【单选题】
Which statement is correct when migrating from a Windows vCenter Server to the vCenter Server Appliance 6.5?___
A. Migration deployments do not migrate local OS users from the source vCenter Server.
B. Migration deployments support DHCP on the source vCenter Server.
C. Migration deployments allow the source vCenter Server to remain powered on afterwards.
D. Migration deployments support custom ports for all services on the source vCenter Server.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【单选题】
How can failback of a recovered virtual machine in vSphere Replication be performed?___
A. No action required, because failback is automatically performed to the source site.
B. Configure a new replication in the reverse direction at the target site.
C. Disable or Stop the virtual machine replication on the source site.
D. Power off and unregister the virtual machine on the target site.
【单选题】
After upgrading the vSphere infrastructure and VMware Tools to version 6.5, the “Upgrade VM Compatibility” option is grayed out in the vSphere Web Client. (See Exhibit.) What must the administrator do to enable the VM compatibility upgrade?___
A. VMware Tools should be upgraded last.
B. Restart the ESXi server.
C. Uninstall VMware Tools.
D. Power off the virtual machine.
【单选题】
What availability mode does vCenter HA provide?___
A. Active-Passive
B. Active-Standby
C. Active-Active
D. Load-balanced
【单选题】
In which scenario will vSphere DRS balance resources when set to Fully Automated?___
A. Hosts with only shared storage
B. Hosts are part of a vSphere HA cluster
C. Power Management is set to Balanced on hosts
D. Hosts with shared or non-shared storage
【单选题】
What VMware technology can be used to move physical servers to the vSphere infrastructure?___
A. VMware vMotion
B. VMware Converter
C. VMware vCenter Server
D. OVF transport
【单选题】
Upgrading vCenter Server with Microsoft SQL database fails with the following error message: The DB User entered does not have the required permissions needed to install and configure vCenter Server with the selected DB. Please correct the following error(s): %sWhat could cause this error?___
A. incorrect ports open on SQL Server
B. incorrect database on the SQL server
C. incorrect compatibility mode on the SQL server
D. incorrect permission on SQL Server database
【单选题】
What is a potential downside of having more than four paths per datastore?___
A. limits the storage protocols
B. increases storage latency for VM
C. limits the path selection policies
D. limits the number of LUNs per host
【单选题】
Which feature facilitates the sharing of templates via vCenter Server?___
A. Content Library
B. OVF
C. folders
D. vApp
【单选题】
A vSphere Administrator is in the process of configuring replication for a virtual machine, but is not able to select the Recovery Point Objective (RPO) value of 5 minutes. Which statement could explain why the RPO value cannot be lower than 15 minutes?___
A. The OS quiescing option is selected for Replication options.
B. The virtual machine hardware version is not compatible.
C. The target and source sites use different types of datastores.
D. The target and source sites are not using VMFS 6.0 datastore.
【单选题】
What advanced parameter defines a custom isolation IP address for a vSphere HA cluster?___
A. das.usedefaultisolationaddress
B. das.isolationshutdowntimeout
C. fdm.isolationpolicydelaysec
D. das.isolationaddress
【单选题】
Which method is supported for backing up the virtual machine that contains vCenter Server?___
A. differential
B. incremental
C. full image
D. individual disks
【单选题】
A vSphere Administrator must ensure that a user is able to view and manage the system configuration in vSphere Web Client. In the vCenter Single Sign-On domain, which group should the user be a part of?___
A. SystemConfiguration.BashShellAdministrators
B. ComponentManager. Administrators
C. Administrators
D. SystemConfiguration.Administrators
【单选题】
What is the minimum number of hosts that must contribute capacity to a non-ROBO single site VMware vSAN cluster?___
【单选题】
Which guest operating system supports PVRDMA?___
A. Windows (32-Bit)
B. Linux (32-Bit)
C. Windows (64-Bit)
D. Linux (64-Bit)
【单选题】
What is the correct way to replace the certificate on an existing vCenter Server that is part of a vCenter HA configuration?___
