【单选题】
How are ports scaled on vSphere Standard Switches (vSS)? ___
A. Ports on a vSS can be dynamically scaled up and down.
B. Ports on a vSS can only be statically scaled up or down.
C. Ports on a vSS can only be dynamically scaled down.
D. Ports on a vSS can only be dynamically scaled up.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【单选题】
A High Availability (HA) cluster is configured to respond to a given number of host failures. The cluster contains virtual machines configured with these settings: VM1 has a 1GHz CPU reservation and no Memory reservation VM2 has a 2GHz CPU reservation and no Memory reservation VM3 has no CPU reservation and no Memory reservation . Given this information, what is the correct slot size for the cluster? ___
A. The CPU Reservation should be set to 32MHz and the memory reservation should be set to 32MB plus memory overhead.
B. The CPU reservation should be set to 1 GHz and the memory reservation should be set to 0MB plus memory overhead.
C. The CPU reservation should be set to 2 GHz, and the memory reservation should be set to 0MB plus the virtual machine memory overhead.
D. The CPU reservation should be set to 2 GHz, and the memory reservation should be set to 32MB, plus the virtual machine memory overhead.
【单选题】
An administrator is planning a vSphere infrastructure with the following specific networking requirements: <The ability to shape inbound (RX) traffic> <Support for Private VLANs (PVLANs)> <Support for LLDP (Link Layer Discovery Protocol)>. What is the minimum vSphere Edition that will support these requirements? ___
A. vSphere Essentials Plus
B. vSphere Standard
C. vSphere Enterprise
D. vSphere
E. nterprise Plus
【单选题】
When you add an ESXi 6.x host to a new Cluster, which vSphere object owns the CPU and Memory resources of the hosts? ___
A. vCenter Server
B. Datacenter
C. Cluster
D. Host
【单选题】
A user is trying to retrieve objects from a SharePoint server and finds the request is taking an excessive amount of time. An administrator tries to isolate the issue and notes the following: Application performance is poor when compared to virtual machines on other hosts. Performance improves when the virtual machine is moved to another host. The virtual machine encounters higher than expected CPU %Ready times. What conclusion can be reached regarding the performance issues for this virtual machine? ___
A. Host Power Management is directly impacting virtual machine performance.
B. The virtual machine has a large number of snapshots.
C. The Path Selection Policy for the storage device is set differently on the affected host.
D. Network I/O control is configured for the portgroup.
【单选题】
A virtual machine template is accidently removed from the vCenter Server Inventory. Which method would be used to recover the template back into the environment?___
A. Use the datastore browser to locate the template, then right click and add the .vmtx file to inventory.
B. Use the datastore browser to locate the template, then right click and add the .vmx file to inventory.
C. Using the Managed Object Browser and adding the template from the ManagedObjectReference:GuestFileManager object.
D. Using the Managed Object Browser and adding the template from the ManagedObjectReference:VirtualDiskManager object.
【单选题】
A vSphere administrator needs to backup a virtual machine that has a Microsoft SQL Server Database installed. Which solution allows for an application quiesce to occur during backup?___
A. VMware vCenter Converter
B. VMware vCenter Site Recovery Manager
C. VMware vSphere Replication
D. VMware vSphere Data Protection Advanced
【单选题】
An administrator is migrating a virtual machine from a Test cluster to a Production cluster. The two environments do not have any shared storage. What is the easiest way to accomplish this task? ___
A. Perform a Storage vMotion.
B. Perform a regular vMotion.
C. Perform a Virtual to Virtual migration.
D. Perform a backup and restore using VMware Data Protection.
【单选题】
An administrator must determine an appropriate backup solution, given these conditions: 50 of the virtual machines are in a resource pool named Finance. 50 of the virtual machines are in a resource pool named QA. Which solution allows an administrator the ability to backup 100 virtual machines? ___
