刷题
导入试题
【单选题】
When you add an ESXi 6.x host to a new Cluster, which vSphere object owns the CPU and Memory resources of the hosts? ___
A. vCenter Server
B. Datacenter
C. Cluster
D. Host
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
C
解析
暂无解析
相关试题
【单选题】
A user is trying to retrieve objects from a SharePoint server and finds the request is taking an excessive amount of time. An administrator tries to isolate the issue and notes the following: Application performance is poor when compared to virtual machines on other hosts. Performance improves when the virtual machine is moved to another host. The virtual machine encounters higher than expected CPU %Ready times. What conclusion can be reached regarding the performance issues for this virtual machine? ___
A. Host Power Management is directly impacting virtual machine performance.
B. The virtual machine has a large number of snapshots.
C. The Path Selection Policy for the storage device is set differently on the affected host.
D. Network I/O control is configured for the portgroup.
【单选题】
A virtual machine template is accidently removed from the vCenter Server Inventory. Which method would be used to recover the template back into the environment?___
A. Use the datastore browser to locate the template, then right click and add the .vmtx file to inventory.
B. Use the datastore browser to locate the template, then right click and add the .vmx file to inventory.
C. Using the Managed Object Browser and adding the template from the ManagedObjectReference:GuestFileManager object.
D. Using the Managed Object Browser and adding the template from the ManagedObjectReference:VirtualDiskManager object.
【单选题】
A vSphere administrator needs to backup a virtual machine that has a Microsoft SQL Server Database installed. Which solution allows for an application quiesce to occur during backup?___
A. VMware vCenter Converter
B. VMware vCenter Site Recovery Manager
C. VMware vSphere Replication
D. VMware vSphere Data Protection Advanced
【单选题】
An administrator is migrating a virtual machine from a Test cluster to a Production cluster. The two environments do not have any shared storage. What is the easiest way to accomplish this task? ___
A. Perform a Storage vMotion.
B. Perform a regular vMotion.
C. Perform a Virtual to Virtual migration.
D. Perform a backup and restore using VMware Data Protection.
【单选题】
An administrator must determine an appropriate backup solution, given these conditions: 50 of the virtual machines are in a resource pool named Finance. 50 of the virtual machines are in a resource pool named QA. Which solution allows an administrator the ability to backup 100 virtual machines? ___
A. Use Snapshot Manager on the vCenter Server to backup the virtual machines.
B. Use the VMware Consolidated Backup (vcb) tool on the ESXi Host to backup the virtual machines.
C. Use the VMware Data Recovery (VDR) Appliance on the vCenter Server to backup the virtual machines.
D. Use the VMware Data Protection (VDP) Appliance on one of the
E. SXi Hosts to backup the virtual machines.
【单选题】
What is a benefit of using Enhanced vMotion Compatibility for an environment? ___
A. EVC masks CPU features to allow compatibility between hosts that are dissimilar.
B. EVC allows for cross platform vMotion to occur.
C. EVC enables Long
D. istance vMotion.
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
An administrator needs to verify that vMotion operations can be performed in a vSphere data center.What round trip time (RTT) latency is the maximum value that will allow vMotion operations to succeed? ___
A. 50ms RTT
B. 100ms RTT
C. 150ms RTT
D. 200ms RTT
【单选题】
A storage administrator has reported that full utilization of all bandwidth from an ESXi 6.x host is not being seen. In troubleshooting the issue, the Adapter details are shown in the Exhibit. Based on the exhibit, what is cause of the issue? ___
A. The array is not setup to use the correct multipathing policy.
B. There are no virtual machines on the ESXi host.
C. Not all links are used because a path is disabled.
D. Another path needs to be configured.
【单选题】
An administrator is migrating a powered-on virtual machine, as shown in the exhibit. Which option should be selected to perform a Storage vMotion of the VM? ___
