【单选题】
Immediately after installing ESXi, an administrator observes that the Configure Lockdown Mode option is grayed out in the Direct Console User Interface (DCUI). What is the most likely explanation? ___
A. The host has not yet been added to a vCenter Server.
B. The BIOS on the host does not have NX/XD enabled.
C. The ESXi host is running in evaluation mode.
D. The host requires a reboot before this feature is available.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【单选题】
Immediately after installing ESXi, an administrator observes that the Configure Lockdown Mode option is grayed out in the Direct Console User Interface (DCUI). What is the most likely explanation? ___
A. The host has not yet been added to a vCenter Server.
B. The BIOS on the host does not have NX/XD enabled.
C. The ESXi host is running in evaluation mode.
D. The host requires a reboot before this feature is available.
【单选题】
Which Single Sign-On deployment mode should an administrator use for two 6.x vCenter Servers configured with linked mode? ___
A. Basic Single Sign-On with vCenter Server Heartbeat
B. Multisite Single Sign-On
C. Basic Single Sign-On
D. Single Sign-On with Linked Mode
【单选题】
What is required when changing a virtual machine name using the vSphere Web Client? ___
A. Verify connectivity to the ESXi host where the virtual machine is running and its inventory list is accessible.
B. Verify in which datastore the virtual machine resides and that you have access and its inventory list is accessible.
C. Verify that virtual machine files are stored in the same datastore and can be accessed in the datastore browser list.
D. Verify the virtual machine is not running in Fault Tolerant mode and that it is not in a Distributed Resource Scheduler cluster.
【单选题】
An administrator deploys vRealize Operations into a vSphere 6.x environment. After the deployment, the administrator notices that badges are not appearing. What is a likely cause of this behavior? ___
A. Badges do not appear until you register vRealize Operations with vCenter Server.
B. Badges do not appear until you register a vCenter Server in vRealize Operations.
C. The vRealize Operations appliance needs to be redeployed.
D. The vCenter Server appliance needs to be redeployed.
【单选题】
How are ports scaled on vSphere Standard Switches (vSS)? ___
A. Ports on a vSS can be dynamically scaled up and down.
B. Ports on a vSS can only be statically scaled up or down.
C. Ports on a vSS can only be dynamically scaled down.
D. Ports on a vSS can only be dynamically scaled up.
【单选题】
A High Availability (HA) cluster is configured to respond to a given number of host failures. The cluster contains virtual machines configured with these settings: VM1 has a 1GHz CPU reservation and no Memory reservation VM2 has a 2GHz CPU reservation and no Memory reservation VM3 has no CPU reservation and no Memory reservation . Given this information, what is the correct slot size for the cluster? ___
A. The CPU Reservation should be set to 32MHz and the memory reservation should be set to 32MB plus memory overhead.
B. The CPU reservation should be set to 1 GHz and the memory reservation should be set to 0MB plus memory overhead.
C. The CPU reservation should be set to 2 GHz, and the memory reservation should be set to 0MB plus the virtual machine memory overhead.
D. The CPU reservation should be set to 2 GHz, and the memory reservation should be set to 32MB, plus the virtual machine memory overhead.
【单选题】
An administrator is planning a vSphere infrastructure with the following specific networking requirements: <The ability to shape inbound (RX) traffic> <Support for Private VLANs (PVLANs)> <Support for LLDP (Link Layer Discovery Protocol)>. What is the minimum vSphere Edition that will support these requirements? ___
A. vSphere Essentials Plus
B. vSphere Standard
C. vSphere Enterprise
D. vSphere
E. nterprise Plus
【单选题】
When you add an ESXi 6.x host to a new Cluster, which vSphere object owns the CPU and Memory resources of the hosts? ___
A. vCenter Server
B. Datacenter
C. Cluster
D. Host
【单选题】
A user is trying to retrieve objects from a SharePoint server and finds the request is taking an excessive amount of time. An administrator tries to isolate the issue and notes the following: Application performance is poor when compared to virtual machines on other hosts. Performance improves when the virtual machine is moved to another host. The virtual machine encounters higher than expected CPU %Ready times. What conclusion can be reached regarding the performance issues for this virtual machine? ___