A. Put the vCenter HA in Maintenance mode, replace the certificate, exit Maintenance mode.
B. Shut down Passive and Witness nodes and replace the certificate on the Active node.
C. Remove the Passive and Witness nodes, replace the certificate, reconfigure the cluster.
D. Replace the certificate while all nodes are participating in the cluster.
【单选题】
The vSphere Data Protection performance analysis results in the “Conditionally Passed” status. What can cause this condition?___
A. The results did not meet the minimum performance expectations.
B. The read, write, and seek tests were successful.
C. The read and write tests were successful but the seek test failed.
D. The read and write tests were successful but the seek test skipped.
【单选题】
A vSphere Administrator wants to reserve 0.5 Gbps for virtual machines on each uplink on a disturbed switch that has 10 uplinks. What is the quota that should be reserved for the network resource pool?___
A. 10 Gbps
B. 5 Gbps
C. 100 Gbps
D. 0.5 Gbps
【单选题】
A vSphere administrator manages a cluster which includes critical and non-critical virtual machines. The cluster requires different permissions for contractors and non-contractors. How can the administrator exclude the contractor group from some of the critical VMs?___
A. Apply permission for both contractors and non-contractors on the cluster level.
B. Apply permission for both contractors and non-contractors on the cluster level. Remove permission on the critical VMs for contractors.
C. Remove permission for contractors on the cluster level. Apply permission on the critical VMs for noncontractors.
D. Apply permission for both contractors and non-contractors on the VMs. Remove permission on the critical VMs for contractors.
【单选题】
In an ESXi 6.5 cluster only "NFS datastore has running or registered virtual machines" returns. A vSphere HA cluster with four hosts has admission control configured to tolerate one host failure. Which statement is true if a fifth host is added?___
A. CPU and Memory capacity will be set to 50%.
B. CPU and Memory capacity will be set to 30%.
C. CPU and Memory capacity will be set to 25%.
D. CPU and Memory capacity will be set to 20%.
【单选题】
Which command can be run to troubleshoot connectivity problems with vmkernal network interfaces?___
A. esxcli network
B. vmkping
C. net-status
D. vicfg-vmknic
【单选题】
What counter should an administrator check to determine if a virtual machine is ballooning?___
A. swapinRate
B. vmmemctltarget
C. swapped
D. vmmemctl
【单选题】
By default, how often is the vCenter vpx user password automatically changed?___
A. 15 days
B. 60 days
C. 30 days
D. 45 days
【单选题】
Which metric in the Exhibit would identify high latency for a virtual machine operating system?___
A. QAVG/cmd
B. KAVG/cmd
C. DAVG/cmd
D. GAVG/cmd
【单选题】
What VM Monitoring setting would ensure that the failure interval for a virtual machine is defined as 120 seconds?___
A. High
B. Normal
C. Low
D. Medium
【单选题】
The business managers have asked the IT administrator to ensure configuration compliance in the vSphere infrastructure. The IT administrator wants to use Host Profiles to accomplish this, but is unable to do so. Why is the administrator unable to use Host Profiles?___
A. The infrastructure uses a vSphere Standard license.
B. The infrastructure has servers with various CPU families.
C. The user has only the “Administrator” role.
D. Host Profiles apply only to storage settings.
【单选题】
What is the result of a “Consolidate” action on a virtual machine?___
A. All snapshots on the virtual machines will be deleted.
B. The virtual machine will be reverted to its last snapshot.
C. Redundant delta disks will be combined and deleted.
D. A new snapshot with memory state will be created.
【单选题】
A Telco customer is implementing NFV using vSphere as the virtualization platform. Which feature can help achieve a high packet rate with lower CPU consumption?___
A. Network I/O Control
B. SplitRX
C. ERSPAN
D. LACP
【单选题】
What is the VMware-recommended best practice for Fibre Channel zoning?___
A. soft zoning
B. single-initiator-multiple-target zoning
C. single-initiator zoning
D. single-initiator-single-target zoning
【单选题】
How can a vSphere administrator ensure that a set of virtual machines run on different hosts in a DRS cluster?___