A. Change storage only
B. Change VM compute resource only
C. Change both compute resource and storage, changing the compute resource first.
D. Change both compute resource and storage, changing the storage resource first.
【单选题】
An administrator is attempting to enable Storage I/O Control on a datastore, but it is failing. What is the likely reason for this failure? ___
A. The host is connected to a datastore is running on ESX 4.0.
B. The host is connected to a Fibre Channel storage array.
C. The datastore has multiple extents.
D. The datastore is managed by a single vCenter Server.
【单选题】
A mission-critical virtual machine built on vSphere 4.1 needs to be moved to an ESXi 6.x host.Which virtual hardware version is needed to move the virtual machine without upgrading? ___
A. 6
B. 7
C. 10
D. 11
【单选题】
An administrator is analyzing a virtual machine as shown in the Exhibit. What is the current long term risk for this virtual machine? ___
A. The virtual machine may run out of memory before April 27.
B. The virtual machine may continue to function after April 27.
C. The virtual machine has adequate memory configured for operation for the next 120 days.
D. The virtual machine has adequate memory reservation configured for operation for the next 120 days.
【单选题】
An administrator is monitoring a High Availability (HA) and Distributed Resource Scheduler (DRS) enabled cluster and has noticed that virtual machines in the cluster are being migrated without user intervention. Why is this happening? ___
A. The DRS Automation level is set to Fully Automated.
B. The Automation level is set to Automatic.
C. The
D. PM Threshold is set to Aggressive.
【单选题】
An administrator attempts to migrate a suspended virtual machine to a newly deployed vSphere 6.x cluster. The compatibility check fails. What condition could cause this behavior?___
A. The new vSphere 6.x cluster is running Intel CPUs instead of AMD CPUs.
B. A suspended virtual machine cannot be migrated.
C. The hardware virtualization feature of the CPU is not enabled on the new hosts.
D. A vSphere Distributed Switch is required to migrate a suspended virtual machine.
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
【单选题】
An administrator has just configured the IP address on an ESXi host from the Direct Console User Interface. How can the configuration be validated as correct without any additional tools?___
A. Add the host to vCenter Server and if it works, then all networking settings are ok.
B. Select the Test Management Network option from the DCUI.
C. Connect to the host with the vSphere Client and click the Test Network option.
D. Use PowerCLI to connect to the host and initiate a network test.
【单选题】
An administrator is installing vCenter Server for an environment that has 40 ESXi 6.x Hosts and 150 virtual machines. Which database would meet the minimal requirements needed for this task? ___
A. vFabric Postgres
B. Microsoft SQL Express 2008
C. Microsoft SQL Server 2014
D. Oracle 11g
【单选题】
What is a requirement when enabling a Virtual SAN cluster in an existing High Availability (HA) and Distributed Resource Scheduler (DRS) Cluster? ___
A. Disable DRS and HA before enabling Virtual SAN
B. Enable DRS before enabling Virtual SAN
C. Disable HA before enabling Virtual SAN
D. Enable Storage DRS before enabling Virtual SAN
【单选题】
The vSphere administrator attempts to connect to an ESXi host via an SSH client and receives the following security alert: The vSphere administrator needs to determine whether the RSA key fingerprint shown in the security alert is the fingerprint of the intended ESXi host. Which tool should the vSphere administrator use? ___
A. Direct Console User Interface
B. vSphere Client
C. vSphere Web Client
D. vSphere Management Assistant
【单选题】
An administrator needs to monitor traffic on vSwitches in a vSphere 6.x environment. Which option, if configured, would accomplish this task? ___
A. Forged Transmits
B. MAC Address Changes
C. Promiscuous Mode
D. Notify Switches
【单选题】
What is true regarding datastores on ESXi 6.x? ___
A. NFS 4.1 datastore does not support Fault Tolerance (FT)
B. VMFS3 and VMFS5 datastores can be newly created
C. NFS datastore can be concurrently mounted using NFS 4.1 on one host and NFS on another
D. NFS 3.0 datastore does not support Fault Tolerance (FT)
【单选题】
An administrator is cloning and configuring five new web server virtual machines. What would be the benefit of configuring resource shares for the new VMs? ___
