刷题
导入试题
【单选题】
What is required when changing a virtual machine name using the vSphere Web Client? ___
A. Verify connectivity to the ESXi host where the virtual machine is running and its inventory list is accessible.
B. Verify in which datastore the virtual machine resides and that you have access and its inventory list is accessible.
C. Verify that virtual machine files are stored in the same datastore and can be accessed in the datastore browser list.
D. Verify the virtual machine is not running in Fault Tolerant mode and that it is not in a Distributed Resource Scheduler cluster.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
A
解析
暂无解析
相关试题
【单选题】
An administrator deploys vRealize Operations into a vSphere 6.x environment. After the deployment, the administrator notices that badges are not appearing. What is a likely cause of this behavior? ___
A. Badges do not appear until you register vRealize Operations with vCenter Server.
B. Badges do not appear until you register a vCenter Server in vRealize Operations.
C. The vRealize Operations appliance needs to be redeployed.
D. The vCenter Server appliance needs to be redeployed.
【单选题】
How are ports scaled on vSphere Standard Switches (vSS)? ___
A. Ports on a vSS can be dynamically scaled up and down.
B. Ports on a vSS can only be statically scaled up or down.
C. Ports on a vSS can only be dynamically scaled down.
D. Ports on a vSS can only be dynamically scaled up.
【单选题】
A High Availability (HA) cluster is configured to respond to a given number of host failures. The cluster contains virtual machines configured with these settings: VM1 has a 1GHz CPU reservation and no Memory reservation VM2 has a 2GHz CPU reservation and no Memory reservation VM3 has no CPU reservation and no Memory reservation . Given this information, what is the correct slot size for the cluster? ___
A. The CPU Reservation should be set to 32MHz and the memory reservation should be set to 32MB plus memory overhead.
B. The CPU reservation should be set to 1 GHz and the memory reservation should be set to 0MB plus memory overhead.
C. The CPU reservation should be set to 2 GHz, and the memory reservation should be set to 0MB plus the virtual machine memory overhead.
D. The CPU reservation should be set to 2 GHz, and the memory reservation should be set to 32MB, plus the virtual machine memory overhead.
【单选题】
An administrator is planning a vSphere infrastructure with the following specific networking requirements: <The ability to shape inbound (RX) traffic> <Support for Private VLANs (PVLANs)> <Support for LLDP (Link Layer Discovery Protocol)>. What is the minimum vSphere Edition that will support these requirements? ___
A. vSphere Essentials Plus
B. vSphere Standard
C. vSphere Enterprise
D. vSphere
E. nterprise Plus
【单选题】
When you add an ESXi 6.x host to a new Cluster, which vSphere object owns the CPU and Memory resources of the hosts? ___
A. vCenter Server
B. Datacenter
C. Cluster
D. Host
【单选题】
A user is trying to retrieve objects from a SharePoint server and finds the request is taking an excessive amount of time. An administrator tries to isolate the issue and notes the following: Application performance is poor when compared to virtual machines on other hosts. Performance improves when the virtual machine is moved to another host. The virtual machine encounters higher than expected CPU %Ready times. What conclusion can be reached regarding the performance issues for this virtual machine? ___
A. Host Power Management is directly impacting virtual machine performance.
B. The virtual machine has a large number of snapshots.
C. The Path Selection Policy for the storage device is set differently on the affected host.
D. Network I/O control is configured for the portgroup.
【单选题】
A virtual machine template is accidently removed from the vCenter Server Inventory. Which method would be used to recover the template back into the environment?___
