【单选题】
What is required when changing a virtual machine name using the vSphere Web Client? ___
A. Verify connectivity to the ESXi host where the virtual machine is running and its inventory list is accessible.
B. Verify in which datastore the virtual machine resides and that you have access and its inventory list is accessible.
C. Verify that virtual machine files are stored in the same datastore and can be accessed in the datastore browser list.
D. Verify the virtual machine is not running in Fault Tolerant mode and that it is not in a Distributed Resource Scheduler cluster.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【单选题】
An administrator deploys vRealize Operations into a vSphere 6.x environment. After the deployment, the administrator notices that badges are not appearing. What is a likely cause of this behavior? ___
A. Badges do not appear until you register vRealize Operations with vCenter Server.
B. Badges do not appear until you register a vCenter Server in vRealize Operations.
C. The vRealize Operations appliance needs to be redeployed.
D. The vCenter Server appliance needs to be redeployed.
【单选题】
How are ports scaled on vSphere Standard Switches (vSS)? ___
A. Ports on a vSS can be dynamically scaled up and down.
B. Ports on a vSS can only be statically scaled up or down.
C. Ports on a vSS can only be dynamically scaled down.
D. Ports on a vSS can only be dynamically scaled up.
【单选题】
A High Availability (HA) cluster is configured to respond to a given number of host failures. The cluster contains virtual machines configured with these settings: VM1 has a 1GHz CPU reservation and no Memory reservation VM2 has a 2GHz CPU reservation and no Memory reservation VM3 has no CPU reservation and no Memory reservation . Given this information, what is the correct slot size for the cluster? ___
A. The CPU Reservation should be set to 32MHz and the memory reservation should be set to 32MB plus memory overhead.
B. The CPU reservation should be set to 1 GHz and the memory reservation should be set to 0MB plus memory overhead.
C. The CPU reservation should be set to 2 GHz, and the memory reservation should be set to 0MB plus the virtual machine memory overhead.
D. The CPU reservation should be set to 2 GHz, and the memory reservation should be set to 32MB, plus the virtual machine memory overhead.
【单选题】
An administrator is planning a vSphere infrastructure with the following specific networking requirements: <The ability to shape inbound (RX) traffic> <Support for Private VLANs (PVLANs)> <Support for LLDP (Link Layer Discovery Protocol)>. What is the minimum vSphere Edition that will support these requirements? ___
A. vSphere Essentials Plus
B. vSphere Standard
C. vSphere Enterprise
D. vSphere
E. nterprise Plus
【单选题】
When you add an ESXi 6.x host to a new Cluster, which vSphere object owns the CPU and Memory resources of the hosts? ___
A. vCenter Server
B. Datacenter
C. Cluster
D. Host
【单选题】
A user is trying to retrieve objects from a SharePoint server and finds the request is taking an excessive amount of time. An administrator tries to isolate the issue and notes the following: Application performance is poor when compared to virtual machines on other hosts. Performance improves when the virtual machine is moved to another host. The virtual machine encounters higher than expected CPU %Ready times. What conclusion can be reached regarding the performance issues for this virtual machine? ___
A. Host Power Management is directly impacting virtual machine performance.
B. The virtual machine has a large number of snapshots.
C. The Path Selection Policy for the storage device is set differently on the affected host.
D. Network I/O control is configured for the portgroup.
【单选题】
A virtual machine template is accidently removed from the vCenter Server Inventory. Which method would be used to recover the template back into the environment?___
A. Use the datastore browser to locate the template, then right click and add the .vmtx file to inventory.
B. Use the datastore browser to locate the template, then right click and add the .vmx file to inventory.
C. Using the Managed Object Browser and adding the template from the ManagedObjectReference:GuestFileManager object.
D. Using the Managed Object Browser and adding the template from the ManagedObjectReference:VirtualDiskManager object.
【单选题】
A vSphere administrator needs to backup a virtual machine that has a Microsoft SQL Server Database installed. Which solution allows for an application quiesce to occur during backup?___
A. VMware vCenter Converter
B. VMware vCenter Site Recovery Manager
C. VMware vSphere Replication
D. VMware vSphere Data Protection Advanced
【单选题】
An administrator is migrating a virtual machine from a Test cluster to a Production cluster. The two environments do not have any shared storage. What is the easiest way to accomplish this task? ___
