刷题
导入试题
【单选题】
An ESXi host's VMCA-Signed certificate has expired. How can the certificate be renewed?___
A. In the vSphere Web Client, browse to the host in question. Click the Manage tab and select settings. Select System and click Certificate, then click the Renew button.
B. In the vSphere Web Client, browse to the host in question. Click the Manage tab and select settings. Select System and click Certificate, then click the Refresh CA Certificates button.
C. Run the command /sbin/generate-certificates on the affected host.
D. Disconnect the host from vCenter Server and reconnect it.
查看试卷,进入试卷练习
微信扫一扫,开始刷题
答案
D
解析
暂无解析
相关试题
【单选题】
Which is the correct order for upgrading vSphere components?___
A. vCenter Server, ESXi hosts, VMware Tools, Virtual Machine hardware
B. VMware Tools, Virtual Machine hardware, ESXi hosts, vCenter Server
C. vCenter Server, Virtual Machine hardware, VMware tools, ESXi hosts
D. ESXi hosts, vCenter Server, Virtual Machine hardware, VMware Tools
【单选题】
Which iSCSI initiator type can be used with any network interface card?___
A. Software iSCSI initiator
B. Software FCoE adapter
C. Hardware Independent iSCSI initiator
D. Hardware Dependent iSCSI initiator
【单选题】
An administrator is attempting to power on a virtual machine with 32GB of memory. The operation fails with the following error: <Could not power on VM: No space left on device> <Checking the space on the virtual machine's datastore, there is 30GB free.> Which action would allow the VM to power on?___
A. Set a 2GB memory reservation on the VM.
B. Mount the virtual disk from the affected VM on to another virtual machine and free up space from within the OS.
C. Enable vSphere HD admission control on the cluster in which the VM resides.
D. Set a 2GB memory limit on the VM.
【单选题】
An administrator attempts to manually reclaim space on thin-provisioned VMFS6 volumes but finds that no additional space is being recovered. Which could be causing this?___
A. vSphere 6.5 does not support manual UNMAP.
B. The manual UNMAP operation has been moved to the vSphere web client.
C. The VASA version is use is incompatible.
D. UNMAP is automated for VMFS6.
【单选题】
An administrator has upgraded to vSphere 6.5 and also wants to use Kerberos authentication for NFS. Which can be done to the existing NFSv3 volumes to enable this feature?___
A. Perform a storage rescan on VMFS volumes.
B. Unmount the NFSv3 datastore, and then mount as NFSv4.1 datastore.
C. Nothing. All NFSv3 mounted datastores are upgraded automatically during vSphere upgrades.
D. Perform a scan of new storage devices.
【单选题】
An administrator wants to restore the vCenter Server Appliance 6.5 from backup. Where can this be accomplished?___
A. from the ESXi Host Client
B. from the VMware vSphere Appliance Management Interface
C. from within the VMware vSphere Web Client
D. from the vCenter Server Appliance Installer
【单选题】
The administrator wants to power on VM-K2, which has a 2GHz CPU reservation. VM-M1, VM-M2, and VM-K1 are all powered on. VM-K2 is not powered on. The exhibit shows the parent and child resource reservations. If Resource Pool RP-KID is configured with an expandable reservation, which statement is true?___
A. VM-K2 will be unable to power on because there are insufficient resources.
B. VM-K2 will be able to power on since resource pool RP-KID has 2GHz available.
C. VM-K2 will be unable to power on because only 2GHz are reserved for RP-KID.
D. VM-K2 will receive resource priority and will be able to power on this scenario.
【单选题】
Which is the block size on the VMFS6 datastore?___
A. All small and large file blocks are 8MB.
B. All small and large file blocks are 1MB.
C. Small file blocks are 512KB. large file blocks are 64MB.
D. Small file blocks are 1MB, large file blocks are 512MB.
【单选题】
When installing vCenter Converter Standalone, why must an administrator perform a client-server installation instead of a local installation?___
A. to manage conversion tasks remotely
B. to convert virtual machines as well as physical machines
C. to allow installation of the Converter agent on remote source machines
D. to hot clone physical or virtual machines
【单选题】
Which is required by vCenter Converter Standalone to convert a physical Red Hat Enterprise Linux 7 machine to a virtual machine?___