A. Use Snapshot Manager on the vCenter Server to backup the virtual machines.
B. Use the VMware Consolidated Backup (vcb) tool on the ESXi Host to backup the virtual machines.
C. Use the VMware Data Recovery (VDR) Appliance on the vCenter Server to backup the virtual machines.
D. Use the VMware Data Protection (VDP) Appliance on one of the
E. SXi Hosts to backup the virtual machines.
【单选题】
What is a benefit of using Enhanced vMotion Compatibility for an environment? ___
A. EVC masks CPU features to allow compatibility between hosts that are dissimilar.
B. EVC allows for cross platform vMotion to occur.
C. EVC enables Long
D. istance vMotion.
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
An administrator needs to verify that vMotion operations can be performed in a vSphere data center.What round trip time (RTT) latency is the maximum value that will allow vMotion operations to succeed? ___
A. 50ms RTT
B. 100ms RTT
C. 150ms RTT
D. 200ms RTT
【单选题】
A storage administrator has reported that full utilization of all bandwidth from an ESXi 6.x host is not being seen. In troubleshooting the issue, the Adapter details are shown in the Exhibit. Based on the exhibit, what is cause of the issue? ___
A. The array is not setup to use the correct multipathing policy.
B. There are no virtual machines on the ESXi host.
C. Not all links are used because a path is disabled.
D. Another path needs to be configured.
【单选题】
An administrator is migrating a powered-on virtual machine, as shown in the exhibit. Which option should be selected to perform a Storage vMotion of the VM? ___
A. Change storage only
B. Change VM compute resource only
C. Change both compute resource and storage, changing the compute resource first.
D. Change both compute resource and storage, changing the storage resource first.
【单选题】
An administrator is attempting to enable Storage I/O Control on a datastore, but it is failing. What is the likely reason for this failure? ___
A. The host is connected to a datastore is running on ESX 4.0.
B. The host is connected to a Fibre Channel storage array.
C. The datastore has multiple extents.
D. The datastore is managed by a single vCenter Server.
【单选题】
A mission-critical virtual machine built on vSphere 4.1 needs to be moved to an ESXi 6.x host.Which virtual hardware version is needed to move the virtual machine without upgrading? ___
【单选题】
An administrator is analyzing a virtual machine as shown in the Exhibit. What is the current long term risk for this virtual machine? ___
A. The virtual machine may run out of memory before April 27.
B. The virtual machine may continue to function after April 27.
C. The virtual machine has adequate memory configured for operation for the next 120 days.
D. The virtual machine has adequate memory reservation configured for operation for the next 120 days.
【单选题】
An administrator is monitoring a High Availability (HA) and Distributed Resource Scheduler (DRS) enabled cluster and has noticed that virtual machines in the cluster are being migrated without user intervention. Why is this happening? ___
A. The DRS Automation level is set to Fully Automated.
B. The Automation level is set to Automatic.
C. The
D. PM Threshold is set to Aggressive.
【单选题】
An administrator attempts to migrate a suspended virtual machine to a newly deployed vSphere 6.x cluster. The compatibility check fails. What condition could cause this behavior?___
A. The new vSphere 6.x cluster is running Intel CPUs instead of AMD CPUs.
B. A suspended virtual machine cannot be migrated.
C. The hardware virtualization feature of the CPU is not enabled on the new hosts.
D. A vSphere Distributed Switch is required to migrate a suspended virtual machine.
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
【单选题】
An administrator has just configured the IP address on an ESXi host from the Direct Console User Interface. How can the configuration be validated as correct without any additional tools?___