A. Use the datastore browser to locate the template, then right click and add the .vmtx file to inventory.
B. Use the datastore browser to locate the template, then right click and add the .vmx file to inventory.
C. Using the Managed Object Browser and adding the template from the ManagedObjectReference:GuestFileManager object.
D. Using the Managed Object Browser and adding the template from the ManagedObjectReference:VirtualDiskManager object.
【单选题】
A vSphere administrator needs to backup a virtual machine that has a Microsoft SQL Server Database installed. Which solution allows for an application quiesce to occur during backup?___
A. VMware vCenter Converter
B. VMware vCenter Site Recovery Manager
C. VMware vSphere Replication
D. VMware vSphere Data Protection Advanced
【单选题】
An administrator is migrating a virtual machine from a Test cluster to a Production cluster. The two environments do not have any shared storage. What is the easiest way to accomplish this task? ___
A. Perform a Storage vMotion.
B. Perform a regular vMotion.
C. Perform a Virtual to Virtual migration.
D. Perform a backup and restore using VMware Data Protection.
【单选题】
An administrator must determine an appropriate backup solution, given these conditions: 50 of the virtual machines are in a resource pool named Finance. 50 of the virtual machines are in a resource pool named QA. Which solution allows an administrator the ability to backup 100 virtual machines? ___
A. Use Snapshot Manager on the vCenter Server to backup the virtual machines.
B. Use the VMware Consolidated Backup (vcb) tool on the ESXi Host to backup the virtual machines.
C. Use the VMware Data Recovery (VDR) Appliance on the vCenter Server to backup the virtual machines.
D. Use the VMware Data Protection (VDP) Appliance on one of the
E. SXi Hosts to backup the virtual machines.
【单选题】
What is a benefit of using Enhanced vMotion Compatibility for an environment? ___
A. EVC masks CPU features to allow compatibility between hosts that are dissimilar.
B. EVC allows for cross platform vMotion to occur.
C. EVC enables Long
D. istance vMotion.
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
An administrator needs to verify that vMotion operations can be performed in a vSphere data center.What round trip time (RTT) latency is the maximum value that will allow vMotion operations to succeed? ___
A. 50ms RTT
B. 100ms RTT
C. 150ms RTT
D. 200ms RTT
【单选题】
A storage administrator has reported that full utilization of all bandwidth from an ESXi 6.x host is not being seen. In troubleshooting the issue, the Adapter details are shown in the Exhibit. Based on the exhibit, what is cause of the issue? ___
A. The array is not setup to use the correct multipathing policy.
B. There are no virtual machines on the ESXi host.
C. Not all links are used because a path is disabled.
D. Another path needs to be configured.
【单选题】
An administrator is migrating a powered-on virtual machine, as shown in the exhibit. Which option should be selected to perform a Storage vMotion of the VM? ___
A. Change storage only
B. Change VM compute resource only
C. Change both compute resource and storage, changing the compute resource first.
D. Change both compute resource and storage, changing the storage resource first.
【单选题】
An administrator is attempting to enable Storage I/O Control on a datastore, but it is failing. What is the likely reason for this failure? ___
A. The host is connected to a datastore is running on ESX 4.0.
B. The host is connected to a Fibre Channel storage array.
C. The datastore has multiple extents.
D. The datastore is managed by a single vCenter Server.
【单选题】
A mission-critical virtual machine built on vSphere 4.1 needs to be moved to an ESXi 6.x host.Which virtual hardware version is needed to move the virtual machine without upgrading? ___
A. 6
B. 7
C. 10
D. 11
【单选题】
An administrator is analyzing a virtual machine as shown in the Exhibit. What is the current long term risk for this virtual machine? ___
A. The virtual machine may run out of memory before April 27.
B. The virtual machine may continue to function after April 27.
C. The virtual machine has adequate memory configured for operation for the next 120 days.
D. The virtual machine has adequate memory reservation configured for operation for the next 120 days.
【单选题】
An administrator is monitoring a High Availability (HA) and Distributed Resource Scheduler (DRS) enabled cluster and has noticed that virtual machines in the cluster are being migrated without user intervention. Why is this happening? ___
A. The DRS Automation level is set to Fully Automated.
B. The Automation level is set to Automatic.
C. The
D. PM Threshold is set to Aggressive.
【单选题】
An administrator attempts to migrate a suspended virtual machine to a newly deployed vSphere 6.x cluster. The compatibility check fails. What condition could cause this behavior?___
