【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
An administrator needs to verify that vMotion operations can be performed in a vSphere data center.What round trip time (RTT) latency is the maximum value that will allow vMotion operations to succeed? ___
A. 50ms RTT
B. 100ms RTT
C. 150ms RTT
D. 200ms RTT
【单选题】
A storage administrator has reported that full utilization of all bandwidth from an ESXi 6.x host is not being seen. In troubleshooting the issue, the Adapter details are shown in the Exhibit. Based on the exhibit, what is cause of the issue? ___
A. The array is not setup to use the correct multipathing policy.
B. There are no virtual machines on the ESXi host.
C. Not all links are used because a path is disabled.
D. Another path needs to be configured.
【单选题】
An administrator is migrating a powered-on virtual machine, as shown in the exhibit. Which option should be selected to perform a Storage vMotion of the VM? ___
A. Change storage only
B. Change VM compute resource only
C. Change both compute resource and storage, changing the compute resource first.
D. Change both compute resource and storage, changing the storage resource first.
【单选题】
An administrator is attempting to enable Storage I/O Control on a datastore, but it is failing. What is the likely reason for this failure? ___
A. The host is connected to a datastore is running on ESX 4.0.
B. The host is connected to a Fibre Channel storage array.
C. The datastore has multiple extents.
D. The datastore is managed by a single vCenter Server.
【单选题】
A mission-critical virtual machine built on vSphere 4.1 needs to be moved to an ESXi 6.x host.Which virtual hardware version is needed to move the virtual machine without upgrading? ___
【单选题】
An administrator is analyzing a virtual machine as shown in the Exhibit. What is the current long term risk for this virtual machine? ___
A. The virtual machine may run out of memory before April 27.
B. The virtual machine may continue to function after April 27.
C. The virtual machine has adequate memory configured for operation for the next 120 days.
D. The virtual machine has adequate memory reservation configured for operation for the next 120 days.
【单选题】
An administrator is monitoring a High Availability (HA) and Distributed Resource Scheduler (DRS) enabled cluster and has noticed that virtual machines in the cluster are being migrated without user intervention. Why is this happening? ___
A. The DRS Automation level is set to Fully Automated.
B. The Automation level is set to Automatic.
C. The
D. PM Threshold is set to Aggressive.
【单选题】
An administrator attempts to migrate a suspended virtual machine to a newly deployed vSphere 6.x cluster. The compatibility check fails. What condition could cause this behavior?___
A. The new vSphere 6.x cluster is running Intel CPUs instead of AMD CPUs.
B. A suspended virtual machine cannot be migrated.
C. The hardware virtualization feature of the CPU is not enabled on the new hosts.
D. A vSphere Distributed Switch is required to migrate a suspended virtual machine.
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
【单选题】
An administrator has just configured the IP address on an ESXi host from the Direct Console User Interface. How can the configuration be validated as correct without any additional tools?___
A. Add the host to vCenter Server and if it works, then all networking settings are ok.
B. Select the Test Management Network option from the DCUI.
C. Connect to the host with the vSphere Client and click the Test Network option.
D. Use PowerCLI to connect to the host and initiate a network test.
【单选题】
An administrator is installing vCenter Server for an environment that has 40 ESXi 6.x Hosts and 150 virtual machines. Which database would meet the minimal requirements needed for this task? ___
A. vFabric Postgres
B. Microsoft SQL Express 2008
C. Microsoft SQL Server 2014
D. Oracle 11g
【单选题】
What is a requirement when enabling a Virtual SAN cluster in an existing High Availability (HA) and Distributed Resource Scheduler (DRS) Cluster? ___
A. Disable DRS and HA before enabling Virtual SAN
B. Enable DRS before enabling Virtual SAN
C. Disable HA before enabling Virtual SAN
D. Enable Storage DRS before enabling Virtual SAN
【单选题】
The vSphere administrator attempts to connect to an ESXi host via an SSH client and receives the following security alert: The vSphere administrator needs to determine whether the RSA key fingerprint shown in the security alert is the fingerprint of the intended ESXi host. Which tool should the vSphere administrator use? ___
A. Direct Console User Interface
B. vSphere Client
C. vSphere Web Client
D. vSphere Management Assistant
【单选题】
An administrator needs to monitor traffic on vSwitches in a vSphere 6.x environment. Which option, if configured, would accomplish this task? ___
A. Forged Transmits
B. MAC Address Changes
C. Promiscuous Mode
D. Notify Switches
【单选题】
What is true regarding datastores on ESXi 6.x? ___
A. NFS 4.1 datastore does not support Fault Tolerance (FT)
B. VMFS3 and VMFS5 datastores can be newly created
C. NFS datastore can be concurrently mounted using NFS 4.1 on one host and NFS on another
D. NFS 3.0 datastore does not support Fault Tolerance (FT)
【单选题】
An administrator is cloning and configuring five new web server virtual machines. What would be the benefit of configuring resource shares for the new VMs? ___
