【单选题】
Which feature facilitates the sharing of templates via vCenter Server?___
A. Content Library
B. OVF
C. folders
D. vApp
查看试卷,进入试卷练习
微信扫一扫,开始刷题
相关试题
【单选题】
A vSphere Administrator is in the process of configuring replication for a virtual machine, but is not able to select the Recovery Point Objective (RPO) value of 5 minutes. Which statement could explain why the RPO value cannot be lower than 15 minutes?___
A. The OS quiescing option is selected for Replication options.
B. The virtual machine hardware version is not compatible.
C. The target and source sites use different types of datastores.
D. The target and source sites are not using VMFS 6.0 datastore.
【单选题】
What advanced parameter defines a custom isolation IP address for a vSphere HA cluster?___
A. das.usedefaultisolationaddress
B. das.isolationshutdowntimeout
C. fdm.isolationpolicydelaysec
D. das.isolationaddress
【单选题】
Which method is supported for backing up the virtual machine that contains vCenter Server?___
A. differential
B. incremental
C. full image
D. individual disks
【单选题】
A vSphere Administrator must ensure that a user is able to view and manage the system configuration in vSphere Web Client. In the vCenter Single Sign-On domain, which group should the user be a part of?___
A. SystemConfiguration.BashShellAdministrators
B. ComponentManager. Administrators
C. Administrators
D. SystemConfiguration.Administrators
【单选题】
What is the minimum number of hosts that must contribute capacity to a non-ROBO single site VMware vSAN cluster?___
【单选题】
Which guest operating system supports PVRDMA?___
A. Windows (32-Bit)
B. Linux (32-Bit)
C. Windows (64-Bit)
D. Linux (64-Bit)
【单选题】
What is the correct way to replace the certificate on an existing vCenter Server that is part of a vCenter HA configuration?___
A. Put the vCenter HA in Maintenance mode, replace the certificate, exit Maintenance mode.
B. Shut down Passive and Witness nodes and replace the certificate on the Active node.
C. Remove the Passive and Witness nodes, replace the certificate, reconfigure the cluster.
D. Replace the certificate while all nodes are participating in the cluster.
【单选题】
The vSphere Data Protection performance analysis results in the “Conditionally Passed” status. What can cause this condition?___
A. The results did not meet the minimum performance expectations.
B. The read, write, and seek tests were successful.
C. The read and write tests were successful but the seek test failed.
D. The read and write tests were successful but the seek test skipped.
【单选题】
A vSphere Administrator wants to reserve 0.5 Gbps for virtual machines on each uplink on a disturbed switch that has 10 uplinks. What is the quota that should be reserved for the network resource pool?___
A. 10 Gbps
B. 5 Gbps
C. 100 Gbps
D. 0.5 Gbps
【单选题】
A vSphere administrator manages a cluster which includes critical and non-critical virtual machines. The cluster requires different permissions for contractors and non-contractors. How can the administrator exclude the contractor group from some of the critical VMs?___
A. Apply permission for both contractors and non-contractors on the cluster level.
B. Apply permission for both contractors and non-contractors on the cluster level. Remove permission on the critical VMs for contractors.
C. Remove permission for contractors on the cluster level. Apply permission on the critical VMs for noncontractors.
D. Apply permission for both contractors and non-contractors on the VMs. Remove permission on the critical VMs for contractors.
【单选题】
In an ESXi 6.5 cluster only "NFS datastore has running or registered virtual machines" returns. A vSphere HA cluster with four hosts has admission control configured to tolerate one host failure. Which statement is true if a fifth host is added?___
