【单选题】
A High Availability (HA) cluster is configured to respond to a given number of host failures. The cluster contains virtual machines configured with these settings: VM1 has a 1GHz CPU reservation and no Memory reservation VM2 has a 2GHz CPU reservation and no Memory reservation VM3 has no CPU reservation and no Memory reservation . Given this information, what is the correct slot size for the cluster? ___
A. The CPU Reservation should be set to 32MHz and the memory reservation should be set to 32MB plus memory overhead.
B. The CPU reservation should be set to 1 GHz and the memory reservation should be set to 0MB plus memory overhead.
C. The CPU reservation should be set to 2 GHz, and the memory reservation should be set to 0MB plus the virtual machine memory overhead.
D. The CPU reservation should be set to 2 GHz, and the memory reservation should be set to 32MB, plus the virtual machine memory overhead.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【单选题】
An administrator is planning a vSphere infrastructure with the following specific networking requirements: <The ability to shape inbound (RX) traffic> <Support for Private VLANs (PVLANs)> <Support for LLDP (Link Layer Discovery Protocol)>. What is the minimum vSphere Edition that will support these requirements? ___
A. vSphere Essentials Plus
B. vSphere Standard
C. vSphere Enterprise
D. vSphere
E. nterprise Plus
【单选题】
When you add an ESXi 6.x host to a new Cluster, which vSphere object owns the CPU and Memory resources of the hosts? ___
A. vCenter Server
B. Datacenter
C. Cluster
D. Host
【单选题】
A user is trying to retrieve objects from a SharePoint server and finds the request is taking an excessive amount of time. An administrator tries to isolate the issue and notes the following: Application performance is poor when compared to virtual machines on other hosts. Performance improves when the virtual machine is moved to another host. The virtual machine encounters higher than expected CPU %Ready times. What conclusion can be reached regarding the performance issues for this virtual machine? ___
A. Host Power Management is directly impacting virtual machine performance.
B. The virtual machine has a large number of snapshots.
C. The Path Selection Policy for the storage device is set differently on the affected host.
D. Network I/O control is configured for the portgroup.
【单选题】
A virtual machine template is accidently removed from the vCenter Server Inventory. Which method would be used to recover the template back into the environment?___
A. Use the datastore browser to locate the template, then right click and add the .vmtx file to inventory.
B. Use the datastore browser to locate the template, then right click and add the .vmx file to inventory.
C. Using the Managed Object Browser and adding the template from the ManagedObjectReference:GuestFileManager object.
D. Using the Managed Object Browser and adding the template from the ManagedObjectReference:VirtualDiskManager object.
【单选题】
A vSphere administrator needs to backup a virtual machine that has a Microsoft SQL Server Database installed. Which solution allows for an application quiesce to occur during backup?___
A. VMware vCenter Converter
B. VMware vCenter Site Recovery Manager
C. VMware vSphere Replication
D. VMware vSphere Data Protection Advanced
【单选题】
An administrator is migrating a virtual machine from a Test cluster to a Production cluster. The two environments do not have any shared storage. What is the easiest way to accomplish this task? ___
A. Perform a Storage vMotion.
B. Perform a regular vMotion.
C. Perform a Virtual to Virtual migration.
D. Perform a backup and restore using VMware Data Protection.
【单选题】
An administrator must determine an appropriate backup solution, given these conditions: 50 of the virtual machines are in a resource pool named Finance. 50 of the virtual machines are in a resource pool named QA. Which solution allows an administrator the ability to backup 100 virtual machines? ___
A. Use Snapshot Manager on the vCenter Server to backup the virtual machines.
B. Use the VMware Consolidated Backup (vcb) tool on the ESXi Host to backup the virtual machines.
C. Use the VMware Data Recovery (VDR) Appliance on the vCenter Server to backup the virtual machines.
D. Use the VMware Data Protection (VDP) Appliance on one of the
E. SXi Hosts to backup the virtual machines.
【单选题】
What is a benefit of using Enhanced vMotion Compatibility for an environment? ___
