster for the compute resource.
C. Select a network adapter.
D. Select the virtual machine compatibility.
【多选题】
An administrator has been given requirements to configure vMotion for a new virtual machine. The configuration should: <Provide Network Redundancy Use VLAN 550> <Be secured against anyone trying to spoof communication The vSwitch1 configuration is shown in the Exhibit.> Which three changes should be made to meet the stated requirements? (Choose three.)___
A. The VLAN ID must be set appropriately.
B. The default values for MAC Address Changes and Forged Transmits must be altered.
C. The teaming and failover adapters must be set appropriately.
D. The Traffic Shaping configuration must be altered.
E. The Load Balancing Policy must be set appropriately.
【多选题】
Which three traffic types are available services options when configuring a vmkernel port? (Choose three.)___
A. Provisioning Traffic
B. Virtual Volumes Traffic
C. vSphere Replication NFC Traffic
D. Virtual SAN Traffic
E. FCoE Traffic
【多选题】
An administrator logs into the vSphere Web Client, but is unable to see any hosts and clusters. Which two options could fix the problem? (Choose two.)___
A. Verify that the client web browser and vCenter Server are in the same broadcast domain.
B. Verify that the vCenter Server system is registered with the same Platform Services Controller as the vSphere Web Client.
C. Log in to the vCenter Server as a user within the Active
D. irectory domain.
【多选题】
Which three VLAN Tagging modes are available in vSphere 6.x? (Choose three.)___
A. External Switch Tagging
B. Private VLAN Tagging
C. Virtual Switch Tagging
D. VXLAN Tagging
E. Virtual Guest Tagging
【多选题】
Which two statements are true about VMFS5 datastores on ESXi 6.x? (Choose two.)___
A. Virtual Disk (VMDK) size can be larger than 2TB.
B. Datastore extent size can be larger than 2TB.
C. Only Physical Mode Raw
D. evice Map (Passthrough-RDM) can be larger than 2TB.
【多选题】
Which two statements are correct when turning off a Distributed Resource Scheduler (DRS) Cluster? (Choose two.)___
A. The resource pool hierarchy of the DRS cluster is maintained.
B. The resource pool hierarchy of the DRS cluster is removed.
C. The affinity settings of the
D. RS cluster are removed and not maintained when DRS is re-enabled.
【多选题】
An administrator is creating a new Virtual SAN cluster on a Layer 2 network. There is an existing Virtual SAN cluster on the same Layer 2 network. Which two actions would allow the new Virtual SAN cluster to coexist with the older cluster? (Choose two.)___
A. Change the default Multicast Address on the new Virtual SAN cluster.
B. Change the default Unicast Address on the new Virtual SAN Cluster.
C. Create a separate VLAN for each cluster.
D. Create an ARP Alias for the Virtual SAN VMkernel Network Adapter.
【多选题】
A vCenter Operations Manager 5.7 environment is upgraded to vRealize Operations. After the upgrade, the analytics services fail to start. Which three steps must be taken to resolve the problem? (Choose three.)___
A. Take the vRealize Operations cluster offline.
B. Delete the activity persistence files.
C. Bring the cluster back online.
D. Remove any unresponsive nodes.
E. Stop the CaSA service.
【多选题】
An organization has an ESXi 6.x host that contains two resource pools. The host is being relocated to a DRS cluster. What two actions can be taken to integrate the host into the cluster, and what would happen to the existing ESXi resource pool hierarchy as a result? (Choose two.)___
A. Place all of the host's virtual machines into the DRS cluster root resource pool. The resource pools present on the host will be deleted.
B. Create a resource pool for the ESXi host's virtual machines and resource pools. The resource pools present on the host will be deleted.
C. Place all of the host's virtual machines into the DRS cluster root resource pool. The resource pools present on the host will be preserved.