A. CPU and Memory capacity will be set to 50%.
B. CPU and Memory capacity will be set to 30%.
C. CPU and Memory capacity will be set to 25%.
D. CPU and Memory capacity will be set to 20%.
【单选题】
Which command can be run to troubleshoot connectivity problems with vmkernal network interfaces?___
A. esxcli network
B. vmkping
C. net-status
D. vicfg-vmknic
【单选题】
What counter should an administrator check to determine if a virtual machine is ballooning?___
A. swapinRate
B. vmmemctltarget
C. swapped
D. vmmemctl
【单选题】
By default, how often is the vCenter vpx user password automatically changed?___
A. 15 days
B. 60 days
C. 30 days
D. 45 days
【单选题】
Which metric in the Exhibit would identify high latency for a virtual machine operating system?___
A. QAVG/cmd
B. KAVG/cmd
C. DAVG/cmd
D. GAVG/cmd
【单选题】
What VM Monitoring setting would ensure that the failure interval for a virtual machine is defined as 120 seconds?___
A. High
B. Normal
C. Low
D. Medium
【单选题】
The business managers have asked the IT administrator to ensure configuration compliance in the vSphere infrastructure. The IT administrator wants to use Host Profiles to accomplish this, but is unable to do so. Why is the administrator unable to use Host Profiles?___
A. The infrastructure uses a vSphere Standard license.
B. The infrastructure has servers with various CPU families.
C. The user has only the “Administrator” role.
D. Host Profiles apply only to storage settings.
【单选题】
What is the result of a “Consolidate” action on a virtual machine?___
A. All snapshots on the virtual machines will be deleted.
B. The virtual machine will be reverted to its last snapshot.
C. Redundant delta disks will be combined and deleted.
D. A new snapshot with memory state will be created.
【单选题】
A Telco customer is implementing NFV using vSphere as the virtualization platform. Which feature can help achieve a high packet rate with lower CPU consumption?___
A. Network I/O Control
B. SplitRX
C. ERSPAN
D. LACP
【单选题】
What is the VMware-recommended best practice for Fibre Channel zoning?___
A. soft zoning
B. single-initiator-multiple-target zoning
C. single-initiator zoning
D. single-initiator-single-target zoning
【单选题】
How can a vSphere administrator ensure that a set of virtual machines run on different hosts in a DRS cluster?___
A. Use a VM-Host affinity rule.
B. Add the VMs to a vApp.
C. Use a VM-VM affinity rule.
D. Place the VMs in different folders.
【单选题】
vCenter Server Appliance Instance can be backed up using which Client Interface?___
A. vSphere Client Interface
B. vSphere Web Client Interface
C. VMware Host Client Interface
D. Virtual Appliance Management Interface
【单选题】
What tool can capture network traffic at the uplinks, or vSwitch, or virtual port levels?___
A. tcpdump-uw
B. wireshark
C. pktcap-uw
D. pcap
【单选题】
Which storage feature always requires the use of third-party software on ESXi?___
A. Hardware Acceleration for NAS devices
B. VVOL
C. Hardware Acceleration for Block
D. evices
【单选题】
An ESXi host's VMCA-Signed certificate has expired. How can the certificate be renewed?___
A. In the vSphere Web Client, browse to the host in question. Click the Manage tab and select settings. Select System and click Certificate, then click the Renew button.
B. In the vSphere Web Client, browse to the host in question. Click the Manage tab and select settings. Select System and click Certificate, then click the Refresh CA Certificates button.
C. Run the command /sbin/generate-certificates on the affected host.
D. Disconnect the host from vCenter Server and reconnect it.
【单选题】
Which is the correct order for upgrading vSphere components?___
A. vCenter Server, ESXi hosts, VMware Tools, Virtual Machine hardware
B. VMware Tools, Virtual Machine hardware, ESXi hosts, vCenter Server
C. vCenter Server, Virtual Machine hardware, VMware tools, ESXi hosts
D. ESXi hosts, vCenter Server, Virtual Machine hardware, VMware Tools
【单选题】
Which iSCSI initiator type can be used with any network interface card?___
A. Software iSCSI initiator
B. Software FCoE adapter
C. Hardware Independent iSCSI initiator
D. Hardware Dependent iSCSI initiator
【单选题】
An administrator is attempting to power on a virtual machine with 32GB of memory. The operation fails with the following error: <Could not power on VM: No space left on device> <Checking the space on the virtual machine's datastore, there is 30GB free.> Which action would allow the VM to power on?___