A. Perform a Storage vMotion.
B. Perform a regular vMotion.
C. Perform a Virtual to Virtual migration.
D. Perform a backup and restore using VMware Data Protection.
【单选题】
An administrator must determine an appropriate backup solution, given these conditions: 50 of the virtual machines are in a resource pool named Finance. 50 of the virtual machines are in a resource pool named QA. Which solution allows an administrator the ability to backup 100 virtual machines? ___
A. Use Snapshot Manager on the vCenter Server to backup the virtual machines.
B. Use the VMware Consolidated Backup (vcb) tool on the ESXi Host to backup the virtual machines.
C. Use the VMware Data Recovery (VDR) Appliance on the vCenter Server to backup the virtual machines.
D. Use the VMware Data Protection (VDP) Appliance on one of the
E. SXi Hosts to backup the virtual machines.
【单选题】
What is a benefit of using Enhanced vMotion Compatibility for an environment? ___
A. EVC masks CPU features to allow compatibility between hosts that are dissimilar.
B. EVC allows for cross platform vMotion to occur.
C. EVC enables Long
D. istance vMotion.
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
An administrator needs to verify that vMotion operations can be performed in a vSphere data center.What round trip time (RTT) latency is the maximum value that will allow vMotion operations to succeed? ___
A. 50ms RTT
B. 100ms RTT
C. 150ms RTT
D. 200ms RTT
【单选题】
A storage administrator has reported that full utilization of all bandwidth from an ESXi 6.x host is not being seen. In troubleshooting the issue, the Adapter details are shown in the Exhibit. Based on the exhibit, what is cause of the issue? ___
A. The array is not setup to use the correct multipathing policy.
B. There are no virtual machines on the ESXi host.
C. Not all links are used because a path is disabled.
D. Another path needs to be configured.
【单选题】
An administrator is migrating a powered-on virtual machine, as shown in the exhibit. Which option should be selected to perform a Storage vMotion of the VM? ___
A. Change storage only
B. Change VM compute resource only
C. Change both compute resource and storage, changing the compute resource first.
D. Change both compute resource and storage, changing the storage resource first.
【单选题】
An administrator is attempting to enable Storage I/O Control on a datastore, but it is failing. What is the likely reason for this failure? ___
A. The host is connected to a datastore is running on ESX 4.0.
B. The host is connected to a Fibre Channel storage array.
C. The datastore has multiple extents.
D. The datastore is managed by a single vCenter Server.
【单选题】
A mission-critical virtual machine built on vSphere 4.1 needs to be moved to an ESXi 6.x host.Which virtual hardware version is needed to move the virtual machine without upgrading? ___
【单选题】
An administrator is analyzing a virtual machine as shown in the Exhibit. What is the current long term risk for this virtual machine? ___
A. The virtual machine may run out of memory before April 27.
B. The virtual machine may continue to function after April 27.
C. The virtual machine has adequate memory configured for operation for the next 120 days.
D. The virtual machine has adequate memory reservation configured for operation for the next 120 days.
【单选题】
An administrator is monitoring a High Availability (HA) and Distributed Resource Scheduler (DRS) enabled cluster and has noticed that virtual machines in the cluster are being migrated without user intervention. Why is this happening? ___
A. The DRS Automation level is set to Fully Automated.
B. The Automation level is set to Automatic.
C. The
D. PM Threshold is set to Aggressive.
【单选题】
An administrator attempts to migrate a suspended virtual machine to a newly deployed vSphere 6.x cluster. The compatibility check fails. What condition could cause this behavior?___
A. The new vSphere 6.x cluster is running Intel CPUs instead of AMD CPUs.
B. A suspended virtual machine cannot be migrated.
C. The hardware virtualization feature of the CPU is not enabled on the new hosts.
D. A vSphere Distributed Switch is required to migrate a suspended virtual machine.
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
【单选题】
An administrator has just configured the IP address on an ESXi host from the Direct Console User Interface. How can the configuration be validated as correct without any additional tools?___