A. To prioritize access to a resource during contention.
B. To guarantee access to a resource during contention.
C. To prioritize access to a resource before contention occurs.
D. To guarantee access to a resource before contention occurs.
【单选题】
An administrator logs into the vSphere Web Client and sees the warning shown in the Exhibit. During a change control window, the warning was addressed. What should be done to verify that the host is no longer showing the warning? ___
A. Run a Remediate host operation.
B. Recheck the compliance of the host.
C. Restart the host to get rid of the warning.
D. Install VMware tools to clear the warning.
【单选题】
A vApp named Sales has a Memory Limit of 32 GB and a CPU Limit of 12,000 MHz. There are three virtual machines within the vApp: <Sales-DB -- Has a memory reservation of 20 GB. > <Sales-DC -- Has a memory reservation of 8 GB. > <Sales-Web -- Has a memory reservation of 8 GB.> Which statement is correct? ___
A. All three virtual machines can power on, but will have memory contention.
B. All three virtual machines can power on without memory contention.
C. Only two of the three virtual machines can power on.
D. Only one of the virtual machines can power on.
【单选题】
You are editing the management network configuration of an ESXi 6.x Host from the vSphere Web Client. You mistakenly put the incorrect VLAN in place for the management network. What action do you need to take to correct this? ___
A. You need to manually edit the configuration on the host with command line utilities.
B. No action is required. By default ESXi rolls back configuration changes that disconnect the host.
C. The ESXi host system configuration will need to be restored to the factory configuration to fix the issue.
D. The change can be reverted in the vSphere Web Client by simply editing the switch again.
【单选题】
What is true about resource pools created on a Distributed Resource Scheduler (DRS) cluster?___
A. A root resource pool is created with the specified values.
B. A root resource pool is automatically created using the aggregate total of the ESXi host resources in the cluster.
C. A root resource pool is automatically created using the aggregate total of all resources in the datacenter.
D. A root resource pool is not needed when creating resource pools on a DRS cluster.
【单选题】
An administrator attempts to enable Enhanced vMotion Compatibility (EVC) on a cluster. The operation results in a compatibility error, as shown in the exhibit. What is the likely cause of this error? ___
A. The CPUs in the ESXi host are not AMD CPUs.
B. The CPUs in the ESXi host do not support hardware virtualization capabilities.
C. The XD/NX CPU features have not been enabled in the BIOS of the server.
D. There is no shared storage between the hosts in the cluster.
【单选题】
What condition would prevent an administrator from creating a new VMFS3 datastore on an ESXi 6.x host using the vSphere Web Client? ___
A. A VMFS3 datastore cannot be created on an ESXi 6.x host.
B. The VMFS3 kernel module is not loaded.
C. A VMFS3 datastore cannot be mounted on an ESXi 6.x host.
D. VMFS3 datastores are not compatible with virtual machines created on an
E. SXi 6.x host.
【单选题】
During a new vSphere Distributed Switch configuration, where does the Maximum Transmission Unit (MTU) value get modified? ___
A. Uplink Settings
B. Switch Settings
C. Portgroup Settings
D. NIC Teaming Settings
【单选题】
A small company wants to use VMware products for its production systems. The system administrator needs to recommend a solution that will deliver High Availability to the company's production applications. What is minimum vSphere offering that will support this requirement? ___
A. vSphere Essentials
B. vSphere Essentials Plus
C. vSphere Hypervisor
D. vSphere Standard
【单选题】
Which scenario shows a reason for VMware Tools failing to install? ___
A. Virtual machine has a CD-ROM configured.
B. Guest OS Antivirus is blocking the VMware Tools installation.
C. Guest OS has 64-bit ldd (list dynamic dependencies) utility installed.
D. Virtual machine is powered on.
【单选题】
An administrator is configuring an ESXi 6.x host to use multiple NICs to resolve a management network redundancy error. After configuring a second NIC, the server is not able to communicate when the primary connection is taken down. The administrator analyzes the Exhibit shown here. Based on the exhibit, what is the likely cause of the issue? ___