A. The new vSphere 6.x cluster is running Intel CPUs instead of AMD CPUs.
B. A suspended virtual machine cannot be migrated.
C. The hardware virtualization feature of the CPU is not enabled on the new hosts.
D. A vSphere Distributed Switch is required to migrate a suspended virtual machine.
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
【单选题】
An administrator has just configured the IP address on an ESXi host from the Direct Console User Interface. How can the configuration be validated as correct without any additional tools?___
A. Add the host to vCenter Server and if it works, then all networking settings are ok.
B. Select the Test Management Network option from the DCUI.
C. Connect to the host with the vSphere Client and click the Test Network option.
D. Use PowerCLI to connect to the host and initiate a network test.
【单选题】
An administrator is installing vCenter Server for an environment that has 40 ESXi 6.x Hosts and 150 virtual machines. Which database would meet the minimal requirements needed for this task? ___
A. vFabric Postgres
B. Microsoft SQL Express 2008
C. Microsoft SQL Server 2014
D. Oracle 11g
【单选题】
What is a requirement when enabling a Virtual SAN cluster in an existing High Availability (HA) and Distributed Resource Scheduler (DRS) Cluster? ___
A. Disable DRS and HA before enabling Virtual SAN
B. Enable DRS before enabling Virtual SAN
C. Disable HA before enabling Virtual SAN
D. Enable Storage DRS before enabling Virtual SAN
【单选题】
The vSphere administrator attempts to connect to an ESXi host via an SSH client and receives the following security alert: The vSphere administrator needs to determine whether the RSA key fingerprint shown in the security alert is the fingerprint of the intended ESXi host. Which tool should the vSphere administrator use? ___
A. Direct Console User Interface
B. vSphere Client
C. vSphere Web Client
D. vSphere Management Assistant
【单选题】
An administrator needs to monitor traffic on vSwitches in a vSphere 6.x environment. Which option, if configured, would accomplish this task? ___
A. Forged Transmits
B. MAC Address Changes
C. Promiscuous Mode
D. Notify Switches
【单选题】
What is true regarding datastores on ESXi 6.x? ___
A. NFS 4.1 datastore does not support Fault Tolerance (FT)
B. VMFS3 and VMFS5 datastores can be newly created
C. NFS datastore can be concurrently mounted using NFS 4.1 on one host and NFS on another
D. NFS 3.0 datastore does not support Fault Tolerance (FT)
【单选题】
An administrator is cloning and configuring five new web server virtual machines. What would be the benefit of configuring resource shares for the new VMs? ___
A. To prioritize access to a resource during contention.
B. To guarantee access to a resource during contention.
C. To prioritize access to a resource before contention occurs.
D. To guarantee access to a resource before contention occurs.
【单选题】
An administrator logs into the vSphere Web Client and sees the warning shown in the Exhibit. During a change control window, the warning was addressed. What should be done to verify that the host is no longer showing the warning? ___
A. Run a Remediate host operation.
B. Recheck the compliance of the host.
C. Restart the host to get rid of the warning.
D. Install VMware tools to clear the warning.
【单选题】
A vApp named Sales has a Memory Limit of 32 GB and a CPU Limit of 12,000 MHz. There are three virtual machines within the vApp: <Sales-DB -- Has a memory reservation of 20 GB. > <Sales-DC -- Has a memory reservation of 8 GB. > <Sales-Web -- Has a memory reservation of 8 GB.> Which statement is correct? ___
A. All three virtual machines can power on, but will have memory contention.
B. All three virtual machines can power on without memory contention.
C. Only two of the three virtual machines can power on.
D. Only one of the virtual machines can power on.
【单选题】
You are editing the management network configuration of an ESXi 6.x Host from the vSphere Web Client. You mistakenly put the incorrect VLAN in place for the management network. What action do you need to take to correct this? ___