A. The Linux machine must be powered off.
B. The Linux machine must have the SSH daemon started.
C. The Linux machine must use a static IP address.
D. The Linux machine must have a fully-qualified domain name.
【单选题】
An administrator is troubleshooting network communications between a vCenter Server and an ESXi 6.5 host. Which log shows the related events between these components?___
A. /var/log/fdm.log
B. /var/log/vpxa.log
C. /var/log/hostd.log
D. /var/log/auth.log
【单选题】
An administrator has recently upgraded from vSphere 6.0 to 6.5, and can no longer see the software iSCSI named vmhba33. Which could be the reason for this?___
A. The upgrade has changed the vmhba name.
B. vSphere 6.5 automates iSCSI configurations.
C. vSphere 6.5 no longer supports software iSCSI.
D. The upgrade has deleted the vmhba.
【单选题】
An administrator is trying to vMotion a VM from his datacenter to a recovery site. Which is the maximum allowed RTT (Round-Trip Time) latency between source and destination host?___
A. 100 milliseconds
B. 150 milliseconds
C. 15 milliseconds
D. 10 milliseconds
【单选题】
Which is required for configuring iSCSI Software Adapter network port binding?___
A. VMkernel of the iSCSI traffic must be load balanced using Route based on IP Hash algorithm.
B. VMkernel of the iSCSI traffic must be load balanced using Route based on Source Virtual Port ID algorithm.
C. VMkernel of the iSCSI traffic must be load balanced using Route based on Source MAC Hash algorithm.
D. VMkernel of the iSCSI traffic must be bound to only one active network adapter.
【单选题】
In vSphere Data Protection 6.1, which is the function of a Backup Verification job?___
A. None. Backup Verification job is not a feature of vSphere Data Protection
B. It is a manual task -Power it on -Verify the guest OS -Check started applications
C. It is an automatic process -Restore a virtual machine -Power it on -Verify that the guest OS is booted by communicating with the Backup Verification agent
D. It is an automatic process -Restore a virtual machine -Power it on -Verify that the guest OC is booted by detecting the VMware ToolsTM "heartbeats"
【单选题】
An administrator has enabled vSphere Distributed Switch Health Check. The hosts connected to that Distributed Switch all display an alert:< vSphere Distributed Switch MTU supported status > .The administrator has all of the VMkernel ports MTU sizes set to 1600. Which action will remedy this problem?___
A. Configure the Distributed Switch to MTU 9100.
B. Disconnect and reconnect the physical network cable.
C. Configure the physical switch to MTU 1600.
D. Disable the Distributed Switch MTU.
【单选题】
Which Host Profile Subprofile configuration is used to configure firewall settings for ESXi hosts?___
A. Advanced Configuration Settings
B. General System Settings
C. Security
D. Networking
【单选题】
Where would a vSphere administrator find general vCenter Server logs on a vCenter Server Appliance?___
A. /var/log/vmware/vpxd/
B. /var/log/messages
C. /etc/vmware-vpx/
D. /var/log/vmware/vsan-health/
【单选题】
An administrator wishes to enable network port mirroring based on source port. Which feature should be enabled?___
A. vSphere standard switch port
B. ERSPAN
C. NSX Virtual Wire
D. VLAN
【单选题】
Which CLI command shows the physical uplink status for a vmnic?___
A. esxcli network ip connection list
B. esxcli network ip neighbor list
C. esxcli network nic get
D. esxcli network nic list
【单选题】
Which is the maximum number of block devices (LUNs) that are supported by ESXi hosts that are running version 6.5?___
A. 1024
B. 512
C. 2048
D. 256
【单选题】
When performing a vCenter Server 5.5 for Windows with Microsoft SQL Server Express database migration to vCenter Server Appliance 6.5, which will be the target database?___
A. Microsoft SQL Server Express 2012R2
B. Microsoft SQL Server Standard 2012R2
C. PostgreSQL
D. Oracle DB 11g
【单选题】
An administrator has multiple vCenter Server 6.5 systems but cannot enable Storage I/O Control (SIOC) on a datastore shared by ESXi hosts managed by the vCenter Server systems. Which action should the administrator take to resolve the issue?___