D. Create a resource pool for the
E. SXi host's virtual machines and resource pools. The resource pools present on the host will be preserved.
【多选题】
Which two parameters are required when adding an iSCSI target to an iSCSI Software Adapter using Dynamic Discovery? (Choose two.)___
A. The iSCSI device's IP Address or Fully Qualified Domain Name
B. The Port Number
C. The iSCSI device's iSCSI Qualified Name (IQN)
D. The Default Gateway IP Address
【多选题】
Which two SMTP Notification Event Details are specific to alarms triggered by events? (Choose two.)___
A. User Name
B. Summary
C. Old Status
D. Target
【多选题】
Which two High Availability ___ Cluster admission control policies can help avoid resource fragmentation? (Choose two.)(AC)
A. Define failover capacity by static number of hosts
B. Define failover capacity by reserving a percentage of the cluster resources
C. Use dedicated failover hosts
D. Use Virtual Machine Monitoring
【多选题】
An attempt to enable vSphere Fault Tolerance for a powered-on virtual machine fails. Which two scenarios would result in this failure? (Choose two.)___
A. The virtual machine has three vCPUs configured.
B. The host on which the virtual machine is running has insufficient memory resources.
C. The virtual machine has insufficient resources to accommodate full reservation plus the overhead memory.
D. VMware High Availability is enabled on the cluster of which this host is a member.
【多选题】
A vApp template recently added to a Content Library is not displayed. Which two actions could correct this problem? (Choose two.)___
A. Manually synchronize the library
B. Select the Download all library content immediately option
C. Select the Sync subscribed library option
D. Manually download the vApp template
【多选题】
What are three valid disk configurations for the vSphere Data Protection 6.x Appliance? (Choose three.)___
A. 500GB
B. 1TB
C. 1.5TB
D. 2TB
E. 4TB
【多选题】
Which three connection types are available when configuring a vSwitch in the vSphere Web Client? (Choose three.)___
A. VMkernel Network Adapter
B. Physical Network Adapter
C. Virtual Machine Port Group for a Standard Switch
D. vMotion Network Adapter
E. vSAN Network Adapter
【多选题】
Which three features can be enabled for a new host cluster? (Choose three.)___
A. Storage Distributed Resource Scheduling
B. High Availability
C. Fault Tolerance
D. Distributed Resource Scheduling
E. Virtual SAN
【多选题】
An administrator receives a report that no real time statistics are available for a virtual machine in the vCenter Server inventory. Which two statements indicate likely causes of the problem? (Choose two.)___
A. The virtual machine is powered off.
B. The host containing the virtual machine is disconnected from vCenter Server.
C. There is insufficient real time data to display the information.
D. The vCenter Server service is not running.
【多选题】
Your manager has given you a bash script that retrieves data for ESXi 6.x host configurations. This data needs to be collected right after the installation of a host and must be run directly on the host. Which two actions can be used to run this script on an ESXi host? (Choose two.)___
A. Connect to the host with Ruby vSphere Console and run the script from there.
B. Enable SSH access from the Direct Console User Interface.
C. Enable the ESXi Shell from the
D. irect Console User Interface.
【多选题】
Which two are true about the Risk badge in vRealize Operations? (Choose two.)___
A. The Risk badge indicates potential future problems that may degrade the performance of the system.
B. Risks may require attention in the near future.
C. The Risk badge indicates problems that are degrading performance of the system.
D. Risks require attention now to correct system performance problems.
【多选题】
vSphere Update Manager allows which two virtual machine attributes to be upgraded? (Choose two.)___