A. Host Power Management is directly impacting virtual machine performance.
B. The virtual machine has a large number of snapshots.
C. The Path Selection Policy for the storage device is set differently on the affected host.
D. Network I/O control is configured for the portgroup.
【单选题】
A virtual machine template is accidently removed from the vCenter Server Inventory. Which method would be used to recover the template back into the environment?___
A. Use the datastore browser to locate the template, then right click and add the .vmtx file to inventory.
B. Use the datastore browser to locate the template, then right click and add the .vmx file to inventory.
C. Using the Managed Object Browser and adding the template from the ManagedObjectReference:GuestFileManager object.
D. Using the Managed Object Browser and adding the template from the ManagedObjectReference:VirtualDiskManager object.
【单选题】
A vSphere administrator needs to backup a virtual machine that has a Microsoft SQL Server Database installed. Which solution allows for an application quiesce to occur during backup?___
A. VMware vCenter Converter
B. VMware vCenter Site Recovery Manager
C. VMware vSphere Replication
D. VMware vSphere Data Protection Advanced
【单选题】
An administrator is migrating a virtual machine from a Test cluster to a Production cluster. The two environments do not have any shared storage. What is the easiest way to accomplish this task? ___
A. Perform a Storage vMotion.
B. Perform a regular vMotion.
C. Perform a Virtual to Virtual migration.
D. Perform a backup and restore using VMware Data Protection.
【单选题】
An administrator must determine an appropriate backup solution, given these conditions: 50 of the virtual machines are in a resource pool named Finance. 50 of the virtual machines are in a resource pool named QA. Which solution allows an administrator the ability to backup 100 virtual machines? ___
A. Use Snapshot Manager on the vCenter Server to backup the virtual machines.
B. Use the VMware Consolidated Backup (vcb) tool on the ESXi Host to backup the virtual machines.
C. Use the VMware Data Recovery (VDR) Appliance on the vCenter Server to backup the virtual machines.
D. Use the VMware Data Protection (VDP) Appliance on one of the
E. SXi Hosts to backup the virtual machines.
【单选题】
What is a benefit of using Enhanced vMotion Compatibility for an environment? ___
A. EVC masks CPU features to allow compatibility between hosts that are dissimilar.
B. EVC allows for cross platform vMotion to occur.
C. EVC enables Long
D. istance vMotion.
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
An administrator needs to verify that vMotion operations can be performed in a vSphere data center.What round trip time (RTT) latency is the maximum value that will allow vMotion operations to succeed? ___
A. 50ms RTT
B. 100ms RTT
C. 150ms RTT
D. 200ms RTT
【单选题】
A storage administrator has reported that full utilization of all bandwidth from an ESXi 6.x host is not being seen. In troubleshooting the issue, the Adapter details are shown in the Exhibit. Based on the exhibit, what is cause of the issue? ___
A. The array is not setup to use the correct multipathing policy.
B. There are no virtual machines on the ESXi host.
C. Not all links are used because a path is disabled.
D. Another path needs to be configured.
【单选题】
An administrator is migrating a powered-on virtual machine, as shown in the exhibit. Which option should be selected to perform a Storage vMotion of the VM? ___
A. Change storage only
B. Change VM compute resource only
C. Change both compute resource and storage, changing the compute resource first.
D. Change both compute resource and storage, changing the storage resource first.
【单选题】
An administrator is attempting to enable Storage I/O Control on a datastore, but it is failing. What is the likely reason for this failure? ___
A. The host is connected to a datastore is running on ESX 4.0.
B. The host is connected to a Fibre Channel storage array.
C. The datastore has multiple extents.
D. The datastore is managed by a single vCenter Server.
【单选题】
A mission-critical virtual machine built on vSphere 4.1 needs to be moved to an ESXi 6.x host.Which virtual hardware version is needed to move the virtual machine without upgrading? ___
【单选题】
An administrator is analyzing a virtual machine as shown in the Exhibit. What is the current long term risk for this virtual machine? ___
A. The virtual machine may run out of memory before April 27.
B. The virtual machine may continue to function after April 27.
C. The virtual machine has adequate memory configured for operation for the next 120 days.
D. The virtual machine has adequate memory reservation configured for operation for the next 120 days.
【单选题】
An administrator is monitoring a High Availability (HA) and Distributed Resource Scheduler (DRS) enabled cluster and has noticed that virtual machines in the cluster are being migrated without user intervention. Why is this happening? ___