A. Unmount the datastore and then enable SIOC on the vCenter Server system.
B. Configure the datastore to be managed by a single vCenter Server system.
C. Configure Storage DRS and then enable SIOC on the vCenter Server system.
D. Enable Raw Device Mapping (RDM) on the
E. SXi hosts.
【单选题】
“OneAppServer” is a VM template stored in a content library named “LibraryOne”, but the vSphere administrator is not able to use this template for deployment. Why is the administrator unable to deploy OneAppServer?___
A. OneAppServer must be updated before it can be deployed.
B. LibraryOne is a subscribed library and OneAppServer is not downloaded yet.
C. LibraryOne is published and optimized for syncing over HTTP.
D. OneAppServer was imported from a local file on the system.
【单选题】
An administrator sets the Failover Capacity for both CPU and Memory at 25%. Based on the Exhibit below, how much of the cluster’s total CPU resources are still available to power on additional virtual machines?___
A. 45%
B. 25%
C. 70%
D. 60%
【单选题】
Which statement applies to the vSphere Replication appliance?___
A. Only one vSphere Replication appliance can be deployed per vCenter Server instance.
B. VMware Tools in the vSphere Replication appliance can be upgraded.
C. A single vSphere Replication appliance can manage a maximum of 4000 replications.
D. vSphere Replication is available only with the vSphere
E. ssentials Plus license.
【单选题】
Which esxcli namespace can a vSphere Administrator use to adjust the queue depth?___
A. esxcli system module parameters
B. esxcli storage core device
C. esxcli system module set
D. esxcli storage core adapter
【单选题】
Which statement regarding datastore clusters meets VMware’s recommended best practices?___
A. Clusters should contain only datastores presented from the same storage array.
B. Clusters should contain only datastores with equal hardware acceleration capability.
C. Clusters should contain only datastores with the same capacity.
D. Clusters should contain only datastores using the same connection method (iSCSI, FC, etc.).
【单选题】
What VM Monitoring setting would ensure that the maximum reset window for a virtual machine is 24 hours?___
A. Medium
B. Low
C. High
D. Normal
【单选题】
What is the default space threshold for vSphere Storage DRS?___
A. 80%
B. 70%
C. 90%
D. 95%
【单选题】
Which is the correct sequence to upgrade a vSphere infrastructure?___
A. vCenter Server>ESXi host> VMware Tools>VM compatibility
B. ESXi host>vCenter Server> VMware Tools>VM compatibility
C. vCenter host> ESXi host> VM compatibility> VMware Tools
D. ESXi host>vCenter Server> VM compatibility>VMware Tools
【单选题】
An administrator has a large boot from SAN cluster and wants to ensure consistent configuration by using host profiles. What special considerations are required for boot from SAN hosts?___
A. Change the “Device is shared clusterwide” setting to “false” in the host profile.
B. Verify that the boot LUN is correctly identified as the boot device in the host profile.
C. The boot from SAN device must report as a local device.
D. Host profiles are incompatible with boot from SAN hosts.
【单选题】
When using VMware Converter to import a Windows server and improve the consistency of the destination virtual machine, which optional step can be performed immediately prior to powering down the source server?___
A. Perform a final synchronization task.
B. Remove the server from the network.
C. Uninstall production applications.
D. Remove the server from the Active Directory domain.
【单选题】
Restoration of the vCenter Server Appliance is accomplished using which interface?___
A. vSphere Web Client
B. vSphere Client
C. vCenter Server Appliance Management Interface
D. vCenter Server Appliance GUI Installer
【单选题】
When attempting to migrate a virtual machine to another host in the same cluster, the error message, “Select a valid compute resource” returns. What could cause this error?___
A. Both hosts run different versions of ESXi.
B. Both hosts are not sharing the same datastore.
C. VMware Tools is not installed.
D. Virtual machine has an ISO attached.
【单选题】
When will vSphere Data Protection delete the expired backup image of a Platform Service Controller?___
A. Immediately after the retention period has expired.
B. After the expired backup image is restored.
C. During the next backup window following expiry.
D. During the next maintenance window following expiry.
【单选题】
Group A has permission to download files in Content Library. Group B does not have permission to download files in Content Library. If a user is a member of both groups, what will be the result?___
A. The user cannot download file from Content Library.
B. The user can download file from Content Library.
C. The user cannot access Content Library.
D. The user can access Content Library.
【单选题】
An administrator is trying to set up Host Partial Failure Response, but the Automated option is grayed out. What can the administrator change to enable the Automated option?___