A. Set a 2GB memory reservation on the VM.
B. Mount the virtual disk from the affected VM on to another virtual machine and free up space from within the OS.
C. Enable vSphere HD admission control on the cluster in which the VM resides.
D. Set a 2GB memory limit on the VM.
【单选题】
An administrator attempts to manually reclaim space on thin-provisioned VMFS6 volumes but finds that no additional space is being recovered. Which could be causing this?___
A. vSphere 6.5 does not support manual UNMAP.
B. The manual UNMAP operation has been moved to the vSphere web client.
C. The VASA version is use is incompatible.
D. UNMAP is automated for VMFS6.
【单选题】
An administrator has upgraded to vSphere 6.5 and also wants to use Kerberos authentication for NFS. Which can be done to the existing NFSv3 volumes to enable this feature?___
A. Perform a storage rescan on VMFS volumes.
B. Unmount the NFSv3 datastore, and then mount as NFSv4.1 datastore.
C. Nothing. All NFSv3 mounted datastores are upgraded automatically during vSphere upgrades.
D. Perform a scan of new storage devices.
【单选题】
An administrator wants to restore the vCenter Server Appliance 6.5 from backup. Where can this be accomplished?___
A. from the ESXi Host Client
B. from the VMware vSphere Appliance Management Interface
C. from within the VMware vSphere Web Client
D. from the vCenter Server Appliance Installer
【单选题】
The administrator wants to power on VM-K2, which has a 2GHz CPU reservation. VM-M1, VM-M2, and VM-K1 are all powered on. VM-K2 is not powered on. The exhibit shows the parent and child resource reservations. If Resource Pool RP-KID is configured with an expandable reservation, which statement is true?___
A. VM-K2 will be unable to power on because there are insufficient resources.
B. VM-K2 will be able to power on since resource pool RP-KID has 2GHz available.
C. VM-K2 will be unable to power on because only 2GHz are reserved for RP-KID.
D. VM-K2 will receive resource priority and will be able to power on this scenario.
【单选题】
Which is the block size on the VMFS6 datastore?___
A. All small and large file blocks are 8MB.
B. All small and large file blocks are 1MB.
C. Small file blocks are 512KB. large file blocks are 64MB.
D. Small file blocks are 1MB, large file blocks are 512MB.
【单选题】
When installing vCenter Converter Standalone, why must an administrator perform a client-server installation instead of a local installation?___
A. to manage conversion tasks remotely
B. to convert virtual machines as well as physical machines
C. to allow installation of the Converter agent on remote source machines
D. to hot clone physical or virtual machines
【单选题】
Which is required by vCenter Converter Standalone to convert a physical Red Hat Enterprise Linux 7 machine to a virtual machine?___
A. The Linux machine must be powered off.
B. The Linux machine must have the SSH daemon started.
C. The Linux machine must use a static IP address.
D. The Linux machine must have a fully-qualified domain name.
【单选题】
An administrator is troubleshooting network communications between a vCenter Server and an ESXi 6.5 host. Which log shows the related events between these components?___
A. /var/log/fdm.log
B. /var/log/vpxa.log
C. /var/log/hostd.log
D. /var/log/auth.log
【单选题】
An administrator has recently upgraded from vSphere 6.0 to 6.5, and can no longer see the software iSCSI named vmhba33. Which could be the reason for this?___
A. The upgrade has changed the vmhba name.
B. vSphere 6.5 automates iSCSI configurations.
C. vSphere 6.5 no longer supports software iSCSI.
D. The upgrade has deleted the vmhba.
【单选题】
An administrator is trying to vMotion a VM from his datacenter to a recovery site. Which is the maximum allowed RTT (Round-Trip Time) latency between source and destination host?___
A. 100 milliseconds
B. 150 milliseconds
C. 15 milliseconds
D. 10 milliseconds
【单选题】
Which is required for configuring iSCSI Software Adapter network port binding?___