A. To prioritize access to a resource during contention.
B. To guarantee access to a resource during contention.
C. To prioritize access to a resource before contention occurs.
D. To guarantee access to a resource before contention occurs.
【单选题】
An administrator logs into the vSphere Web Client and sees the warning shown in the Exhibit. During a change control window, the warning was addressed. What should be done to verify that the host is no longer showing the warning? ___
A. Run a Remediate host operation.
B. Recheck the compliance of the host.
C. Restart the host to get rid of the warning.
D. Install VMware tools to clear the warning.
【单选题】
A vApp named Sales has a Memory Limit of 32 GB and a CPU Limit of 12,000 MHz. There are three virtual machines within the vApp: <Sales-DB -- Has a memory reservation of 20 GB. > <Sales-DC -- Has a memory reservation of 8 GB. > <Sales-Web -- Has a memory reservation of 8 GB.> Which statement is correct? ___
A. All three virtual machines can power on, but will have memory contention.
B. All three virtual machines can power on without memory contention.
C. Only two of the three virtual machines can power on.
D. Only one of the virtual machines can power on.
【单选题】
You are editing the management network configuration of an ESXi 6.x Host from the vSphere Web Client. You mistakenly put the incorrect VLAN in place for the management network. What action do you need to take to correct this? ___
A. You need to manually edit the configuration on the host with command line utilities.
B. No action is required. By default ESXi rolls back configuration changes that disconnect the host.
C. The ESXi host system configuration will need to be restored to the factory configuration to fix the issue.
D. The change can be reverted in the vSphere Web Client by simply editing the switch again.
【单选题】
What is true about resource pools created on a Distributed Resource Scheduler (DRS) cluster?___
A. A root resource pool is created with the specified values.
B. A root resource pool is automatically created using the aggregate total of the ESXi host resources in the cluster.
C. A root resource pool is automatically created using the aggregate total of all resources in the datacenter.
D. A root resource pool is not needed when creating resource pools on a DRS cluster.
【单选题】
An administrator attempts to enable Enhanced vMotion Compatibility (EVC) on a cluster. The operation results in a compatibility error, as shown in the exhibit. What is the likely cause of this error? ___
A. The CPUs in the ESXi host are not AMD CPUs.
B. The CPUs in the ESXi host do not support hardware virtualization capabilities.
C. The XD/NX CPU features have not been enabled in the BIOS of the server.
D. There is no shared storage between the hosts in the cluster.
【单选题】
What condition would prevent an administrator from creating a new VMFS3 datastore on an ESXi 6.x host using the vSphere Web Client? ___
A. A VMFS3 datastore cannot be created on an ESXi 6.x host.
B. The VMFS3 kernel module is not loaded.
C. A VMFS3 datastore cannot be mounted on an ESXi 6.x host.
D. VMFS3 datastores are not compatible with virtual machines created on an
E. SXi 6.x host.
【单选题】
During a new vSphere Distributed Switch configuration, where does the Maximum Transmission Unit (MTU) value get modified? ___
A. Uplink Settings
B. Switch Settings
C. Portgroup Settings
D. NIC Teaming Settings
【单选题】
A small company wants to use VMware products for its production systems. The system administrator needs to recommend a solution that will deliver High Availability to the company's production applications. What is minimum vSphere offering that will support this requirement? ___
A. vSphere Essentials
B. vSphere Essentials Plus
C. vSphere Hypervisor
D. vSphere Standard
【单选题】
Which scenario shows a reason for VMware Tools failing to install? ___
A. Virtual machine has a CD-ROM configured.
B. Guest OS Antivirus is blocking the VMware Tools installation.
C. Guest OS has 64-bit ldd (list dynamic dependencies) utility installed.
D. Virtual machine is powered on.
【单选题】
An administrator is configuring an ESXi 6.x host to use multiple NICs to resolve a management network redundancy error. After configuring a second NIC, the server is not able to communicate when the primary connection is taken down. The administrator analyzes the Exhibit shown here. Based on the exhibit, what is the likely cause of the issue? ___
