How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
A
解析
暂无解析
相关试题
【单选题】
An administrator needs to verify that vMotion operations can be performed in a vSphere data center.What round trip time (RTT) latency is the maximum value that will allow vMotion operations to succeed? ___
A. 50ms RTT
B. 100ms RTT
C. 150ms RTT
D. 200ms RTT
【单选题】
A storage administrator has reported that full utilization of all bandwidth from an ESXi 6.x host is not being seen. In troubleshooting the issue, the Adapter details are shown in the Exhibit. Based on the exhibit, what is cause of the issue? ___
A. The array is not setup to use the correct multipathing policy.
B. There are no virtual machines on the ESXi host.
C. Not all links are used because a path is disabled.
D. Another path needs to be configured.
【单选题】
An administrator is migrating a powered-on virtual machine, as shown in the exhibit. Which option should be selected to perform a Storage vMotion of the VM? ___
A. Change storage only
B. Change VM compute resource only
C. Change both compute resource and storage, changing the compute resource first.
D. Change both compute resource and storage, changing the storage resource first.
【单选题】
An administrator is attempting to enable Storage I/O Control on a datastore, but it is failing. What is the likely reason for this failure? ___
A. The host is connected to a datastore is running on ESX 4.0.
B. The host is connected to a Fibre Channel storage array.
C. The datastore has multiple extents.
D. The datastore is managed by a single vCenter Server.
【单选题】
A mission-critical virtual machine built on vSphere 4.1 needs to be moved to an ESXi 6.x host.Which virtual hardware version is needed to move the virtual machine without upgrading? ___
A. 6
B. 7
C. 10
D. 11
【单选题】
An administrator is analyzing a virtual machine as shown in the Exhibit. What is the current long term risk for this virtual machine? ___
A. The virtual machine may run out of memory before April 27.
B. The virtual machine may continue to function after April 27.
C. The virtual machine has adequate memory configured for operation for the next 120 days.
D. The virtual machine has adequate memory reservation configured for operation for the next 120 days.
【单选题】
An administrator is monitoring a High Availability (HA) and Distributed Resource Scheduler (DRS) enabled cluster and has noticed that virtual machines in the cluster are being migrated without user intervention. Why is this happening? ___
A. The DRS Automation level is set to Fully Automated.
B. The Automation level is set to Automatic.
C. The
D. PM Threshold is set to Aggressive.
【单选题】
An administrator attempts to migrate a suspended virtual machine to a newly deployed vSphere 6.x cluster. The compatibility check fails. What condition could cause this behavior?___
A. The new vSphere 6.x cluster is running Intel CPUs instead of AMD CPUs.
B. A suspended virtual machine cannot be migrated.
C. The hardware virtualization feature of the CPU is not enabled on the new hosts.
D. A vSphere Distributed Switch is required to migrate a suspended virtual machine.
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
【单选题】
An administrator has just configured the IP address on an ESXi host from the Direct Console User Interface. How can the configuration be validated as correct without any additional tools?___