A. vmnic4 is not attached to a vSwitch.
B. vmnic2 is not connected to a physical switch.
C. E1000 is the incorrect NIC
D. river for this card.
【单选题】
What information is required as part of an interactive ESXi 6.x installation? ___
A. Keyboard layout
B. IP Address
C. Root password
D. DNS information
【单选题】
What is the default load balancing policy for a newly created VMkernel port on a vSphere Distributed Switch? ___
A. Route based on orginating virtual port ID
B. Route based on IP Hash
C. Route based on source mac address
D. Route based on physical NIC load
【单选题】
An administrator deploys vCenter Server using the embedded Platform Services Controller. After testing the deployment for a couple of months, it is determined that the environment would be better served with an external Platform Services Controller. What should the administrator do to meet this new requirement? ___
A. Deploy a fresh instance of vCenter Server with an external Platform Services Controller.
B. Perform a fresh install of an external Platform Services Controller.
C. Migrate the embedded Platform Services Controller to an external Platform Services Controller.
D. Upgrade the embedded Platform Services Controller to an external Platform Services Controller.
【单选题】
Why are some virtual machines orphaned after rebooting a High Availability (HA) enabled host? ___
A. The Orphaned virtual machines have HA restart disabled.
B. The Orphaned virtual machines moved recently and the change did not persist.
C. The host is attached to failed storage.
D. The host just came out of maintenance mode.
【单选题】
Which vSphere 6 Standard Edition feature will allow an organization to ensure that critical multi-threaded applications have the maximum possible uptime? ___
A. Fault Tolerance
B. High Availability
C. Distributed Resource Scheduler
D. App HA
推荐试题
【多选题】
关于电票到期自动备款错误的为___。
A. 电票到期系统自动备款功能同纸票到期自动备款
B. 票据系统将已达到期日的票据(节假日顺延到下一工作日)发送核心系统进行备款处理
C. 定期保证金账户利息随同本金一起入24300301银承保证金备付科目,当保证金扣款金额大于票面金额时,系统自动将多扣款项转入客户结算账户