A. VMkernel of the iSCSI traffic must be load balanced using Route based on IP Hash algorithm.
B. VMkernel of the iSCSI traffic must be load balanced using Route based on Source Virtual Port ID algorithm.
C. VMkernel of the iSCSI traffic must be load balanced using Route based on Source MAC Hash algorithm.
D. VMkernel of the iSCSI traffic must be bound to only one active network adapter.
【单选题】
In vSphere Data Protection 6.1, which is the function of a Backup Verification job?___
A. None. Backup Verification job is not a feature of vSphere Data Protection
B. It is a manual task -Power it on -Verify the guest OS -Check started applications
C. It is an automatic process -Restore a virtual machine -Power it on -Verify that the guest OS is booted by communicating with the Backup Verification agent
D. It is an automatic process -Restore a virtual machine -Power it on -Verify that the guest OC is booted by detecting the VMware ToolsTM "heartbeats"
推荐试题
【单选题】
管理是由多个环节组成的过程,为了说明组成管理的这些环节可以使用___。
A. 项目组织设计文件
B. 项目任务分期表
C. 工作任务分工表
D. 管理职能分工描述书
【单选题】
关于缺陷责任的说法,错误的是___。
A. 缺陷责任期自竣工验收合格之日起计算
B. 缺陷责任期最长不得超过 2 年
C. 缺陷责任期内,发包人对已接收使用的工程负责日常维护工作
D. 承包人不能在合理时间内修复缺陷的,发包人可自行修复或委托他人修复
【单选题】
根据《建设工程施工合同(示范文本)》(GF-2017-0201),工程变更项目在已标价工程量清单中有相同项目,但变更工程量超过原有幅度 15%,则变更工程单价___。
A. 直接按合同已有的价格确定
B. 由发包人提供并经双方确认执行
C. 由合同当事人协商确定
【单选题】
D.参照已有价格并结合67.在下列合同形式中,承包人承担风险最大的合同类型的___。
A. 固定总价合同
B. 固定单价合同
C. 成本加固定费用合同
D. 最大成本加费用合同
【单选题】
具有防止污染设施的建设工程项目可投入生产或者使用的条件是,防止污染的设施必须经___验收合格。
A. 项目所在地的建设主管部门
B. 项目投资人所在地的环境保护行政主管部门
C. 审批设计文件的建设主管部门
D. 原审批环境影响报告书的环境保护行政主管部门
【单选题】
技术交底书应由施工项目技术人员编制,并经___批准实施。
A. 施工单位负责人
B. 监理工程师
C. 项目技术负责人
D. 建设单位负责人
【单选题】
建设工程施工平行发包模式在进度控制方面的特点是( )。
A. 需全部施工图完成后,才能进行招标,对进度控制不利
B. 招标次数较少,对进度控制有利
C. 无法做到边设计边施工,对进度控制不利
D. 某部分施工图完成后即可开始这部分工程招标,有利于缩短建设周期
【单选题】
某建设工程施工合同约定:“工程预付款从未施工工程尚需的主要材料及构件的价值相当于工程预付款数额时扣起”。已知该工程合同总价 2000 万元,工程预付款 240 万元,主材费占比重为 60%,则该工程预付款起扣点为( )万元。
A. 240