A. Add the host to vCenter Server and if it works, then all networking settings are ok.
B. Select the Test Management Network option from the DCUI.
C. Connect to the host with the vSphere Client and click the Test Network option.
D. Use PowerCLI to connect to the host and initiate a network test.
【单选题】
An administrator is installing vCenter Server for an environment that has 40 ESXi 6.x Hosts and 150 virtual machines. Which database would meet the minimal requirements needed for this task? ___
A. vFabric Postgres
B. Microsoft SQL Express 2008
C. Microsoft SQL Server 2014
D. Oracle 11g
【单选题】
What is a requirement when enabling a Virtual SAN cluster in an existing High Availability (HA) and Distributed Resource Scheduler (DRS) Cluster? ___
A. Disable DRS and HA before enabling Virtual SAN
B. Enable DRS before enabling Virtual SAN
C. Disable HA before enabling Virtual SAN
D. Enable Storage DRS before enabling Virtual SAN
【单选题】
The vSphere administrator attempts to connect to an ESXi host via an SSH client and receives the following security alert: The vSphere administrator needs to determine whether the RSA key fingerprint shown in the security alert is the fingerprint of the intended ESXi host. Which tool should the vSphere administrator use? ___
A. Direct Console User Interface
B. vSphere Client
C. vSphere Web Client
D. vSphere Management Assistant
【单选题】
An administrator needs to monitor traffic on vSwitches in a vSphere 6.x environment. Which option, if configured, would accomplish this task? ___
A. Forged Transmits
B. MAC Address Changes
C. Promiscuous Mode
D. Notify Switches
【单选题】
What is true regarding datastores on ESXi 6.x? ___
A. NFS 4.1 datastore does not support Fault Tolerance (FT)
B. VMFS3 and VMFS5 datastores can be newly created
C. NFS datastore can be concurrently mounted using NFS 4.1 on one host and NFS on another
D. NFS 3.0 datastore does not support Fault Tolerance (FT)
【单选题】
An administrator is cloning and configuring five new web server virtual machines. What would be the benefit of configuring resource shares for the new VMs? ___
A. To prioritize access to a resource during contention.
B. To guarantee access to a resource during contention.
C. To prioritize access to a resource before contention occurs.
D. To guarantee access to a resource before contention occurs.
【单选题】
An administrator logs into the vSphere Web Client and sees the warning shown in the Exhibit. During a change control window, the warning was addressed. What should be done to verify that the host is no longer showing the warning? ___
A. Run a Remediate host operation.
B. Recheck the compliance of the host.
C. Restart the host to get rid of the warning.
D. Install VMware tools to clear the warning.
【单选题】
A vApp named Sales has a Memory Limit of 32 GB and a CPU Limit of 12,000 MHz. There are three virtual machines within the vApp: <Sales-DB -- Has a memory reservation of 20 GB. > <Sales-DC -- Has a memory reservation of 8 GB. > <Sales-Web -- Has a memory reservation of 8 GB.> Which statement is correct? ___
A. All three virtual machines can power on, but will have memory contention.
B. All three virtual machines can power on without memory contention.
C. Only two of the three virtual machines can power on.
D. Only one of the virtual machines can power on.
【单选题】
You are editing the management network configuration of an ESXi 6.x Host from the vSphere Web Client. You mistakenly put the incorrect VLAN in place for the management network. What action do you need to take to correct this? ___
A. You need to manually edit the configuration on the host with command line utilities.
B. No action is required. By default ESXi rolls back configuration changes that disconnect the host.
C. The ESXi host system configuration will need to be restored to the factory configuration to fix the issue.
D. The change can be reverted in the vSphere Web Client by simply editing the switch again.
【单选题】
What is true about resource pools created on a Distributed Resource Scheduler (DRS) cluster?___
A. A root resource pool is created with the specified values.
B. A root resource pool is automatically created using the aggregate total of the ESXi host resources in the cluster.
C. A root resource pool is automatically created using the aggregate total of all resources in the datacenter.
D. A root resource pool is not needed when creating resource pools on a DRS cluster.
【单选题】
An administrator attempts to enable Enhanced vMotion Compatibility (EVC) on a cluster. The operation results in a compatibility error, as shown in the exhibit. What is the likely cause of this error? ___
A. The CPUs in the ESXi host are not AMD CPUs.
B. The CPUs in the ESXi host do not support hardware virtualization capabilities.
C. The XD/NX CPU features have not been enabled in the BIOS of the server.
D. There is no shared storage between the hosts in the cluster.
【单选题】
What condition would prevent an administrator from creating a new VMFS3 datastore on an ESXi 6.x host using the vSphere Web Client? ___