A. Add the host to vCenter Server and if it works, then all networking settings are ok.
B. Select the Test Management Network option from the DCUI.
C. Connect to the host with the vSphere Client and click the Test Network option.
D. Use PowerCLI to connect to the host and initiate a network test.
【单选题】
An administrator is installing vCenter Server for an environment that has 40 ESXi 6.x Hosts and 150 virtual machines. Which database would meet the minimal requirements needed for this task? ___
A. vFabric Postgres
B. Microsoft SQL Express 2008
C. Microsoft SQL Server 2014
D. Oracle 11g
【单选题】
What is a requirement when enabling a Virtual SAN cluster in an existing High Availability (HA) and Distributed Resource Scheduler (DRS) Cluster? ___
A. Disable DRS and HA before enabling Virtual SAN
B. Enable DRS before enabling Virtual SAN
C. Disable HA before enabling Virtual SAN
D. Enable Storage DRS before enabling Virtual SAN
【单选题】
The vSphere administrator attempts to connect to an ESXi host via an SSH client and receives the following security alert: The vSphere administrator needs to determine whether the RSA key fingerprint shown in the security alert is the fingerprint of the intended ESXi host. Which tool should the vSphere administrator use? ___
A. Direct Console User Interface
B. vSphere Client
C. vSphere Web Client
D. vSphere Management Assistant
【单选题】
An administrator needs to monitor traffic on vSwitches in a vSphere 6.x environment. Which option, if configured, would accomplish this task? ___
A. Forged Transmits
B. MAC Address Changes
C. Promiscuous Mode
D. Notify Switches
【单选题】
What is true regarding datastores on ESXi 6.x? ___
A. NFS 4.1 datastore does not support Fault Tolerance (FT)
B. VMFS3 and VMFS5 datastores can be newly created
C. NFS datastore can be concurrently mounted using NFS 4.1 on one host and NFS on another
D. NFS 3.0 datastore does not support Fault Tolerance (FT)
【单选题】
An administrator is cloning and configuring five new web server virtual machines. What would be the benefit of configuring resource shares for the new VMs? ___
A. To prioritize access to a resource during contention.
B. To guarantee access to a resource during contention.
C. To prioritize access to a resource before contention occurs.
D. To guarantee access to a resource before contention occurs.
【单选题】
An administrator logs into the vSphere Web Client and sees the warning shown in the Exhibit. During a change control window, the warning was addressed. What should be done to verify that the host is no longer showing the warning? ___
A. Run a Remediate host operation.
B. Recheck the compliance of the host.
C. Restart the host to get rid of the warning.
D. Install VMware tools to clear the warning.
【单选题】
A vApp named Sales has a Memory Limit of 32 GB and a CPU Limit of 12,000 MHz. There are three virtual machines within the vApp: <Sales-DB -- Has a memory reservation of 20 GB. > <Sales-DC -- Has a memory reservation of 8 GB. > <Sales-Web -- Has a memory reservation of 8 GB.> Which statement is correct? ___
A. All three virtual machines can power on, but will have memory contention.
B. All three virtual machines can power on without memory contention.
C. Only two of the three virtual machines can power on.
D. Only one of the virtual machines can power on.
【单选题】
You are editing the management network configuration of an ESXi 6.x Host from the vSphere Web Client. You mistakenly put the incorrect VLAN in place for the management network. What action do you need to take to correct this? ___
A. You need to manually edit the configuration on the host with command line utilities.
B. No action is required. By default ESXi rolls back configuration changes that disconnect the host.
C. The ESXi host system configuration will need to be restored to the factory configuration to fix the issue.
D. The change can be reverted in the vSphere Web Client by simply editing the switch again.
【单选题】
What is true about resource pools created on a Distributed Resource Scheduler (DRS) cluster?___
A. A root resource pool is created with the specified values.
B. A root resource pool is automatically created using the aggregate total of the ESXi host resources in the cluster.
C. A root resource pool is automatically created using the aggregate total of all resources in the datacenter.
D. A root resource pool is not needed when creating resource pools on a DRS cluster.
【单选题】
An administrator attempts to enable Enhanced vMotion Compatibility (EVC) on a cluster. The operation results in a compatibility error, as shown in the exhibit. What is the likely cause of this error? ___