A. You need to manually edit the configuration on the host with command line utilities.
B. No action is required. By default ESXi rolls back configuration changes that disconnect the host.
C. The ESXi host system configuration will need to be restored to the factory configuration to fix the issue.
D. The change can be reverted in the vSphere Web Client by simply editing the switch again.
【单选题】
What is true about resource pools created on a Distributed Resource Scheduler (DRS) cluster?___
A. A root resource pool is created with the specified values.
B. A root resource pool is automatically created using the aggregate total of the ESXi host resources in the cluster.
C. A root resource pool is automatically created using the aggregate total of all resources in the datacenter.
D. A root resource pool is not needed when creating resource pools on a DRS cluster.
【单选题】
An administrator attempts to enable Enhanced vMotion Compatibility (EVC) on a cluster. The operation results in a compatibility error, as shown in the exhibit. What is the likely cause of this error? ___
A. The CPUs in the ESXi host are not AMD CPUs.
B. The CPUs in the ESXi host do not support hardware virtualization capabilities.
C. The XD/NX CPU features have not been enabled in the BIOS of the server.
D. There is no shared storage between the hosts in the cluster.
【单选题】
What condition would prevent an administrator from creating a new VMFS3 datastore on an ESXi 6.x host using the vSphere Web Client? ___
A. A VMFS3 datastore cannot be created on an ESXi 6.x host.
B. The VMFS3 kernel module is not loaded.
C. A VMFS3 datastore cannot be mounted on an ESXi 6.x host.
D. VMFS3 datastores are not compatible with virtual machines created on an
E. SXi 6.x host.
【单选题】
During a new vSphere Distributed Switch configuration, where does the Maximum Transmission Unit (MTU) value get modified? ___
A. Uplink Settings
B. Switch Settings
C. Portgroup Settings
D. NIC Teaming Settings
【单选题】
A small company wants to use VMware products for its production systems. The system administrator needs to recommend a solution that will deliver High Availability to the company's production applications. What is minimum vSphere offering that will support this requirement? ___
A. vSphere Essentials
B. vSphere Essentials Plus
C. vSphere Hypervisor
D. vSphere Standard
【单选题】
Which scenario shows a reason for VMware Tools failing to install? ___
A. Virtual machine has a CD-ROM configured.