A. EVC masks CPU features to allow compatibility between hosts that are dissimilar.
B. EVC allows for cross platform vMotion to occur.
C. EVC enables Long
D. istance vMotion.
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
How many Link Aggregation Groups (LAGs) can be configured on a vSphere 6.x Distributed Switch? ___
A. 64
B. 96
C. 128
D. 256
【单选题】
An administrator needs to verify that vMotion operations can be performed in a vSphere data center.What round trip time (RTT) latency is the maximum value that will allow vMotion operations to succeed? ___
A. 50ms RTT
B. 100ms RTT
C. 150ms RTT
D. 200ms RTT
【单选题】
A storage administrator has reported that full utilization of all bandwidth from an ESXi 6.x host is not being seen. In troubleshooting the issue, the Adapter details are shown in the Exhibit. Based on the exhibit, what is cause of the issue? ___
A. The array is not setup to use the correct multipathing policy.
B. There are no virtual machines on the ESXi host.
C. Not all links are used because a path is disabled.
D. Another path needs to be configured.
【单选题】
An administrator is migrating a powered-on virtual machine, as shown in the exhibit. Which option should be selected to perform a Storage vMotion of the VM? ___
A. Change storage only
B. Change VM compute resource only
C. Change both compute resource and storage, changing the compute resource first.
D. Change both compute resource and storage, changing the storage resource first.
【单选题】
An administrator is attempting to enable Storage I/O Control on a datastore, but it is failing. What is the likely reason for this failure? ___
A. The host is connected to a datastore is running on ESX 4.0.
B. The host is connected to a Fibre Channel storage array.
C. The datastore has multiple extents.
D. The datastore is managed by a single vCenter Server.
【单选题】
A mission-critical virtual machine built on vSphere 4.1 needs to be moved to an ESXi 6.x host.Which virtual hardware version is needed to move the virtual machine without upgrading? ___
【单选题】
An administrator is analyzing a virtual machine as shown in the Exhibit. What is the current long term risk for this virtual machine? ___
A. The virtual machine may run out of memory before April 27.
B. The virtual machine may continue to function after April 27.
C. The virtual machine has adequate memory configured for operation for the next 120 days.
D. The virtual machine has adequate memory reservation configured for operation for the next 120 days.
【单选题】
An administrator is monitoring a High Availability (HA) and Distributed Resource Scheduler (DRS) enabled cluster and has noticed that virtual machines in the cluster are being migrated without user intervention. Why is this happening? ___
A. The DRS Automation level is set to Fully Automated.
B. The Automation level is set to Automatic.
C. The
D. PM Threshold is set to Aggressive.
【单选题】
An administrator attempts to migrate a suspended virtual machine to a newly deployed vSphere 6.x cluster. The compatibility check fails. What condition could cause this behavior?___
A. The new vSphere 6.x cluster is running Intel CPUs instead of AMD CPUs.
B. A suspended virtual machine cannot be migrated.
C. The hardware virtualization feature of the CPU is not enabled on the new hosts.
D. A vSphere Distributed Switch is required to migrate a suspended virtual machine.
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
【单选题】
A vSphere administrator has been using vSphere in evaluation mode and now wants to deploy an environment that provides the same features. Which edition of vSphere provides similar functionality to evaluation mode? ___
A. Enterprise Plus
B. Enterprise
C. Standard
D. Essentials
【单选题】
An administrator has just configured the IP address on an ESXi host from the Direct Console User Interface. How can the configuration be validated as correct without any additional tools?___