A. Virtual machine firewall policies for NSX.
B. Software Packages in the virtual machine.
C. Virtual machine Hardware Version.
D. VMware Tools Upgrade.
推荐试题
【单选题】
ZL44、项目正在进展之中,项目经理正与质量保证部门一起,致力于提高相关方对项目将要满足质量标准的信心。在开始该过程之前,他们需要下面哪项内容?___
A. 质量问题
B. 过程分析的结果
C. 质量审计
D. 质量管理计划
【单选题】
ZL45、在项目执行期间,发起人很担心项目是否满足项目可交付物规范。项目经理应与发起人一起查看下列哪一份文件?___
A. 质量管理计划
B. 风险管理计划
C. 过程改进计划
D. 项目管理计划更新
【单选题】
ZL46、从项目的角度来看,质量特征:___
A. 决定了执行机构是否有效的支持项目
B. 提供了评判项目是否成功的基础
C. 是设计和测试产品的具体特征
D. 是必须满足的客观条件
【单选题】
ZL47、下列哪一项工具可以用来确定产生最大数量缺陷的原因?___
A. 鱼骨图
B. 散点图
C. 趋势图
D. 帕累托图
【单选题】
ZL48、项目X处于测试阶段,并落后于进度,测试团队测试出缺陷,并将其报告给测试经理,这些缺陷归因于11项需求中的4项需求。由于项目落后于进度,项目经理对大量的未解决的缺陷表示担心。项目经理应该采用哪一种工具来分析?___
A. 直方图
B. 帕累托图
C. 鱼骨图
D. 快速跟进和赶工
【单选题】
ZL49、某个产品的生产线存在多个缺陷,高级经理让项目经理按类别整理缺陷数量,并按照缺陷排列优先顺序,高级经理向项目经理要求的是哪种质量控制工具类型?___
A. 散点图
B. 因果图
C. 鱼骨图
D. 帕累托图
【单选题】
CB1、公司要你编制一个去年启动、而后搁置的项目的预算。下列哪项不包括在预算中?___——(第六版最新全套机密真题及详细解释,请私加微信yoyosun2019)
A. 固定成本
B. 沉没成本
C. 直接成本
D. 可变成本
【单选题】
CB2、某项目进度超前,但是预算超支,下列哪一项可能是项目进度和成本绩效指数?___
A. 进度绩效指数为1.20;成本绩效指数为1.15
B. 进度绩效指数为1.10;成本绩效指数为0.90
C. 进度绩效指数为0.95;成本绩效指数为0.85
D. 进度绩效指数为0.90;成本绩效指数为1.10
【单选题】
CB3、在项目绩效审核会上,项目经理告诉团队实际成本低于初始估算,进度执行良好,比计划的基准还稍好一些。在这种情况下使用挣值管理,CPI和SPI的指数的表现如何?___
A. CPI>1.0;SPI<1.0
B. CPI>1.0;SPI>1.0
C. CPI<1.0;SPI>1.0
D. CPI<1.0;SPI<1.0
【单选题】
CB4、一个项目的CPI比较稳定。项目发起人增加了十个附加活动,对该项目的CPI有什么影响?___
A. CPI变好
B. CPI变坏
C. CPI不变
D. 无法确定
【单选题】
CB5、在一个项目状态评审中,项目成本绩效指数是0.94。这意味着什么呢?___
A. 已完成的工作成本超支
B. 项目很有可能会提前完成
C. 执行的工作比计划更有效率
D. 进度基准的偏差为6%
【单选题】
CB6、项目处于执行阶段。成本绩效指数为1.2,进度绩效指数为0.8。下列哪一项最恰当的描述了项目实际情况?___
A. 超出预算但超前于进度
B. 未超出预算并超前于进度
C. 未超出预算但落后于进度
D. 超出预算并落后于进度
【单选题】
CB7、成本基准和成本预算的区别是:___
A. 管理储备
B. 应急储备
C. 项目成本估算
D. 成本帐目
【单选题】
CB8、下列哪一项进度安排技术包含一种风险评估形式?___
A. 计划评审技术
B. 箭线绘图法
C. 紧前关系绘图法
D. 关键路径法
【单选题】
CB9、下列哪种基线综合了范围,进度和成本?___
A. 质量基线
B. 综合基线
C. 绩效测量基准
D. 总体项目基线
【单选题】
CB10、是谁控制一个项目的间接成本(管理费)?___
A. 项目经理
B. 高级管理层
C. 成本帐目经理
D. 内部审计员
【单选题】
CB11、ABC公司正在对三家咨询公司进行评估,希望选出一名顾问来做专业的服务。他们要求三家公司提供如何向客户分配边际利润的信息。ABC公司询问的这类成本属于:___