A. Use a VM-Host affinity rule.
B. Add the VMs to a vApp.
C. Use a VM-VM affinity rule.
D. Place the VMs in different folders.
【单选题】
vCenter Server Appliance Instance can be backed up using which Client Interface?___
A. vSphere Client Interface
B. vSphere Web Client Interface
C. VMware Host Client Interface
D. Virtual Appliance Management Interface
【单选题】
What tool can capture network traffic at the uplinks, or vSwitch, or virtual port levels?___
A. tcpdump-uw
B. wireshark
C. pktcap-uw
D. pcap
【单选题】
Which storage feature always requires the use of third-party software on ESXi?___
A. Hardware Acceleration for NAS devices
B. VVOL
C. Hardware Acceleration for Block
D. evices
【单选题】
An ESXi host's VMCA-Signed certificate has expired. How can the certificate be renewed?___
A. In the vSphere Web Client, browse to the host in question. Click the Manage tab and select settings. Select System and click Certificate, then click the Renew button.
B. In the vSphere Web Client, browse to the host in question. Click the Manage tab and select settings. Select System and click Certificate, then click the Refresh CA Certificates button.
C. Run the command /sbin/generate-certificates on the affected host.
D. Disconnect the host from vCenter Server and reconnect it.
【单选题】
Which is the correct order for upgrading vSphere components?___
A. vCenter Server, ESXi hosts, VMware Tools, Virtual Machine hardware
B. VMware Tools, Virtual Machine hardware, ESXi hosts, vCenter Server
C. vCenter Server, Virtual Machine hardware, VMware tools, ESXi hosts
D. ESXi hosts, vCenter Server, Virtual Machine hardware, VMware Tools
【单选题】
Which iSCSI initiator type can be used with any network interface card?___
A. Software iSCSI initiator
B. Software FCoE adapter
C. Hardware Independent iSCSI initiator
D. Hardware Dependent iSCSI initiator
【单选题】
An administrator is attempting to power on a virtual machine with 32GB of memory. The operation fails with the following error: <Could not power on VM: No space left on device> <Checking the space on the virtual machine's datastore, there is 30GB free.> Which action would allow the VM to power on?___
A. Set a 2GB memory reservation on the VM.
B. Mount the virtual disk from the affected VM on to another virtual machine and free up space from within the OS.
C. Enable vSphere HD admission control on the cluster in which the VM resides.
D. Set a 2GB memory limit on the VM.
【单选题】
An administrator attempts to manually reclaim space on thin-provisioned VMFS6 volumes but finds that no additional space is being recovered. Which could be causing this?___
A. vSphere 6.5 does not support manual UNMAP.
B. The manual UNMAP operation has been moved to the vSphere web client.
C. The VASA version is use is incompatible.
D. UNMAP is automated for VMFS6.
【单选题】
An administrator has upgraded to vSphere 6.5 and also wants to use Kerberos authentication for NFS. Which can be done to the existing NFSv3 volumes to enable this feature?___
A. Perform a storage rescan on VMFS volumes.
B. Unmount the NFSv3 datastore, and then mount as NFSv4.1 datastore.
C. Nothing. All NFSv3 mounted datastores are upgraded automatically during vSphere upgrades.
D. Perform a scan of new storage devices.
【单选题】
An administrator wants to restore the vCenter Server Appliance 6.5 from backup. Where can this be accomplished?___
A. from the ESXi Host Client
B. from the VMware vSphere Appliance Management Interface
C. from within the VMware vSphere Web Client
D. from the vCenter Server Appliance Installer
【单选题】
The administrator wants to power on VM-K2, which has a 2GHz CPU reservation. VM-M1, VM-M2, and VM-K1 are all powered on. VM-K2 is not powered on. The exhibit shows the parent and child resource reservations. If Resource Pool RP-KID is configured with an expandable reservation, which statement is true?___