D. 核心的扣款顺序为先扣结算账户金额、再扣保证金账户锁定金额,若扣款金额仍不足票据金额时,核心系统自动生成银承备款
【多选题】
在办理全额电子商业汇票时,客户经理提交的资料有:___
A. 信贷客户放款业务审批表、信贷客户单笔单批业务审批表、银行承兑汇票承兑申请书、银行承兑协议。
B. 放款通知书、信贷客户单笔单批业务审批表、银行承兑汇票承兑申请书、银行承兑协议。
C. 放款通知书、信贷客户放款业务审批表、银行承兑汇票承兑申请书、银行承兑协议。
D. 放款通知书、银行承兑汇票承兑审查(审批)书、银行承兑汇票承兑申请书、银行承兑协议、银行承兑汇票清单、保证金质押合同。
【多选题】
需要在本行办理电子商业汇票业务的客户,应具备___。
A. 组织机构代码
B. 营业执照
C. 税务登记证
【多选题】
电票到期系统自动备款是指票据系统将已达到期日的票据(节假日顺延到下一工作日)发送核心系统进行备款处理,核心的扣款顺序为先扣()、再扣(),若扣款金额仍不足票据金额时()正确的扣款顺序为以下哪一项___。
A. 结算账户金额、保证金账户锁定金额、生成银承备款
B. 保证金账户锁定金额、结算账户金额、生成银承备款
C. 生成银承备款、保证金账户锁定金额、结算账户金额
D. 生成银承备款、结算账户金额、保证金账户锁定金额
【多选题】
电子商业汇票业务的各票据行为参与者(客户)必须为我行___签约客户,具有有效的电子签名认证信息。
A. 手机银行
B. 网上银行
C. 电子银行
D. 电话银行
【多选题】
办理电子银行承兑汇票业务,出票人需按照票面金额的___向承兑机构支付银承签发手续费。
A. 万分之三
B. 千分之三
C. 万分之五
D. 千分之五
【多选题】
超过提示付款期提示付款的,按照逾期提示付款进行处理,可在票据到期日后___内发起逾期提示付款。
A. 3个月
B. 6个月
C. 1年
D. 2年
【多选题】
客户在网上银行发起电票批量出票申请时,单个批次出票上限为___张。
A. 50
B. 100
C. 150
D. 200
【多选题】
电子商业汇票提示付款期自票据到期日起___日,最后一日遇法定休假日、大额支付系统非营业日、电子商业汇票系统非营业日顺延。
A. 10天
B. 一个月
C. 三个月
D. 六个月
【多选题】
电子商业汇票系统适用于___对电子商业汇票业务的处理需求。
A. 对私客户
B. 对公客户
C. 财务公司
D. 商业银行各分支机构
【多选题】
电子商业汇票系统适用于对公客户、财务公司、各商业银行分支机构对电子商业汇票业务的处理需求, 需要客户___。
A. 应具备组织机构代码,在本行开立结算账户
B. 必须为我行网上银行签约客户,具有有效的电子签名认证信息;
C. 开通企业短信业务
D. 需与开户机构签订《单位银行结算账户综合服务协议》、《单位银行结算账户综合服务申请表》,并提供相应企业资质文件等;
【多选题】
电票银票签发,客户经理提交的资料有___。
A. 放款通知书
B. 银行承兑汇票承兑审查(审批)书
C. 银行承兑汇票清单
D. 银行承兑汇票承兑申请书
E. 银行承兑协议
【多选题】
电子商业汇票业务是指以电子商业汇票系统为基础,网上银行 为前端,核心业务系统为账务处理中心,为客户提供全面的电子商业汇票的出票、承兑、背书、___等业务。
A. 托收
B. 解付
C. 质押
D. 贴现
E. 转贴现
【多选题】
电票银票签发,客户通过企业网银发起___操作,向我行网点发起承兑申请。
A. 出票清单编辑
B. 出票申请
C. 出票登记
D. 提示承兑申请
【多选题】
下列关于电票业务正确的有___。
A. 电票到期系统自动备款功能同纸票到期自动备款;
B. 人行签收应答成功后,贴现业务不再支持撤回;
C. 我行网银客户发起的贴现申请都默认为线上清算方式;
D. 银承签发手续费收取按信贷合同批次一次性收取。
【多选题】
电子商业汇票业务为客户提供全面的电子商业汇票业务,包括电子商业汇票的___等业务。
A. 出票
B. 承兑
C. 背书
D. 质押
E. 贴现
【多选题】
关于承兑记账,下列说法正确的是___。
A. 柜员可在作复核前先从跟踪查询中查询该张电子银行承兑汇票的状态
B. 柜员可在“承兑撤销记账”菜单发起承兑记账撤销,将承兑记账撤退回信贷系统修改
C. 当票据状态为“出票已登记”时,客户在网银端撤票成功后,系统无账务处理
D. 当票据状态为“提票承兑已签收”时,客户在网银端撤票成功后,系统自动账务处理,同时解绑原已绑定的保证金账号金额;对原收取的承兑手续费冲销返还,票据系统处理完上述操作后,自动往综合柜面系统发送通知任务,通知网点该笔电票已撤票
【多选题】
电子商业汇票业务包括___
A. 票据承兑
B. 提示付款