A. 可变成本
B. 固定成本
C. 直接成本
D. 间接成本
【单选题】
CB12、项目经理正负责一个高端项目,而完成项目的关键就是控制预算。项目经理是位新手,但经过专业培训,他看到项目的花费低于预算非常激动,所以计划休假一段时间,这时一个高级项目经理警告他说,项目还有很多很重要的工作需要完成。那位高级项目经理为何提出这样的警告?___
A. 实际花费低于预算有可能意味着进度内有些活动还未完成,项目经理应该对比一下成本绩效和进度绩效。
B. 项目经理需要制定一个项目控制系统,确保将来不会发生问题。
C. 尽管实际花费低于预算,但还会有合同需要管理。
D. 每周需要召开团队会议,休假意味着将取消团队会议。
【单选题】
CB13、你的成本预测显示在项目末期时,你的成本会超支。你应采取下列哪项措施?___
A. 消除估算和重估的风险
B. 会见出资人,找出哪项工作能够最快完成
C. 降低质量
D. 减少范围
【单选题】
CB14、你的项目管理体制经验告诉你对于成本方差做出的不正确的反应可能会产生质量或者进度问题,或者不可接受的项目风险。你正召开一个团队会议来讨论成本控制的重要性。你的很多团队成员都是项目管理的新手。为了将这个重要的议题介绍给大家,你申明成本控制关注的是:___
A. 影响那些会引发成本基准线变更的因素,确保变更是有益的
B. 对完成这个项目所需资源的成本形成一个大约估计
C. 将全部成本估计分配到工作条目
D. 建立一个成本基准线
【单选题】
CB15、卖方告诉你,你的经营活动使得卖方的成本增加了。你应该:___
A. 建议变更项目成本
B. 会见管理层,找到解决办法
C. 寻求卖方提供支持信息
D. 拒绝承认做错事
【单选题】
CB16、你项目的初始成本是$25,000,这将在以后四年内每年节省公司$6,000。根据以下表格数据,如果利率是12%,那么项目的净现值是多少?___
A. -$1,000
B. -$6,772
C. +$1,758
D. +$6,772
【单选题】
CB17、项目经理使用挣值分析和其他方法来预测项目成本和进度目标的潜在偏差,这使用的是哪一个技术?___
A. 绩效报告
B. 风险重新评估
C. 储备分析
D. 偏差和趋势
【单选题】
CB18、审查项目管理计划时,项目经理确定成本指数为0.8,而进度绩效指数为0.7,发生下列一项?___
A. 关键相关方未充分参与
B. 项目执行超前
C. 项目执行欠佳
D. 项目范围蔓延
【单选题】
CB19、一项调查显示执行一个项目的最低可能成本为1亿美元。进一步调查同类项目比估算多25%,而另一个项目成本比最低成本估算多三倍。使用提供的估算,下列哪一项应作为成本估算?___
A. $1亿美元
B. $1.5亿美元
C. $2亿美元
D. $2.5亿美元
【单选题】
CB20、客户对一个项目采取竞争性投标。客户规定项目成本为150万美元。年收入50万美元的X投标方,也参与该招标过程。该潜在客户项目获得的年净现金流为25万美元。根据X投标方的情况,在这种情况下投资回收期是多长时间?___
【单选题】
CB21、一个组织正在考虑一个项目方案,这个项目将耗资$100,000,用6个月交付。他们预测项目将从第7个月开始赢利,而后每个月赢利$20,000。项目的回收期是多长时间?___
A. 信息不足
B. 11个月
C. 5个月
D. 6个月
【单选题】
CB22、在某个项目预计工期进行到一年时,项目经理发现实际成本为75,000美元,而项目预算为100,000美元,经过详细分析之后,项目经理发现项目活动已完成60%,委员会决定未来开支将保持在目前水平。那么项目的完工尚需估算是多少?___
A. 25,000美元
B. 50,000美元
C. 60,000美元
D. 91,667美元
【单选题】
CB23、ABC公司通常用年和法来计算资产的折旧。他们花1.7万元买了一台计算机,估计三年后能卖2000元。那么第三年的折旧是多少?___
A. 5000元
B. 4500元
C. 7500元
D. 2500元
【单选题】
CB24、项目即将完工三分之二。挣值=1000,BAC=1500,AC=1350,项目此时的ETC为多少?___
A. 675
B. 650
C. 500
D. 150
【单选题】
CB25、项目经理管理的沥青公路项目已完工50%。项目经理原本计划到现在为止铺4000平方码的沥青。而实际上他们已经铺完了8000平方码。这项工作的估算成本为1美元/平方码,实际花费8000美元。这告诉项目经理什么信息?___