A. A VMFS3 datastore cannot be created on an ESXi 6.x host.
B. The VMFS3 kernel module is not loaded.
C. A VMFS3 datastore cannot be mounted on an ESXi 6.x host.
D. VMFS3 datastores are not compatible with virtual machines created on an
E. SXi 6.x host.
【单选题】
During a new vSphere Distributed Switch configuration, where does the Maximum Transmission Unit (MTU) value get modified? ___
A. Uplink Settings
B. Switch Settings
C. Portgroup Settings
D. NIC Teaming Settings
【单选题】
A small company wants to use VMware products for its production systems. The system administrator needs to recommend a solution that will deliver High Availability to the company's production applications. What is minimum vSphere offering that will support this requirement? ___
A. vSphere Essentials
B. vSphere Essentials Plus
C. vSphere Hypervisor
D. vSphere Standard
【单选题】
Which scenario shows a reason for VMware Tools failing to install? ___
A. Virtual machine has a CD-ROM configured.
B. Guest OS Antivirus is blocking the VMware Tools installation.
C. Guest OS has 64-bit ldd (list dynamic dependencies) utility installed.
D. Virtual machine is powered on.
【单选题】
An administrator is configuring an ESXi 6.x host to use multiple NICs to resolve a management network redundancy error. After configuring a second NIC, the server is not able to communicate when the primary connection is taken down. The administrator analyzes the Exhibit shown here. Based on the exhibit, what is the likely cause of the issue? ___
A. vmnic4 is not attached to a vSwitch.
B. vmnic2 is not connected to a physical switch.
C. E1000 is the incorrect NIC
D. river for this card.
【单选题】
What information is required as part of an interactive ESXi 6.x installation? ___
A. Keyboard layout
B. IP Address
C. Root password
D. DNS information
【单选题】
What is the default load balancing policy for a newly created VMkernel port on a vSphere Distributed Switch? ___
A. Route based on orginating virtual port ID
B. Route based on IP Hash
C. Route based on source mac address
D. Route based on physical NIC load
【单选题】
An administrator deploys vCenter Server using the embedded Platform Services Controller. After testing the deployment for a couple of months, it is determined that the environment would be better served with an external Platform Services Controller. What should the administrator do to meet this new requirement? ___
A. Deploy a fresh instance of vCenter Server with an external Platform Services Controller.
B. Perform a fresh install of an external Platform Services Controller.
C. Migrate the embedded Platform Services Controller to an external Platform Services Controller.
D. Upgrade the embedded Platform Services Controller to an external Platform Services Controller.
【单选题】
Why are some virtual machines orphaned after rebooting a High Availability (HA) enabled host? ___
A. The Orphaned virtual machines have HA restart disabled.
B. The Orphaned virtual machines moved recently and the change did not persist.
C. The host is attached to failed storage.
D. The host just came out of maintenance mode.
【单选题】
Which vSphere 6 Standard Edition feature will allow an organization to ensure that critical multi-threaded applications have the maximum possible uptime? ___
A. Fault Tolerance
B. High Availability
C. Distributed Resource Scheduler
D. App HA
【多选题】
An application running in a virtual machine is experiencing performance issues. When utilizing performance monitoring utilities, it is noted that the CPU Utilization of the application is at 100%. Which two scenarios are probable causes of the CPU contention for the application? (Choose two.)___
A. There is a network I/O constraint.
B. There is a storage I/O constraint.
C. There is insufficient disk space assigned to the virtual machine.
D. The application is not virtualization aware.
【多选题】
A Fault Tolerance (FT) virtual machine with four vCPUs is experiencing high latency when performing ICMP and Application tests. What are three potential causes that may be attributing to this latency? (Choose three.)___
A. The FT network has insufficient bandwidth and is running on a 1GB Link.
B. The FT network is on a particularly high latency link.
C. The FT network has been configured with Network I/O Control.
D. The FT virtual machine is running an e1000 network adapter.
E. The
F. T virtual machine is running on poor performing network-based storage.
【多选题】
A virtual machine is experiencing performance issues. The following performance metrics are observed: <CPU usage value for the virtual machine is above 90%> < CPU ready value for the virtual machine is above 20%> Which two activities will likely resolve the performance issues? (Choose two.)___