A. Add the host to vCenter Server and if it works, then all networking settings are ok.
B. Select the Test Management Network option from the DCUI.
C. Connect to the host with the vSphere Client and click the Test Network option.
D. Use PowerCLI to connect to the host and initiate a network test.
【单选题】
An administrator is installing vCenter Server for an environment that has 40 ESXi 6.x Hosts and 150 virtual machines. Which database would meet the minimal requirements needed for this task? ___
A. vFabric Postgres
B. Microsoft SQL Express 2008
C. Microsoft SQL Server 2014
D. Oracle 11g
【单选题】
What is a requirement when enabling a Virtual SAN cluster in an existing High Availability (HA) and Distributed Resource Scheduler (DRS) Cluster? ___
A. Disable DRS and HA before enabling Virtual SAN
B. Enable DRS before enabling Virtual SAN
C. Disable HA before enabling Virtual SAN
D. Enable Storage DRS before enabling Virtual SAN
【单选题】
The vSphere administrator attempts to connect to an ESXi host via an SSH client and receives the following security alert: The vSphere administrator needs to determine whether the RSA key fingerprint shown in the security alert is the fingerprint of the intended ESXi host. Which tool should the vSphere administrator use? ___
A. Direct Console User Interface
B. vSphere Client
C. vSphere Web Client
D. vSphere Management Assistant
【单选题】
An administrator needs to monitor traffic on vSwitches in a vSphere 6.x environment. Which option, if configured, would accomplish this task? ___
A. Forged Transmits
B. MAC Address Changes
C. Promiscuous Mode
D. Notify Switches
【单选题】
What is true regarding datastores on ESXi 6.x? ___
A. NFS 4.1 datastore does not support Fault Tolerance (FT)
B. VMFS3 and VMFS5 datastores can be newly created
C. NFS datastore can be concurrently mounted using NFS 4.1 on one host and NFS on another
D. NFS 3.0 datastore does not support Fault Tolerance (FT)
【单选题】
An administrator is cloning and configuring five new web server virtual machines. What would be the benefit of configuring resource shares for the new VMs? ___
A. To prioritize access to a resource during contention.
B. To guarantee access to a resource during contention.
C. To prioritize access to a resource before contention occurs.
D. To guarantee access to a resource before contention occurs.
【单选题】
An administrator logs into the vSphere Web Client and sees the warning shown in the Exhibit. During a change control window, the warning was addressed. What should be done to verify that the host is no longer showing the warning? ___
A. Run a Remediate host operation.
B. Recheck the compliance of the host.
C. Restart the host to get rid of the warning.
D. Install VMware tools to clear the warning.
【单选题】
A vApp named Sales has a Memory Limit of 32 GB and a CPU Limit of 12,000 MHz. There are three virtual machines within the vApp: <Sales-DB -- Has a memory reservation of 20 GB. > <Sales-DC -- Has a memory reservation of 8 GB. > <Sales-Web -- Has a memory reservation of 8 GB.> Which statement is correct? ___
A. All three virtual machines can power on, but will have memory contention.
B. All three virtual machines can power on without memory contention.
C. Only two of the three virtual machines can power on.
D. Only one of the virtual machines can power on.
【单选题】
You are editing the management network configuration of an ESXi 6.x Host from the vSphere Web Client. You mistakenly put the incorrect VLAN in place for the management network. What action do you need to take to correct this? ___
A. You need to manually edit the configuration on the host with command line utilities.
B. No action is required. By default ESXi rolls back configuration changes that disconnect the host.
C. The ESXi host system configuration will need to be restored to the factory configuration to fix the issue.
D. The change can be reverted in the vSphere Web Client by simply editing the switch again.
【单选题】
What is true about resource pools created on a Distributed Resource Scheduler (DRS) cluster?___
A. A root resource pool is created with the specified values.
B. A root resource pool is automatically created using the aggregate total of the ESXi host resources in the cluster.
C. A root resource pool is automatically created using the aggregate total of all resources in the datacenter.
D. A root resource pool is not needed when creating resource pools on a DRS cluster.
【单选题】
An administrator attempts to enable Enhanced vMotion Compatibility (EVC) on a cluster. The operation results in a compatibility error, as shown in the exhibit. What is the likely cause of this error? ___