A. Add the host to vCenter Server and if it works, then all networking settings are ok.
B. Select the Test Management Network option from the DCUI.
C. Connect to the host with the vSphere Client and click the Test Network option.
D. Use PowerCLI to connect to the host and initiate a network test.
【单选题】
An administrator is installing vCenter Server for an environment that has 40 ESXi 6.x Hosts and 150 virtual machines. Which database would meet the minimal requirements needed for this task? ___
A. vFabric Postgres
B. Microsoft SQL Express 2008
C. Microsoft SQL Server 2014
D. Oracle 11g
【单选题】
What is a requirement when enabling a Virtual SAN cluster in an existing High Availability (HA) and Distributed Resource Scheduler (DRS) Cluster? ___
A. Disable DRS and HA before enabling Virtual SAN
B. Enable DRS before enabling Virtual SAN
C. Disable HA before enabling Virtual SAN
D. Enable Storage DRS before enabling Virtual SAN
【单选题】
The vSphere administrator attempts to connect to an ESXi host via an SSH client and receives the following security alert: The vSphere administrator needs to determine whether the RSA key fingerprint shown in the security alert is the fingerprint of the intended ESXi host. Which tool should the vSphere administrator use? ___
A. Direct Console User Interface
B. vSphere Client
C. vSphere Web Client
D. vSphere Management Assistant
【单选题】
An administrator needs to monitor traffic on vSwitches in a vSphere 6.x environment. Which option, if configured, would accomplish this task? ___
A. Forged Transmits
B. MAC Address Changes
C. Promiscuous Mode
D. Notify Switches
【单选题】
What is true regarding datastores on ESXi 6.x? ___
A. NFS 4.1 datastore does not support Fault Tolerance (FT)
B. VMFS3 and VMFS5 datastores can be newly created
C. NFS datastore can be concurrently mounted using NFS 4.1 on one host and NFS on another
D. NFS 3.0 datastore does not support Fault Tolerance (FT)
【单选题】
An administrator is cloning and configuring five new web server virtual machines. What would be the benefit of configuring resource shares for the new VMs? ___
A. To prioritize access to a resource during contention.
B. To guarantee access to a resource during contention.
C. To prioritize access to a resource before contention occurs.
D. To guarantee access to a resource before contention occurs.
【单选题】
An administrator logs into the vSphere Web Client and sees the warning shown in the Exhibit. During a change control window, the warning was addressed. What should be done to verify that the host is no longer showing the warning? ___
A. Run a Remediate host operation.
B. Recheck the compliance of the host.
C. Restart the host to get rid of the warning.
D. Install VMware tools to clear the warning.
【单选题】
A vApp named Sales has a Memory Limit of 32 GB and a CPU Limit of 12,000 MHz. There are three virtual machines within the vApp: <Sales-DB -- Has a memory reservation of 20 GB. > <Sales-DC -- Has a memory reservation of 8 GB. > <Sales-Web -- Has a memory reservation of 8 GB.> Which statement is correct? ___
A. All three virtual machines can power on, but will have memory contention.
B. All three virtual machines can power on without memory contention.
C. Only two of the three virtual machines can power on.
D. Only one of the virtual machines can power on.
【单选题】
You are editing the management network configuration of an ESXi 6.x Host from the vSphere Web Client. You mistakenly put the incorrect VLAN in place for the management network. What action do you need to take to correct this? ___
A. You need to manually edit the configuration on the host with command line utilities.
B. No action is required. By default ESXi rolls back configuration changes that disconnect the host.
C. The ESXi host system configuration will need to be restored to the factory configuration to fix the issue.
D. The change can be reverted in the vSphere Web Client by simply editing the switch again.
【单选题】
What is true about resource pools created on a Distributed Resource Scheduler (DRS) cluster?___
A. A root resource pool is created with the specified values.
B. A root resource pool is automatically created using the aggregate total of the ESXi host resources in the cluster.
C. A root resource pool is automatically created using the aggregate total of all resources in the datacenter.
D. A root resource pool is not needed when creating resource pools on a DRS cluster.
【单选题】
An administrator attempts to enable Enhanced vMotion Compatibility (EVC) on a cluster. The operation results in a compatibility error, as shown in the exhibit. What is the likely cause of this error? ___
A. The CPUs in the ESXi host are not AMD CPUs.
B. The CPUs in the ESXi host do not support hardware virtualization capabilities.
C. The XD/NX CPU features have not been enabled in the BIOS of the server.
D. There is no shared storage between the hosts in the cluster.
【单选题】
What condition would prevent an administrator from creating a new VMFS3 datastore on an ESXi 6.x host using the vSphere Web Client? ___
A. A VMFS3 datastore cannot be created on an ESXi 6.x host.
B. The VMFS3 kernel module is not loaded.
C. A VMFS3 datastore cannot be mounted on an ESXi 6.x host.
D. VMFS3 datastores are not compatible with virtual machines created on an
E. SXi 6.x host.
【单选题】
During a new vSphere Distributed Switch configuration, where does the Maximum Transmission Unit (MTU) value get modified? ___
A. Uplink Settings
B. Switch Settings
C. Portgroup Settings
D. NIC Teaming Settings
【单选题】
A small company wants to use VMware products for its production systems. The system administrator needs to recommend a solution that will deliver High Availability to the company's production applications. What is minimum vSphere offering that will support this requirement? ___