B. 1200
C. 1600
D. 1760
【单选题】
根据《建筑安装工程费用项目组成》(建标[2013]44 号),下列费用属于企业管理费的是( )。
A. 流动施工津贴
B. 城市维护建设税与教育费附加
C. 停工学习期间支付的工资
D. 采购及保管费
【单选题】
关于分部(子分部)工程质量验收合格应符合的规定,下列说法不正确的是( )。
A. 所含分项工程的质量均验收合格
B. 质量控制资料完整
C. 工程施工符合设计文件的要求
D. 观感质量验收符合要求
【单选题】
施工项目竣工质量验收时,如参与验收的建设、勘察、设计、施工、监理等各方不能形成一致意见时,正确的做法是( )。
A. 协商提出解决方法,待意见一致后作出验收结论
B. 协商提出解决方法,待意见一致后重新组织工程竣工验收
C. 由建设单位作出验收结论
D. 由监理单位作出验收结论
【单选题】
根据国务院《生产安全事故报告和调查处理条例》,致使 120 名操作工人急性工业中毒的安全事故属于( )。
A. 特别重大事故
B. 重大事故
C. 较大事故
D. 一般事故
【单选题】
劳务分包合同中关于劳务分包人的主要义务,下列说法正确的是( )。
A. 对劳务分包范围内的工程质量向工程发包人负责
B. 承担由于自身责任造成的质量返工损失
C. 服从工程发包人的指令
D. 服从工程监理人的指令
【单选题】
某工程因施工需要,需取得出入施工场地的某条临时道路的通行权,根据《标准施工招标文件》的规定,该通行权应当由( )。
A. 承包人负责办理,并承担有关费用
B. 承包人负责办理,发包人承担有关费用
C. 发包人负责办理,并承担有关费用
D. 发包人负责办理,承包人承担有关费用
【单选题】
以独立的单项工程或完整的工程项目为计算对象编制确定的生产要素消耗的数量标准或项目费用标准是( )。
A. 概算定额
B. 概算指标
C. 投资估算指标
D. 预算定额
【单选题】
已知某挖土机挖土的一个工作循环需 2min,每循环一次挖土 0.5m³,工作班的延续时间为 8h,时间利用系数 K=0.80,则该机械的时间定额为( )台班/100m³。
A. 0.42
B. 0.83
C. 1.04
D. 3.33
【单选题】
关于施工质量控制,下列说法正确的是( )。
A. 对施工过程的质量控制,必须以检验批质量控制为基础和核心
B. 工序施工质量控制主要包括工序施工条件质量控制和工序施工效果质量控制
C. 工序施工质量控制属于事后质量控制
D. 工序施工效果质量控制主要途径是制定相关标准与操作规程、实测获取数据、统计分 析所获取的数据、判断认定质量等级和纠正质量偏差
【单选题】
某防洪堤坝填筑压实后,其压实土的干密度未达到规定值,经核算将影响土体的稳定且不满足抗渗能力的要求,须挖除不合格土,重新填筑,则属于( )。
A. 修补处理
B. 加固处理
C. 返工处理
D. 重新处理
【单选题】
根据施工组织设计内容,下列选项中不属于单位工程施工组织设计内容的是( )。
A. 编制资源需求量计划
B. 编制施工进度计划
C. 确定核心工程施工方案
D. 制定各项施工措施
【单选题】
建设工程项目的信息管理的目的旨在通过有效的项目信息传输的组织和控制为
A. 项目建设的增值服务
B. 项目目标控制服务
C. 尽快发挥项目投资效益服务
D. 提高项目管理效率服务
【单选题】
职业健康安全管理体系标准由五大要素构成,其中,目标与方案属于( )。
A. 策划
B. 实施和运行
C. 检查
D. 管理评审
【单选题】
关于招标人在工程量清单中提供的暂估价和暂列金额,下列说法正确的是( )。
A. 暂列金额和暂估价由投标人按估算金额确定
B. 依法必须招标的暂估价材料和专业工程,由招标人、承包人与分包人共同通过招标确 定材料单价与专业工程分包价
C. 若暂估价材料不属于依法必须招标的,经发承包双方协商确认单价后计价
D. 若暂估价的专业工程不属于依法必须招标的,由发包人、总承包人按有关计价依据进 行计价
【单选题】
对于需要旁站监理的施工关键部位与关键工序,施工企业应在进行施工前( )小时,书面通知项目监理机构。
【单选题】
从建设工程施工质量验收的角度来说,工程施工质量验收的最小单位是( )。
A. 检验批
B. 工序过程
C. 分部工程
D. 分项工程
【单选题】
某工程主体结构混凝土工程量为 3200m³,预算单价为 550 元/m³,计划 4 个月内均
A. -1.8 和-11