A. The CPUs in the ESXi host are not AMD CPUs.
B. The CPUs in the ESXi host do not support hardware virtualization capabilities.
C. The XD/NX CPU features have not been enabled in the BIOS of the server.
D. There is no shared storage between the hosts in the cluster.
【单选题】
What condition would prevent an administrator from creating a new VMFS3 datastore on an ESXi 6.x host using the vSphere Web Client? ___
A. A VMFS3 datastore cannot be created on an ESXi 6.x host.
B. The VMFS3 kernel module is not loaded.
C. A VMFS3 datastore cannot be mounted on an ESXi 6.x host.
D. VMFS3 datastores are not compatible with virtual machines created on an
E. SXi 6.x host.
【单选题】
During a new vSphere Distributed Switch configuration, where does the Maximum Transmission Unit (MTU) value get modified? ___
A. Uplink Settings
B. Switch Settings
C. Portgroup Settings
D. NIC Teaming Settings
【单选题】
A small company wants to use VMware products for its production systems. The system administrator needs to recommend a solution that will deliver High Availability to the company's production applications. What is minimum vSphere offering that will support this requirement? ___
A. vSphere Essentials
B. vSphere Essentials Plus
C. vSphere Hypervisor
D. vSphere Standard
【单选题】
Which scenario shows a reason for VMware Tools failing to install? ___
A. Virtual machine has a CD-ROM configured.
B. Guest OS Antivirus is blocking the VMware Tools installation.
C. Guest OS has 64-bit ldd (list dynamic dependencies) utility installed.
D. Virtual machine is powered on.
【单选题】
An administrator is configuring an ESXi 6.x host to use multiple NICs to resolve a management network redundancy error. After configuring a second NIC, the server is not able to communicate when the primary connection is taken down. The administrator analyzes the Exhibit shown here. Based on the exhibit, what is the likely cause of the issue? ___
A. vmnic4 is not attached to a vSwitch.
B. vmnic2 is not connected to a physical switch.
C. E1000 is the incorrect NIC
D. river for this card.
【单选题】
What information is required as part of an interactive ESXi 6.x installation? ___
A. Keyboard layout
B. IP Address
C. Root password
D. DNS information
【单选题】
What is the default load balancing policy for a newly created VMkernel port on a vSphere Distributed Switch? ___
A. Route based on orginating virtual port ID
B. Route based on IP Hash
C. Route based on source mac address
D. Route based on physical NIC load
推荐试题
【多选题】
DTⅥ2-1型扣件螺栓道钉规格为?___
A. 150mm
B. 155mm
C. 160mm
D. 165mm
E. 170mm
【多选题】
下列关于三角坑的说法正确的是?___
A. 在检查三角坑时,基长为6.25m,但在延长18m的距离内应不允许出现三角坑
B. 在检查三角坑时,基长为12.5m,但在延长18m的距离内应不允许出现三角坑
C. 三角坑有可能使车辆的四个车轮只有三个正常压紧钢轨,另一个悬空
D. 三角坑对列车运行安全无影响
E. 线路上如果发现超限三角坑,必须及时消除
【多选题】
杭州地铁库内线道床类型主要有?___
A. 浮置板减震道床
B. 柱式检查坑整体道床
C. 壁式检查坑整体道床
D. 一般短枕式整体道床
E. 木枕碎石道床
【多选题】
下列___是25m钢轨曲线标准缩短轨?
A. 24.96m短轨
B. 24.92m短轨
C. 24.88m短轨
D. 24.84m短轨
E. 24.82m短轨
【多选题】
轨道加强设备包括___?
A. 轨撑
B. 轨距杆
C. 防爬设备
D. 扣板
E. 夹板
【多选题】
道床病害主要有___?
A. 道床脏污
B. 道床沉陷
C. 道床翻浆
D. 接头错牙
E. 三角坑
【多选题】
钢轨的接头形式分哪几种?___
A. 普通钢轨接头
B. 异型钢轨接头
C. 导电钢轨接头
D. 绝缘钢轨接头
E. 冻结钢轨接头
【多选题】
普通线路钢轨接头主要病害有___?