A. Set a CPU reservation for the virtual machine.
B. Increase the CPU limit on the virtual machine.
C. Decrease CPU shares equally for all virtual machines on the host.
D. Increase CPU shares equally for all virtual machines on the host.
【多选题】
An administrator is upgrading a vSphere Distributed Switch. The existing switch is version 6.0 and the administrator wants to upgrade to the latest version possible. The environment contains several ESXi 6.1 hosts. Which two options are available to ensure that the upgraded switch will be compatible with these hosts? (Choose two.)___
A. Upgrade the vSphere Distributed Switch to 6.0
B. Upgrade the ESXi 5.5 hosts to version 6.0, then upgrade the vSphere Distributed Switch to 5.5
C. Upgrade the vSphere Distributed Switch to 5.1
D. Upgrade the
E. SXi host switches to 5.5, then upgrade the vSphere Distributed Switch to 5.5
【多选题】
An administrator attempts to create a Thick Provisioned Virtual Disk (VMDK) on an NFS datastore; but it fails. Which two reasons would explain the failure? (Choose two.)___
A. Datastore is on an NFS 3 storage server that does not support Hardware Acceleration
B. Datastore is on an NFS 4.1 storage server
C. Only VMFS datastores support "Thick Provisioned" VMDK
D. The NFS datastore was not created on a "Thick Provisioned" device
【多选题】
Which two NFS Protocol versions does vSphere 6 support? (Choose two.)___
A. Version 3
B. Version 3.1
C. Version 4
D. Version 4.1
【多选题】
Which three operations occur during a cold migration of a virtual machine? (Choose three.)___
A. The virtual machine disks are moved if the datastore is being changed.
B. The virtual machine is registered with the destination server.
C. The source virtual machine is removed from the old hosts.
D. The virtual machine hardware is upgraded.
E. The virtual machine files are quiesced prior to the migration.
【多选题】
A 4 GB Memory virtual machine is experiencing extended memory issues, as shown in the Exhibit. What potential issues could be attributed to this memory pressure?___
A. A limit is imposed on the virtual memory of this virtual machine.