A. vmnic4 is not attached to a vSwitch.
B. vmnic2 is not connected to a physical switch.
C. E1000 is the incorrect NIC
D. river for this card.
【单选题】
What information is required as part of an interactive ESXi 6.x installation? ___
A. Keyboard layout
B. IP Address
C. Root password
D. DNS information
【单选题】
What is the default load balancing policy for a newly created VMkernel port on a vSphere Distributed Switch? ___
A. Route based on orginating virtual port ID
B. Route based on IP Hash
C. Route based on source mac address
D. Route based on physical NIC load
【单选题】
An administrator deploys vCenter Server using the embedded Platform Services Controller. After testing the deployment for a couple of months, it is determined that the environment would be better served with an external Platform Services Controller. What should the administrator do to meet this new requirement? ___
A. Deploy a fresh instance of vCenter Server with an external Platform Services Controller.
B. Perform a fresh install of an external Platform Services Controller.
C. Migrate the embedded Platform Services Controller to an external Platform Services Controller.
D. Upgrade the embedded Platform Services Controller to an external Platform Services Controller.
【单选题】
Why are some virtual machines orphaned after rebooting a High Availability (HA) enabled host? ___
A. The Orphaned virtual machines have HA restart disabled.
B. The Orphaned virtual machines moved recently and the change did not persist.
C. The host is attached to failed storage.
D. The host just came out of maintenance mode.
【单选题】
Which vSphere 6 Standard Edition feature will allow an organization to ensure that critical multi-threaded applications have the maximum possible uptime? ___
A. Fault Tolerance
B. High Availability
C. Distributed Resource Scheduler
D. App HA
【多选题】
An application running in a virtual machine is experiencing performance issues. When utilizing performance monitoring utilities, it is noted that the CPU Utilization of the application is at 100%. Which two scenarios are probable causes of the CPU contention for the application? (Choose two.)___
A. There is a network I/O constraint.
B. There is a storage I/O constraint.
C. There is insufficient disk space assigned to the virtual machine.
D. The application is not virtualization aware.
【多选题】
A Fault Tolerance (FT) virtual machine with four vCPUs is experiencing high latency when performing ICMP and Application tests. What are three potential causes that may be attributing to this latency? (Choose three.)___
A. The FT network has insufficient bandwidth and is running on a 1GB Link.
B. The FT network is on a particularly high latency link.
C. The FT network has been configured with Network I/O Control.
D. The FT virtual machine is running an e1000 network adapter.
E. The
F. T virtual machine is running on poor performing network-based storage.
【多选题】
A virtual machine is experiencing performance issues. The following performance metrics are observed: <CPU usage value for the virtual machine is above 90%> < CPU ready value for the virtual machine is above 20%> Which two activities will likely resolve the performance issues? (Choose two.)___
A. Set a CPU reservation for the virtual machine.
B. Increase the CPU limit on the virtual machine.
C. Decrease CPU shares equally for all virtual machines on the host.
D. Increase CPU shares equally for all virtual machines on the host.
【多选题】
An administrator is upgrading a vSphere Distributed Switch. The existing switch is version 6.0 and the administrator wants to upgrade to the latest version possible. The environment contains several ESXi 6.1 hosts. Which two options are available to ensure that the upgraded switch will be compatible with these hosts? (Choose two.)___
A. Upgrade the vSphere Distributed Switch to 6.0
B. Upgrade the ESXi 5.5 hosts to version 6.0, then upgrade the vSphere Distributed Switch to 5.5
C. Upgrade the vSphere Distributed Switch to 5.1
D. Upgrade the
E. SXi host switches to 5.5, then upgrade the vSphere Distributed Switch to 5.5
【多选题】
An administrator attempts to create a Thick Provisioned Virtual Disk (VMDK) on an NFS datastore; but it fails. Which two reasons would explain the failure? (Choose two.)___
A. Datastore is on an NFS 3 storage server that does not support Hardware Acceleration
B. Datastore is on an NFS 4.1 storage server
C. Only VMFS datastores support "Thick Provisioned" VMDK
D. The NFS datastore was not created on a "Thick Provisioned" device
【多选题】
Which two NFS Protocol versions does vSphere 6 support? (Choose two.)___
A. Version 3
B. Version 3.1
C. Version 4
D. Version 4.1
【多选题】
Which three operations occur during a cold migration of a virtual machine? (Choose three.)___