A. 磨耗
B. 低塌
C. 低头
D. 肥边
E. 剥落掉块
【多选题】
杭州地铁线路轨距加宽值有?___
A. 3
B. 5
C. 10
D. 15
E. 20
【多选题】
我国钢轨按每米质量划分有?___
A. 75kg/m
B. 60kg/m
C. 50kg/m
D. 43kg/m
E. 40kg/m
【多选题】
钢轨接头按平面位置可分为?___
A. 悬空式
B. 承垫式
C. 对接式
D. 相对式
E. 相错式
【多选题】
线路维修工作的原则?___
A. 预防为主
B. 经济可行
C. 节能环保
D. 防治结合
E. 修养并重
【多选题】
在拨道作业时,要做到?___
A. 一准
B. 二清
C. 三测
D. 四不超
E. 五不走
【多选题】
拆垫垫片作业时需要带的工具包括?___
A. 液压起道机
B. 长柄板手
C. 轨距道尺、石笔
D. 弦线
E. 丁字扳手
【多选题】
轨底坡设置是否正确,可以从钢轨顶面上的光带位置判定。下列关于光带和轨底坡的说法中正确是? ___
A. 如果光带偏向内侧,说明轨底坡合适
B. 如果光带偏向内侧,说明轨底坡偏小
C. 如果光带偏向外侧,则说明轨底坡不足
D. 如果光带偏向外侧,则说明轨底坡合适
E. 如果光带居中,说明轨底坡合适
【多选题】
关于曲线外轨超高设置的目的,叙述正确的是? ___
A. 减少曲线外股钢轨所受的垂直力和水平力,使两股钢轨受力均匀
B. 便于养护维修
C. 保证轨道稳定,防止车辆倾覆
D. 将离心力限制在一定范围内,保证旅客的舒适度
E. 减少外股磨耗
【多选题】
下列___是12.5m钢轨曲线标准缩短轨?
A. 12.46m短轨
B. 12.42m短轨
C. 12.38m短轨
D. 12.36m短轨
E. 12.34m短轨
【多选题】
钢轨按材质来讲一般有?___
A. 锌轨
B. 铜轨
C. 锰轨
D. 硅轨
E. 铝轨
【多选题】
轨道线路上的钢轨类型应与什么相适应?___
A. 运量
B. 容许速度
C. 轨距
D. 线路长度
E. 轴重
【多选题】
对钢轨接头病害的综合整治可通过___方法?
A. 打磨
B. 焊补
C. 更换道砟
D. 更换垫砟
E. 更换大胶垫
【多选题】
在正线及试车线上个别插入的短轨可以有?___
A. 6m
B. 7m
C. 5m
D. 8m
E. 3m
【多选题】
25m钢轨地段每千米轨缝总误差不超限的有?___
A. 0mm
B. 10mm
C. 120mm
D. 100mm
E. 80mm
【多选题】
其他部门在钢轨上钻孔时可以在钢轨的___位置进行钻孔?
A. 轨腹中
B. 轨底
C. 轨头
D. 轴上
E. 钢轨下颚
【多选题】
扣件伤损达到下列哪种情况应有计划地修理或更换?___
A. 螺旋道钉折断,螺帽或螺杆丝扣损坏,严重锈蚀
B. 垫圈损坏或作用不良
C. 弹条、扣板(弹片)损坏或不能保持应有的扣压力
D. 扣板、轨距挡板严重磨损,与轨底边离缝超过2mm
E. 挡板座、铁座损坏或作用不良
【多选题】
下列关于曲线超高说法正确的是?___
A. 车辆段、停车场线上由于运行速度低,可不设缓和曲线和超高
B. 杭州地铁2号线正线最大超高值为120mm,允许欠超高为61mm,允许过超高为30mm
C. 超高顺坡率一般不大于2‰,困难条件下不大于3‰
D. 半超高是指外轨抬高超高值一半,内轨降低超高值一半的方法设置
E. 曲线超高值在缓和曲线内递减顺坡,无缓和曲线时在圆曲线两端直线段递减顺坡
【多选题】
线路标志及信号标志的式样应符合标准图的规定,并经常保持完整及?___
A. 位置正确
B. 蓝底黑字
C. 白底蓝字
D. 标志鲜明
E. 白底黑字
【多选题】
用绳正法拨正曲线的基本要求有?___
A. 曲线两端直线轨向不良,一般应事先拨正,两曲线间直线段较短时,可与两线同时计算、拨正
B. 在外股钢轨上用钢尺丈量,每10m设置一个测点(曲线头或尾是否在测点上不限)
C. 在风力较小条件下,拉绳测量每个测点正矢,测量三次取平均值
D. 按绳正法计算拨道量,计算时不宜为减少拨道量而大量调整计划正矢
E. 在里股钢轨上用钢尺丈量,每10m设置一个测点(曲线头或尾是否在测点上不限)
【多选题】
路基的类型可划分为?___
A. 路堤
B. 路堑
C. 半路堤
D. 半路堑
E. 半堤半堑
【多选题】
下列路基中,需要在天然地面上进行填筑的有___?