B. Guest OS Antivirus is blocking the VMware Tools installation.
C. Guest OS has 64-bit ldd (list dynamic dependencies) utility installed.
D. Virtual machine is powered on.
【单选题】
An administrator is configuring an ESXi 6.x host to use multiple NICs to resolve a management network redundancy error. After configuring a second NIC, the server is not able to communicate when the primary connection is taken down. The administrator analyzes the Exhibit shown here. Based on the exhibit, what is the likely cause of the issue? ___
A. vmnic4 is not attached to a vSwitch.
B. vmnic2 is not connected to a physical switch.
C. E1000 is the incorrect NIC
D. river for this card.
推荐试题
【单选题】
稻草芦苇等堆垛发生自燃的主要原因是___。
A. 分解放热
B. 氧化发热
C. 聚合放热
D. 发酵放热
【单选题】
采用喷雾水流带电灭火,喷雾水枪可以不接地线,但要根据电压大小选好与带电体的安全距离,消防车泵压力保持___MPA。
A. 0.3~0.5
B. 0.2~0.4
C. 0.5~0.7
D. 0.1~0.3
【单选题】
对能溶于水的有毒或刺激性气体,可喷射雾状水流,降低其在空气中的___。
A. 毒性
B. 比重
C. 浓度
D. 质量
【单选题】
当发现有大量毒气扩散,且短时间内难以控制时,消防人员应协同有关部门及时疏散可能遭遇毒气侵害的人员,特别要先疏散毒源___受威胁的人员。
A. 上风方向
B. 下风方向
C. 沾染区域
D. 扩散区域
【单选题】
扑救有毒区域的火灾,水源的选用.水枪阵地的选择,在不影响火灾扑救效果的前提下,坚持从___方向进攻为主的原则。
A. 上风
B. 下风
C. 侧上风
D. 侧下风
【单选题】
消防人员在有毒区域进行侦察.排险.灭火等行动时,应以___为单位,不可单独行动。
A. 2~3人
B. 分队
C. 班
D. 小组
【单选题】
有毒区域是指存在或通过___能产生有毒物质的区域。
A. 燃烧
B. 化学反应
C. 分解
D. 化合反应
【单选题】
带电设备.线路火灾时,对地电压在___以下的电源,可穿戴绝缘手套,用绝缘电剪将电线剪断。
A. 250V
B. 300V
C. 350V
D. 400V
【单选题】
救带电设备.线路火灾时,如需在配电室断电时,应首先断开___。
A. 磁力开关
B. 主开关
C. 设备电源
D. 动力开关
【单选题】
有毒区域进行火灾扑救时,消防人员___采取防护措施,禁止无关人员进入。
A. 应当
B. 需要
C. 必须
D. 应该
【单选题】
灭火时,灭火人员要穿戴绝缘胶靴和手套,必要时穿着___。
A. 均压服
B. 防化服
C. 隔热服
D. 防护服
【单选题】
灭火时,在金属水枪喷嘴上安装接地线,接地线两端分别与水枪喷嘴和接地棒牢固连接。接地棒最好钉入地下___深,并在接地棒处倒入盐水或普通水。
A. 0.2m
B. 0.3m
C. 0.4m
D. 0.5m
【单选题】
扑救带电设备.线路火灾,电线断落对地短路,参战人员进入积水地面,易形成___,造成触电伤害。
A. 电流
B. 磁场
C. 跨步电压
D. 电场
【单选题】
有毒物质是指凡___进入人.畜体内,能与机体组织发生作用,破坏正常生理功能,引起机体暂时或永久性病理状态,甚至死亡的物质。
A. 大剂量
B. 微小剂量
C. 小剂量
D. 中等剂量
【单选题】
参加建筑物倒塌抢险救援任务时,要利用___搜救犬等器材装备,全力搜寻失踪.被埋的遇险人员。
A. 生命探测仪
B. 测温仪
C. 测速仪
D. 雷达
【单选题】
城市给水管网爆裂事故处置公安消防部队的主要任务是协助城市给水部门制止爆裂管道的___,抽排重要目标或受灾居民家的积水,为缺水的单位.居民提供饮用水。
A. 泄漏
B. 燃烧
C. 喷射
D. 开花喷射
【单选题】
城市给水管网爆裂事故处置视情调集水罐.___等消防车辆,以及手抬机动泵.虹吸泵.堵漏等器材装备。
A. 举高
B. 抢险救援
C. 照明
D. 排烟
【单选题】
处置交通事故时,抢救出来的重.危急伤员,应立即交由___进行现场急救。
A. 防疫部门
B. 交警
C. 医疗救护部门
D. 治安部门
【单选题】
处置完液氯槽车泄漏交通事故之后,洗消污水___。
A. 直接排放到河流里
B. 经环保部门检测后排放
C. 经医疗部门检测后排放
D. 直接通过下水道排放
【单选题】
地铁事故特点为___。
A. 事故频率高.人员伤亡大.易引发次生灾害和救援难度大
B. 事故地点不确定.物质性质难判定.事故危险性大和处置难度大
C. 易引发次生灾害.人员伤亡大.堵塞隧道交通.经济损失大和救援困难
D. 人员伤亡重.容易引发次生灾害.造成交通中断和救援困难。
【单选题】
地震导致___.供电设施毁坏等,极易形成地震火灾,而且火灾大多在同一时间多处发生,蔓延速度极快,最后往往扩大成火烧连营。
A. 道路损坏
B. 水管爆裂
C. 可燃气体泄漏
D. 地层塌陷
【单选题】
地震救援装备从使用功能上划分,主要分为___两大类.