B. The Balloon driver has been uninstalled.
C. A limit has been imposed on the Virtual CPU of the virtual machine.
D. Storage IO control has been enabled for the virtual machine causing the swapped memory.
推荐试题
【单选题】
___是新时代党的建设的根本方针。
A. 坚定信念、坚守追求
B. 坚持党要管党、全面从严治党
C. 以人为本、执政为民、
D. 积极发扬党内民主
【单选题】
全面从严治党是推进___战略布局的关键。
A. 干部建设
B. “四个全面”
C. 党员素质现代化
D. 法治与德治
【单选题】
全面从严治党为全面建成小康社会、全面深化改革、全面依法治国提供了___
A. 基本前提
B. 自我保障
C. 根本政治保证
D. 制度基础
【单选题】
___是党的纪律中最重要、最根本、最关键的纪律。
A. 政治纪律
B. 组织纪律
C. 群众纪律
D. 外事纪律
【单选题】
___是党指挥枪原则落地生根的坚实基础。
A. 军委主席负责制
B. 首长分工负责制
C. 支部建在连上
D. 政治委员制
【单选题】
把___作为唯一的根本的标准,是有效履行我军根本职能的内在要求,也是提高军队建设质量效益的客观需要。
A. 战斗力
B. 创新力
C. 学习力
D. 改革力
【单选题】
___是人民军队的立军之本。
A. 改革强军
B. 政治建军
C. 科技兴军
D. 依法治军
【单选题】
前进道路上,人民军队必须牢牢坚持党对军队的绝对领导,把这一条当作人民军队永远不能变的军魂、永远不能丢的命根子,任何时候任何情况下都___。
A. 以党的旗帜为旗帜
B. 以党的方向为方向
C. 以党的意志为意志
D. ABC都对
【单选题】
要加快形成精干、联合、多能、高效的信息化军事力量体系,重点是___,建设现代化陆军、海军、空军、火箭军、战略支援部队和武警部队,促进各军兵种力量协调发展。
A. 加强军事人才培养体系建设
B. 依法治军
C. 科技兴军
D. 优化作战力量结构
【单选题】
坚持富国和强军相统一是我们党的一贯主张,下面哪种说法是邓小平提出的。___
A. 中国必须建立强大的国防军,必须建立强大的经济力量,这是两件大事
B. 要走军民结合、平战结合、军品优先、以民养军的道路,强调国防和军队建设必须服从服务于经济建设大局的思想
C. 我国现代化建设的一条重要经验,就是坚持国防建设与经济建设协调发展的方针,在经济发展的基础上推进国防和军队现代化
D. 必须站在国家安全和发展战略全局的高度,统筹经济建设和国防建设,在全面建设小康社会进程中实现富国和强军的统一
【单选题】
军民融合,源于我们党的___的思想。
A. 军民结合
B. 寓军于民
C. 军民结合、寓军于民
D. 军民鱼水情
【单选题】
长期以来,我国积极推动军民融合实践,取得了丰硕成果,促进了___的同步增长。
A. 经济实力和科技实力
B. 国防实力和科技实力
C. 国防实力和创新实力
D. 经济实力和国防实力
【单选题】
必须做好军民融合这篇大文章,加快形成___的军民融合深度发展格局,逐步构建军民一体化的国家战略体系和能力。
A. 全方位、多角度、高效益
B. 全要素、多领域、高效益
C. 全方位、多角度、讲效率
D. 全要素、多领域、讲效率
【单选题】
十九大报告中指出,坚持走中国特色强军之路,全面推进国防和军队现代化,适应世界新军事革命发展趋势和国家安全需求,提高建设质量和效益,确保到二〇二〇年基本实现____ ,____ 建设取得重大进展,____ 有大的提升。下列填法正确的是___
A. 现代化 信息化 战斗能力
B. 机械化 信息化 战斗能力
C. 机械化 信息化 战略能力
D. 现代化 信息化 战略能力
【单选题】
力争到二〇三五年____ 国防和军队现代化,到本世纪中叶把人民军队____ 世界一流军队。下列填法正确的是___
A. 全面实现 基本建成
B. 全面实现 全面建成
C. 基本实现 基本建成
D. 基本实现 全面建成
【单选题】
树立___是现代战争的核心战斗力的思想,推进重大技术创新、自主创新,加强军事人才培养体系建设,建设创新型人民军队。
A. 创新
B. 科技
C. 人才
D. 技术
【单选题】
军队是要准备打仗的,一切工作都必须坚持___标准,向能打仗、打胜仗聚焦。
A. 战斗力
B. 斗争力
C. 战争力
D. 硬实力
【单选题】
党的十九大报告中指出,组建___机构,维护军人军属合法权益,让军人成为全社会尊崇的职业。
A. 退伍军人管理保障
B. 退伍军人社会保障
C. 退役军人管理保障