C. 到期解付
D. 贴现/转贴现
E. 质押
【多选题】
电子商业汇票面临___风险。
A. 系统运行瘫痪
B. 数据文件丢失
C. 票据诈骗
D. 网络遭遇攻击
E. 病毒入侵
【多选题】
财政零余额账户为___,预算单位零余额账户为( )。
A. 专用存款账户、基本存款账户或专用存款账户
B. 基本存款账户或专用存款账、专用存款账户户
C. 基本存款账户、基本存款账户
【多选题】
转入零余额账户的款项必须在___对账清算前支付(转出)。
A. 前一天
B. 当天
C. 隔日
D. 一周内
【多选题】
一个预算单位原则上只能开立___零余额账户。
A. 0
B. 1
C. 2
D. 3
【多选题】
以下哪个账户可办理提取现金业务___
A. 财政零余额账户
B. 预算单位零余额账户
C. 预算外资金财政专户
D. 国库单一账户
【多选题】
代理银行依据《人民币银行结算账户管理办法》的规定,预算单位零余额账户和特设专户,须审核哪些资料?___。
A. 预算单位机构设置的批准
B. 同级财政局同意其在代理银行开户的文件
C. 预算单位的预留印鉴
D. 其它资料
【多选题】
关于财政账户说法正确的有___。
A. 财政局标识为财政局名称的第一位大写拼音或数字,六位数。
B. 财政集中支付相关交易能通过存款模块冲账交易进行冲账。
C. 授权支付方式下,在清算前可以进行撤销,但不可以通过红字支付指令进行退款。
D. 转入零余额账户的款项必须在当日对账清算前支付(转出)。
【多选题】
财政集中支付业务是指根据支付方式和支付地点的不同,采用___等方式将财政资金划拨给收款人或用款单位账户,以及国库单一账户体系中各账户之间的资金划拨行为。
A. 同城转账
B. 异地汇兑
C. 现金支付
D. 转账支付
【多选题】
下列哪些账户不得提取现金?___。
A. 财政零余额账户
B. 预算单位零余额账户
C. 特设专户
D. 国库单一账户和预算外资金财政专户
【多选题】
国库单一账户体系由下列银行账户构成:___
A. 财政局在人民银行开设的国库单一账户
B. 财政局在代理银行开设的预算外资金财政专户、财政零余账户和财政特设专户
C. 财政局在代理银行为预算单位开设的预算单位零余额账户和预算单位特设专户
【多选题】
下列说法正确的有___。
A. 财政零余额账户可以办理转账等支付结算业务、提取现金;
B. 清算完成后的直接支付款项,可以进行部分退款和全额退款;
C. 财政授权支付,需审查支付凭证上是否记载指令号;未记载指令号的,代理银行不得受理;
D. 支付凭证上记录内容不全的,应退回持票人。
【多选题】
预算单位零余额账户可以为___账户。
A. 基本存款账户
B. 一般存款账户
C. 专用存款账户
D. 临时存款账户
【多选题】
代理银行为财政局或预算单位开设___专户时,须向人民银行国库部门备案并预留申请划款印鉴章。
A. 财政零余额账户
B. 预算单位零余额账户
C. 预算外资金财政专户
D. 特设专户等
【多选题】
有关单位公务卡说法错误的是___
A. 单位公务卡“预开”状态可做启用、销户操作;
B. “启用”状态可做变更、停用、销户操作;
C. “停用”状态可做启用、销户操作;
D. “变更”操作后单位公务卡状态为“停用”
【多选题】
纳入国库集中支付预算单位申请开立单位公务卡,每个预算单位可以申请___张。
A. 1
B. 5
C. 10
【多选题】
单位公务卡批扣欠款超过还款免息期的,我行再允许___天宽限期。
A. 1
B. 2
C. 3
【多选题】
单位公务卡的信用额度,由预算单位根据___个连续工作日最大托收资金量提出申请,由财政局根据各预算单位的申请并结合国库集中支付资金流量测算确定并通知发卡行。
A. 3
B. 4
C. 5
D. 6
【多选题】
单位公务卡只有在___状态时可以进行账务处理。
A. 预开
B. 启用
C. 变更
D. 停用
【多选题】
单位公务卡是指以单位名义申请的贷记卡,仅用于本单位同城特约___业务。
A. 消费支出
B. 委托收款
C. 现金支取
D. 交易转账
【多选题】
单位公务卡账户为___存款账户,计息标志为( )
A. 可透支 不计息
B. 不可透支 不计息
C. 可透支 计息
D. 不可透支 计息
【多选题】
发卡行应于发生垫款___个工作日内书面或1个工作日内短信通知预算单位有关托收事项,以便预算单位及时还款。
A. 1
B. 2
C. 3
D. 5
【多选题】
当单位公务卡缴款金额___全部欠款时,溢缴款部分将留存于单位公务卡账户。
A. 大于
B. 等于
C. 小于
欢迎使用我爱刷题
×
微信搜索我爱刷题小程序
温馨提示
×
请在电脑上登陆“www.woaishuati.com”使用