A. The DRS Automation level is set to Fully Automated.
B. The Automation level is set to Automatic.
C. The
D. PM Threshold is set to Aggressive.
【单选题】
An administrator attempts to migrate a suspended virtual machine to a newly deployed vSphere 6.x cluster. The compatibility check fails. What condition could cause this behavior?___
A. The new vSphere 6.x cluster is running Intel CPUs instead of AMD CPUs.
B. A suspended virtual machine cannot be migrated.
C. The hardware virtualization feature of the CPU is not enabled on the new hosts.
D. A vSphere Distributed Switch is required to migrate a suspended virtual machine.
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
【单选题】
An administrator has just configured the IP address on an ESXi host from the Direct Console User Interface. How can the configuration be validated as correct without any additional tools?___
A. Add the host to vCenter Server and if it works, then all networking settings are ok.
B. Select the Test Management Network option from the DCUI.
C. Connect to the host with the vSphere Client and click the Test Network option.
D. Use PowerCLI to connect to the host and initiate a network test.
【单选题】
An administrator is installing vCenter Server for an environment that has 40 ESXi 6.x Hosts and 150 virtual machines. Which database would meet the minimal requirements needed for this task? ___
A. vFabric Postgres
B. Microsoft SQL Express 2008
C. Microsoft SQL Server 2014
D. Oracle 11g
【单选题】
What is a requirement when enabling a Virtual SAN cluster in an existing High Availability (HA) and Distributed Resource Scheduler (DRS) Cluster? ___
A. Disable DRS and HA before enabling Virtual SAN
B. Enable DRS before enabling Virtual SAN
C. Disable HA before enabling Virtual SAN
D. Enable Storage DRS before enabling Virtual SAN
【单选题】
The vSphere administrator attempts to connect to an ESXi host via an SSH client and receives the following security alert: The vSphere administrator needs to determine whether the RSA key fingerprint shown in the security alert is the fingerprint of the intended ESXi host. Which tool should the vSphere administrator use? ___
A. Direct Console User Interface
B. vSphere Client
C. vSphere Web Client
D. vSphere Management Assistant
【单选题】
An administrator needs to monitor traffic on vSwitches in a vSphere 6.x environment. Which option, if configured, would accomplish this task? ___
A. Forged Transmits
B. MAC Address Changes
C. Promiscuous Mode
D. Notify Switches
【单选题】
What is true regarding datastores on ESXi 6.x? ___
A. NFS 4.1 datastore does not support Fault Tolerance (FT)
B. VMFS3 and VMFS5 datastores can be newly created
C. NFS datastore can be concurrently mounted using NFS 4.1 on one host and NFS on another
D. NFS 3.0 datastore does not support Fault Tolerance (FT)
【单选题】
An administrator is cloning and configuring five new web server virtual machines. What would be the benefit of configuring resource shares for the new VMs? ___
A. To prioritize access to a resource during contention.
B. To guarantee access to a resource during contention.
C. To prioritize access to a resource before contention occurs.
D. To guarantee access to a resource before contention occurs.
【单选题】
An administrator logs into the vSphere Web Client and sees the warning shown in the Exhibit. During a change control window, the warning was addressed. What should be done to verify that the host is no longer showing the warning? ___
A. Run a Remediate host operation.
B. Recheck the compliance of the host.
C. Restart the host to get rid of the warning.
D. Install VMware tools to clear the warning.
【单选题】
A vApp named Sales has a Memory Limit of 32 GB and a CPU Limit of 12,000 MHz. There are three virtual machines within the vApp: <Sales-DB -- Has a memory reservation of 20 GB. > <Sales-DC -- Has a memory reservation of 8 GB. > <Sales-Web -- Has a memory reservation of 8 GB.> Which statement is correct? ___
A. All three virtual machines can power on, but will have memory contention.
B. All three virtual machines can power on without memory contention.
C. Only two of the three virtual machines can power on.
D. Only one of the virtual machines can power on.
【单选题】
You are editing the management network configuration of an ESXi 6.x Host from the vSphere Web Client. You mistakenly put the incorrect VLAN in place for the management network. What action do you need to take to correct this? ___