A. The CPUs in the ESXi host are not AMD CPUs.
B. The CPUs in the ESXi host do not support hardware virtualization capabilities.
C. The XD/NX CPU features have not been enabled in the BIOS of the server.
D. There is no shared storage between the hosts in the cluster.
【单选题】
What condition would prevent an administrator from creating a new VMFS3 datastore on an ESXi 6.x host using the vSphere Web Client? ___
A. A VMFS3 datastore cannot be created on an ESXi 6.x host.
B. The VMFS3 kernel module is not loaded.
C. A VMFS3 datastore cannot be mounted on an ESXi 6.x host.
D. VMFS3 datastores are not compatible with virtual machines created on an
E. SXi 6.x host.
【单选题】
During a new vSphere Distributed Switch configuration, where does the Maximum Transmission Unit (MTU) value get modified? ___
A. Uplink Settings
B. Switch Settings
C. Portgroup Settings
D. NIC Teaming Settings
【单选题】
A small company wants to use VMware products for its production systems. The system administrator needs to recommend a solution that will deliver High Availability to the company's production applications. What is minimum vSphere offering that will support this requirement? ___
A. vSphere Essentials
B. vSphere Essentials Plus
C. vSphere Hypervisor
D. vSphere Standard
【单选题】
Which scenario shows a reason for VMware Tools failing to install? ___
A. Virtual machine has a CD-ROM configured.
B. Guest OS Antivirus is blocking the VMware Tools installation.
C. Guest OS has 64-bit ldd (list dynamic dependencies) utility installed.
D. Virtual machine is powered on.
【单选题】
An administrator is configuring an ESXi 6.x host to use multiple NICs to resolve a management network redundancy error. After configuring a second NIC, the server is not able to communicate when the primary connection is taken down. The administrator analyzes the Exhibit shown here. Based on the exhibit, what is the likely cause of the issue? ___
A. vmnic4 is not attached to a vSwitch.
B. vmnic2 is not connected to a physical switch.
C. E1000 is the incorrect NIC
D. river for this card.
推荐试题
【单选题】
货舱门控制系统中电控选择valve在下列情况通电:___
A. 手柄和隔框接近电门目标块在"远离";
B. 只要隔框接近电门目标块在"远离";
C. 锁轴接近电门目标块在"远离"并操纵人工选择valve时。
D.
【单选题】
货舱门液压控制系统包括:___
A. 双向作动器,人工选择valve,电控选择valve;
B. 双向作动器,人工选择valve,单向阀;
C. 双向作动器,电控选择valve,单向阀。
D.
【单选题】
货舱门作动器供压由:___
A. 兰系统;
B. 黄系统;
C. 兰系统和黄系统。
D.
【单选题】
客舱门承受的压力负荷由:___
A. 门锁传递到机身;
B. 止挡块传递到机身;
C. A+B。
D.
【单选题】
旅客门封严条上开有小孔,目的是:___
A. 排水;
B. 平衡压力;
C. 封严。
D.
【单选题】
旅客门外部手柄不在收藏位,从内部关门则外部手柄:___
A. 收藏;
B. 不动;
C. 不能关门。
D.
【单选题】
旅客门外部手柄在收藏位,从内部开门则外部手柄:___
【单选题】
前后货舱门上的通风门的作用是:___
A. 通风;
B. 平衡压差;
C. 安全锁。
D.
【单选题】
前后货舱门允许保持于:___
A. 全开/全关位;
B. 任意位;
C. A+B。
D.
【单选题】
人工开货舱门顺序:___
A. 手摇泵增压,门锁手柄放开位,保持人工选择手柄在"开位";
B. 人工选择手柄在"开位"手摇泵增压,门锁手柄放开位;
C. 门锁手柄放开位,人工选择手柄在"开位",手摇泵增压。
D.
【单选题】
如果门开锁,在ECAM页面上门的指示为:___
【单选题】
维护需要打开全部应急出口门时,对滑梯释放机构:___
A. 须逐个解除;
B. 相应侧解除一个(A320);
C. 只须解除一个。
D.
【单选题】
要解除客舱门撤离装置,将待命控制手柄向上抬起后:___
A. 确定目视指示器显示"DISARMED";
B. 扣上安全销;
C. A+B。
D.
【单选题】
应急出口门滑梯释放机构:___
A. 不能被脱开;
B. 可人工脱开;
C. 断电后脱开。
D.