A. The virtual machine disks are moved if the datastore is being changed.
B. The virtual machine is registered with the destination server.
C. The source virtual machine is removed from the old hosts.
D. The virtual machine hardware is upgraded.
E. The virtual machine files are quiesced prior to the migration.
推荐试题
【单选题】
施工项目部依据《施工进度计划》和《物资需求计划》,编制《工程停电需求计划》,报( )审批
A. 施工单位
B. 监理项目部
C. 建设管理单位
D. 业主项目部
【单选题】
地市公司配改办牵头,以配网规划为指导,依据省公司制定的下一年度配网建设改造原则,结合本单位实际需求,在( )完成下一年度项目建议计划编制。
A. 3月份;
B. 4月份
C. 5月份;
D. 4月份
【单选题】
地市公司配改办( )组织审查下一年配网项目需求。
A. 3月;
B. 5月;
C. 6月;
D. 8月
【单选题】
设计、监理费低于( ),施工费低于( )的项目纳入年度框架招标。
A. 50万,100万;
B. 50万,200万;
C. 100万,200万;
D. 100万,300万
【单选题】
省公司发展部( )完成投资计划下达。
A. 次年1月;
B. 次年2月;
C. 次年3月;
D. 次年4月
【单选题】
承包商在合同签订( )内,依照《国网浙江省电力有限公司配网工程标准化施工作业实施细则》、《国网浙江省电力有限公司配网工程承包商分包管理实施意见》,签订安全、分包相关的协议。
A. 一周;
B. 两周;
C. 三周;
D. 四周
【单选题】
配网建设改造应以( )为指导,并根据实际需求、运行建设情况滚动修编,形成配网规划项目库。
A. 目标网架;
B. 规划;
C. 配网运行情况;
D. 线路负荷情况
【单选题】
设计变更与现场签证应由监理单位、设计单位、施工单位、业主项目部、配改办依次签署确认,单项变更投资增减额不超过( )由配改办审批,超过( )的由分管领导审批。
A. 15万;
B. 20万;
C. 25万;
D. 30万
【单选题】
施工结算报告完成审价后,施工单位应在( )工作日内开具结算发票,并提供结算审价报告。
A. 5个;
B. 7个;
C. 10个;
D. 15个
【单选题】
业主项目部应树立资料归档意识,确保配网项目档案完整、准确。负责做好配网项目归档资料收集和整理,在配网项目竣工投产后( )内移交档案室。业主项目部应树立资料归档意识,确保配网项目档案完整、准确。负责做好配网项目归档资料收集和整理,在配网项目竣工投产后( )内移交档案室。
A. 一个月;
B. 两个月;
C. 三个月;
D. 六个月
【单选题】
配电站房优质工程评价要求工程资金、规模调整不得超过( )。
A. ±8%
B. ±10%
C. ±12%
D. ±15%
【单选题】
优质工程评价标准由()组成。
A. 必备条件
B. 考核条件
C. 必备条件和考核条件
D. 选备条件
【单选题】
省公司每年( )月组织各市、县公司依据本办法开展配电网优质工程评选工作。
A. 3-4
B. 5-6
C. 7-8
D. 9-10
【单选题】
配电变台优质工程评价要求变压器容量不小于( )千伏安。
A. 100
B. 200
C. 315
D. 400
【单选题】
地市公司依据评价标准,对县(市、区)公司申报参评项目进行现场核检,核检率应不低于( )%,依据现场核检结果,对达到优质工程标准的项目进行命名,并综合评价排序。
【单选题】
获得“百佳工程”称号的项目参建单位,在名录发布后( )年内(以发布日期为准)参与同类工程投标时可适当加分,具体加分标准按公司有关规定执行。
【单选题】
国网公司每年( )组织对各单位上报的配电网优质工程评选结果及申报配电网“百佳工程”项目进行审核和现场核检,经过综合评定,择优确定并发布年度配电网“百佳工程”项目名录。
A. 3-4
B. 5-6
C. 7-8
D. 9-10
【单选题】
配电网优质新建(含整体改造)10千伏线路工程,亘长超过( )公里,双回线路回长超过( )公里;
A. 1,2
B. 2,3
C. 3,4
D. 4,5