A. VM-K2 will be unable to power on because there are insufficient resources.
B. VM-K2 will be able to power on since resource pool RP-KID has 2GHz available.
C. VM-K2 will be unable to power on because only 2GHz are reserved for RP-KID.
D. VM-K2 will receive resource priority and will be able to power on this scenario.
推荐试题
【单选题】
系统频率过低时应增加电网上与之并列的发电机___。
A. 有功功率;
B. 无功功率;
C. 感性功率;
D. 容性功率。
【单选题】
转动设备的电动机被水淹没,应___。
A. 申请停运;
B. 紧急停止运行;
C. 视情况而定;
D. 可以运行。
【单选题】
发电机转子铁芯采用___冷却。
A. 氢气;
B. 水;
C. 双水;
D. 水氢。
【单选题】
发电机定子电压低于额定值的95%时,定子电流长期允许的数值不得超过额定值的___。
A. 95%;
B. 100%;
C. 105%;
D. 110%。
【单选题】
新投运的变压器或更换绕组后的变压器,应从高压侧在额定电压下空载合闸___次,以检查励磁涌流下的继电保护动作情况。
【单选题】
断路器的额定开断容量可用___表示。
A. 额定开断容量=额定电压×额定开断电流;
B. 额定开断容量=额定电压×额定开断电流;
C. 额定开断容量=额定电压×极限开断电流;
D. 额定开断容量=额定电压×极限开断电流。
【单选题】
真空断路器的灭弧介质是___。
A. 油;
B. SF6;
C. 真空;
D. 空气。
【单选题】
真空断路器的触头常常采用___触头。
A. 桥式;
B. 指形;
C. 对接式;
D. 插入。
【单选题】
6kV厂用工作电源切换至备用电源后,应在___上将快切装置复位。
A. DCS;
B. 快切装置;
C. 工作电源开关;
D. 备用电源开关。
【单选题】
电缆的运行电压不得超过额定电压的___。
A. 5%;
B. 10%;
C. 15%;
D. 20%。
【单选题】
发电机机内定冷水温度应___冷氢温度。
A. 低于;
B. 高于;
C. 等于;
D. 不一定。
【单选题】
发电机定子铁芯采用___冷却。
A. 氢气;
B. 水;
C. 双水;
D. 水氢。
【单选题】
当发电机的定子线棒层间温差达到___在确认测温元件正常的情况下应停机处理。
A. 8℃;
B. 10℃;
C. 12℃;
D. 14℃。
【单选题】
6kV电动机定子线圈对地绝缘电阻值每千伏不得低于___。
A. 0.5MΩ;
B. 1MΩ;
C. 6MΩ;
D. 2500MΩ。
【单选题】
励磁系统强励倍数等于___倍,允许强励时间为10s。
A. 1.1;
B. 1.5;
C. 2;
D. 3。
【单选题】
对有载调压装置进行远方调压操作时,就地必须派专人监视,以防___。
A. 分接头过热;
B. 操作失控;
C. 产生火花;
D. 开关跳闸。
【单选题】
厂用电压降低时,若要不降低厂用电动机的出力,则电动机电流会___。
A. 降低;
B. 显著增加;
C. 保持不变;
D. 摆动。
【单选题】
变压器的调压分接头装置都装在高压侧,原因是高压侧线圈中流过的___,分接装置因接触电阻引起的( C )。
A. 电流小;
B. 电流大;
C. 发热量小;
D. 发热量大。
【单选题】
当发电机任一槽内线棒层间温度大于___且出水温度超过85℃时,在确认测温元件正常的情况下应停机处理。
A. 85℃;
B. 90℃;
C. 95℃;