【单选题】
应急出口是嵌入式向内开舱们,打开门可从:___
A. 内侧;
B. 外侧;
C. 内侧和外侧。
D.
【单选题】
应急开门系统包括:___
A. GIRTBAR控制手柄、应急滑梯/筏指示、作动筒;
B. GIRTBAR控制手柄、应急滑梯/筏、安全装置;
C. GIRTBAR控制手柄、应急滑梯/筏、阻尼/应急作动筒。
D.
【单选题】
余压指示灯的压力电门的触发值是:___
A. 压差>25mb;
B. 压差>45mb;
C. 压差>10mb。
D.
【单选题】
指示系统是:___
A. 机械指示;
B. 电气指示;
C. A+B。
D.
【单选题】
阻尼/应急作动筒的阻尼功能是由谁来实现的:___
A. 负荷弹簧;
B. 节流器;
C. 蓄压器。
D.
【单选题】
关于开启CARGODOOR___
A. 风速和开货舱门没有关系
B. 风速过大不能开启货仓门
C. 任何情况下都可以人工开启货仓门
D. 周围无障碍物就可以开
【单选题】
ECAME上DOOR页显示门为绿色说明___
A. 门在打开位
B. 门在关闭位
C. 门滑梯释放
D. 门在正常状态
【单选题】
A319飞机上,机身增压area(气密区)在:()___
A. FR1—FR64
B. FR1—FR70
C. FR1—FR77
D. FR1—FR87
【单选题】
A319飞机上中央翼油箱的位置在机身哪个部分?()___
A. FR42—FR46
B. FR35—FR46
C. FR36—FR42
D. FR24—FR28
【单选题】
从外面开门,如果登机门的红灯亮,说明什么?()___
A. 滑梯在“预位”位
B. 发动机在运转
C. 座舱有余压
D. 以上都对
【单选题】
当货舱门完全打开并锁好时,在货舱门控制面板上有什么指示?()___
A. 绿灯亮
B. 红灯亮
C. 黄灯亮
D. 无指示
【单选题】
滑梯在“预位”位,开门时GIRTBAR(挂接杆)在什么位置()___
A. 客舱地板上
B. 门上
C. 滑梯上
D. 叉槽里
【单选题】
货舱门靠什么来作动?()___
A. 电马达
B. 液压作动筒
C. 弹簧作动筒
D. B+C
【单选题】
空中,应急出口滑梯的释放机构指示在什么位置?()___
A. 正常位
B. 备用位
C. 维护位
D. 自动位
【单选题】
如果滑梯预位,能否从外面打开登机门?()___
A. 不能
B. 必须解除预位才能开门
C. 不须解除预位就能开门
D. 以上都对
【单选题】
如果应急出口滑梯释放机构在“正常”位,怎样解除滑梯预位?()___
A. 锁杆顺时针转1/4圈
B. 锁杆反时针转1/4圈
C. 锁杆顺时针转1/2圈
D. 锁杆反时针转1/2圈
【单选题】
下面哪个操纵面不是由复合材料制造的?()___
A. 副翼
B. 方向舵
C. 缝翼
D. 扰流板
【单选题】
下面哪些部件不在气密区?()___
A. APU
B. 雷达罩
C. 起落架
D. 以上都对
【单选题】
下面哪些area在气密区?()___
A. APU舱
B. 电子舱
C. 客舱
D. B+C
【单选题】
在操纵货舱门时,应注意什么问题?()___
A. 风速大于40节,不要开门
B. 风速大于60节,门要关闭
C. 前、后货舱门可以同时打开
D. 以上都对
【单选题】
在登机门顶部的一个机械指示窗口指示哪个部件的位置?()___
A. 门
B. 滑梯
C. GIRTBAR(挂接杆)
D. 预位手柄
【单选题】
在发动机吊架的外侧有几块缝翼?()___
【单选题】
在货舱门操纵时,有几个选择valve控制作动筒的液压?()___
A. 2个人工选择valve和1个电选择valve
B. 2个人工选择valve和2个电选择valve
C. 1个人工选择valve和1个电选择valve
D. 1个人工选择valve和2个电选择valve
【单选题】
在货舱门的底部,如果看见指示窗为红色,说明:()___
A. 货舱内有余压
B. 门已锁好
C. 门未锁好
D. 门锁故障