A. EVis2.
B. SPIis2.
C. SPIis0.50.
D. SVis0.50
【单选题】
CB26、你要从另一名项目经理手中接管一个项目,你发现了关于该项目的如下信息:活动Z的最早开始日期为15号,最晚开始日期为20号。活动Z很困难,其成本绩效指数(CPI)为1.1,进度计划执行指数(SPI)为0.8。该项目共有11名相关方。根据如上信息,你最关注的问题是:___
A. 进度
B. 浮动时间
C. 成本
D. 可用资源数量
【单选题】
CB27、项目经理使用EVM管理项目。在项目执行期间,项目经理得到以下数据:SV>0,SPI>1.0,CV<0,CPI=0.85,下列哪一项是这个项目的准确描述?___
A. 进度超前,符合预算
B. 进度和预算符合预期
C. 进度超前,但超出预算
D. 进度落后,并超出预算
【单选题】
CB28、如果一个工作的动作估计花费成本1500美元,这个工作今天结束,但是却花费了1,350美元而且只完成了三分之二,那么成本偏离是___
A. +150美元
B. –150美元
C. –350美元
D. –500美元
【单选题】
CB29、项目经理分析后得出结论,项目的成本绩效指数为80%,到目前为止项目的实际成本为100,000美元,但是预计到目前的成本应为120,000美元,项目的进度绩效指数为?___
A. 0.96
B. 0.83
C. 0.76
D. 0.67
【单选题】
CB30、项目情况报告显示,实际成本超出计划20%并且挣值等于计划价值。项目经理得知,一些资源将于下星期临时休假。下列关于项目的陈述哪一项正确?___
A. 需要调整成本基线
B. CPI小于1
C. SPI小于1
D. 无需采取措施
【单选题】
CB31、在绩效审核期间,项目经理发现项目的进度绩效指数大于1.0,这说明什么?___
A. 比原计划完成更多的工作
B. 比原计划完成更少的工作
C. 项目按计划顺利进展
D. 只完成了计划在这个时间点完成的工作
【单选题】
CB32、进度显示任务已完成70%。虽然项目经理计划的工作价值8,000美元,但实际上完成的工作价值为5,000美元,衡量团队实际完成工作的美元价值是什么指标?___
A. 完工预算
B. 挣值
C. 实际成本
D. 计划价值
【单选题】
CB33、项目的实际成本为2,000美元,挣值为2,100美元,计划价值为2,400美元,下列哪一项将会是项目的进度偏差(SV)和成本偏差(CV)?___
A. SV=300美元CV=-100美元
B. SV=-300美元CV=100美元
C. SV=300美元CV=100美元
D. SV=-300美元CV=-100美元
【单选题】
CB34、某处于执行阶段的项目的完工预算为300美元.在某个特定的时间点,实际成本达到125美元.计划价值为110美元,挣值为130美元.从这个信息中,项目经理可以得出什么结论?___
A. 项目提前于进度
B. 完工预算将增加
C. 项目落后于进度
D. 完工预算将减少