A. Change the vSphere DRS Automation level to Partially Automated.
B. Change the vSphere DRS Automation level to Fully Automated.
C. Enable vSphere HA Host Monitoring.
D. Change the vSphere DPM Automation level to Automatic.
【单选题】
When you attempt to open a virtual machine console from the vSphere Web Client, the console does not connect. The following error message appears:<HTTP ERROR 404> <Problem accessin/.Reason: Not Found>. Why did not connect?___
A. Port 443 is in use.
B. Port 9443 is in use.
C. Port 8443 is in use.
D. Port 22443 is in use.
【单选题】
What new feature was introduced to the Content Library in vSphere 6.5?___
A. Mount an ISO directly from the Content Library.
B. Deploy a virtual machine from an OVF Package in a Content Library.
C. Upload a File from a URL to a Library Item.
D. Upload a File from a Local System to a Library Item.
推荐试题
【单选题】
在电力线路运行中,为了弥补主保护性能不足而专门装设的保护称为___。
A. 主保护;
B. 次保护;
C. 后备保护;
D. 辅助保护;
【单选题】
反应电力的改变的保护,有电流速断.定时限过流及___等保护。
A. 零序电流;
B. 零序电压;
C. 负序电流;
D. 方向过流;
【单选题】
定时限过流保护的缺点是:故障点离电源越近,保护装置的动作___。
A. 时间越短;
B. 时间越长;
C. 越可靠;
D. 越稳定;
【单选题】
定时限过流保护在35kV以上回路中或大容量重要元件上,广泛用于___。
A. 主保护;
B. 后备保护;
C. 后继保护;
D. 辅助保护;
【单选题】
定时限过流保护用在单电源辐射形线路上能保证动作的( ),但在两端电源的线路上则不能保证动作的___。
A. 选择性;选择性;
B. 灵敏性;灵敏性;
C. 可靠性;可靠性;
D. 快速性;快速性;
【单选题】
方向元件反应___方向,只有当短路( )有母线流向线路是,相应的保护才能动作。
A. 功率;功率;
B. 功率;电流;
C. 电流;电流;
D. 电流;功率;
【单选题】
功率方向继电器的任务是测量加入继电器的电压和电流之间的相位,以判别___
A. 短路电流的流向;
B. 短路电流的大小;
C. 短路功率的方向;
D. 故障电压的相位;
【单选题】
反应相间短路的功率方向继电器采用___接线方式。
A. 360°;
B. 270°;
C. 180°;
D. 90°;
【单选题】
瞬时电流速断保护的缺点是___
A. 具有前端死区;
B. 具有末端死区;
C. 具有中间死区;
D. 灵敏性差;
【单选题】
瞬时电流速断保护的动作电流是按躲过被保护线路末端的___来整定的。
A. 最大短路电流;
B. 最小短路电流;
C. 最大负荷电流;
D. 最小负荷电流;
【单选题】
当系统运行方式变化很大时,电流速断保护的___往往得不到满足。
A. 选择性;
B. 灵敏度;
C. 可靠性;
D. 快速性;
【单选题】
瞬时电流速断保护与过电流保护相比,区别之一是瞬时电流速断保护是通过___来获得动作的选择性。
A. 动作时限和动作电流;
B. 动作时限;
C. 动作电流;
D. 动作时限阶差;
【单选题】
过电流保护与瞬时电流速断保护相比,区别之一是过电流保护是通过___来获得动作的选择性。
A. 动作时限和动作电流;
B. 动作时限阶差;
C. 动作电流;
D. 动作时限;
【单选题】
延时电流速断保护的动作时间一般为___,定时限过电流保护的动作时间一般为( )。
A. 0.5~0.6s;几秒;
B. 几十秒;0.5~0.6s;;
C. 几秒;0.5~0.6s;
D. 0.5~0.6s;几十秒;
【单选题】