A. 侦察和破拆装备
B. 堵漏和洗消装备
C. 搜索和救助装备
D. 搜索和打捞设备
【单选题】
地震灾害是指由于强烈的地面振动,形成___而造成大量人员伤亡和巨大社会财富损失的灾难。
A. 火山
B. 湖泊
C. 地面断裂和变形
D. 大裂谷
【单选题】
飞行器事故处置,如发生在几场及其附近区域,力量调集应首先通知___出动。
A. 机场消防队
B. 消防救援队
C. 特勤消防队
D. 医疗急救力量
【单选题】
处置公路交通事故,应当与事故车辆保持一定的安全距离,并在事故区域前.后方___,注意防止来往车辆冲撞。
A. 安排人员警戒
B. 设置明显的警示标志
C. 进行交通管制
D. 设置禁行通道
【单选题】
处置公路隧道交通事故时,车辆应选择在隧道___停放。
A. 一端洞外右侧
B. 一端洞外左侧
C. 两端洞外左侧
D. 两端洞外右侧
【单选题】
处置危险性较大的灾害事故,一旦接到撤退命令,一律___撤离。
A. 携带装备
B. 徒手
C. 携带器材
D. 开消防车
【单选题】
放空点燃必须从___方向接近,并保持足够的安全距离。
A. 上风
B. 侧上风
C. 上风或侧上风
D. 下风
【单选题】
各级消防救援队伍必须建立___管理制度,健全安全组织,设立安全员,制定安全措施,落实安全责任,定期组织安全检查。
A. 作战安全
B. 训练安全
C. 作战和训练
D. 作战和训练安全
【单选题】
各级消防救援队伍必须遵循___的指导思想,牢固树立安全意识,严密组织,科学实施,减少和避免各类安全事故的发生。
A. 安全第一.预防为主
B. 安全第一
C. 预防为主
D. 以练为战
【单选题】
排烟防火阀安装在排烟系统的管道上,烟气温度超过___时能自行关闭。
A. 72℃
B. 70℃
C. 280℃
D. 220℃
【单选题】
使用消火栓系统试水检测装置检测消火栓的动压时,正确的检测顺序是:___①将水带一端连接到消火栓栓口;②安装好压力表,调整压力表至便于观察的位置;③缓慢打开消火栓放水阀门开始放水,待出水水柱稳定后,读取压力表的数值即为消火栓的动压;④将水带的另一端与消火栓系统检测装置相连接,将端盖从装置上拧下来。
A. ①②③④
B. ③①④②
C. ①④②③
D. ④①②③
【单选题】
消防电梯的运行速度与建筑高度相适应,应保证___分钟内到达顶层。
A. 1
B. 2
C. 3
D. 4
【单选题】
防排烟的设计理论就是对___的理论。
A. 烟气控制
B. 火灾控制
C. 人员疏散控制
D. 火灾扑救
【单选题】
《中华人民共和国消防法》由中华人民共和国第十三届全国人民代表大会常务委员会第十次会议于___修订通过
A. 2019年4月21日
B. 2019年4月22日
C. 2019年4月23日
D. 2019年4月24日
【单选题】
避火服适用于高温有火灼伤危险的场合,防火温度___℃,防辐射温度()℃。
A. 833,1111
B. 800,1000
C. 600,900
D. 600,1000
【单选题】
电绝缘手套有经特殊处理的天然橡胶制成,最高测试电压5000伏,最高使用电压___伏,具有耐油.耐酸.耐臭氧和耐低温,抗机械强度。
A. 800
B. 1000
C. 1200
D. 5000
【单选题】
毒害品引起人体和其他动物中毒的主要途径是___。
A. 呼吸道和消化道
B. 呼吸道和皮肤
C. 消化道和皮肤
D. 呼吸道.消化道和皮肤
【单选题】
多用途滤毒罐主要用于氧气含量不低于___,在一定浓度的有害气体场所使用,尤其适合进入狭小和通风条件不好的空间。
A. 17%
B. 19%
C. 13%
D. 15%
【单选题】
井下救人时,当井口已垮塌.人员被埋压时,应___井口作业人员,及时调集挖掘机等工程机械到现场协助救援。
A. 维持
B. 增加
C. 减少
D. 更换
欢迎使用我爱刷题
×
微信搜索我爱刷题小程序
温馨提示
×
请在电脑上登陆“www.woaishuati.com”使用