A. You need to manually edit the configuration on the host with command line utilities.
B. No action is required. By default ESXi rolls back configuration changes that disconnect the host.
C. The ESXi host system configuration will need to be restored to the factory configuration to fix the issue.
D. The change can be reverted in the vSphere Web Client by simply editing the switch again.
【单选题】
What is true about resource pools created on a Distributed Resource Scheduler (DRS) cluster?___
A. A root resource pool is created with the specified values.
B. A root resource pool is automatically created using the aggregate total of the ESXi host resources in the cluster.
C. A root resource pool is automatically created using the aggregate total of all resources in the datacenter.
D. A root resource pool is not needed when creating resource pools on a DRS cluster.
【单选题】
An administrator attempts to enable Enhanced vMotion Compatibility (EVC) on a cluster. The operation results in a compatibility error, as shown in the exhibit. What is the likely cause of this error? ___
A. The CPUs in the ESXi host are not AMD CPUs.
B. The CPUs in the ESXi host do not support hardware virtualization capabilities.
C. The XD/NX CPU features have not been enabled in the BIOS of the server.
D. There is no shared storage between the hosts in the cluster.
【单选题】
What condition would prevent an administrator from creating a new VMFS3 datastore on an ESXi 6.x host using the vSphere Web Client? ___
A. A VMFS3 datastore cannot be created on an ESXi 6.x host.
B. The VMFS3 kernel module is not loaded.
C. A VMFS3 datastore cannot be mounted on an ESXi 6.x host.
D. VMFS3 datastores are not compatible with virtual machines created on an
E. SXi 6.x host.
【单选题】
During a new vSphere Distributed Switch configuration, where does the Maximum Transmission Unit (MTU) value get modified? ___
A. Uplink Settings
B. Switch Settings
C. Portgroup Settings
D. NIC Teaming Settings
推荐试题
【判断题】
依据《中国南方电网有限责任公司电力事故事件调查规程》,非计划停运或被迫停运。是指设备立即从可用状态改变到不可用状态,或设备损坏修复后未达到额定容量(参数)、额定运行工况的状态
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,电压互感器的二次回路通电试验时,为防止由二次侧向一次侧反充电,除应将二次回路断开外,还应取下电压互感器高压熔断器或断开电压互感器一次隔离开关
【判断题】
依据《云南电网有限责任公司厂站工作票业务指导书》规定,外单位在运行中的厂站从事基建投产后满一年的缺陷处理工作,不用办理“外单位工作任务许可单”
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,人员工作中与10kV及以下带电设备的距离大于0.35m小于0.7m,同时无绝缘隔板、安全遮栏等措施的,厂站设备应停电
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,对于无人值班的厂站,在第二种工作票不需要值班人员现场办理安全措施时,可使用电话许可的方式
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,在线路工频参数测量工作结束后,应确认拆接地线已恢复,无遗留物
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,值班人员应熟悉电气设备。单独值班人员和值班负责人还应有实际工作经验。单人值班时,可以单独从事修理工作
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,携带型接地线宜存放在专用架上,架上的号码与接地线的号码可以不一致
【判断题】
依据《云南电网有限责任公司现场电气操作票业务指导书(变电部分)(2017)》,倒闸操作前应充分考虑系统中性点的运行方式,不得使中性点直接接地系统或中性点经小电阻接地系统连接接地点
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,传真方式送达的工作票许可在收到传真后履行
【判断题】