方向过电流保护中,当电流由母线流向线路,或从线路流向母线时,两种情况下继电保护的反应情况是___。
A. 都动作;
B. 前者动作,后者不动作;
C. 前者不动作,后者动作;
D. 都不动作;
【单选题】
低电压闭锁过电流保护在线路发生短路时,通过产生的短路电流的___,在伴随母线电压的( )才会启动。
A. 增大;上升;
B. 增大;下降;
C. 减小;上升;
D. 减小;下降;
【单选题】
低电压闭锁过电流保护应加装___闭锁。
A. 电压;
B. 电流;
C. 电气;
D. 电容;
【单选题】
用于接地故障保护的功率方向继电器的型号为___。
A. GG—11;
B. GG—12;
C. GL—11;
D. GH—11;
【单选题】
GG—11型功率方向继电器的最大灵敏角为___。
A. 300 ;
B. 450 ;
C. 700 ;
D. 90;0
【单选题】
整流式功率方向继电器按比较方式不同,可分为相位比较式和___比较式2类。
A. 电压;
B. 电流;
C. 功率方向;
D. 绝对值;
【单选题】
整流型继电器一般由___.整流滤波回路.比较回路和执行回路构成。
A. 电流形成回路;
B. 电压形成回路;
C. 信号回路;
D. 控制回路;
【单选题】
在ZC-23 冲击继电器构成的中央复归能重复动作的事故信号装置中,作为执行元件的是___继电器。
A. 中间;
B. 信号;
C. 干簧;
D. 时间;
【单选题】
预告信号装置主要由预告信号小母线,信号母线,___继电器,警铃,光字牌信号,转换开关,预告信号试验及复归按钮等组成。
A. 信号.脉冲.电压;
B. 脉冲.中间;
C. 脉冲.信号.中间;
D. 信号.中间;
【单选题】
变电所变压器常见预告信号有过负荷信号.___信号.轻瓦斯动作信号。
A. 油温过低;
B. 油温过高;
C. 重瓦斯动作;
D. 油位过高;
【单选题】
变电所控制室装设的警铃音响信号和光字牌称为___装置。
A. 中央信号;
B. 事故信号;
C. 闪光信号;
D. 预告信号;
【单选题】
预告信号的任务是运行设备发生异常时___发出音响信号和灯光显示。
A. 瞬时或延时;
B. 定期;
C. 定时;
D. 及时;
【单选题】
预告信号的延时可以由反映该不正常工作状态的保护所带有的___继电器来获得,也可以是若干信号回路公用一个( )继电器来构成延时预告信号回路。
A. 时间;中间;
B. 中间;时间;
C. It寸间;时间;
D. 中间;中间;
【单选题】
事故信号的作用是在断路器___跳闸时提醒值班人员及时进行处理。
A. 操作;
B. 事故;
C. 异常;
D. 过负荷;
【单选题】
事故信号中的音响信号是共用的,用来引起值班人员注意的灯光信号是___的。
A. 专用;
B. 共用;
C. 独立 ;
D. 分闸;
【单选题】
事故信号是利用控制开关与断路器的位置不对应原理启动___的。
A. 中间继电器;
B. 时间继电器;
C. 信号继电器;
D. 冲击继电器;
【单选题】
输电线路多数故障是暂时性的,采用自动___装置后,可大大提高供电可靠性。
A. 重合闸;
B. 自投;
C. 控制;
D. 合闸;
【单选题】
重合闸装置动作后,应能自动___,以准备下次动作。
A. 发信号;
B. 跳闸;
C. 掉牌;
D. 复归;
【单选题】
电容式重合闸是利用电容器的___来实现一次重合的。
A. 延时放电和长时充电;
B. 瞬时放电和长时充电;
C. 长时放电和长时充电;
D. 长时放电和延时充电;
【单选题】
瓦斯保护是变压器内部故障的___之一。
A. 后备保护;
B. 辅助保护;
C. 继电保护;
D. 主保护;
【单选题】
瓦斯继电器的开口杯可反映变压器内部___故障动作于气体容积。
A. 轻微;
B. 严重;
C. 温度过高;
D. 振动过大;
【单选题】
新式瓦斯继电器的上接点由上浮筒或上开口杯控制,构成( )保护,其动作后发出___信号。
A. 重瓦斯;延时预报;
B. 轻瓦斯;延时预报;
C. 重瓦斯;跳闸;
D. 轻瓦斯;瞬时预报;
【单选题】
变压器的电流速断保护可作为电源侧绕组和电源侧套管及___故障的主保护。
A. 引出线;
B. 内部;
C. 匝间短路;
D. 温度过高;
【单选题】
变压器的电流速断保护可作为内部故障的___保护。
A. 主;
B. 后备;
C. 辅助;
D. 控制;
【单选题】
变压器电流速断保护用的电流互感器装于___。
A. 负荷侧;
B. 电源侧;
C. 任意侧;
D. 二次侧;
【单选题】
采用比较被保护元件两端___的方法构成的保护称为纵差动保护。
A. 电流的大小;
B. 电流的方向;
C. 电流的大小和方向;
D. 电阻;
欢迎使用我爱刷题
×
微信搜索我爱刷题小程序
温馨提示
×
请在电脑上登陆“www.woaishuati.com”使用