A. 路堤
B. 路堑
C. 半路堤
D. 半路堑
E. 不填不挖
【多选题】
路基由哪三部分组成的?___
A. 路基本体(路堤、路堑等)
B. 路基排水设备
C. 防护和加固设备
D. 桥梁
E. 隧道
【多选题】
路基宽度的设计需考虑___因素?
A. 路拱断面、
B. 轨道类型
C. 道床标准形式和尺寸
D. 路肩宽度
E. 机械化作业的需求
【多选题】
下列关于路肩的作用,说法正确的是?___
A. 防止道砟散落,保持道床完整
B. 阻止土体横向运动,保持路基的稳定
C. 为相关作业人员提供行走、避车之处
D. 作为临时堆放城市轨道交通相关专业维修所需的材料、机具的场所
E. 为设置规定的线路标志和信号标志提供空间
【多选题】
路堑是由___部分组成的?
A. 路基顶面
B. 侧沟
C. 路堑边坡
D. 路堑隔带
E. 弃土堆
【多选题】
下列属于路基病害的是?___
A. 路基干燥
B. 路基沉陷
C. 边坡滑塌
D. 翻浆冒泥
E. 路基冻害
【多选题】
下列属于地面排水设备的有?___
A. 排水沟
B. 侧沟
C. 天沟
D. 吊沟
E. 渗井
【多选题】
下列关于隧道的说法,正确的四项是?___
A. 隧道是围护车辆、行人或各种专业设施通行的设备
B. 城市轨道交通,为回避地面交通拥挤,选择在地下土层内设置隧道,再于隧道内铺设轨道
C. 隧道,是一种建筑物,是地下车站之间的连接设施
D. 当轨道铺设于隧道内部时,隧道既是轨道设施的下部建筑,又是轨道设施的围护建筑
E. 隧道一定是圆形的
【多选题】
隧道按断面形式可以分为哪几种?___
A. 矩形
B. 拱形
C. 圆形
D. 多圆形
E. 椭圆形
【多选题】
车站之间的隧道线路,为什么会采用高站位、低区间的方式?___
A. 节省车站工程费用
B. 设计师随意设计的,并没有特别用意
C. 缓和与地下管线、建筑物之间的矛盾
D. 节能省电,减少隧道温升
E. 地铁列车进站上坡有利制动,出站下坡有利加速
【多选题】
道砟陷坑是路基基床内部由于道床下陷形成的各种坑洼的统称,道砟陷坑最常见形式有___?
A. 道砟槽
B. 道砟锅
C. 道砟囊
D. 道砟窝
E. 道床板结
【多选题】
造成道床沉陷的原因有那三种原因?___
A. 道床脏污,积水排不出去,在猫土路基地段,使路基顶面软化,道砟逐渐压人路基内,形成道床沉陷
B. 道床捣固不实,存在小坑,随着地铁列车振动,小坑逐渐扩大,形成道床沉陷
C. 捣固作业时,道砟捣固紧实造成的
D. 道床厚度不足,或在非渗水土路基地段未按规定铺砂垫层,道砟压人路基面内形成道作陷槽造成道床沉陷
E. 对上道前的道砟进行清筛作业