A. vSphere Essentials
B. vSphere Essentials Plus
C. vSphere Hypervisor
D. vSphere Standard
【单选题】
Which scenario shows a reason for VMware Tools failing to install? ___
A. Virtual machine has a CD-ROM configured.
B. Guest OS Antivirus is blocking the VMware Tools installation.
C. Guest OS has 64-bit ldd (list dynamic dependencies) utility installed.
D. Virtual machine is powered on.
【单选题】
An administrator is configuring an ESXi 6.x host to use multiple NICs to resolve a management network redundancy error. After configuring a second NIC, the server is not able to communicate when the primary connection is taken down. The administrator analyzes the Exhibit shown here. Based on the exhibit, what is the likely cause of the issue? ___
A. vmnic4 is not attached to a vSwitch.
B. vmnic2 is not connected to a physical switch.
C. E1000 is the incorrect NIC
D. river for this card.
【单选题】
What information is required as part of an interactive ESXi 6.x installation? ___
A. Keyboard layout
B. IP Address
C. Root password
D. DNS information
【单选题】
What is the default load balancing policy for a newly created VMkernel port on a vSphere Distributed Switch? ___
A. Route based on orginating virtual port ID
B. Route based on IP Hash
C. Route based on source mac address
D. Route based on physical NIC load
【单选题】
An administrator deploys vCenter Server using the embedded Platform Services Controller. After testing the deployment for a couple of months, it is determined that the environment would be better served with an external Platform Services Controller. What should the administrator do to meet this new requirement? ___
A. Deploy a fresh instance of vCenter Server with an external Platform Services Controller.
B. Perform a fresh install of an external Platform Services Controller.
C. Migrate the embedded Platform Services Controller to an external Platform Services Controller.
D. Upgrade the embedded Platform Services Controller to an external Platform Services Controller.
推荐试题
【填空题】
《关于印发铁路工程混凝土结构高强钢筋设计规定》铁总建设[2015]343号文 规定,使用通用参考图的混凝土工程,在采用HRB400钢筋的通用参考图发布前,暂按___的原则用HRB400钢筋代换图中的HRB335钢筋。
【填空题】
《关于铁路建设项目实施阶段材料价差调整的指导意见》铁建设[2009]46号文规定,铁路项目实施中,建设单位要根据材料调差批复,履行决策程序,与施工单位签订___,依据合同约定和已完工程数量等,与施工单位办理材料价差结算。
【填空题】
《关于铁路建设项目实施阶段材料价差调整的指导意见》铁建设[2009]46号文规定,铁路项目施工合同有风险包干费的,概算内材料价格变化幅度<以批准编制期概算为准>在___以内部分由施工企业承担,超出部分纳入概算并由建设单位承担。