D. 100℃。
【单选题】
当___时,柴油发电机自启动。
A. 机组跳闸;
B. 保安A、B段母线均失压或欠压;
C. 保安电源高电压;
D. 保安电源进线过电流未动作。
【单选题】
当UPS整流器输出电压低于___、直流输入电压低于( A )、逆变器故障、旁路电源故障及冷却风机故障时,UPS均有报警信号。
A. 240V 210V;
B. 220V 220V;
C. 300V 220V;
D. 220V 220V。
【单选题】
柴油发电机组的控制起动、保护、测量、信号系统采用直流电压,断路器控制、操作及其信号采用机组自身提供的直流___电压。
A. 12V;
B. 24V;
C. 36V;
D. 220V。
【单选题】
柴油发电机组备用状态下其的控制方式在应在___位置。
A. 手动;
B. 2自动;
C. 就地;
D. 远方。
【单选题】
当发电机的定子线棒出水温差大于___在确认测温元件正常的情况下应停机处理。
A. 8℃;
B. 10℃;
C. 12℃;
D. 14℃。
【单选题】
在直流电路中,我们把电流流入电源的一端叫做电源的___。
A. 正极;
B. 负极;
C. 端电压;
D. 电势。
【单选题】
蓄电池是一种储能设备,它能把电能转变为___能。
A. 热;
B. 光;
C. 机械;
D. 化学。
【单选题】
把几组参数相同的蓄电池并联接入电路中,它们的___等于各个蓄电池输出电流之和。
A. 总电压;
B. 总电流;
C. 总电阻;
D. 无法计算。
【单选题】
浮充电运行的铅酸蓄电池,单只蓄电池电压应保持在___之间。
A. 1.15±0.05V;
B. 1.65±0.05V;
C. 2.25±0.02V;
D. 2.55±0.05V。
【单选题】
新安装或大修后的铅酸蓄电池进行放电容量试验的目的是为了确定其___。
A. 额定容量;
B. 实际容量;
C. 终止电压;
D. 放电电流。
【单选题】
直流负母线的颜色为___。
A. 黑色;
B. 绿色;
C. 蓝色;
D. 赭色。
【单选题】
在寻找直流系统接地时,应使用___。
A. 兆欧表;
B. 低内阻电压表;
C. 高内阻电压表;
D. 验电笔。
【单选题】
蓄电池充电结束后,连续通风___小时以上,室内方可进行明火作业。
A. 2;
B. 1;
C. 半;
D. 1.5。
【单选题】
当发电机的定子线棒出水温差大于___在确认测温元件正常的情况下应停机处理。
A. 8℃;
B. 10℃;
C. 12℃;
D. 14℃。
【单选题】
蓄电池浮充电运行,如果直流母线电压下降,超过许可范围时,则应___恢复电压。
A. 切断部分直流负载;
B. 增加蓄电池投入的个数;
C. 增加浮充电流;
D. 减小浮充电流。
【单选题】
鼠笼式电动机的启动次数应遵照制造厂规定执行,无规定时,一般允许在冷态下启动两次,每次间隔不少于___。
A. 1min;
B. 3min;
C. 5min;
D. 10min。
【单选题】
蓄电池温度上升,当环境温度在___以上时,对环境温度进行降温处置。
A. 20℃;
B. 30℃;
C. 40℃;
D. 50℃。
【单选题】
全密封免维护酸性蓄电池在正常浮充条件下,可___均衡充电。
A. 不进行;
B. 进行;
C. 延时进行;
D. 无明确规定。
【单选题】
发电机定子绝缘电阻测定时需用2500V专用兆欧表对其三相测试___。
A. 15S;
B. 1min;
C. 2min;
D. 3min。
【单选题】
蓄电池与硅整流充电机并联于直流母线上作浮充电运行,当断路器合闸时,突增的大电流负荷___。
A. 主要由蓄电池承担;
B. 主要由硅整流充电机承担;
C. 蓄电池和硅整流充电机各承担1/2;
D. 无法确定。
【单选题】
阀控式密封免维护铅酸蓄电池浮充电应采用___充电法。
A. 半恒流;
B. 恒流;
C. 恒压;
D. 恒压限流。