D. 退役军人社会保障
【单选题】
我国中央军事委员会实行___。
A. 委员会集体领导制
B. 主席负责制
C. 主席、副主席领导制
D. 军委党委领导制
【单选题】
党的十九大报告指出,要加强军队党的建设,开展___主题教育,永葆人民军队性质、宗旨、本色。
A. “不忘初心、牢记使命”
B. 改革强军
C. “传承红色基因、担当强军重任”
D. “两学一做”
【单选题】
党的十九大报告强调,全面从严治军,推动治军方式根本性转变,提高国防和军队建设___水平。
A. 科学化
B. 法治化
C. 现代化
D. 信息化
【单选题】
党的十九大报告指出,组建退役军人管理保障机构,维护军人军属合法权益,让军人成为全社会___的职业。
A. 向往
B. 尊崇
C. 尊敬
D. 崇敬
【单选题】
军民融合是___,必须站在党和国家事业发展全局的高度思考问题,切实把思想和行动统一到党中央决策部署上来。
A. 国家意志
B. 国家战略
C. 创新战略
D. 改革试点
【单选题】
要全面实施___战略,坚持自主创新的战略基点,瞄准世界军事科技前沿,加快战略性、前沿性、颠覆性技术发展,争取实现弯道超车,不断提高科技创新对人民军队建设和战斗力发展的贡献率。
A. 创新强军
B. 改革创新
C. 军民融合
D. 科技兴军
【单选题】
当今世界的时代主题是___。
A. 战争与革命
B. 和平与发展
C. 战争与和平
D. 和平与革命
【单选题】
世界多极化、经济全球化、文化多样化、社会信息化深入发展,全球治理体系和国际秩序变革___。
A. 很难推进
B. 基本末变
C. 加速推进
D. 不必改变
【单选题】
冷战结束以后,特别是进入21世纪以来,世界政治格局正处在一个加快演变的历史性进程中,表现为___。
A. 社会信息化
B. 文化多样化
C. 经济全球化
D. 世界多极化
【单选题】
随着冷战的结束,新科技革命的大力推进,特别是信息技术取得突破并广泛运用,全球资本的跨国流动迅速加快,___得以迅猛发展。
A. 多党资源
B. 宪政资源
C. 经济全球化
D. 两极发展
【单选题】
世界不同国家、民族的思想文化各有千秋,它们___。
A. 有利于以我为主,赢得世界话语主导权
B. 只有姹紫嫣红之别,而无高低优劣之分
C. 不利于世界价值导向的统一性
D. 争斗激烈,难以成为国家软实力
【单选题】
社会信息化和经济全球化相互促进,___日益成为重要生产要素和社会财富。
A. 信息资源
B. 多样资源
C. 多党资源
D. 宪政资源
【单选题】
新中国成立近70年来特别是改革开放40年来,中国形成了___,成功地走上了一条与本国国情和时代特征相适应的和平发展道路。
A. 独立自主的和平外交政策   
B. 解决各国问题的政策
C. 平衡各国实力发展的政策    
D. 霸权发展的政策
【单选题】
中国坚定不移地奉行___,是由我国的社会主义性质和在国际上的地位所决定的,是从历史、现实、未来的客观判断中得出的结论,是思想自信和实践自觉的有机统一。
A. 解决各国问题的政策   
B. 独立自主的和平外交政策
C. 平衡各国实力发展的政策    
D. 霸权发展的政策
【单选题】
中国外交政策的宗旨是___。
A. 发展自己的经济   
B. 遏制反华、分裂势力
C. 维护世界和平、促进共同发展   
D. “强国必霸”
【单选题】
推动建设相互尊重、公平正义、合作共赢的___,是党中央立足时代发展潮流和我国根本利益作出的战略选择,反映了中国人民和世界人民的共同心愿。
A. 经济关系
B. 生产关系
C. 宪政关系
D. 新型国际关系
【单选题】
中国倡导建立合作共赢的新型国际关系,核心是维护___。
A. 信息资源
B. 多样资源
C. 多党资源
D. 联合国宪章的宗旨和原则,
【单选题】
新型国际关系,“新”在___
A. 独立自主
B. 合作共赢
C. 和平发展
D. 永不称霸
【单选题】
推动建立新型国际关系,要坚决___。
A. 放弃自己的正当利益
B. 维护意识形态导向性
C. 维护国家核心利益
D. 维护旧的国际秩序
【单选题】
推动建立新型国际关系,要在___基础上发展同世界各国的友好合作。
A. 逢强必霸
B. 和平共处五项原则
C. 中国特色道路
D. 西方主导
【单选题】
构建人类命运共同体思想,在政治上要___。
A. 相互尊重、平等协商
B. 和平共处、相互协商
C. 独立自主、相互尊重
D. 自力更生、艰苦创业
【单选题】
构建人类命运共同体思想,在经济上要___。
A. 公平竞争,坚持发展是第一要务
B. 积极协商,推进全球经济一体化
C. 同舟共济,促进贸易和投资自由化便利化
D. 平等协商,反对霸权主义和强权政治
欢迎使用我爱刷题
×
微信搜索我爱刷题小程序
温馨提示
×
请在电脑上登陆“www.woaishuati.com”使用