【填空题】
《关于公布<铁路路基工程预算定额>等二十九项定额标准的通知》铁总建设[2016]359号文等现行定额中的其他材料费乘以___的系数,其他机械使用费乘以___的系数,其他消耗量按原定额执行。
【填空题】
《关于转发财政部、税务总局调整增值税税率等5个文件的通知》铁总办财[2018]58号文要求,自2018年5月1日起,铁路项目各单位必须按照___方式签订各类采购合同,增值税税率按财税[2018]32号文件执行;对已签订但尚未执行的购买合同,各单位必须按财税文件[2018]32号文规定增值税税率,对价格和合同条款进行调整。
【填空题】
《关于转发财政部、税务总局调整增值税税率等5个文件的通知》铁总办财[2018]58号文要求,自2018年5月1日起,已签订建设项目合同的建设项目,采用一般计税方法的,建设单位应于施工单位按照价税分离的原则签订补充合同,约定剩余建筑安装工程费税金与设备购置费税金按10%的税率计算,并相应调整合同额,减少投资纳入项目___管理。
【填空题】
依据《铁路建设项目验工计价办法》的通知,铁路建设工程验工计价报表应由施工承包单位编制、监理单位审核、建设单位核准,其他验工计价报表由___编制、建设单位核准,并由各单位负责人签字、加盖单位印章。
【填空题】
根据最新版《造价工程师职业资格制度规定》,造价工程师分为___和二级造价工程师。
【填空题】
国家设置造价工程师___,纳入国家职业资格目录。
【填空题】
一级和二级造价工程师职业资格考试均设置基础科目和___。
【填空题】
国家对造价工程师职业资格实行___制度。
【填空题】
造价工程师执业时应持注册证书和___。
【填空题】
取得造价工程师注册证书的人员,应当按照国家专业技术人员继续教育的有关规定接受___,更新专业知识,提高业务水平。
【填空题】
一级造价工程师职业资格考试设《建设工程造价管理》《建设工程计价》___《建设工程造价案例分析》4个科目。
【填空题】
建筑安装工程费按照工程造价形成由分部分项工程费、___、___、规费、税金组成。
【填空题】
建筑安装工程费按照费用构成要素划分:由人工费、材料<包含工程设备>费、___、企业管理费、利润、___和税金组成。
【填空题】
建筑工程施工发包与承包价在政府宏观调控下,由___形成。
【填空题】
政府性融资担保机构应按照市场化方式运作,依法依规开展___,自主经营、自负盈亏,不得要求或接受地方政府以任何形式在出资范围之外承担责任。
【填空题】
对于中央预算内直接投资项目,因项目建设期价格大幅上涨、政策调整、地质条件发生重大变化和自然灾害等不可抗力因素等原因导致原核定概算不能满足工程实际需要的,可以向___申请调整概算。
【填空题】
公路工程缺陷责任期的“缺陷”是指建设工程质量不符合工程建设强制性标准、___,以及承包合同的约定。
【填空题】
根据《房屋建筑和市政基础设施工程施工招标投标管理办法》<建设部令第89号>,工程施工招标分为公开招标和___。
【填空题】
根据《房屋建筑和市政基础设施工程施工招标投标管理办法》<建设部令第89号>,招标人采用邀请招标方式的,应当向___个以上符合资质条件的施工企业发出投标邀请书。
【填空题】
增值税一般纳税人<以下称“纳税人”>提供建筑服务,按规定适用或选择适用简易计税方法计税的,实行___制。
【填空题】
国务院___部门指导和协调全国招标投标工作,对国家重大建设项目的工程招标投标活动实施监督检查。
【填空题】
依法必须进行招标的项目的境内投标单位,以现金或者支票形式提交的投标保证金应当从其___转出。
【填空题】
___级交通运输主管部门对公路工程定额中缺项的,或者地域性强且技术成熟的建设工艺,可以编制补充性定额规定。
【填空题】
《公路工程标准施工招标文件》2018版与2009版相比,增加了___章节。
【填空题】
《公路工程标准施工招标文件》<2018版>中投标偏差分为___和细微偏差。
【填空题】
合同签订之后28天内,承包人向监理人报送施工进度计划,进度计划应按照关键线路网络图和___两种形式分别编绘,并应包括每月预计完成的工作量和形象进度。
【填空题】
根据《企业安全生产费用提取和使用管理办法》<财企〔2012〕16号>,施工企业以建筑安装工程造价为计提依据,其中铁路工程提取标准为___%。
【填空题】
根据《企业安全生产费用提取和使用管理办法》<财企〔2012〕16号>,施工企业以建筑安装工程造价为计提依据,其中公路工程工程提取标准为___%。
【填空题】
《公路工程标准施工招标文件》<2018版>明确了投标保证金___计算利息。
【填空题】
根据《公路工程标准施工招标文件》<2018版>,当图纸与工程量清单所列数量不一致时,以___作为报价的依据。
【填空题】
《公路工程标准施工招标文件》<2018版>中对于信用查询,新增投标人在___网站查询的要求。
【填空题】
国务院___主管部门负责全国建筑业企业资质的统一监督管理。
【填空题】
铁路预算定额[2017]33号路基工程规定:___是指临时场站至工点间的运输。
【填空题】
铁路预算定额[2017]33号路基工程规定: 路基土石方工程中汽车运输定额仅适用于10km 及以内运输,超过10km部分应乘以___的系数。
【填空题】
铁路预算定额[2017]33号路基工程规定:岩土天然密实方与压实方换算系数表中已考虑了___。
【填空题】
铁路预算定额[2017]33号路基工程规定:支挡结构锚杆计算长度是指___,按规定应留的外露部分及加工过程中的损耗,均已计入定额。