依据《云南电网有限责任公司现场电气操作票业务指导书(变电部分)(2017)》,拉开、合上500kV并联电抗器隔离开关前,其所在的500kV线路必须停电,验明线路确无电压后才能拉开、合上500kV并联电抗器隔离开关
【判断题】
依据《中国南方电网调度运行操作管理规定》规定,集控中心、监控中心属于发电厂或变电站的异地值班单位,未经调度机构同意可以自行操作、控制调度管辖范围的任何设备
【判断题】
依据《云南电网有限责任公司现场电气操作票业务指导书(变电部分)(2017)》,电容器组停电接地时,不需待放电完毕后即可进行验电接地
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,在带电设备附近测量绝缘电阻时,测量人员和绝缘电阻表安放位置应保持安全距离,以免绝缘电阻表引线或引线支持物触碰带电部分。移动引线时,应注意监护,防止工作人员触电
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,工作终结是指工作票的终结,调度检修申请单的终结或书面形式布置和记录的终结
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,星形接线电容器的中性点应接地。串联电容器及与整组电容器脱离的电容器应逐个多次放电,装在绝缘支架上的电容器外壳也应放电
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,台风天气接到抢修任务,应使用紧急抢修工作票,紧急抢修作业许可时间为2016年10月7日08:10,抢修一直持续到2016年10月8日21:10结束。汇报调度抢修工作完成
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,高压开关柜内手车开关拉出后,隔离带电部位的挡板封闭后不应开启,并设置“止步,高压危险!”标示牌
【判断题】
依据《云南电网有限责任公司现场电气操作票业务指导书(变电部分)(2017)》,验电后因故中断未立即进行接地操作时,返回后应立即进行接地操作
【判断题】
依据《云南电网有限责任公司现场电气操作票业务指导书(变电部分)(2017)》,联跳:指本设备保护装置跳本设备断路器的操作
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,检修设备停电,应将各方面的电源完全断开。任何运行中的星形接线设备的中性点,应视为带电设备。可以在只经断路器断开电源或只经换流器闭锁隔离电源的设备上工作
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,应以手触试的设备:厂站内的电压等级在110kV及以下、高度在2m以下的一次设备导体部分,以及使用厂站工作票的高压配电设备(环网柜和电缆分支箱除外)
【判断题】
依据《云南电网有限责任公司现场电气操作票业务指导书(变电部分)(2017)》,500kV线路停电应先断开未装有并联高压电抗器一侧的断路器,再断开装有并联高压电抗器一侧的断路器,送电时则相反
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,经本单位批准允许单独巡视高压设备的人员,巡视高压设备时,可以进行其他工作,移开或越过遮栏
【判断题】
依据《中国南方电网调度运行操作管理规定》规定,将××开关由运行转检修,即要求:断开该开关,拉开该开关两侧刀闸,合上该开关两侧地刀
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,非金属外壳的仪器,不用与地绝缘,金属外壳的仪器和仪用变压器外壳应接地
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,新SF6气体按有关规定进行复核、检验,合格后方准使用。气瓶内存放半年以上的SF6气体,使用前应先检验其水分和空气含量
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,停电操作应按照“断路器→电源(母线)侧隔离开关→负荷侧隔离开关”的顺序依次操作,送电操作顺序相反
【判断题】
依据《云南电网有限责任公司现场电气操作票业务指导书(变电部分)(2017)》,变电站35kV及以下电压互感器高压熔断器或站用变高压熔断器,在发生高压熔断器(保险)熔断需更换及检修要求时,应先拉开高压侧隔离开关,取下高压熔断器,再断开二次空气开关(或取下二次熔断器)
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,梯子可以绑接使用。人字梯应有限制开度的措施。人在梯子上时,禁止移动梯子
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,部分停电的工作,距离小于非作业安全距离的未停电设备,应装设临时遮栏
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,停电操作,两个操作人员分约好晚18:00分进行
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,操作票的操作全部结束后,监护人应再次检查操作项目有无错误或遗漏,确认无误后,办理操作票结束手续,并向值班负责人汇报
【判断题】
依据《中国南方电网调度运行操作管理规定》规定,高压侧未装设开关但装设刀闸的高抗,只有运行、冷备用、检修三种状态
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,已装设的接地线发生摆动,其与带电部分的距离不符合安全距离要求时,应采取相应措施
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,电气工具使用前应检查电线是否完好,有无接地线;不合格的禁止使用;使用时应按有关规定接好剩余电流动作保护器(漏电保护器)和接地线
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,操作中发生事故事件时,可以继续操作
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,梯子应坚固完整,有防滑措施。梯子的支柱应能承受作业人员及所携带的工具、材料攀登时的总重量。作业中使用梯子时,应设专人扶持或绑扎牢固
【判断题】
依据《云南电网有限责任公司厂站工作票业务指导书》规定,动火工作负责人,宜具备电气工作票工作负责人资格。动火作业作为电气工作票的附加工作时,电气工作票负责人可以担任动火工作负责人
【判断题】
依据《中国南方电网有限责任公司电力安全工作规程》,测量线路绝缘电阻,若有感应电压,应将相关线路同时停电,通知对侧后就可进行