B. 1.8 和-11
C. -1.8 和 11
D. 1.8 和 11
【单选题】
关于关键工作和关键线路,下列说法正确的是( )。
A. 关键线路上的工作全部是关键工作
B. 关键工作不能在非关键线路上
C. 关键线路上不允许出现虚工作
D. 关键线路上的工作总时差均为零
【单选题】
某施工企业签订了工程施工承包合同,在项目管理目标责任书中确定了成本目标, 项目经理运用动态控制原理控制施工成本的步骤中,第一步应做的工作是( )。
A. 按照成本控制的要求收集施工成本的实际值
B. 找出偏差,采取纠偏措施
C. 施工成本目标的逐层分解
D. 定期对施工成本的计划值和实际值进行比较
【单选题】
某室内装饰工程根据《建设工程工程量清单计价规范》GB 50500--2013 签订了单价
A. 发包人承担延误责任,材料价格按 280 元/㎡计算
B. 发包人承担延误责任,材料价格按 360 元/㎡计算
C. 承包人承担延误责任,材料价格按 280 元/㎡计算
D. 承包人承担延误责任,材料价格按 360 元/㎡计算
【单选题】
根据《质量管理体系》GB/T 19000-2016,关于质量管理的说法,下列选项错误的是( )。
A. 是在质量方面指挥和控制组织的协调活动
B. 可以包括制定质量方针和质量目标
C. 是关于质量的管理
D. 通过质量策划、质量保证、质量控制、质量考核、质量改进实现这些质量目标的过程
【单选题】
建设工程实行施工总承包的,由( )负责收集、整理和汇总各个分包单位的施工档案资料。
A. 建设单位
B. 监理单位
C. 施工总承包单位
D. 城建档案管理部门
【单选题】
施工现场搅拌机前台、混凝土输送泵及运输车辆清洗等产生的废水应( )。
A. 根据施工方便就近排放
B. 直接排入市政排水管网或河流
C. 直接排出场外
D. 经现场沉淀池后排入市政排水管网
【单选题】
根据《建设工程工程量清单计价规范》GB 50500-2013,招标工程以( )为基准日, 其后国家的法律、法规、规章和政策发生变化引起工程造价增减变化的,发承包双方应当按照相关规定调整合同价款。
A. 投标截止日前 28d
B. 合同签订前 28d
C. 招标截止日前 28d
D. 合同备案前 28d
【单选题】
为预防企业员工在工作过程中发生工伤事故的各项措施,安装防护装置、保险装置、 信号装置属于安全措施计划制度的( )。
A. 安全技术措施
B. 职业卫生措施
C. 辅助用房间及设施
D. 安全宣传教育措施
【单选题】
在竣工验收前,对已完工程及设备进行保护所需的费用属于( )。
A. 建设单位管理费
B. 建筑安装工程直接工程费
C. 建筑安装工程措施项目费
D. 建筑安装工程现场经费
【单选题】
根据财政部、国家税务总局《关于全面推开营业税改征增值税试点的通知》(财税
A. 分部分项工程费+措施项目费+其他项目费+规费+利润
B. 分部分项工程费+措施项目费+其他项目费+规费+利润+税金
C. 人工费+材料费+施工机具使用费+企业管理费+利润+规费
D. 人工费+材料费+施工机具使用费+企业管理费+利润+规费+税金.
【单选题】
下列施工承包合同形式中,承包商承担全部工作量和价格风险的是( )。
A. 单价合同
B. 固定总价合同
C. 变动总价合同
D. 成本加酬金合同
【单选题】
下列建设工程项目进度控制的措施中,属于技术措施的是( )。
A. 确定各类进度计划的审批程序
B. 选择合理的合同结构
C. 选择工程承发包方式
D. 优化项目的设计方案或施工方案
【单选题】
某施工企业项目经理在组织项目施工中,为了赶工期,施工质量控制不严,造成某分项工程返工,使其施工项目受到了较大的经济损失,则该项目经理可能要承担的责任包括
A. 法律责任和合同责任
B. 法律责任和经济责任
C. 民事责任和刑事责任
D. 法律责任和赔偿责任
【单选题】
政府对施工质量实施监督管理的主要手段是( )。
A. 施工旁站制度和竣工验收备案制度
B. 施工许可制度和标准化管理制度
C. 施工标准化管理制度和竣工验收备案制度
D. 施工许可制度与竣工验收备案制度
【单选题】
关于施工管理的工作流程组织,下列说法错误的是( )。
A. 设计变更流程属于管理工作流程组织
B. 与生成月度进度报告有关的数据处理流程属于信息处理工作流程
C. 工作流程组织反映一个组织系统中各部门之间的逻辑关系
D. 钢结构深化设计工作流程属于物质流程组织