【单选题】
新建(含整体改造)配电站房(开关站、配电室、箱式变电站)工程。 箱式变电站变压器容量不小于( )千伏安。新建(含整体改造)配电站房(开关站、配电室、箱式变电站)工程。 箱式变电站变压器容量不小于( )千伏安。
A. 100
B. 200
C. 300
D. 400
【单选题】
申报优质工程项目上报材料 其中反映项目全貌、土建施工、设备安装、关键及特色部位的数码照片不少于( )张照片,并配简要文字说明。
【单选题】
配电网“百佳工程”申报材料其中工程照片:反映项目全貌、土建工程、安装工程、特色部位的数码照片 15-20 张照片,并配简要文字说明。照片应有较高清晰度,像素应至少达到 1024×768,图片文件大小应至少达到 ( )。
A. 1MB
B. 2MB
C. 3MB
D. 4MB
【单选题】
配电网优质(百佳)工程每年评选一次,有效期( )年。
【单选题】
省公司每年( )月组织各市、县公司依据本办法开展配电网优质工程评选工作。
A. 3-4
B. 5-6
C. 7-8
D. 9-10
【单选题】
“百佳工程”参评项目基本要求中配电室进线不小于2回,馈线不小于2回,变压器容量不小于( )千伏安;箱式变电站变压器容量不小( )千伏安。
A. 300,100
B. 400,100
C. 630 200
D. 630,100
【单选题】
配电网优质(百佳)工程每年评选一次,有效期( )年。
【单选题】
( )开展分包单位能力评估,并将评估情况上报业主项目部,组织教育培训,提升施工人员素质。
A. 业主项目部;
B. 施工项目部;
C. 监理项目部;
D. 工程承包商
【单选题】
( )监督管控现场分包作业,确保分包工程安全、质量、进度和造价全面受控。
A. 业主项目部;
B. 施工项目部;
C. 监理项目部;
D. 工程承包商
【单选题】
( )执行、落实上级单位和业主单位分包管理的各项规定与要求,负责工程项目实施过程中的分包管理工作。
A. 工程承包商;
B. 业主项目部;
C. 施工项目部;
D. 监理项目部
【单选题】
( )执行、落实上级单位和业主单位分包管理的各项规定与要求,具体负责分包工程监管工作。
A. 工程承包商;
B. 业主项目部;
C. 施工项目部;
D. 监理项目部
【单选题】
( )通过见证、质量旁站和巡视、平行检验、验收和初检等监理手段及方法,实施分包工程质量监理。
A. 工程承包商;
B. 业主项目部;
C. 施工项目部;
D. 监理项目部
【单选题】
( )收集、分析、上报管理范围内的分包管理信息并上报业主单位。
A. 工程承包商;
B. 业主项目部;
C. 施工项目部;
D. 监理项目部
【单选题】
开工前,由( )给审查合格人员本人照片的“施工出入证”,承包(分包)商工作人员在施工过程全程携带,“施工出入证”严禁转借他人。
A. 业主项目部;
B. 施工项目部;
C. 监理项目部;
D. 业主单位
【单选题】
( )应根据工程现场一线管理人员配置情况,确定同时施工的作业现场数量,严禁不顾分包管理能力盲目增加分包队伍和作业现场。
A. 业主项目部;
B. 施工项目部;
C. 监理项目部;
D. 工程承包商
【单选题】
( )负责审查专业分包商的施工组织措施、技术措施、质量保证措施。
A. 业主单位;
B. 业主项目部;
C. 施工项目部;
D. 监理项目部
【单选题】
( )是县(区)配改办对工程承包商进行经济考核、分级管理的主要依据。
A. 工程现场检查;
B. 工程竣工验收;
C. 年度考核结果;
D. 季度考核结果
【单选题】
一个日历年( )季度分包评价为较差的分包商可认定为不良分包商。
A. 一次;
B. 两次;
C. 三次;
D. 四次
【单选题】
业主单位根据季度考核积分情况及综合检查情况,每年( )前编制辖区不良分包商、不良人员评价建议书,行文上报地市公司配改办。
A. 6月30日;
B. 7月30日;
C. 8月30日;
D. 9月30日
【单选题】
业主项目部对因外包商责任原因发生的同一事件多次投诉,须下达整改通知单,并责令停工整顿( )。
A. 一个月;
B. 两个月;
C. 三个月;
D. 四个月
【单选题】
对涉及拆旧的工程,在项目可行性研究报告的工程规模中需描述( )
A. 计划拆旧物资清单
B. 报废处置意见
C. 拆旧鉴定手续
D. 拆旧规模
【单选题】
( )应按照拟拆除清单,组织实施相关设备、材料拆除工作。
A. 项目实施单位(部门)
B. 项目管理单位
C. 实物资产管理部门
D. 监理单位